This is a comprehensive spreadsheet listing details for 17 elevators at the Grand Coulee Dam facility, including their specifications and testing requirements for FY25-29. The elevators are distributed across multiple locations including the Main Dam, Power Houses, Industrial Area, and other facilities, with payload capacities ranging from 2,100 to 44,000 lbs and installation dates from 1942 to 2024.
The document outlines annual and 5-year testing schedules for fiscal years 2025-2029, with specific notes about Block 31 and Fire Station elevators being excluded from 5-year inspections in 2025 due to warranty considerations. Technical specifications include machine types (Gearless, Geared, Hydraulic), controller types, counterweight percentages, and modernization dates. The TPP Inclined Elevator is noted as out of service with no estimated return date. This information appears to support a Bureau of Reclamation solicitation (140R1725Q0018) for elevator inspection services at Grand Coulee Dam.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140R1725Q0018.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 List of Elevators
Grand Coulee Elevators Main Dam Right Power House Left Power House Pump/Generation Plant Wing Dam tc={2C514140-C2ED-4E0B-B9BF-BBC874035DF8}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
| Forebay Dam | Third Power Plant | Industrial Area | Fire Station | |||||||||||||||||
| B11 | B31 | B64 | B84 | RP1 | RP2 | LP1 | LP2 | P1 | P11 | P13 | B119 | TPN | TPS | TP Inclined | ADMIN | VAC | FS | |||
| Parameter | ||||||||||||||||||||
| Rated Payload-Lbs | 10,000 | 10,000 & 44,000 | 10,000 | 10,000 | 12,000 | 12,000 | 12,000 | 4,000 | 8,500 | 5,000 | 8,000 | 3,500 | 10,000 | 10,000 | 10,000 | 3,500 | 3,500 | 2,100 |
Car Speed-FPM 500 500 & 25 500 500 500 500 500 500 500 200 500 350 200 200 200 150 50 100
Machine Type Gearless Gearless Gearless Gearless Gearless Gearless Gearless Gearless Gearless Geared Gearless Geared Geared Geared Geared Hydraulic Hydraulic Hydraulic
Machine-AC/DC DC DC-Two in tandem DC DC DC DC DC DC DC AC DC AC DC DC DC n/a n/a n/a
| Controller Type | Thyssen | Otis | MCE | MCE | MCE | MCE | MCE | MCE | MCE | MCE | MCE | MCE | Westinghouse | Westinghouse | MCE | ThyssenKrupp | Otis | |
| Counterweight-% | 45 | 45 | 40 | 40 | 45 | 45 | 45 | 45 | 40 | 40 | 40 | 40 | 40 | 40 | n/a | n/a | n/a | |
| Roping Hitch | 2:1 | 2:1 | 2:1 | 2:1 | 2:1 | 2:1 | 2:1 | 2:1 | 2:1 | 1:1 | 2:1 | 1:1 | 2:1 | 2:1 | n/a | n/a | n/a | |
| Wrap | Double | Double | Double | Double | Double | Double | Double | Double | Double | Double | Underslung | Underslung | Double | n/a | n/a | n/a | ||
| Number of Landings | 10 | 12 | 12 | 9 | 9 | 6 | 11 | 11 | 5 | 5 | 12 | 9 | 5 | 5 | 3 | 2 | 3 | 2 |
| Installed Date | 1942 | 1942 | 1947 | 1947 | 1949 | 1949 | 1942 | 1942 | 1950-53 | 1950-53 | 1950-53 | 1972 | 1972 | 1972 | 1990 | 2005 | 2024 | |
| Contract Modernized Award Date | 1996 | 2006 | 2006 | 1999 | 1999 | 1999 | 1999 | 2006 | 2006 | 2006 | 2006 | 2013 | 2013 | |||||
| Original Manufacturer | Otis | Otis | Otis | Otis | Otis | Otis | Otis | Otis | Westinghouse | Westinghouse | Westinghouse | Westinghouse | Westinghouse | Westinghouse | Western Gear | Amtech | ThyssenKrupp | Otis |
Inspect and Test to ASME Code Edition 1996 As applicable 2004 2004 1996 1996 1996 1996 2004 2004 2004 2004 2010 2010 As applicable 2004 2016
Test Schedule
Elevator B11 B31 B64 B84 RP1 RP2 LP1 LP2 P1 P11 P13 B119 TPN TPS TP Inclined ADMIN VAC Fire Station
| Test Type | Year | ||||||||||||||||||
| 5-year Test Required | FY25 | Yes | No | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Out of Service | Yes | Yes | No |
| Annual Test Required | FY26 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Out of Service | Yes | Yes | Yes |
| Annual Test Required | FY27 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Out of Service | Yes | Yes | Yes |
| Annual Test Required | FY28 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Out of Service | Yes | Yes | Yes |
| Annual Test Required | FY29 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Out of Service | Yes | Yes | Yes |
| Block 31 modernization contract work is in progress. Work is expected to be completed and elevator returned to service in early 2025. |
| GCPO does not want the 5-Year inspection performed on the Block 31 elevator in 2025 as the elevator will still be within warranty and we do not wish to accept the liability of damaging it while under warranty. |
| TPP Inclined Elevator is out of service with no estimated return to service date. |
| GCPO does not want the 5-Year inspection performed on the Fire Station selevator in 2025 as the elevator will still be within warranty and we do not wish to accept the liability of damaging it while under warranty. |