FA302217R0010.pdf

PDF 280 KB Posted

Attached to
Replace HVAC System and Interior Work, UOQ Bldgs 971, 972, & 973 Federal contract opportunity
Solicitation number
EEPZ16-1001
Issued by
Department of the Air Force Air Education and Training Command

About this file

Solicitation

View the file

Other files for this federal contract opportunity

Other files attached to Replace HVAC System and Interior Work, UOQ Bldgs 971, 972, & 973, newest first.
File Type Posted
Mechanical_CADS.pdf PDF
Plumbing_CADS.pdf PDF
Floor_Plan_CAD.pdf PDF
General_CADS.pdf PDF
Civil_CADS.pdf PDF
DESIGN_SOW_05Oct17.pdf PDF
FA302217R00100001.pdf PDF
UOQ_HVAC_Questions_&_Answers_Final.pdf PDF
Central_System.pdf PDF
972_Floor_Plan.pdf PDF
Attachment_1._DESIGN_SOW_19July17.pdf PDF
Attachment_4._Proposal_Summary_Sheet.pdf PDF
Attachment_5._PPQ.pdf PDF
EEPZ_99-3007_Officer_Quarters.pdf PDF
Chill_H20_Supply_Lines.pdf PDF
Attachment_3._MS170090.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

“Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No aw ard w ill be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.”

REPLACE HVAC SYSTEM and INTERIOR WORK, UOQ BUILDINGS 971, 972, AND 973.

THIS ACQUSITION IS SET ASIDE FOR WOMAN-OWNED SMALL BUSINESSES.

MAGNITUDE OF THE PROJECT IS BETWEEN $1,000,000.00 AND $5,000,000.00.

NAICS CODE IS 238220 AND SIZE STANDARD IS $15,000,000.00.

OFFERORS MUST COMPLETE AND RETURN ALL PERTINENT INFORMATION CONTAINED IN THIS REQUEST FOR PROPOSAL TO INCLUDE SF

1442, SECTIONS K AND L.

OFFEROR MUST BE REGISTERED ONLINE AND HAVE CURRENT REPRESENTATIONS AND CERTIFICATIONS IN THE SYSTEM FOR AWARD MANAGEMENT AT WWW.SAM.GOV. OFFEROR MUST BE REGISTERED AS A WOMAN OWNED SMALL BUSINESS IN THE WOMAN OWNED

SMALL BUSINESS REPOSITORY AT HTTPS://CERTIFY.SBA.GOV.

MICAEL L JIGGETTS 662-434-7761

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

13-Sep-2017

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________420 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________FAR 52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________13 Oct 2017 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

14 CONS/LGCA-FA3022

495 HARPE BLVD, STE 293

INFRASTRUCTURE TEAM

COLUMBUS AFB MS 39710-1006

FA3022

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour) Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

662-434-3049FAX:TEL: 662-434-7773 TEL: FAX:

FA302217R0010 39

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

FA302217R0010

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Replace HVAC Units & Interior Work UOQs

FFP

Provide all plant, labor, material, equipment, and transportation required to replace the 4-pipe HVAC system to include air handlers, fan coil units, chilled/hot water piping, domestic water piping, and interior finishes in Buildings 971, 972, and 973.

NET AMT

0001AA 1 Lot Replace HVAC Units & Interior Work B971

FFP

Provide all plant, labor, material, equipment, and transportation required to replace the 4-pipe HVAC system to include air handlers, fan coil units, chilled/hot water piping, domestic water piping, and interior finishes in B971.

FOB: Destination

0001AB 1 Lot Replace HVAC Units & Interior Work B972

FFP

Provide all plant, labor, material, equipment, and transportation required to replace the 4-pipe HVAC system to include air handlers, fan coil units, chilled/hot water piping, domestic water piping, and interior finishes in B972.

0001AC 1 Lot Replace HVAC Units & Interior Work B973

FFP

Provide all plant, labor, material, equipment, and transportation required to replace the 4-pipe HVAC system to include air handlers, fan coil units, chilled/hot water piping, domestic water piping, and interior finishes in B973.

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 N/A N/A N/A N/A 0001AA Destination Government Destination Government 0001AB Destination Government Destination Government 0001AC Destination Government Destination Government

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 N/A N/A N/A N/A

0001AA 420 dys. ANP 1 14CES/CECC-F1N3BC

DONALD YOUNG

555 SIMLER BLVD, SUITE 110

COLUMBUS AFB MS 39710-6010

662-434-7946

F1N3BC

0001AB 420 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0001AC 420 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

Section I - Contract Clauses

CLAUSES INCORPORATED BY REFERENCE

52.202-1 Definitions NOV 2013 52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees MAY 2014 52.203-6 Restrictions On Subcontractor Sales To The Government SEP 2006 52.203-7 Anti-Kickback Procedures MAY 2014 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or

Improper Activity

MAY 2014

52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014 52.203-12 Limitation On Payments To Influence Certain Federal

Transactions

OCT 2010

52.203-17 Contractor Employee Whistleblower Rights and Requirement To Inform Employees of Whistleblower Rights

APR 2014

52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreeements or Statements

JAN 2017

52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper

MAY 2011

52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier

Subcontract Awards

OCT 2016

52.204-13 System for Award Management Maintenance OCT 2016 52.204-22 Alternative Line Item Proposal JAN 2017 52.209-6 Protecting the Government's Interest When Subcontracting

With Contractors Debarred, Suspended, or Proposed for Debarment

OCT 2015

52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters

JUL 2013

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations

NOV 2015

52.215-2 Audit and Records--Negotiation OCT 2010 52.215-8 Order of Precedence--Uniform Contract Format OCT 1997 52.219-13 Notice of Set-Aside of Orders NOV 2011 52.219-14 Limitations On Subcontracting JAN 2017 52.219-28 Post-Award Small Business Program Rerepresentation JUL 2013 52.219-30 Notice of Set-Aside for, or Sole Source Award to, Women-

Owned Small Business Concerns Eligible Under the Women- Owned Small Business Program

DEC 2015

52.222-3 Convict Labor JUN 2003 52.222-4 Contract Work Hours and Safety Standards- Overtime

Compensation

MAY 2014

52.222-6 Construction Wage Rate Requirements MAY 2014 52.222-7 Withholding of Funds MAY 2014 52.222-8 Payrolls and Basic Records MAY 2014 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-11 Subcontracts (Labor Standards) MAY 2014 52.222-12 Contract Termination-Debarment MAY 2014 52.222-13 Compliance With Construction Wage Rate Requirements and

Related Regulations

MAY 2014

52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility MAY 2014

52.222-21 Prohibition Of Segregated Facilities APR 2015 52.222-23 Notice of Requirement for Affirmative Action to Ensure

Equal Employment Opportunity for Construction

FEB 1999

52.222-26 Equal Opportunity SEP 2016 52.222-27 Affirmative Action Compliance Requirements for

Construction

APR 2015

52.222-35 Equal Opportunity for Veterans OCT 2015 52.222-36 Equal Opportunity for Workers with Disabilities JUL 2014 52.222-37 Employment Reports on Veterans FEB 2016 52.222-40 Notification of Employee Rights Under the National Labor

Relations Act

DEC 2010

52.222-50 Combating Trafficking in Persons MAR 2015 52.222-54 Employment Eligibility Verification OCT 2015 52.222-55 Minimum Wages Under Executive Order 13658 DEC 2015 52.222-60 Paycheck Transparency (Executive Order 13673) OCT 2016 52.222-62 Paid Sick Leave Under Executive Order 13706 JAN 2017 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts

SEP 2013

52.223-3 Hazardous Material Identification And Material Safety Data JAN 1997 52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-6 Drug-Free Workplace MAY 2001 52.223-11 Ozone-Depleting Substances and High Global Warming

Potential Hydrofluorocarbons.

JUN 2016

52.223-12 Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners.

JUN 2016

52.223-15 Energy Efficiency in Energy-Consuming Products DEC 2007 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts

MAY 2008

52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving

AUG 2011

52.223-21 Foams JUN 2016 52.225-9 Buy American--Construction Materials MAY 2014 52.225-10 Notice of Buy American Requirement--Construction

Materials

MAY 2014

52.225-13 Restrictions on Certain Foreign Purchases JUN 2008 52.228-2 Additional Bond Security OCT 1997 52.228-5 Insurance - Work On A Government Installation JAN 1997 52.228-11 Pledges Of Assets JAN 2012 52.228-12 Prospective Subcontractor Requests for Bonds MAY 2014 52.228-14 Irrevocable Letter of Credit NOV 2014 52.228-15 Performance and Payment Bonds--Construction OCT 2010 52.229-3 Federal, State And Local Taxes FEB 2013 52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014 52.232-17 Interest MAY 2014 52.232-18 Availability Of Funds APR 1984 52.232-23 Alt I Assignment of Claims (May 2014) - Alternate I APR 1984 52.232-27 Prompt Payment for Construction Contracts JAN 2017 52.232-33 Payment by Electronic Funds Transfer--System for Award

Management

JUL 2013

52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business

Subcontractors

DEC 2013

52.233-1 Disputes MAY 2014 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004

52.236-2 Differing Site Conditions APR 1984 52.236-3 Site Investigation and Conditions Affecting the Work APR 1984 52.236-5 Material and Workmanship APR 1984 52.236-6 Superintendence by the Contractor APR 1984 52.236-7 Permits and Responsibilities NOV 1991 52.236-8 Other Contracts APR 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements

APR 1984

52.236-10 Operations and Storage Areas APR 1984 52.236-11 Use and Possession Prior to Completion APR 1984 52.236-12 Cleaning Up APR 1984 52.236-13 Accident Prevention NOV 1991 52.236-14 Availability and Use of Utility Services APR 1984 52.236-15 Schedules for Construction Contracts APR 1984 52.236-21 Alt I Specifications and Drawings for Construction (Feb 1997) -

Alternate I

APR 1984

52.236-26 Preconstruction Conference FEB 1995 52.242-13 Bankruptcy JUL 1995 52.242-14 Suspension of Work APR 1984 52.243-4 Changes JUN 2007 52.244-6 Subcontracts for Commercial Items JAN 2017 52.246-12 Inspection of Construction AUG 1996 52.246-21 Warranty of Construction MAR 1994 52.249-2 Alt I Termination for Convenience of the Government (Fixed-

Price) (Apr 2012) - Alternate I

SEP 1996

52.249-10 Default (Fixed-Price Construction) APR 1984 52.253-1 Computer Generated Forms JAN 1991 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense- Contract-Related Felonies

DEC 2008

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7005 Representation Relating to Compensation of Former DoD

Officials

NOV 2011

252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Alt A System for Award Management Alternate A FEB 2014 252.209-7004 Subcontracting With Firms That Are Owned or Controlled By

The Government of a Country that is a State Sponsor of Terrorism

OCT 2015

252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or Hazardous Materials

SEP 2014

252.223-7008 Prohibition of Hexavalent Chromium JUN 2013 252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

JUN 2012

252.232-7010 Levies on Contract Payments DEC 2006 252.236-7000 Modification Proposals-Price Breakdown DEC 1991 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.243-7002 Requests for Equitable Adjustment DEC 2012 252.244-7000 Subcontracts for Commercial Items JUN 2013 252.246-7004 Safety of Facilities, Infrastructure, and Equipment for

Military Operations

OCT 2010

5352.242.-9000 Contractor Access to Air Force Installations AUG 2007

CLAUSES INCORPORATED BY FULL TEXT

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 420 days after the Notice to Proceed. The time stated for completion shall include final cleanup of the premises.

(End of clause)

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $358.70 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (MAY 2014)

(a) Definitions. As used in this clause--

Commercially available off-the-shelf (COTS) item—

(1) Means any item of supply (including construction material) that is--

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4) such as agricultural products and petroleum products.

Component means an article, material, or supply incorporated directly into a construction material.

Construction material means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site.

Materials purchased directly by the Government are supplies, not construction material.

Cost of components means--

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

Domestic construction material means--

(1) An unmanufactured construction material mined or produced in the United States;

(2) A construction material manufactured in the United States, if--

(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or

(ii) The construction material is a COTS item.

Foreign construction material means a construction material other than a domestic construction material.

United States means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American Act. (1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison Construction material description Unit of measure Quantity Price (dollars) \1\ Item 1 Foreign construction material.... ........... ___ ........ ....... ………. ___ ................ ........ ___ Domestic construction material... ........ ___ ............... .............. ___ .................. ...... ___ Item 2 Foreign construction material.... ......... ___ ............. ........ ……. ___ ............... ......... ___ Domestic construction material... ....... ___ .................. ............. ___ ................. ....... ___ Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).

List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.

Include other applicable supporting information.

52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.

The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000.00, whichever is less.-

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of provision)

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

http://farsite.hill.af.mil

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)

(a) Definitions. As used in this clause--

Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.

Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.

(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall--

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:

(1) Document type. The Contractor shall use the following document type(s).

Combo

(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table* Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC F87700 Issue By DoDAAC FA3022 Admin DoDAAC FA3022 Inspect By DoDAAC F1N3BC Service Approver (DoDAAC) F1N3BC Service Acceptor (DoDAAC) F1N3BC

(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.

(5) WAWF email notifications. The Contractor shall enter the email address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.

MICAEL.JIGGETTS@US.AF.MIL

(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

MICAEL.JIGGETTS@US.AF.MIL

(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall--

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general--

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

Title Drawing No.

972 1ST Floor Plan 1 972 2nd Floor Plan 2

965 Chiller Plant 3 EEPZ-99-3007 Officer Quarters 4 Design Statement of Work n/a

5352.201-9101 Ombudsman

OMBUDSMAN (Jun 2016)

(a) An ombudsman has been appointed to hear and facilitate the resolution of concerns from offerors, potential offerors, and others for this acquisition. When requested, the ombudsman will maintain strict confidentiality as to the source of the concern. The existence of the ombudsman does not affect the authority of the program manager, contracting officer, or source selection official. Further, the ombudsman does not participate in the evaluation of proposals, the source selection process, or the adjudication of protests or formal contract disputes. The ombudsman may refer the interested party to another official who can resolve the concern.

(b) Before consulting with an ombudsman, interested parties must first address their concerns, issues, disagreements, and/or recommendations to the contracting officer for resolution. Consulting an ombudsman does not alter or postpone the timelines for any other processes (e.g., agency level bid protests, GAO bid protests, requests for debriefings, employee-employer actions, contests of OMB Circular A-76 competition performance decisions).

(c) If resolution cannot be made by the contracting officer, the interested party may contact the ombudsman for AETC, which is the Deputy Director of Contracting, AFICA/KT (OL-AET), 2035 First Street West, JBSA Randolph TX 78150-4304, telephone 210-652-1722 (DSN 487-1722). The alternate Ombudsman is the Chief, Clearance & Program Support Division, AFICA/KTC, 2035 First Street West, JBSA Randolph TX 78150-4304, telephone 210-652-7075 (DSN 487-7075) Concerns, issues, disagreements, and recommendations that cannot be resolved at the Center/MAJCOM/DRU/SMC ombudsman level, may be brought by the interested party for further consideration to the Air Force ombudsman, Associate Deputy Assistant Secretary (ADAS) (Contracting), SAF/AQC, 1060 Air Force Pentagon, Washington DC 20330-1060, phone number (571) 256-2395, facsimile number (571) 256-2431.

(d) The ombudsman has no authority to render a decision that binds the agency.

(e) Do not contact the ombudsman to request copies of the solicitation, verify offer due date, or clarify technical requirements. Such inquiries shall be directed to the Contracting Officer.

5352.223-9000 ELIMINATION OF USE OF CLASS I OZONE DEPLETING SUBSTANCES (ODS) (MAY 1996)

(a) It is Air Force policy to preserve mission readiness while minimizing dependency on Class I Ozone Depleting Substances (ODS), and their release into the environment, to help protect the Earth’s stratospheric ozone layer.

(b) Unless a specific waiver has been approved, Air Force procurements:

http://www.whitehouse.gov/omb/circulars_a076_a76_incl_tech_correction/

(1) May not include any specification, standard, drawing, or other document that requires the use of a Class I ODS in the design, manufacture, test, operation, or maintenance of any system, subsystem, item, component, or process; and

2) May not include any specification, standard, drawing, or other document that establishes a requirement that can only be met by use of a Class I ODS;

(c) For the purposes of Air Force policy, the following are Class I ODS:

(1) Halons: 1011, 1202, 1211, 1301, and 2402;

(2) Chlorofluorocarbons (CFCs): CFC-11, CFC-12, CFC-13, CFC-111, CFC-112, CFC-113, CFC-114, CFC- 115, CFC-211, CFC-212, CFC-213, CFC-214, CFC-215, CFC-216, and CFC-217, and the blends R-500, R-501, R-502, and R-503; and

(3) Other Controlled Substances: Carbon Tetrachloride, Methyl Chloroform, and Methyl Bromide.

(d) The Air Force has reviewed the requirements specified in this contract to reflect this policy. Where considered essential, specific approval has been obtained to require use of the following substances:

Substance Application/Use Quantity (lbs)

(e) To assist the Air Force in implementing this policy, the offeror/contractor is required to notify the contracting officer if any Class I ODS not specifically listed above is required in the performance of this contract.

5352.242-9000 Contractor Access to Air Force Installations

COLUMBUS AFB INSTALLATION SECURITY REQUIREMENTS AND INFORMATION

1. Contractor Access to Columbus Air Force Base Installations

a. Background Checks: All contractor and subcontractor personnel requiring entry on Columbus AFB (CAFB) must submit to a local background check to include criminal history checks conducted by the 14th Security Forces Squadron (14 SFS). Cooperation with the investigation is mandatory for entry to CAFB. Contractor personnel convicted of certain crimes will not be allowed to work on CAFB. Such crimes include, but are not limited to the following: espionage, sabotage, treason or terrorism; felony convictions; violent crimes against persons; sex crimes;

drug crimes related to distribution or intent to distribute and firearms/explosives violations. Other grounds for exclusion from working on CAFB include, but are not limited to: inability to provide proof of U.S. citizenship or legal U.S. residency, outstanding warrants, individuals identified on Federal terrorist watch lists, and incarceration for any offense. Deviations from this guideline are permitted on a case by case basis as determined by 14 MSG/CC and/or the 14 FTW/CC.

Background checks will be considered valid for a period of twelve (12) months for contractors working on Columbus AFB without a break in service. In the event of any break in service, the contractor will have to resubmit a request for a background check

b. Base Pass/Background Check Procedures:

The following procedures apply to all base-issued passes and identification cards. To reduce wait time at the Visitor Control Center (VCC), requests for base access shall be submitted five duty days prior to event, allowing 14 SFS sufficient time to conduct background checks on all employees. All passes, with the exception of the Common Access Card (CAC) will be issued at the Visitors Center; *Note* the contractor must notify the visitor’s center five duty days prior to event as to who is obtaining a CaC in order to issue the appropriate 30 day pass. To initiate a request for contractor/subcontractor employee access to Columbus AFB, the contractor shall submit the below information directly to the VCC (Bldg 99, Ph: (662) 434-7133). Background checks can only be completed on personnel who have proper documentation at the VCC. If paperwork is not on file, background checks will be completed by Visitor Center personnel upon arrival of the individual requesting base entry.

(1) A release authorization form must be accomplished by each employee requesting installation entry; National Crime Information Center (NCIC) checks will be conducted for each employee accessing the installation.

(2) Defense Biometric Identification Data System (DBIDS) Request Letter (for template, contact your contract administrator or contracting officer).

1. A DBIDS Pass (if DBIDS is not operational, AF Form 75) will be issued to each employee. A Day Pass/Short Term Pass is for periods for 30 days or less. *Note* DBIDS Cards/passes will only be issued IAW AFMAN 31- 113.

(3) If applying for a Common Access Card (CAC), a 30 day DBIDS pass will be issued in order to complete the CAC NACI security questionnaire process (IAW AFMAN 31-113,CaCs are required if contractor will have access to computer on the CAFB network or based upon the DoD Government sponsor’s determination of the type and frequency of access required to DoD facilities). Contractors must contact the sponsoring unit’s security manager to begin NACI process. (see 2. Personnel and Information Security Requirements below for additional information).

(4) Pass Issuance. The following must be presented to the Visitors Center by each employee at the time of pass issuance.

1. Two valid forms of ID (at least one form of US Government-issued ID and one form of photo ID)

2. For vehicle passes - a valid driver’s license, vehicle registration and proof of insurance meeting the minimum Mississippi liability coverage.

3. Fingerprinting and/or biometric data collection on each employee will be conducted at the VCC prior to a pass being issued. Failure to comply with the procedures will result in denial of access.

(5) Non-routine access requirements: Non-routine delivery drivers are drivers requiring access to the installation when necessary or called upon producing infrequent visits. This will be tracked by a database maintained by the Visitors Center. Once the delivery driver has been validated by the delivery recipient they will be required to comply with the requirements in Paragraphs b(1) and b(4) above. The Visitors Center may then issue a DBIDS Pass or an AF Form 75 that will be valid only for the length of time required for the driver to make their delivery and depart the installation. Special priority WILL NOT be given upon arrival, but may be expedited to the maximum extent possible. Time-sensitive deliveries such as asphalt and concrete must have current drivers license, current insurance documentation and vehicle registration paperwork on hand prior to entering the Visitor Center as to assist in expediting the process. Proper pass issue and vehicle inspections will continue as security measures dictate. Access will not be allowed until the entire process has been completed successfully.

c. Credentials

(1) Contractors are not permitted to sponsor individuals on base. Retired DoD personnel and dependents who are employed by a contractor may not use their sponsorship privilege for the contractor or subcontractor’s benefit;

contractor employees must go through the regular process to obtain a pass to work on base.

(2) Contractor personnel must have a valid base credentials on them at all times while on the installation. After initial base credentials have been issued, the Contracting Officer’s Representative (COR) shall be responsible for sponsoring contractors and subcontractor employees on the base and ensuring they have the appropriate credentials.

If a day worker or other contractor/subcontractor employee reports to the Visitors Center for a short notice pass, the COR will be contacted, and if necessary report to the Visitors Center, to validate that the employee is authorized and obtain the required access.

d. Additional Contractor Responsibilities: Contractor/subcontractor employees shall report all lost, stolen or missing base issued passes or ID cards (AF Form 75, DBIDS cards/passes or Common Access Cards) to issuing agency immediately upon discovery. All passes/ID cards will be turned in, to issuing agency, at the completion of stated contract, termination of employee, barment from base, release from contract, and/or Government termination of contract. Failure to follow stated procedures may prevent contractor/subcontractor from further qualifying for base access.

(1) Contractor and subcontractor personnel gaining access to the installation will conduct all work during the days and hours of Monday thru Friday, 7:30 AM to 4:30 PM, unless otherwise specified in the contract or as approved by the Contracting Officer. Contractor/subcontractor personnel will not be allowed to access other base facilities unless specified in the contract.

e. Entry to Restricted or Controlled Areas: When work under this contract requires unescorted entry to controlled, restricted or other areas designated sensitive by the installation commander, the contractor shall comply with AFI 31-101, Integrated Defense, DoD 5200.2-R and AFI 31-501, Personnel Security Program Management, requirements. Contractor or sub-contractors who require escorted or unescorted entry to controlled areas, must be added to the Entry Authority List (EAL) for that respective controlled area. Note* only contractors possessing a CAC card and approved by unit Commander are authorized unescorted access to controlled areas. EALs requiring unescorted access must be signed by the sponsoring unit’s security manager verifying individuals have a minimum of a valid NACI security investigation. EALs will be signed by the owner/using commander and authenticated by Security Forces. These documents will be routed through the Security Forces S-5 office.

Contractors shall produce and maintain EALs IAW AFI 31-101 chapter 7.

(1) Restricted Area Training: The Government controlled area monitors provide initial and follow-on training to contractor personnel who work in Air Force controlled/restricted areas. Air Force restricted and controlled areas are explained in AFI 31-101. The contractor security representative will coordinate with their COR in order for the respective Government controlled area monitor to provide the training.

(2) Implementation of local Procedures: Contractors shall implement local base procedures for entry to Air Force controlled/restricted areas where contractor personnel will work. Local base procedures will be provided at the pre-performance briefing when required. Updates will be provided to the contractor as changes are made in the procedures.

(3) Operating Procedures: When specified in the contract, the contractor security representative shall develop written procedures for internal circulation control, protection of resources, and to regulate entry into Air Force controlled areas during normal, simulated and actual emergency operations. The procedures shall be written in accordance with AFI 31-101, The Physical Security Program, 14 FTW Antiterrorism Plan 10-245 and AFI 10-245, The Air Force Antiterrorism/Force Protection (AT/FP) Program Standards, and coordinated through the Security Forces S-5 office.

2. Personnel and Information Security Requirements The contractor shall coordinate with their COR for the below requirements as necessary.

a. Common Access Card (CAC) Issuance: AFFARS 5352.242-9001, Common Access Cards (CACs) for Contractor Personnel is included in the terms and conditions of this contract (Section I or clause section). Any long term contract (defined in CAFB IDP 31-101, Columbus Air Force Base Integrated Defense Plan, Enclosure 1 to Tab A to Appendix 3 to Annex C, ID Vetting and Authorization Determinations, Para. g.(1)), meeting contractor CAC eligibility requirements IAW AFMAN 31-113, Installation Perimeter Access Control and any supplements must obtain a CAC card. Advance Fingerprints and a NACI investigation must be accomplished prior to being issued the CAC card. Note* Contractors must complete all CAC card requirements within 20 days of the contractor’s start date. In accordance with AFI 31-501, Personnel Security Management, CAC card issuance and access to Automated Information Systems (AIS) will be prohibited until the biometric fingerprint data is returned favorable (usually takes a couple of weeks) and the initial SF 85/NACI is transmitted by the Information Protection office to the Office of Personnel Management. If the biometric fingerprint data results return unfavorable, the individual must wait until the Air Force Central Adjudication Facility makes a determination on their NACI investigation before being issued a CAC card. The requesting activity’s Government Trusted Agent will verify this information through the Information Protection office at 434-2603 before authorizing/approving CAC issuance and Government computer access via the Contractor Verification System (CVS). Once the contractor’s information is approved in the CVS, they will go to the Military Personnel Section in building 730 to obtain their CAC.

(1) Advance fingerprint biometric data is conducted at the 14 FTW Information Protection office (Bldg 926, Rm

125) when the contractor/sub-contractor has completed their NACI security questionnaire.

(2) NACI background investigations are initiated in the Electronic Questionnaires for Investigations Processing (e- QIP) by the sponsoring agency security manager. Contractors must report to the unit security manager on their first work day to initiate the questionnaire. This questionnaire will be e-mailed to the contractor and may be accomplished from any computer with internet access. The 14 FTW/IP office reviews the questionnaire once completed by the contractor. The contractor will be contacted to report to the 14 FTW/IP office, provide a completed OF 306 Declaration of Federal Employment, and sign off on all release forms. Then the completed background investigation will be submitted to and investigated by the Office of Personnel Management.

b. Security Representative Appointment: Any contract longer than 6 months in duration and/or if personnel require access to Automated Information Systems and/or if personnel require access to work in or in close proximity to Air Force sensitive information/areas, the contractor shall designate a security representative for on-base contract performance. The security representative, working in concert with the security manager shall ensure employees receive initial and recurring training required by AFI 16-1404, Air Force Information Security Program.

c. Reporting Potential Threats: The contractor shall fully comply with AFI 71-101, Volume-1, Criminal Investigations, and Volume-2, Protective Service Matters. Contractor personnel shall immediately report any information or circumstances which they are aware may be a threat to the security of DoD personnel, contractor personnel, resources, and classified or unclassified defense information. Contractor employees shall be briefed by their company’s immediate supervisor upon initial on-base assignment and as required thereafter.

d. Reporting Suspicious Activity: Contractor/subcontractor employees working on classified, sensitive and/or high risk projects shall report any suspicious activity or suspicious contacts by personnel to the COR, the Office of Special Investigations (662)434-2852, 14th Flying Training Wing Information Protection office (14 FTW/IP) at

(662) 434-2603 or the Government requesting activity’s unit security manager. The Government requesting activity’s unit security manager is also referred to herein as the security manager and will be identified in the contract.

e. Handling of Unattended Classified Information: Any person finding unattended classified information will immediately secure it in a GSA safe or maintain it on their person (do not open/read/examine) and contact 14 FTW Information Protection office and the COR. During non-duty hours, notify 14 SFS Emergency Communications Center at (662) 434-7128 and the COR.

3. Physical Security

a. Key Control

(1) Establish Procedures: The contractor shall establish and implement key control procedures in their Quality Control Plan to ensure keys issued to the contractor by the Government are properly safeguarded and not used by unauthorized personnel. The contractor shall not duplicate keys issued by the Government.

(2) Lost Keys: Lost keys shall be reported immediately to the CO. The Government replaces lost keys or performs re-keying. The contractor shall be responsible for the total cost of lost keys, re-keying or lock replacement; the cost may be deducted from the…