CREWS/ICON PYLON DECOMMISSIONING AND ECOLOGICAL FRIENDLY
DISPOSAL MONITORING SYSTEM EXAMPLE DOCUMENTS
Figure 1 Figure –Existing CREWS Stations
Shawana.Roach Typewritten Text
Shawana.Roach Typewritten Text
Shawana.Roach Typewritten Text
Shawana.Roach Typewritten Text
Shawana.Roach Typewritten Text
Shawana.Roach
FIGURE 2
Mechanical Drawings- CREWS Station Components Figures 2A through 10.
( Higher Resolution Electronic Versions Available )
Figure 2 Base of the Dynamic Pylon
Figure 3
Base Section of Dynamic Pylon
Figure 4
Center of Dynamic Pylon
Figure 5
Ladder Rung Section of Dynamic Pylon
Figure 6
Top Section of Dynamic Pylon
Figure 7
Hound Section of Dynamic Pylon
Figure 8
Hounds
Figure 9
Delrin and Solid Fiberglass Rod Step Insert
Figure 10
Stainless Steel Pylon Base Plate
Figure 11
Pylon Construction Sequence (Section 2 d) Hound Point Layering.
Figure 12
Pylon Construction Sequence (Section 2 d) Hound Point Layering.
Figure 13
Pylon Construction Sequence (Section 2 f) Install Ground Plate & Ground Wire
Figure 14
Pylon Construction Sequence (Section 3) Delrin Base Step Construction and Fitting
Figure 15
Pylon Construction Sequence (Section 5) Internal Conduits Fabrication & Install
Figure 16
Figure 17
Figure 18
Figure 19
Figure 20
Figure 21
Figure 22
Figure 23
Pylon Construction Sequence (Section 6) Construct and Fit Upper Bulkhead
Figure 24
Pylon Construction Sequence (Section 7) Construct and Fit Pylon Cap
Figure 25
Pylon Construction Sequence (Section 8) Install Delrin Base Step
Fig 26
Figure 27
Fig 28
Figure 29
Figure 30
Pylon Construction Sequence (Section 10) Install Ladder Rung Port Assemblies
Figure 31
Pylon Construction Sequence (Section 13) External Conduit / Mast Construction & Prep
Figure 32
Pylon Construction Sequence (Section 14) Install External Conduit & Mast Supports
Figure 33
Figure 34
Figure 35
Figure 36
Figure 37
Pylon Construction Sequence (Section 15) Fiberglass Reinforcement
Figure 38
Figure 39
Figure 40
Figure 41
Figure 42
Figure 43
Figure 44
Figure 45
Figure 46
Figure 47
Figure 48
Figure 49
Figure 50
Figure 51
Figure 52
Figure 53
Figure 54
Figure 55
Figure 56
Figure 57
Figure 58
Figure 59
Figure 60
Pylon Construction Sequence (Section 16) Fabricate Solar Panel Mounts
Figure 61
Pylon Construction Sequence (Section 16) Fabricate Solar Panel Mounts
Figure 62
Pylon Construction Sequence (Section 17) Fitting Solar Panels
Figure 63
Pylon Construction Sequence (Section 18) Pylon Painting
Figure 64
Figure 65
Figure 66
Pylon Construction Sequence (Section 18). Pylon Painting
FIGURE 67
LOCATION OF CREWS STATION PUERTO RICO
FIGURE 68
LOCATION OF CREW STATION ST. CROIX, USVI
UNDERWATER PHOTO - BASE OF CREW STRUCTURE
Shawana.Roach Typewritten Text
Shawana.Roach Typewritten Text
UNDERWATER PHOTO OF CREW STRUCTURE
Shawana.Roach Typewritten Text
TOP OF CREW STRUCTURE