EDR.pdf
PDF 61 KB Posted
- Attached to
- F-16 Valve, Solenoid
- Solicitation number
- Sprha4-25-Q-0356
- Issued by
-
Defense Logistics Agency Aviation
About this file
This Engineering Data Requirements (EDR) document provides manufacturing specifications for a Valve, Nitrogen-Emergency Power Unit for the F-16 aircraft. The document specifies technical details including Part Number 16VH003006-2 and National Stock Number 4810-01-099-6392WF. Key requirements include:
The document mandates strict adherence to specified sources and materials, prohibiting substitutions without prior approval from the cognizant engineering activity. Manufacturers must follow precise marking requirements per MIL-STD-130 and are not authorized to deviate from specifications identified in control drawings without explicit prior approval. The document was prepared by Adrian Gustai from the 416 SCMS/GUEAA office on 15 November 2022, indicating it is an official military engineering specification for a critical aircraft component.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SPRHA425Q0356_______0002.pdf | ||
| SPRHA425Q0356_______0001.pdf | ||
| Unmarked Eng Data 2022.pdf | ||
| EDL.pdf | ||
| MQR.pdf | ||
| SOW.pdf | ||
| SPRHA425Q0356.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REV: ENGINEERING DATA REQUIREMENTS
(ATTACHMENT “A”)
NOTE: MILITARY SPECIFICATIONS / STANDARDS WILL NOT BE FURNISHED IN THE BID SET.
1. THE FOLLOWING INSTRUCTIONS ARE FURNISHED FOR THE MANUFACTURE OF:
VALVE, NITROGEN-EMERGENCY POWER UNIT. F-16
2. PART NUMBER:
16VH003006-2
3. NATIONAL STOCK NUMBER:
4810-01-099-6392WF
PREPARED BY:
ADRIAN GUSTAI
OFFICE SYMBOL:
416 SCMS/GUEAA
DATE:
15 NOVEMBER 2022
HILL AFB FORM 462 Page 1 of 1
4. THE FOLLOWING SPECIFICATIONS/STANDARDS, ETC., WILL BE USED IN LIEU OF THE DATA INDICATED. THE
SUPERSEDED DATA WILL NOT BE FURNISHED UNLESS SO INDICATED.
5. THE SOURCES/MATERIALS IF LISTED ON THE STANDARDS, SPECIFICATION AND DRAWINGS ARE THE ONLY SOURCES/MATERIALS FOR THOSE ITEMS. SUBSTITUTIONS SHALL HAVE PRIOR APPROVAL BY THE COGNIZANT
ENGINEERING ACTIVITY.
6. DEVIATIONS FROM SPECIFICATIONS IDENTIFIED IN CONTROL DRAWINGS ARE NOT AUTHORIZED WITHOUT PRIOR
APPROVAL BY THE COGNIZANT ENGINEERING ACTIVITY.
7. MARKING PER MIL-STD-130.
File details come from the government source that posted it. Updated .