EDR.pdf

PDF 175 KB Posted

Attached to
F-16 Transmitter, Pressure
Solicitation number
SPRHA4-24-R-0545
Issued by

About this file

This document is an Engineering Data Requirements (EDR) attachment that provides technical instructions for the manufacture of a Pneumatic Sensor, Part Number 16VC001001-5, with National Stock Number 6685-01-149-6398WF. The EDR specifies the applicable military specifications and standards to be used, notes that substitutions require prior approval, and states that deviations from the control drawings are not authorized without prior approval. It also requires marking per MIL-STD-130.

The related federal contract opportunity is a solicitation from the Defense Logistics Agency Aviation for 35 each of the Pneumatic Sensor with the specified NSN. The solicitation number is SPRHA4-24-R-0545, and the opportunity type is a Solicitation for the F-16 Transmitter, Pressure item.

View the file

Other files

File Type Posted
SPRHA424R0545_______0004.pdf PDF
SPRHA424R0545_______0003.pdf PDF
SPRHA424R0545_______0002.pdf PDF
SPRHA424R0545_______0001.pdf PDF
MQR.pdf PDF
Unmarked Eng Data 2022.pdf PDF
CDRLCPP.pdf PDF
EDL.pdf PDF
SOW.pdf PDF
SPRHA424R0545.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REV: ENGINEERING DATA REQUIREMENTS

(ATTACHMENT “A”)

NOTE: MILITARY SPECIFICATIONS / STANDARDS WILL NOT BE FURNISHED IN THE BID SET.

1. THE FOLLOWING INSTRUCTIONS ARE FURNISHED FOR THE MANUFACTURE OF:

PNEUMATIC SENSOR. F-16

2. PART NUMBER:

16VC001001-5

3. NATIONAL STOCK NUMBER:

6685-01-149-6398WF

PREPARED BY:

JONATHAN TUCHOW

OFFICE SYMBOL:

448 SCMW/GUEAA

DATE:

4 OCTOBER 2023

HILL AFB FORM 462 Page 1 of 1

4. THE FOLLOWING SPECIFICATIONS/STANDARDS, ETC., WILL BE USED IN LIEU OF THE DATA INDICATED. THE

SUPERSEDED DATA WILL NOT BE FURNISHED UNLESS SO INDICATED.

5. THE SOURCES/MATERIALS IF LISTED ON THE STANDARDS, SPECIFICATION AND DRAWINGS ARE THE ONLY SOURCES/MATERIALS FOR THOSE ITEMS. SUBSTITUTIONS SHALL HAVE PRIOR APPROVAL BY THE COGNIZANT

ENGINEERING ACTIVITY.

6. DEVIATIONS FROM SPECIFICATIONS IDENTIFIED IN CONTROL DRAWINGS ARE NOT AUTHORIZED WITHOUT PRIOR

APPROVAL BY THE COGNIZANT ENGINEERING ACTIVITY.

7. MARKING PER MIL-STD-130.

File details come from the government source that posted it. Updated .