EDR.pdf
PDF 175 KB Posted
- Attached to
- F-16 Transmitter, Pressure
- Solicitation number
- SPRHA4-24-R-0545
- Issued by
-
Defense Logistics Agency Aviation
About this file
This document is an Engineering Data Requirements (EDR) attachment that provides technical instructions for the manufacture of a Pneumatic Sensor, Part Number 16VC001001-5, with National Stock Number 6685-01-149-6398WF. The EDR specifies the applicable military specifications and standards to be used, notes that substitutions require prior approval, and states that deviations from the control drawings are not authorized without prior approval. It also requires marking per MIL-STD-130.
The related federal contract opportunity is a solicitation from the Defense Logistics Agency Aviation for 35 each of the Pneumatic Sensor with the specified NSN. The solicitation number is SPRHA4-24-R-0545, and the opportunity type is a Solicitation for the F-16 Transmitter, Pressure item.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SPRHA424R0545_______0004.pdf | ||
| SPRHA424R0545_______0003.pdf | ||
| SPRHA424R0545_______0002.pdf | ||
| SPRHA424R0545_______0001.pdf | ||
| MQR.pdf | ||
| Unmarked Eng Data 2022.pdf | ||
| CDRLCPP.pdf | ||
| EDL.pdf | ||
| SOW.pdf | ||
| SPRHA424R0545.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REV: ENGINEERING DATA REQUIREMENTS
(ATTACHMENT “A”)
NOTE: MILITARY SPECIFICATIONS / STANDARDS WILL NOT BE FURNISHED IN THE BID SET.
1. THE FOLLOWING INSTRUCTIONS ARE FURNISHED FOR THE MANUFACTURE OF:
PNEUMATIC SENSOR. F-16
2. PART NUMBER:
16VC001001-5
3. NATIONAL STOCK NUMBER:
6685-01-149-6398WF
PREPARED BY:
JONATHAN TUCHOW
OFFICE SYMBOL:
448 SCMW/GUEAA
DATE:
4 OCTOBER 2023
HILL AFB FORM 462 Page 1 of 1
4. THE FOLLOWING SPECIFICATIONS/STANDARDS, ETC., WILL BE USED IN LIEU OF THE DATA INDICATED. THE
SUPERSEDED DATA WILL NOT BE FURNISHED UNLESS SO INDICATED.
5. THE SOURCES/MATERIALS IF LISTED ON THE STANDARDS, SPECIFICATION AND DRAWINGS ARE THE ONLY SOURCES/MATERIALS FOR THOSE ITEMS. SUBSTITUTIONS SHALL HAVE PRIOR APPROVAL BY THE COGNIZANT
ENGINEERING ACTIVITY.
6. DEVIATIONS FROM SPECIFICATIONS IDENTIFIED IN CONTROL DRAWINGS ARE NOT AUTHORIZED WITHOUT PRIOR
APPROVAL BY THE COGNIZANT ENGINEERING ACTIVITY.
7. MARKING PER MIL-STD-130.
File details come from the government source that posted it. Updated .