east hampton runway 2.pdf

PDF 76 KB Posted

Attached to
Runway 16-34 Repair
Solicitation number
EH26-050
Issued by
Suffolk County, New York

About this file

This is a project description document for the Town of East Hampton, New York, detailing the Runway 16-34 Repair project. The project encompasses the repair and rehabilitation of Runway 16-34 at East Hampton Airport, addressing pavement deterioration, drainage issues, and safety concerns. The scope of work includes full-depth asphalt pavement removal and replacement, installation of an underdrain system, grooving of the new pavement surface, and installation of edge lines and runway designation markings. The project is designed to extend the runway's service life and ensure compliance with Federal Aviation Administration standards. The document specifies technical requirements for materials, construction methods, and quality standards, with particular emphasis on proper drainage design and pavement performance specifications.

The project requires adherence to federal guidelines and standards applicable to airport construction, including FAA regulations and New York State specifications. Contractors must demonstrate experience with airport runway construction and rehabilitation projects. The work involves coordination with airport operations to minimize disruption to existing runway activities. Environmental and safety considerations are integral to the project scope, including erosion control, dust management, and worker safety protocols. Funding for this project is anticipated through the Town of East Hampton's capital improvement budget and potentially supplemented by federal or state airport improvement grants.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .