Amendment_01_SF-30.pdf

PDF 80 KB Posted

Attached to
Ronald Brown Lodging in Charleston, SC
Solicitation number
EA-133M-19-RQ-00021
Issued by

About this file

Amendment 01 SF-30

View the file

Other files

File Type Posted
EA-133M-19-RQ-00021.pdf PDF
Past_Performance_Questionnaire.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name and Title of Signer (Type or Print) 16A. Name and title of Contracting Officer (Type or Print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States of America

(Signature of Contracting Officer)

16C. Date Signed

(Signature of person authorized to sign)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITIONS UNUSABLE Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page of Pages 1 2

2. Amendment/Modification No. 3. Effective Date 4. Requisition/Purchase Req. No. 5. Project No. (if applicable) 0001 October 1, 2018 NMAN7200-19-00021

6. Issued By Code AJ930073 7. Administered By (If other than Item 6) Code SEE BLOCK 6

NOAA/EASTERN REGION ACQUISITION

200 GRANBY STREET

SUITE 815

NORFOLK, VA 23510

8. Name and Address of Contractor (No., Street, County, and Zip Code) (X) 9A. Amendment of Solicitation No.

X

EA-133M-19-RQ-00021

9B. Date (See Item 11) August 20, 2012 10A. Modification of Contract/Order No.

10B. Date (See Item 13)

Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended X is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG- MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting and Appropriation Data (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(x) A. This change order is issued pursuant to: (Specify authority) The changes set forth in item 14 are made in the Contract Order No. in item 10A.

B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.)

Set fourth item 14, pursuant to the authority of FAR 43.103 (b)

C. This supplemental agreement is entered into pursuant to authority of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. Description of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The following question and answers are posted:

Question: Will NOAA consider extending the maximum commuting distance required by the SOW?

Answer: No. The requirement is unchanged.

Question: May a contractor submit more than one quote to represent multiple properties?

Answer: Yes.

SF30 Continuation of Block Narrative Page 2 of 3

Page 2 of 3 EA-133F-12-RQ-1124

Question: Can you guarantee the number of room nights?

Answer: NOAA will not guarantee a minimum number of room nights. In accordance with the SOW, “Flexible check-in/check-out during the estimated period of performance 23 Oct 2018 – 07 Dec 2018. As there are variable days and a variable number of rooms required during the estimated period of performance, vendor/contractor is to provide this flexibility at no additional cost to the government. Average number of rooms needed per day is 19; however, the maximum number of rooms will not exceed 20 at any one time. The Government will only be charged for rooms actually occupied on a per day basis.

The Executive Officer shall coordinate with the hotel on a weekly basis. "

Question: Is it acceptable to have two queen size beds in the room, or must they have a single king size bed?

Answer: There must be only one person per room. Two queen size beds in a single room are acceptable.

Question: May the kitchenette have induction burners instead of countertop burners?

Answer: Yes, induction burners are acceptable.