Amend114RQ0309Animation.pdf
PDF 1 MB Posted
- Attached to
- Design Digital Animations
- Solicitation number
- EA-133C-14-RQ-0309
About this file
Amend 1 with questions and answers and extending date for response to solicitation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AmendNo.214RQ0309Animation.pdf | ||
| RFQ140309Animation_Rip_Current.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NSN 7540-01-152-8070 STANDARD FORM 30. (Rev. 10-83) Previous Edition unusable Prescribed by GSA FAR (48 CFR) 53.243
Page of Pages AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code
2. AMENDMENT MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (if applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than item 6) CODE
(x) 9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
8. NAME AND ADDRESS OF CONTRACTOR (NO., Street, Country, State and ZIP Code)
CODE FACILITY CODE
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning ______ copies of amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OR OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
Check One
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 16B. UNITED STATES OF AMERICA
(Signature of person authorized to sign)
15C. DATE SIGNED
(Signature of Contracting Officer)
16C. DATE SIGNED
Table of Contents
PAGE 2 OF 4 EA-133C-14-RQ-0309/A0001
SECTION
PAGE 3 OF 4 EA-133C-14-RQ-0309/A0001
SECTION
. 1
Q1. What is the required minimum and/or maximum runtime anticipated for this animated video?
21 to 30 seconds
Q2. Does the government require any interactive multimedia components to be integrated within the video?
No
Q3. Will there be a requirement for haptic integration as this will be accessible through a (assumed) touch screen kiosk?
No Q4. You have noted in the Statement for Work ( section 5), that the contractor will work at “their offices”. Do you mean in Silver Springs, Maryland or at our own Cinergy Creative studio?
Work should be completed at the contractor’s location. We do not expect any animation work done in or at our offices.
Because of the high quality animation we’re used to providing, we would need use of our CGI renderfarm and motion capture facilities at our offices.
Q5. Will we be able to upload relevant animations to show you our company’s capabilities to help bolster our bid?
Please send any example of work to oceankiosk@noaa.gov.
Q6. Will we be producing a complete stand-alone video for use in the Kiosk, or will animation content only be provided to NOAA who will include it in a video?
Animation will be included within a video. The existing animation can be viewed on this page: http://oceantoday.noaa.gov/ripcurrent/
Q7. Am I to understand that the length of the digital animation content is between 1 and 3 minutes?
In Q1 we’ve estimated the length of the animation at no more than 30 seconds.
Q8. Will there need to be voiceover narration included, or text only treatments to information?
No voiceover narration necessary. Text treatments can be recommended and will be discussed as part of the review process.
Q9. Who will provide and approve the Spanish Translation, is that to be the contractor?
Another contractor will complete the Spanish translation.
Q10. We are located in Utah. Will one trip to Maryland suffice for development, and if so, how many days of meetings are anticipated? I mention this to help estimate travel costs.
One in-person meeting may be needed. The NOAA planning team can accommodate WebEx or other virtual meeting software as an alternative to meeting in-person. Several check-in meetings along the way will be needed to ensure work is meeting our needs and that the desired outcome is understood.
Q11. Is this to be a 3D animation?
No
PAGE 4 OF 4 EA-133C-14-RQ-0309/A0001
Q 12. It is noted that the surroundings are to be photorealistic (water, beach, etc…).
Do the human figures have to be photorealistic as well?
Yes
Q 13. What is the anticipated runtime/duration of the completed animation?
21 o 30 seconds
Q 14. Do you have samples of past animations we can view to get an idea of animation style and quality you desire?
The existing animation can be viewed within the video found on this page:
http://oceantoday.noaa.gov/ripcurrent/
We are looking for a quality and style similar to http://www2.nos.noaa.gov/oceannewskiosk/otksoftware/screensaver-notouch.wmv
Q 15. Is there a budget range set for this project?
The government estimate is not provided for publication. This is a simplified acquisition (under $150,000.00).
Descript: Amendment No. 1 is hereby issued to provide Questions from various offerors and Answers to those questions.
Date for submission of offers is hereby extended until April 16, 2014 at noon ET.
| Descript1: |
| AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT: |
| IDCode: |
| pdfpage1: 1 |
| Pages: 4 |
| DocNo: A0001 |
| EffDate: APR 09, 2014 |
| ReqNo: NCNA2600-14-00445 |
| ProjNo: |
| IssuedByCode: AJ930073 |
| IssuedBy: NOAA/ERAD |
200 GRANBY STREET
NORFOLK VA 23510
| AdminByCode: |
| AdminBy: See Block 6 |
| ContractorCode: |
| FacCode: |
| SolChg: Yes |
| AwdChg: Off |
| SolNo: EA-133C-14-RQ-0309 |
| SolDate: APR 02, 2014 |
| AwdNo: |
| AwdDate: |
| NoCopies: 1 |
| Amended: Yes |
| OffrExt: Yes |
| OffrNoEx: Off |
| ApprData: See Schedule |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).: |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| SignName: |
| SignTitl: |
| ContDate: |
| ContrOfficerInfo: |
| CODate: |
| Contractor Info: |
| ContractorPOC: |
| Contractor: |
| ModAmount: |
| Header: |
| 15B. CONTRACTOR/OFFEROR: |
| Footer1: |
| signature: |
File details come from the government source that posted it. Updated .