E02_Electrical_Upgrades_930_Backus.docx

DOCX document 33 KB Posted

Attached to
930 Backus St - Electrical to Code: Phase 2 State and local contract opportunity
Solicitation number
2025-COMMUNITY DEVELOPMENT-047
Issued by
Kalamazoo County, Huntington Woods City, Michigan

About this file

This is a Work Write-Up for Electrical Upgrades prepared by the City of Jackson for a residential property located at 930 Backus St. in Burton, Michigan, dated February 26, 2025. The project involves comprehensive electrical system improvements to bring the structure into compliance with the Michigan Residential Code (MRC) 2015, including installation of a new 100-amp meter base, hardwired smoke and carbon monoxide detectors, kitchen and bathroom electrical circuit upgrades, and correction of existing electrical violations and hazardous conditions.

The scope of work requires the electrical contractor to perform all necessary repairs and installations, including wall and ceiling repairs from wire routing, with the contractor responsible for daily cleanup and ensuring all new outlets are wired appropriately. No specific pricing details are provided in the document, though the work is part of a rehabilitation project. The electrical upgrades must meet specific code requirements, such as GFCI protection, proper receptacle spacing, and hardwired detector installations. The project appears to be funded through a local government housing improvement program, with the property owner's involvement and consent documented on the work write-up.

View the file

Other files for this state and local contract opportunity

Other files attached to 930 Backus St - Electrical to Code: Phase 2, newest first.
File Type Posted
930_Backus_St_-_Electrical_to_Code:_Phase_2.pdf PDF
All_Services_Sample_Contract_.docx DOCX document
Labor_and_Material_Payment_Bond.pdf PDF
CDBG_Additional_Forms.pdf PDF
Maintenance_and_Guarantee_Bond.pdf PDF
Performance_Bond.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Work Write-Up E02 Electrical Upgrades

* EXHIBIT 1 *

Dated: 2/26/2025

CUSTOMER INFORMATION

930 Backus St.

2395 E. Judd Rd., Burton, MI 48529

PREPARED BY

sharrison@cityofjackson.org

* NOTE *

THE CUSTOMER AND CONTRACTOR MUST SIGN THE BOTTOM OF EACH PAGE ONLY IF

1) THIS WORK WRITE-UP BECOMES PART OF A CONSTRUCTION CONTRACT

2) THE UNDERSIGNED CUSTOMER AND CONTRACTOR HAVE REVIEWED, APPROVED AND AGREED TO THE WORK AND PRICES DESCRIBED IN THIS WORK WRITE-UP

Location: Unassigned

Electrical System
Quantity
Units
Total

1 - E02 – ELECTRICAL TO CODE

(Specification ID:80.00000 Estimated Qty:0)

EA

* PERMIT REQUIRED *

Correct all existing violations or hazardous conditions existing in this structure as specified in the Housing Code and Electrical Regulations as to existing structures, as well as those included below.

I, the Electrical Contractor, shall perform the following alterations or installations stated below and shall further assure that upon completion, the structure shall be in compliance with the respective codes and permit requirements for the agreed contract price.

A change order must be executed by the Rehabilitation Specialist prior to installation of any "wire mold" or similar exposed wiring in living areas.

Fixture allowance included in bid: $ __________. See specs for additional electrical items.

Contractor to list any additional items necessary to comply with minimum code.

Note: Electrical Contractor shall be responsible for all wall and ceiling repairs from any holes that were needed to run wire. Wall repairs shall be smooth, and sanded and ready for paint, owner responsible for painting. Repair of holes shall be done with plaster so as to match the existing materials.

Contractor responsible for daily cleanup.

All new outlets shall be wired with a constant feed unless specifically listed to provide switched lighting.

To include the following.

1: Install new 100- amp meter base, riser, service wire grounding and bonding per MRC 2015 2: Install of a hard wire smoke and carbon monoxide detector in basement, to include interconnected if hardwire cannot be done, then radio frequency interconnect with 10-year lithium battery. Smokes according to MRC 2015. Replace all, some are missing. Replace with new hardwired.

3: Kitchen, verify if done correctly. of dedicated 20-amp circuits with GFCI protection and receptacles spaced according to chapter 39 of the MRC.

4: Bathroom, verify if done correctly. dedicated 20-amp circuit with GFCI protection and lights. GFCI and lights.

Electrical Contractor Name:

Permit Number:

Total

Prepared By: sharrison@cityofjackson.org on 2/26/2025

OWNER ACCEPTS SCOPE OF WORK

I have read the contents of this work write up and received a copy. I fully understand the repairs to be made to my property.

x___________________________________
Owner:Date

CONTRACTOR ACCEPTS SCOPE OF WORK

I have read the contents of this work write up and agree to perform all work called for in accordance with the bid submitted on __________.

x___________________________________
ContractorDate
x______________________________________
Construction SpecialistDate
Prepared By: sharrison@cityofjackson.org on 2/26/2025
4 of 4

image1.png

File details come from the government source that posted it. Updated .