V3201025_FBO_SOW.pdf

PDF 56 KB Posted

Attached to
Aircraft Emissions CO2 Standard Finalization
Solicitation number
DTRT5717Q80069
Issued by

About this file

Statement of Work / Instructions, Conditions, and Notice to Offerors

View the file

Other files

File Type Posted
V3201025_SF1449.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Procurement Request No. V3201025

STATEMENT OF WORK

Aircraft Emissions CO2 Standard Finalization

BACKGROUND

The Volpe National Transportation Systems Center (Volpe Center) in support of the Federal Aviation Administration’s (FAA) Office of Environment and Energy (AEE-300) is developing a certification standard for airplane CO2 emissions based on the consumption of fuel. This certification standard will be incorporated into the International Civil Aviation Organization’s (ICAO) Committee for Aviation Environmental Protection (CAEP) Annex 16 as Volume III. In addition, guidance and information on procedures and methods for determining airplane fuel consumption in for use in determining compliance with the CO2 emissions standard will be provided in an Environmental Technical Manual (ETM).

OBJECTIVE

The goal of this project is to resolve remaining technical work items for the CO2 emissions standard as within the Annex 16 Vol. III and the associated Environmental Technical Manual Vol. III guidance document. The work will be conducted in the form of information exchanges on teleconferences and webexes regarding procedures and methods for flight testing as well as data analysis necessary for determining airplane fuel consumption..

STAFFING APPROACH

The contractor shall provide an individual that has prior/current experience in the following areas:

o Flight test and analysis methods for determining airplane fuel mileage o Airplane certification requirements and procedures o ICAO working methods and procedures o Title 14 Code of Federal Regulations (CFR) part 25 o Draft ICAO Committee on Aviation Environmental Protection (CAEP) Annex 16

Volume III CO2 emissions standards o Advisory Circular (AC) 25-7

GOVERNMENT FURNISHED MATERIAL

All materials to be reviewed as part of this work will be provided to the contractor by the Volpe Center by email or direct mail.

Title 14 CFR part 25 and AC 25-7 information can be found online at the following links:

14 CFR part 25

AC 25-7

TASKS

Task 1: ICAO CAEP CO2 standard support – May 2017 through April 2018 (funded)

The Contractor will support the continuing development of an ICAO CAEP CO2 standard by attending ICAO Working Group 3 meetings and offering specialized technical support in such areas as aircraft performance and handling qualities. This support will involve weekly technical reviews via email and weekly participation in teleconferences and web

Solicitation # DTRT5717Q80069 meetings. Deliverables for this task will be Quarterly Status Reports due July 31, 2017, October 31, 2017, and January 31, 2018. There will also be a Final Quarterly Report summarizing the final Task 1 findings due on April 30, 2018.

All work on Task 1 is expected to be completed by April 30, 2018.

No travel is expected as part of Task 1.

Task 2: ICAO CAEP CO2 standard support – May 2018 through April 2019 (optional)

The Contractor will support the continuing development of an ICAO CAEP CO2 standard by attending ICAO Working Group 3 meetings and offering specialized technical support in such areas as aircraft performance and handling qualities. This support will involve weekly technical reviews via email and weekly participation in teleconferences and web meetings. Deliverables for this task will be Quarterly Status Reports due July 31, 2018, October 31, 2018, and January 31, 2019. There will also be a Final Quarterly Report summarizing the final Task 2 findings due on April 30, 2019.

All work on Task 2 is expected to be completed by April 30, 2019.

No travel is expected as part of Task 2.

DELIVERABLES AND PERIOD OF PERFORMANCE

Project deliverables will be required according to the format and dates outlined in the following table. All work will begin upon date of award and, if the option is exercised, will be completed within 24 months.

CLIN TASK DESCRIPTION DELIVERABLE FORMAT DATE(S)

REQUIRED

0100 1 ICAO CAEP CO2

standard support – May 2017 through April 2018, Four Quarterly Reports

Four Quarterly Reports

MS Word NA

0101 1 1st Task 1 Quarterly Status Report

Status Report MS Word July 31, 2017

0102 1 2nd Task 1 Quarterly Status Report

Status Report MS Word October 31, 2017

0103 1 3rd Task 1 Quarterly Status Report

Status Report MS Word January 31, 2018

0104 1 Final Task 1 Quarterly Report

Final Report MS Word April 30, 2018

0200 2 ICAO CAEP CO2

standard support – May 2018 through April 2019, Four Quarterly Reports

Four Quarterly Reports

MS Word NA

(option)

2 1st Task 2 Quarterly Status Report

Status Report MS Word July 31, 2018

(option)

2 2nd Task 2 Quarterly Status Report

Status Report MS Word October 31, 2018

(option)

2 3rd Task 2 Quarterly Status Report

Status Report MS Word January 31, 2019

CLIN TASK DESCRIPTION DELIVERABLE FORMAT DATE(S)

REQUIRED

(option)

2 Final Task 2 Quarterly Report

Final Report MS Word April 30, 2019

*All deliverables shall be emailed to the technical POC, Clay Reherman, phone: 617-494-6341; email: clay.reherman@dot.gov.

Solicitation # DTRT5717Q80069

Attachment No. 1

INSTRUCTIONS, CONDITIONS, AND NOTICE TO OFFERORS

I. PROPOSAL FORMAT

The Offeror’s written proposal must include the following:

PRICE QUOTATION

The Offeror shall provide pricing for CLINs 0100 through 0204 as reflected in the CLIN structure in the combined synopsis/solicitation notice and provide a total proposed firm fixed price for all CLINs (0100-0204).

TECHNICAL PROPOSAL

The Offeror’s technical proposal shall include the following:

1) A written description of the Offeror’s technical approach for successfully achieving the requirements identified in the Statement of Work (maximum 5 pages);

2) Resumes for all proposed staff (maximum 5 pages)

3) Documentation demonstrating the Offeror’s prior experience in the following areas (maximum 5 pages):

• Flight test and analysis methods for determining airplane fuel mileage

• Airplane certification requirements and procedures

• ICAO working methods and procedures

• Title 14 Code of Federal Regulations (CFR) Part 25

• Draft ICAO Committee on Aviation Environmental Protection (CAEP) Annex 16

Volume III CO2 emissions standards

• Advisory Circular (AC) 25-7

FAR 52.212-3, OFFEROR REPRESENTATIONS AND CERTIFICATIONS –

COMMERCIAL ITEMS

The Offeror must include a completed copy of the provision at FAR 52.212-3, Offeror Representations and Certifications-Commercial Items (see Attachment 2). An Offeror shall complete only paragraph (b) of this provision if the Offeror has completed the annual representations and certifications electronically using the System for Award Management (SAM) accessible via http://www.acquisition.gov. If the Offeror has not completed the annual representations and certifications electronically in SAM, the Offeror shall complete only paragraphs (c) through (o) of this provision. The Offeror is reminded that if it completes its annual representations and certifications electronically in SAM it must update its representations and certifications as necessary, but at least annually, to ensure they are kept current, accurate, and complete. All Contractors must be registered in SAM in order to receive an award from a DOT Agency.

PR# V3201025

Any proposal that does not include the components specified above will be considered non-responsive.

II. EVALUATION FACTORS FOR AWARD

Basis for Award

An award will be made to the responsive and responsible Offeror whose offer, conforming to the solicitation, is determined to offer the best value to the Government in terms of: 1) technical acceptability; 2) past performance 3) price. It is the Government’s intent to award a firm fixed-price purchase order based upon initial offers without entering into discussions or negotiations (except clarifications as described in FAR 15.306(a)). Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a price standpoint, reflecting ANY AVAILABLE DISCOUNTS. While it is the Government's intent to make award based upon initial offers, the Government may, nevertheless, determine during the evaluation period that it is necessary to conduct discussions.

Order of Importance

The technical evaluation criteria that are addressed in the Technical Proposal, are considered equal to price in the selection of the contractor for award. When the Technical Proposals are evaluated as essentially equal, the quoted price may become the determining factor in making an award.

Evaluation Criteria

The Offeror’s proposal will be evaluated in terms of the following criteria:

1) Technical Acceptability

a) Technical Approach

b) Staffing

c) Past Performance

2) Price

Technical Acceptability Technical acceptability of the Offeror’s proposal will be evaluated based on the following:

Technical Approach - The Offeror’s technical capability to satisfy the requirements of the SOW as demonstrated by its written technical approach;

Staffing – The experience and expertise of the Offeror’s proposed staff to meet the requirements of the SOW as demonstrated by the staff resumes.

Past Performance - The Offeror’s relevant work experience in the following areas as demonstrated by its past performance documentation:

• Flight test and analysis methods for determining airplane fuel mileage

PR# V3201025

• Airplane certification requirements and procedures

• ICAO working methods and procedures

• Title 14 Code of Federal Regulations (CFR) Part 25

• Draft ICAO Committee on Aviation Environmental Protection (CAEP) Annex 16

Volume III CO2 emissions standards

• Advisory Circular (AC) 25-7

Price

The Offeror’s quoted price will be evaluated based on the total firm fixed price proposed for CLINs 0100 – 0204.

Please keep pricing separate from technical proposal.

V3201025_SOW_V3
V3201025_TechEvalNotice

File details come from the government source that posted it. Updated .