Industry Questions and Government Responses
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DTMA91B1600012-_Abstract_of_Bids.pdf | ||
| DTMA91B1600012-_IFB.pdf | ||
| SOW_McNulty_Campus_Road_Resurfacing_072916_Only_Pictures.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation: DTMA91B1600012 – McNaulty Campus Road Resurfacing and Drainage Repair
Questions and Answers
Question: Can you provide more information on the size of the catch basins you want installed?
Response: There are 25 small catch basins on either side of the road each is approximately
12”Lx10”W and 24” deep.
At the intersection of Quarters L, Quarters O and the Parking lot entrance two additional catch basins shall be installed. Each of these will measure approximately 3’Lx2’W and 3’ deep.
Question: Can you provide an estimated quantity or drawing indicating the extent of pavement markings required?
Response: The marking in the parking lot will consist of two handicapped spots, one handicapped aisle, and seven regular spots. The dimensions of the parking lot are approximately 49’x51’.
Question: Page 6 says '30 day completion'. Page 22 says '60 day completion'. Which is correct?
Response: 30 Days
Question: What is the size of the new piping?
Response: According to the specification, the drainage pipe shall be 12” polyvinyl chloride
(PVC) with compatible fitting and both shall be manufactured and tested in accordance with
ASTM F949 and installed per ASTM D3212. Also quote similar pipe in 10” and 8” as options.
Question: What is the type of the new piping?
Response: Polyvinyl chloride (PVC) with compatible fitting and both shall be manufactured and tested in accordance with ASTM F949 and installed per ASTM D3212. Please provide manufacturer and model number with bid.
All catch basins and piping need to be approved by the engineer/CO prior the contractor ordering material.
Question: What is the size of the new catch basins?
Response: There are 25 small catch basins on either side of the road each is approximately
12”Lx10”W and 24” deep.
At the intersection of Quarters L, Quarters O and the Parking lot entrance two additional catch basins shall be installed. Each of these will measure approximately 3’Lx2’W and 3’ deep.
All catch basins and piping need to be approved by the engineer/CO prior the contractor ordering material.
Question: What is the spec on the castings?
Response: There is no spec on the castings other than that they should be replaced in kinds. Please submit a drawing with your proposal for approval.
All catch basins and piping need to be approved by the engineer/CO prior the contractor ordering material.
Question: Are there plans available or just an overall description? Page 41 shows no diagram or specs provided in statement of work.
Response: There are no drawings for this project
Question: Is there a curb detail (concrete footings)?
Response: There are no curb details. The Belgium Blocks will serve as the curb.
Question: What is meant by "reinforcement" on page 5 task 1.6?
Response: At the entrance to the Museum, there is a curb area covered with slate tiles. The
Belgium Block border will be extended to reinforce/protect this curb. Please see picture below.