Bridge_Inspection_Report_5140-079P.pdf
PDF 3 MB Posted
- Attached to
- Blue Ridge Parkway Federal contract opportunity
- Solicitation number
- DTFH71-17-B-00020
About this file
Bridge Inspection Report_5140-079P
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bridge_Inspection_Report_5140-082P.pdf | ||
| ADV_Subcontracting_plan.doc | DOC document | |
| Bridge_Inspection_Report_5140-088P.pdf | ||
| Bridge_Inspection_Report_5140-132P.pdf | ||
| Bridge_Inspection_Report_5140-083P.pdf | ||
| ADV_Bidder's_Qualifications_Form.doc | DOC document | |
| Bridge_Inspection_Report_5140-074P.pdf | ||
| Plans_-_FTNP-BLRI_2A15.pdf | ||
| Bridge_Inspection_Report_5140-084P.pdf | ||
| IFB_Solicitation_-_FTNP-BLRI_2A15.pdf | ||
| Bridge_Inspection_Report_5140-080P.pdf | ||
| Bridge_Inspection_Report_5140-081P.pdf | ||
| Bridge_Inspection_Report_5140-076P.pdf | ||
| FP14_Eng.pdf | ||
| VETS-4212_Form.pdf | ||
| Report_Pavement.pdf | ||
| Bridge_Inspection_Report_5140-075P.pdf | ||
| Bridge_Inspection_Report_5140-077P.pdf | ||
| Bridge_Inspection_Report_5140-078P.pdf | ||
| Report_NEPA.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BRIDGE INSPECTION REPORT
BIG PINE CREEK BRIDGE #5
BLUE RIDGE PARKWAY OVER BIG PINE CREEK
BLUE RIDGE PARKWAY
LN
STRUCTURE NO. 5140-079P
INSPECTION TYPE: ROUTINE
INSPECTION DATE: 6/9/15
Report prepared by: WD
MILE POINT: 224.16
Federal Highway Administration KILOMETER POINT: 360.71 Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 https://bridge.flhd.fhwa.dot.gov
STRUCTURE SUMMARY STRUCTURE NO. 5140-079P
BIG PINE CREEK BRIDGE #5 INSPECTION DATE: 6/9/15
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL: ....... CONCRETE NO. OF MAIN SPANS:
MAIN SPAN TYPE: ............... FRAME NO. OF APPR. SPANS:
# OF BEAMS, MAIN SPAN: .. 5 STRUCT. TOTAL LENGTH: .. 42.0 FT (12.8 M)
DECK TYPE: ......................... CONCRETE CAST-IN-PLACE MAX. SPAN LENGTH: .......... 42.0 FT (12.8 M) WEARING SURFACE: .......... BITUMINOUS DECK WIDTH: ...................... 34.8 FT (10.6 M) ABUT. FOUNDATIONS: ........ SPREAD FTG ON BEARING MAT'L CURB TO CURB WIDTH: ..... 31.0 FT (9.4 M)
PIER FOUNDATION(S): ........ N/A YEAR BUILT:
ABUTMENT / PIER MAT'L: ... MASONRY YEAR RECONSTRUCTED: .. N/A
PROJ./PLAN REF. NO: ......... 2A2 / NONE SKEW ANGLE: ..................... 30 °
NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ........ NO
STRUCTURE HISTORY: ...... 1983-JOINT REPAIR.
LOCATION
BLUE RIDGE PARKWAY MILE POINT: ..................... 224.16 (KM PT 360.71)
STATE: ................................. NORTH CAROLINA LOCATION: 0.9 MILES FROM NC ROUTE 1463
FACILITY CARRIED: ............ BLUE RIDGE PARKWAY
FEATURE INTERSECTED: .. BIG PINE CREEK
STRUCTURE EVALUATION SUMMARY
This concrete frame bridge is in poor condition overall. The main problem is deterioration of the concrete deck sides with cracking, spalling with exposed steel reinforcement, delamination, efflorescence, and leakage. Beam #5 is also exhibiting signs of deterioration including longitudinal cracking and efflorescence on all faces. Other problems include southward channel migration causing scour at the south abutment and along the southwest wingwall, deterioration of the parapet and wingwall masonry mortar joints with cracking and efflorescence, damaged capstones in the west parapet, and buried weep holes in the north abutment breastwall.
In addition, consideration should be given to raising the masonry parapets to meet the minimum safety requirement of 2'-3".
Corrective measures should be taken as outlined in this report to help prevent the possible development of more serious or costly problems in the future.
INSPECTION TEAM: M. REGER, H. SALAD
CONDITION ASSESSMENT:
MICHAEL REGER, P.E., FIELD TEAM LEADER 703-948-1424
REPORT REVIEW:
MARCUS MILLER, P.E., SENIOR INSPECTION ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 12/31/15
JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5140-079P
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain in service at reduced loads or with frequent inspections.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
C226 PRIORITY OF IMPROVEMENT
ITEM
NO.
MAINTENANCE RECOMMENDATIONS
(GENERALLY NOT FLHP ELIGIBLE)
QTY. UNIT COST
UNIT
ESTIMATE
COST
PRELIM.
58.6, 60.6 CLEAN AND REPOINT MASONRY MORTAR JOINTS IN PARAPETS AND WINGWALLS
AS NECESSARY. REPLACE FRACTURED STONES IN WEST PARAPET.
50 LF
60.7 CLEAR WEEP HOLES AT NORTH ABUTMENT. 1 LS
PRELIM. MAINTENANCE TOTAL :
ITEM
NO.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS) QTY. UNIT UNIT
COST ESTIMATES
PRELIM. COST
REHAB. RECONSTR.
58.1, 59.2 REMOVE LOOSE CONCRETE FROM DECK SIDES, CLEAN AND COAT
EXPOSED STEEL REINFORCEMENT, AND REPAIR AS ORIGINALLY
CONSTRUCTED. REPAIR DETERIORATED CONCRETE IN BEAM #5.
1 LS
60.9 INSTALL ENGINEERED RIPRAP ALONG SOUTH ABUTMENT TO
PREVENT FURTHER SCOUR.
1 LS
58, 59, 60 CONTRACT COSTS FOR MOBILIZATION, TRAFFIC CONTROL, AND
DESIGN/CONSTRUCTION ENGINEERING.
1 LS
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :
COST ESTIMATE SUMMARY
PRELIM. MAINTENANCE TOTAL:
PRELIM. REHABILITATION TOTAL:
PRELIM. RECONSTRUCTION TOTAL: ...
TOTAL ITEMIZED COSTS:
PRELIMINARY ESTIMATE TOTAL* :
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.
FIELD INSPECTION REPORT STRUCTURE NO. 5140-079P
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
Fatigue cracks in steel or shear cracks in concrete may be present.
CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
“IMMINENT” FAILURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.
FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
NOT APPLICABLE
EXCELLENT CONDITION
VERY GOOD CONDITION - no problems noted.
GOOD CONDITION - some minor problems.
SATISFACTORY CONDITION - structural elements show some minor deterioration.
FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
POOR CONDITION - advanced section loss, deterioration, spalling, or scour.
N
58. DECK ITEM REFERENCE AND REMARKS
OTHER
ALIGNMENT
DEFLECTION AND/OR VIBRATION
FASCIA(E)
DIAPHRAGMS AND BRACING
TRUSSES
FLOOR BEAMS AND STRINGERS
ARCH(ES) OR SLAB(S)
GIRDERS OR BEAMS
BEARING DEVICES
59. SUPERSTRUCTURE
OTHER
DEFLECTION AND/OR VIBRATION
UTILITIES
DRAINS AND DRAINAGE
PARAPETS AND/OR RAILINGS
CURBS, SIDEWALKS, AND MEDIAN
RIDEABILITY
WEARING SURFACE
EXPANSION JOINTS
DECK SLAB
OTHER
SETTLEMENT OR DEFLECTION
EROSION AND/OR SCOUR
FOUNDATIONS
CAPS AND/OR BEARING SEATS
PILE BENTS
WALLS AND/OR COLUMNS
PIER(S)
OTHER
SLOPE PROTECTION
SETTLEMENT OR DEFLECTION
EROSION AND/OR SCOUR
EXPANSION JOINTS
WEEP HOLES
WINGWALLS
FOUNDATIONS
BACKWALLS AND/OR BULKHEADS
CAPS AND/OR BEARING SEATS
PILE BENTS
BREASTWALLS OR COLUMNS
ABUTMENTS
60. SUBSTRUCTURE
1.
10.
2.
3.
4.
5.
6.
7.
8.
9.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
PAINT
11.
N F N N N N N N F
N G
G N N N N G F N G G N N
N N N N N N N
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
12.
13.
14.
15.
16.
17.
18.
19.
58.1 SEVERE DETERIORATION OF DECK OVERHANG AREAS WITH
CRACKING, SPALLING WITH EXPOSED STEEL REINFORCEMENT
(WEST SIDE), DELAMINATION, EFFLORESCENCE, AND LEAKAGE.
MINOR CRACKING WITH EFFLORESCENCE ON DECK UNDERSIDE
ALONG CONSTRUCTION JOINT.
58.3 MINOR DETERIORATION OF WEARING SURFACE ALONG CURB
LINES. MINOR LONGITUDINAL CRACKING OF WEARING SURFACE IN
SOUTHBOUND LANE OVER STRUCTURE.
58.6,7 MINOR TO MODERATE CRACKING OF PARAPET MASONRY MORTAR
JOINTS WITH EFFLORESCENCE. TWO CAP STONES ARE
FRACTURED IN WEST PARAPET. MINOR VEGETATION GROWTH
ALONG CURBLINES AND IN MORTAR JOINTS.
59.2 CONCRETE FRAME STRUCTURE WITH TEE BEAM CROSS SECTION
IN CENTER PORTION OF SPAN.
WIDESPREAD MODERATE LONGITUDINAL CRACKING AND
DELAMINATION WITH HEAVY EFFLORESCENCE ON ALL FACES OF
BEAM # 5.
59.9 NOTICEABLE SAG IN SUPERSTRUCTURE, BEAMS #3, 4, AND 5.
60.1 MODERATE SCALING OF SOUTH ABUTMENT BREASTWALL AT
WATERLINE. MODERATE EFFLORESCENCE AT WEST SIDE OF
SOUTH ABUTMENT. HAIRLINE VERTICAL CRACKING OF BOTH
ABUTMENT BREASTWALLS.
60.6 MINOR CRACKING OF WINGWALL MASONRY MORTAR JOINTS WITH
EFFLORESCENCE AND MINOR VEGETATION AND MOSS GROWTH.
60.7 WEEP HOLES ARE BURIED AT NORTH ABUTMENT DUE TO
AGGRADATION OF SILT AGAINST BREASTWALL.
60.9 MINOR SCOUR AT SOUTH ABUTMENT WITH 8" OF FOOTING
EXPOSED (NOT OBSERVED DUE TO HIGH WATER). MINOR SCOUR
ALONG SOUTHWEST WINGWALL NEAR SOUTH ABUTMENT. MINOR
EROSION AT SOUTHWEST AND NORTHEAST WINGWALLS.
G G N G G N
N
N
G
P
FIELD INSPECTION REPORT STRUCTURE NO. 5140-079P
ITEM REFERENCE AND REMARKS
STREAM BED COMPOSITION : 9.
AVERAGE CLEAR OPENING8.
NORMAL VELOCITY 7.
ADEQUACY OF OPENING6.
OTHER 5.
WATERWAY OBSTRUCTIONS 4.
CHANNEL PROTECTION3.
EROSION AND/OR SCOUR2.
ALIGNMENT1.
61. CHANNEL 6
F F N G N
MED
SUFF
9 FT.
GRAVEL, SILT
222. APPROACHES 7
OTHER 9.
ALIGNMENT8.
SIGNS 7.
SETTLEMENT6.
EROSION5.
SURFACING 4.
APPROACH GUARDRAIL 3.
RELIEF JOINTS2.
1. APPROACH SLABS N
N G G G G N G N
223. RETAINING WALL N
OTHER 6.
SETTLEMENT OR DEFLECTION5.
EROSION AND/OR SCOUR4.
FOUNDATION3.
WEEP HOLES2.
1. WALL
36. TRAFFIC AND SAFETY FEATURES
APPROACH GUARDRAIL ENDS D.
APPROACH GUARDRAILS C.
TRANSITIONS B.
BRIDGE RAILINGSA. 0
N N N
61.1,2 SOUTHWARD CHANNEL MIGRATION. MINOR SLOUGHING ALONG
CHANNEL BANKS WITH UNDERMINING OF SEVERAL TREES.
222.4,6 MINOR SETTLEMENT WITH MINOR TRANSVERSE CRACKING OF
PAVEMENT AT BOTH APPROACHES (PREVIOUS REPAIRS HAVE BEEN
ATTEMPTED). MINOR LONGITUDINAL CRACKING OF SOUTH
APPROACH PAVEMENT ALONG WEST CURBLINE (SEE 222.5).
222.5 TWO MINOR SINKHOLES ALONG WEST PARAPET IN SOUTH
APPROACH SHOULDER.
36.A BRIDGE RAILING HEIGHT OF 2'-0" DOES NOT MEET CURRENT
MINIMUM HEIGHT REQUIREMENT OF 2'-3" FOR TRAFFIC BARRIERS.
TRAFFIC SAFETY RATING CODES
N
Does not meet standards or a safety feature is required and none is provided.
Meets currently acceptable standards.
Not applicable or a safety feature is not required.
STRUCTURE LOAD RATING STRUCTURE NO. 5140-079P
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 15 14 25 23
HS 20 19 34 31
TYPE 3 18 17 31 28
TYPE 3S2 29 26 48 43
TYPE 3-3 35 32 59 53
DESIGN LOADING: H15 (M13.5)
X CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION:
LOAD RATING CONTROLLED BY:
REMARKS: RATING IS BASED ON DESIGN LOAD OF STRUCTURE.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-079P
STRUCTURE IDENTIFICATION
(201) PARK: BLUE RIDGE PARKWAY (1) STATE: ....................................... 374 - NORTH CAROLINA (NC)
(202) STRUCTURE NAME: .......... BIG PINE CREEK BRIDGE #5 (2) STATE HWY. AGENCY DIST:
(203) STRUCTURE KIND: ............1 - BRIDGE (3) COUNTY CODE: ........................ 005 - ALLEGHANY
(204) STRUCTURE NUMBER: ..... 5140-079P (4) CITY/PLACE CODE:
(205) NPS REGION: .................... 4 - SOUTHEAST (5) INVENTORY ROUTE:
(206) ROUTE CODE NUMBER: ... 1 (6) FEATURES INTERSECTED:....... BIG PINE CREEK
(207) ROAD SECTION NO: .......... 079P (7) FACILITY CARRIED: .................. BLUE RIDGE PARKWAY
(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 5140079P0000000
(209) WITHIN NPS BNDRY?: ....... YES (9) LOCATION: ................................ 0.9 MILES FROM NC ROUTE
(210) OPERATING UNIT: ............. BLUFFS (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)
(211) PROJECT NO(S): ................ 2A2 (11) MILE POINT: ............................. 224.16 (KM PT 360.71)
(212) DRAWING NUMBERS: ....... NONE (27) YEAR BUILT:
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED: .... N/A
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................ 3 - FREE ROAD
(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
1 - CONCRETE
07 - FRAME
42.0 FT (12.8 M)
42.0 FT (12.8 M)
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
6 - N/A
6 - N/A
1 - CONCRETE CAST-IN-PLACE
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. 6 - BITUMINOUS
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION: .............. 0 - NONE
(218) IS SALT USED?: ..................... YES
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 2 - H15 (M13.5) (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION
(66) INVENTORY RATING: ...... 20.4 TONS (18.5 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED
(64) OPERATING RATING: ...... 34.1 TONS (30.9 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 6/15 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-079P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE: ............................. 36°29'34.62" (51) CURB TO CURB WIDTH: ........... 31.0 FT (9.4 M)
(17) LONGITUDE: ......................... 80°58'02.76" (52) DECK WIDTH: ............................ 34.8 FT (10.6 M)
(19) DETOUR LENGTH: ............... 25 MI (40 KM) (32) APPR. ROADWAY WIDTH: ........ 28.0 FT (8.5 M)
(28A) LANES ON STRUCT: .......... 02 (213) APPR. PAVEMENT WIDTH: ..... 20.0 FT (6.1 M)
(28B) LANES UNDER STRUCT: ... 00 LEFT SHOULDER: .................. 4.0 FT (1.2 M)
(42A) SERVICE ON: ..................... 1 - HIGHWAY RIGHT SHOULDER: ................ 4.0 FT (1.2 M)
(42B) SERVICE UNDER: .............. 5 - WATERWAY (33) BRIDGE MEDIAN: ....................... 0 - NO MEDIAN
(29) AVG. DAILY TRAFFIC: .......... 1347 (34) SKEW ANGLE: ............................ 30 °
(30) YEAR OF ADT: ...................... 2013 (35) DECK FLARE?: ........................... NO
(114) FUTURE ADT: ..................... 1482 (47) TOTAL HORIZ. CLEARANCE: .... 31.1 FT (9.5 M)
(115) YEAR OF FUTURE ADT: ..... 2033 (50) SIDEWALKS:
(101) PARALLEL STRUCTURE: ... N - NONE LEFT : ...................................... 0.0 FT (0.0 M)
(38) NAVIGATION CONTROL?: ... 0 RIGHT : ................................... 0.0 FT (0.0 M)
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M) (214) BRIDGE RAIL TYPE:
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M) RAIL CONFIGURATION: ......... 1 - FULL HEIGHT (NO PARAPE
(111) ABUT. OR PIER PROT: ....... MATERIAL: .............................. 9 - OTHER
DESIGN TYPE: ........................ 1 - CONTINUOUS RAIL LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 0.0 FT (0.0 M) (215) BRIDGE RAIL HEIGHT: ............ 2.00 FT (0.61 M)
(56) LEFT: ......................... 0.0 FT (0.0 M) (53) MIN. VRT. CLEAR. OVER DECK: 99.99 FT (99.99 M)
(54) MIN. VRT. UNDERCLEARANCE: 0.00 FT (0.00 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:
(59) SUPERSTRUCTURE:
(60) SUBSTRUCTURE:
(61) CHANNEL:
(62) CULVERT: ........................... N
(222) APPROACHES:
(223) RETAINING WALL: ........... N
(36) TRAFFIC SAFETY FEAT: ... 0NNN
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
8 - Stable; scour above top of fo
2 - REHAB/RECONSTRUCTION
C - MODERATE
$0
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
1983-JOINT REPAIR.
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
APPENDIX STRUCTURE NO. 5140-079P
PHOTOGRAPHS STRUCTURE NO. 5140-079P
PHOTO #1 - LOOKING SOUTHBOUND TOWARD BLOWING ROCK
FLOW
PHOTO #2 - EAST (UPSTREAM) SIDE
PHOTO #3 - GENERAL TOPSIDE VIEW LOOKING SOUTH
PHOTO #4 - TYPICAL ASPHALT PATCHING AT APPROACH, SOUTH
APPROACH SHOWN; NOTE TRANSVERSE CRACKING
PHOTO #5 - SETTLEMENT OF APPROACH PAVEMENT, NORTH
APPROACH SHOWN
PHOTO #6 - TYPICAL LONGITUDINAL CRACKING OF WEARING
SURFACE, SOUTHBOUND SHOWN
PHOTO #7 - MOSS GROWTH AND DEBRIS ACCUMULATION ALONG EAST
CURBLINE
PHOTO #8 - SETTLEMENT ALONG WEST PARAPET AT SOUTH
APPROACH
PHOTO #9 - FRACTURED STONE ON WEST PARAPET
PHOTO #10 - TYPICAL CONDITION OF PARAPET MASONRY MORTAR
JOINTS, SOUTHEAST PARAPET SHOWN; NOTE VEGETATION AND MOSS
GROWTH
PHOTO #11 - GENERAL UNDERSIDE VIEW LOOKING SOUTH
PHOTO #12 - EFFLORESCENCE ALONG CONSTRUCTION JOINT NEAR
NORTH ABUTMENT
PHOTO #13 - CRACKING WITH EFFLORESCENCE ON UNDERSIDE OF
EAST OVERHANG
PHOTO #14 - CRACKING WITH EFFLORESCENCE ON UNDERSIDE OF
BEAM # 5 AND WEST DECK OVERHANG
PHOTO #15 - DELAMINATION AND SPALLING WITH EXPOSED STEEL
REINFORCEMENT ALONG WEST SIDE OF DECK
PHOTO #16 - CLOSE-UP VIEW OF EXPOSED STEEL REINFORCEMENT
AT WEST FASCIA OF CURB; NOTE RUSTING AND SECTION LOSS OF
STIRRUP AND LACK OF AGGREGATE IN CONCRETE MIX
PHOTO #17 - GENERAL VIEW OF NORTH ABUTMENT
PHOTO #18 - TYPICAL CRACKING WITH EFFLORESCENCE ON
WINGWALL MASONRY MORTAR JOINTS, NORTHWEST WINGWALL
SHOWN
PHOTO #19 - GENERAL VIEW OF SOUTH ABUTMENT
PHOTO #20 - CRACKING WITH EFFLORESCENCE ON WEST SIDE OF
SOUTH ABUTMENT AND SOUTHWEST WINGWALL
PHOTO #21 - MOSS AND VEGETATION GROWTH ON SOUTHWEST
WINGWALL
PHOTO #22 - SCOUR ALONG SOUTH ABUTMENT; NOTE SCALING AT
WATERLINE
PHOTO #23 - EROSION AT WEST END OF SOUTH ABUTMENT AND IN
FRONT OF SOUTHWEST WINGWALL
PHOTO #24 - UPSTREAM CHANNEL
PHOTO #25 - DOWNSTREAM CHANNEL