Bridge_Inspection_Report_5140-077P.pdf

PDF 4 MB Posted

Attached to
Blue Ridge Parkway Federal contract opportunity
Solicitation number
DTFH71-17-B-00020
Issued by
Department of Transportation Federal Highway Administration

About this file

Bridge Inspection Report_5140-077P

View the file

Other files for this federal contract opportunity

Other files attached to Blue Ridge Parkway, newest first.
File Type Posted
Bridge_Inspection_Report_5140-078P.pdf PDF
Report_NEPA.pdf PDF
Bridge_Inspection_Report_5140-082P.pdf PDF
ADV_Subcontracting_plan.doc DOC document
Bridge_Inspection_Report_5140-088P.pdf PDF
Bridge_Inspection_Report_5140-132P.pdf PDF
Bridge_Inspection_Report_5140-083P.pdf PDF
ADV_Bidder's_Qualifications_Form.doc DOC document
Bridge_Inspection_Report_5140-081P.pdf PDF
Bridge_Inspection_Report_5140-076P.pdf PDF
FP14_Eng.pdf PDF
Bridge_Inspection_Report_5140-079P.pdf PDF
VETS-4212_Form.pdf PDF
Report_Pavement.pdf PDF
Bridge_Inspection_Report_5140-075P.pdf PDF
Bridge_Inspection_Report_5140-074P.pdf PDF
Plans_-_FTNP-BLRI_2A15.pdf PDF
Bridge_Inspection_Report_5140-084P.pdf PDF
IFB_Solicitation_-_FTNP-BLRI_2A15.pdf PDF
Bridge_Inspection_Report_5140-080P.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BRIDGE INSPECTION REPORT

BIG PINE CREEK BRIDGE #3

BLUE RIDGE PARKWAY OVER BIG PINE CREEK

BLUE RIDGE PARKWAY

LS

STRUCTURE NO. 5140-077P

INSPECTION TYPE: ROUTINE

INSPECTION DATE: 6/9/15

Report prepared by: WD

MILE POINT: 223.78

Federal Highway Administration KILOMETER POINT: 360.11 Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 https://bridge.flhd.fhwa.dot.gov

STRUCTURE SUMMARY STRUCTURE NO. 5140-077P

BIG PINE CREEK BRIDGE #3 INSPECTION DATE: 6/9/15

BRIDGE IDENTIFICATION AND DESCRIPTION

MAIN SPAN MATERIAL: ....... CONCRETE CONTINUOUS

MAIN SPAN TYPE: ............... SLAB

# OF BEAMS, MAIN SPAN: .. 1

DECK TYPE: ......................... CONCRETE CAST-IN-PLACE

WEARING SURFACE: .......... BITUMINOUS

ABUT. FOUNDATIONS: ........ UNKNOWN

PIER FOUNDATION(S): ........ UNKNOWN

ABUTMENT / PIER MAT'L: ... MASONRY / CONCRETE

PROJ./PLAN REF. NO: ......... 2A2 / NONE

NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD

STRUCTURE HISTORY: ...... 1982-WEARING SURFACE PLACED.

NO. OF MAIN SPANS:

NO. OF APPR. SPANS:

STRUCT. TOTAL LENGTH: ..

MAX. SPAN LENGTH:

DECK WIDTH:

CURB TO CURB WIDTH:

YEAR BUILT:

YEAR RECONSTRUCTED: ..

SKEW ANGLE:

FRACTURE CRITICAL:

69.8 FT (21.3 M)

26.5 FT (8.1 M)

36.7 FT (11.2 M)

33.3 FT (10.1 M)

N/A 22 °

NO

LOCATION

BLUE RIDGE PARKWAY MILE POINT: ..................... 223.78 (KM PT 360.11)

STATE: ................................. NORTH CAROLINA LOCATION: 1.3 MILES FROM NC ROUTE 1463

FACILITY CARRIED: ............ BLUE RIDGE PARKWAY

FEATURE INTERSECTED: .. BIG PINE CREEK

STRUCTURE EVALUATION SUMMARY

This concrete slab bridge is in poor condition overall. The main structural problem is deterioration of the concrete deck slab, with severe cracking, delamination, spalling with exposed steel reinforcement, and heavy efflorescence present along the sides of the slab.

Other problems noted include spalling of the north pier; deterioration of the stone masonry mortar joints in the abutment breastwalls and wingwalls; and settlement and cracking of the asphalt pavement at both ends of the bridge.

Site-related problems include migration of the channel toward the north; as a result, debris and sediment has collected in the south and center spans. Other issues include scour at the upstream end of the piers, and sloughing of the channel banks at both ends of the north abutment.

It should also be noted that the bridge railing system does not meet current safety requirements for traffic barriers.

This bridge is scheduled for replacement in the near future under Project BLRI 2A16.

INSPECTION TEAM: M. REGER, H. SALAD

CONDITION ASSESSMENT:

MICHAEL REGER, P.E., FIELD TEAM LEADER 703-948-1424

REPORT REVIEW:

MARCUS MILLER, P.E., SENIOR INSPECTION ENGINEER 703-404-6252

REPORT APPROVAL: DATE: 12/31/15

JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244

RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5140-077P

A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.

B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain in service at reduced loads or with frequent inspections.

C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.

D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.

E (Special) - Structure is under construction or reconstruction.

B226 PRIORITY OF IMPROVEMENT

ITEM

NO.

MAINTENANCE RECOMMENDATIONS

(GENERALLY NOT FLHP ELIGIBLE)

QTY. UNIT COST

UNIT

ESTIMATE

COST

PRELIM.

PRELIM. MAINTENANCE TOTAL :

ITEM

NO.

REHABILITATION/RECONSTRUCTION

(TYPICALLY NEEDED WITHIN 5 YEARS) QTY. UNIT UNIT

COST ESTIMATES

PRELIM. COST

REHAB. RECONSTR.

58, 59, 60 REPLACE BRIDGE. 1 LS

PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :

COST ESTIMATE SUMMARY

PRELIM. MAINTENANCE TOTAL:

PRELIM. REHABILITATION TOTAL:

PRELIM. RECONSTRUCTION TOTAL: ...

TOTAL ITEMIZED COSTS:

PRELIMINARY ESTIMATE TOTAL* :

(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)

REMARKS: Bridge is scheduled for replacement in the near future under Project BLRI 2A16.

FIELD INSPECTION REPORT STRUCTURE NO. 5140-077P

CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223

N NOT APPLICABLE 3 SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.

9 EXCELLENT CONDITION Fatigue cracks in steel or shear cracks in concrete may be present.

8 VERY GOOD CONDITION - no problems noted. 2 CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present

7 GOOD CONDITION - some minor problems. or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.

6 SATISFACTORY CONDITION - structural elements show some minor deterioration. 1 “IMMINENT” FAILURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal 5 FAIR CONDITION - all primary structural elements are sound but may have movement affecting structure stability. Structure is closed to traffic but minor section loss, cracking, spalling, or scour. corrective action may return structure to light service.

4 POOR CONDITION - advanced section loss, deterioration, spalling, or scour. 0 FAILED CONDITION - out of service; beyond corrective action.

CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS

G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)

58. DECK 4 ITEM REFERENCE AND REMARKS

P1. DECK SLAB

N2. EXPANSION JOINTS

F3. WEARING SURFACE

G4. RIDEABILITY

N5. CURBS, SIDEWALKS, AND MEDIAN

G6. PARAPETS AND/OR RAILINGS

F7. DRAINS AND DRAINAGE

N8. UTILITIES

G9. DEFLECTION AND/OR VIBRATION

N10. OTHER

59. SUPERSTRUCTURE 4

N

2. GIRDERS OR BEAMS

1. BEARING DEVICES

N

P3. ARCH(ES) OR SLAB(S)

N4. FLOOR BEAMS AND STRINGERS

N5. TRUSSES

N6. DIAPHRAGMS AND BRACING

N7. PAINT

N8. FASCIA(E)

G9. DEFLECTION AND/OR VIBRATION

G10. ALIGNMENT

N11. OTHER

60. SUBSTRUCTURE 6

58.1, 59.3 SEVERE CRACKING, SPALLING, AND DELAMINATION ON EAST SIDE

OF DECK OVERHANG WITH EXPOSED STEEL REINFORCEMENT IN

CENTER AND SOUTH SPANS. SEVERE CRACKING, SPALLING, AND

DELAMINATION ON WEST SIDE OF DECK OVERHANG IN NORTH

SPAN. VEGETATION GROWING IN AREAS OF DETERIORATION

ALONG BOTH DECK SIDES. MODERATE CRACKING WITH

EFFLORESCENCE ON UNDERSIDE OF EAST OVERHANG. MINOR

CRACKING WITH EFFLORESCENCE ON WEST OVERHANG IN NORTH

SPAN. MINOR CRACKING WITH EFFLORESCENCE AND LEAKAGE ON

UNDERSIDE OF SLAB THROUGHOUT. HEAVY EFFLORESCENCE

ALONG CONSTRUCTION JOINT ON DECK UNDERSIDE FOR FULL

LENGTH OF BRIDGE.

58.3 MODERATE TRANSVERSE CRACKING OF WEARING SURFACE OVER

BOTH ABUTMENTS; VEGETATION GROWTH IN CRACK OVER SOUTH

ABUTMENT AT CURBLINES. MINOR LONGITUDINAL CRACKING OF

WEARING SURFACE ALONG WEST CURBLINE WITH VEGETATION

GROWTH IN CRACK. POTHOLE IN SOUTHBOUND LANE NEAR

SOUTH ABUTMENT.

58.6, 222.3 TWO RAIL CONNECTIONS NOT FULLY TIGHTENED IN WEST RAIL

OVER SOUTH SPAN.

58.7, 59.10 PVC DRAINS HAVE BEEN INSTALLED THROUGH DECK

APPROXIMATELY 2' FROM OUTSIDE EDGE BUT WATER CONTINUES

TO FLOW OVER EDGE DUE TO LACK OF CURB. RUNOFF DUE TO

SUPERELEVATION OF ROADWAY CONTRIBUTES TO DETERIORATION

OF DECK OVERHANG ON EAST SIDE. MINOR VEGETATION GROWTH

IN EAST CURBLINE.

60.1 MODERATE DETERIORATION OF MORTAR JOINTS WITH

EFFLORESCENCE AT WEST SIDE OF SOUTH ABUTMENT, MINOR

ELSEWHERE. LEAKAGE STAINS FROM DECK ON BOTH ABUTMENTS.

60.6 MODERATE DETERIORATION OF WINGWALL MASONRY MORTAR

JOINTS WITH EFFLORESCENCE AND MOSS GROWTH IN JOINTS.

MODERATE TO SEVERE DETERIORATION OF STONE MASONRY AT

SOUTHEAST WINGWALL.

ABUTMENTS

BREASTWALLS OR COLUMNS1. F

PILE BENTS 2. N

CAPS AND/OR BEARING SEATS 3. N

BACKWALLS AND/OR BULKHEADS 4. N

FOUNDATIONS 5. N

WINGWALLS 6. F

WEEP HOLES7. P

EXPANSION JOINTS 8. N

EROSION AND/OR SCOUR9. F

SETTLEMENT OR DEFLECTION10. G

SLOPE PROTECTION11. N

OTHER 12. N

PIER(S)

WALLS AND/OR COLUMNS 13. G

PILE BENTS 14. N

CAPS AND/OR BEARING SEATS 15. G

FOUNDATIONS 16. N

EROSION AND/OR SCOUR17. G

SETTLEMENT OR DEFLECTION18. G

OTHER 19. N

FIELD INSPECTION REPORT STRUCTURE NO. 5140-077P

ITEM REFERENCE AND REMARKS

STREAM BED COMPOSITION : 9.

AVERAGE CLEAR OPENING8.

NORMAL VELOCITY 7.

ADEQUACY OF OPENING6.

OTHER 5.

WATERWAY OBSTRUCTIONS 4.

CHANNEL PROTECTION3.

EROSION AND/OR SCOUR2.

ALIGNMENT1.

61. CHANNEL 6

F F N P N

MED

SUFF

7 FT.

GRAVEL, SAND, SILT

222. APPROACHES 6

OTHER 9.

ALIGNMENT8.

SIGNS 7.

SETTLEMENT6.

EROSION5.

SURFACING 4.

APPROACH GUARDRAIL 3.

RELIEF JOINTS2.

1. APPROACH SLABS N

N G F G F N F N

223. RETAINING WALL N

OTHER 6.

SETTLEMENT OR DEFLECTION5.

EROSION AND/OR SCOUR4.

FOUNDATION3.

WEEP HOLES2.

1. WALL

36. TRAFFIC AND SAFETY FEATURES

APPROACH GUARDRAIL ENDS D.

APPROACH GUARDRAILS C.

TRANSITIONS B.

BRIDGE RAILINGSA. 0

TRAFFIC SAFETY RATING CODES

0 - Does not meet standards or a safety feature is required and none is provided.

1 - Meets currently acceptable standards.

N - Not applicable or a safety feature is not required.

60.7 SEVERAL WEEP HOLES ARE BLOCKED AT SOUTH ABUTMENT, WEEP

HOLES AT NORTH ABUTMENT ARE AT OR BELOW NORMAL

WATERLINE; STREAM FLOW HAS CONTRIBUTED TO LOSS OF FILL

MATERIAL (PROBE REACHES UP TO 6' BEHIND WEEP HOLES).

60.9, 61.2 MODERATE SCOUR HOLE AT UPSTREAM SIDE OF SOUTH

ABUTMENT. MINOR CHANNEL EROSION ON UPSTREAM SIDE OF

SOUTH CHANNEL BANK. MODERATE SLOUGHING OF CHANNEL

BANKS AT BOTH SIDES OF NORTH ABUTMENT RESULTING FROM

CHANNEL MIGRATION.

60.13 MINOR CRACKING OF PIER WALLS WITH EFFLORESCENCE. MINOR

SPALL WITH EXPOSED STEEL REINFORCEMENT ON NORTH FACE OF

NORTH PIER AT WEST SIDE.

60.17, 61.2 MINOR TO MODERATE SCOUR AT UPSTREAM SIDE OF BOTH PIERS;

HOWEVER, FOOTINGS ARE NOT EXPOSED AT THIS TIME. MINOR

SCOUR AT NORTHEAST AND NORTHWEST CHANNEL BANKS DUE TO

CHANNEL MIGRATION.

61.1 STREAM MIGRATING TOWARD NORTH. STREAM FLOW IS

CONCENTRATED ENTIRELY THROUGH NORTH SPAN (SEE ALSO 60.9,

61.2 AND 61.4).

61.4 HEAVY SILT AND SEDIMENT ACCUMULATION UNDER SOUTH AND

CENTER SPANS. MINOR DEBRIS ACCUMULATION IN CENTER SPAN

ON UPSTREAM SIDE OF NORTH AND SOUTH PIERS. MINOR DRIFT IN

NORTH SPAN. ONE FALLEN TREE ACROSS UPSTREAM CHANNEL

222.3 5TH POST FROM SOUTH END OF WEST RAIL HAS BEEN MISALIGNED

6" FROM ROADWAY DUE TO COLLISION (DAMAGE HAS BEEN

PATCHED).

222.4,6 MODERATE TRANSVERSE CRACKING AND MINOR SETTLEMENT

(OVER 1") OF PAVEMENT AT BOTH APPROACHES.

222.8 BRIDGE IS IN CURVE WITH LIMITED SIGHT DISTANCE AT BOTH

APPROACHES.

36.A,C,D RAILING HEIGHT OF 1'-7" DOES NOT MEET CURRENT HEIGHT

REQUIREMENT OF 2'-3" FOR TRAFFIC BARRIERS. RAIL ENDS ARE

NOT TERMINATED SAFELY. NORTHEAST GUARDRAIL FACE IS 2'-11"

FROM EDGE OF PAVEMENT.

STRUCTURE LOAD RATING STRUCTURE NO. 5140-077P

TRUCK TYPE

INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)

TONS METRIC TONS TONS METRIC TONS

H 15 14 25 23

HS 25 23 42 38

TYPE 3 21 19 35 31

TYPE 3S2 31 28 52 47

TYPE 3-3 40 36 67 61

DESIGN LOADING: H15 (M13.5)

X CAPACITY MEETS OR EXCEEDS DESIGN LOAD

CAPACITY IS LESS THAN DESIGN LOAD

ORIGINAL LOAD RATING CALCULATION APPLICABLE

ORIGINAL LOAD RATING CALCULATION REVISED

DATE OF LOAD RATING CALCULATION:

LOAD RATING CONTROLLED BY:

REMARKS: RATING IS BASED ON DESIGN LOAD OF STRUCTURE.

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-077P

STRUCTURE IDENTIFICATION

(201) PARK: BLUE RIDGE PARKWAY (1) STATE: ....................................... 374 - NORTH CAROLINA (NC)

(202) STRUCTURE NAME: .......... BIG PINE CREEK BRIDGE #3 (2) STATE HWY. AGENCY DIST:

(203) STRUCTURE KIND: ............1 - BRIDGE (3) COUNTY CODE: ........................ 005 - ALLEGHANY

(204) STRUCTURE NUMBER: ..... 5140-077P (4) CITY/PLACE CODE:

(205) NPS REGION: .................... 4 - SOUTHEAST (5) INVENTORY ROUTE:

(206) ROUTE CODE NUMBER: ... 1 (6) FEATURES INTERSECTED:....... BIG PINE CREEK

(207) ROAD SECTION NO: .......... 077P (7) FACILITY CARRIED: .................. BLUE RIDGE PARKWAY

(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 5140077P0000000

(209) WITHIN NPS BNDRY?: ....... YES (9) LOCATION: ................................ 1.3 MILES FROM NC ROUTE

(210) OPERATING UNIT: ............. BLUFFS (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)

(211) PROJECT NO(S): ................ 2A2 (11) MILE POINT: ............................. 223.78 (KM PT 360.11)

(212) DRAWING NUMBERS: ....... NONE (27) YEAR BUILT:

(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED: .... N/A

(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................ 3 - FREE ROAD

(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE

STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE

(43A) MAIN STR. MATERIAL: ..

(43B) MAIN STR. TYPE:

(45) NO. OF MAIN SPANS:

(48) MAX. SPAN LENGTH:

(49) STRUCTURE LENGTH:

(216A) ABUTMENT #1 FDN:

(216B) ABUTMENT #2 FDN:

(217A) PREDOM. PIER FDN.: ..

(217B) SECOND. PIER FDN: ...

(107) DECK TYPE:

2 - CONCRETE CONTINUOUS

01 - SLAB

26.5 FT (8.1 M)

69.8 FT (21.3 M)

0 - UNKNOWN

0 - UNKNOWN

0 - UNKNOWN

0 - UNKNOWN

1 - CONCRETE CAST-IN-PLACE

(44A) APPR. STR. MATERIAL: ........ 0 - OTHER

(44B) APPR. STR. TYPE: ................ 00 - OTHER

(46) NO. OF APPROACH SPANS: .. 0

(108) WEAR SURFACE/PROTECT SYSTEM:

A) TYPE WEARING SURFACE: .. 6 - BITUMINOUS

B) TYPE MEMBRANE: ................. 0 - NONE

C) TYPE PROTECTION: .............. 0 - NONE

(218) IS SALT USED?: ..................... YES

LOAD RATING AND POSTING

(31) DESIGN LOAD: ................. 2 - H15 (M13.5) (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION

(66) INVENTORY RATING: ...... 25.2 TONS (22.9 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED

(64) OPERATING RATING: ...... 42.1 TONS (38.2 METRIC TONS)

INSPECTION DATES

(90) INSPECTION DATE: 6/15 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):

(219) ADD. STUDIES NEEDED: Y - 1 - DECK SURVEY (A) FRACTURE CRITICAL: ... NO

INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE

(B) UNDERWATER: .............. NO

(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :

(C) SPECIAL INSPECTION: .. NO

INSP. EVERY: MONTHS - LAST INSP. :

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-077P

GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA

(16) LATITUDE: ............................. 36°29'49.02" (51) CURB TO CURB WIDTH: ........... 33.3 FT (10.1 M)

(17) LONGITUDE: ......................... 80°57'52.32" (52) DECK WIDTH: ............................ 36.7 FT (11.2 M)

(19) DETOUR LENGTH: ............... 25 MI (40 KM) (32) APPR. ROADWAY WIDTH: ........ 29.0 FT (8.8 M)

(28A) LANES ON STRUCT: .......... 02 (213) APPR. PAVEMENT WIDTH: ..... 21.0 FT (6.4 M)

(28B) LANES UNDER STRUCT: ... 00 LEFT SHOULDER: .................. 4.0 FT (1.2 M)

(42A) SERVICE ON: ..................... 1 - HIGHWAY RIGHT SHOULDER: ................ 4.0 FT (1.2 M)

(42B) SERVICE UNDER: .............. 5 - WATERWAY (33) BRIDGE MEDIAN: ....................... 0 - NO MEDIAN

(29) AVG. DAILY TRAFFIC: .......... 1347 (34) SKEW ANGLE: ............................ 22 °

(30) YEAR OF ADT: ...................... 2013 (35) DECK FLARE?: ........................... NO

(114) FUTURE ADT: ..................... 1482 (47) TOTAL HORIZ. CLEARANCE: .... 33.3 FT (10.1 M)

(115) YEAR OF FUTURE ADT: ..... 2033 (50) SIDEWALKS:

(101) PARALLEL STRUCTURE: ... N - NONE LEFT : ...................................... 0.0 FT (0.0 M)

(38) NAVIGATION CONTROL?: ... 0 RIGHT : ................................... 0.0 FT (0.0 M)

(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M) (214) BRIDGE RAIL TYPE:

(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M) RAIL CONFIGURATION: ......... 1 - FULL HEIGHT (NO PARAPE

(111) ABUT. OR PIER PROT: ....... MATERIAL: .............................. 7 - TIMBER

DESIGN TYPE: ........................ 3 - SIMPLE RAIL (joints at eachLATERAL UNDERCLEARANCE:

(55) RIGHT: ....................... 0.0 FT (0.0 M) (215) BRIDGE RAIL HEIGHT: ............ 1.58 FT (0.48 M)

(56) LEFT: ......................... 0.0 FT (0.0 M) (53) MIN. VRT. CLEAR. OVER DECK: 99.99 FT (99.99 M)

(54) MIN. VRT. UNDERCLEARANCE: 0.00 FT (0.00 M)

CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST

(58) DECK:

(59) SUPERSTRUCTURE:

(60) SUBSTRUCTURE:

(61) CHANNEL:

(62) CULVERT: ........................... N

(222) APPROACHES:

(223) RETAINING WALL: ........... N

(36) TRAFFIC SAFETY FEAT: ... 0000

(75A) TYPE OF WORK: .............. 38 - OTHER STRUCT. WORK

(75B) WORK DONE BY: ............. 1 - CONTRACT

(76) IMPROVEMENT LENGTH: ..

(67) STRUCTURAL EVALUATION:

(68) DECK GEOMETRY:

(69) UNDERCLEARANCES:

(71) WATERWAY ADEQUACY:

(72) APPROACH ALIGNMENT:

(113) SCOUR CRITICAL:

(225) PURPOSE OF IMPROVEMENT:

(226) PRIORITY OF IMPROVEMENT:

(227) MAINTENANCE COST:

(228) REHAB./RECONSTR. COST: ...

(229) CONSTRUCTION COST:

N

5 - Stable; scour within limits of

2 - REHAB/RECONSTRUCTION

B - MAJOR

$0

$0

ADDITIONAL INFORMATION

(230) STRUCTURE HISTORY:

1982-WEARING SURFACE PLACED.

(231) ADDITIONAL CONSIDERATIONS:

(330) ADDITIONAL CONFIG. INFO.:

APPENDIX STRUCTURE NO. 5140-077P

PHOTOGRAPHS STRUCTURE NO. 5140-077P

PHOTO #1 - LOOKING NORTHBOUND TOWARD CUMBERLAND KNOB

FLOW

PHOTO #2 - EAST (UPSTREAM) SIDE

PHOTO #3 - GENERAL TOPSIDE VIEW LOOKING SOUTH

PHOTO #4 - TYPICAL SETTLEMENT AT APPROACHES, NORTH

APPROACH SHOWN

PHOTO #5 - TYPICAL LONGITUDINAL CRACKING OF WEARING

SURFACE OVER BRIDGE NEAR SOUTH END

PHOTO #6 - TYPICAL TRANSVERSE CRACKING OF PAVEMENT AT

APPROACH, SOUTH APPROACH SHOWN; NOTE POTHOLE IN

SOUTHBOUND LANE

PHOTO #7 - CRACKING WITH VEGETATION

GROWTH AND DEBRIS ACCUMULATION ALONG

WEST CURBLINE

PHOTO #8 - DELAMINATION AND SCALING OF

EAST EDGE OF DECK WITH EXPOSED REBAR

PHOTO #9 - TYPICAL SPALLING AND

DELAMINATION ALONG DECK EDGES, WEST

DECK EDGE OVER NORTH SPAN SHOWN

PHOTO #10 - VEGETATION GROWTH AND

DEBRIS ACCUMULATION ALONG EAST

CURBLINE

PHOTO #11 - DISPLACED STONE AT END OF NORTHWEST WINGWALL

PHOTO #12 - TYPICAL APPROACH GUARDRAIL END, NORTHEAST RAIL

END SHOWN

PHOTO #13 - CLEARANCE FROM FACE OF

GUARDRAIL TO EDGE OF ROADWAY LESS

THAN 3 FT, NORTHEAST BRIDGE END SHOWN

PHOTO #14 - DAMAGED STEEL BACKED

TIMBER RAIL ALONG WITH TWO DISPLACED

SECTIONS OF TIMBER RAIL, NORTHWEST

APPROACH RAIL

PHOTO #15 - TYPICAL LOOSE RAIL CONNECTIONS, WEST RAIL OVER

SOUTH ABUTMENT SHOWN

PHOTO #16 - ROTATED TIMBER APPROACH RAIL, NORTHEAST

APPROACH

PHOTO #17 - GENERAL UNDERSIDE VIEW LOOKING EAST, CENTER

SPAN

PHOTO #18 - TYPICAL CRACKING WITH EFFLORESCENCE ON DECK

UNDERSIDE, EAST SIDE OF NORTH SPAN SHOWN

PHOTO #19 - CRACKING WITH WATER LEAKAGE ON DECK UNDERSIDE,

SOUTH SPAN

PHOTO #20 - CRACKING WITH EFFLORESCENCE, SPALLING, AND

DELAMINATION OF EAST EDGE OF DECK IN NORTH SPAN

PHOTO #21 - TYPICAL SPALLING AND DELAMINATION ALONG DECK

EDGE AT SOUTH AND CENTER SPAN, EAST DECK EDGE SHOWN; NOTE

EXPOSED REBAR

PHOTO #22 - EXPOSED STIRRUPS AND MAIN REINFORCEMENT ALONG

EAST EDGE OF DECK, SOUTH SPAN

PHOTO #23 - SPALL WITH EXPOSED REBAR AT EAST EDGE OF DECK,

CENTER SPAN

PHOTO #24 - GENERAL VIEW OF NORTH ABUTMENT

PHOTO #25 - TYPICAL SLOUGHING OF CHANNEL BANKS AT BOTH ENDS

OF NORTH ABUTMENT, UPSTREAM CHANNEL BANK SHOWN

PHOTO #26 - GENERAL VIEW OF NORTH FACE OF NORTH PIER; NOTE

DEBRIS ACCUMULATION

PHOTO #27 - SPALLING WITH EXPOSED STEEL REINFORCEMENT ON

WEST END OF NORTH PIER ON UPPER PORTION OF NORTH FACE;

NOTE ALSO EFFLORESCENCE ON DECK OVERHANG

PHOTO #28 - TYPICAL FULL HEIGHT VERTICAL CRACKING WITH

EFFLORESCENCE ON PIERS, NORTH PIER SHOWN

PHOTO #29 - TYPICAL EFFLORESCENCE ALONG CONSTRUCTION

JOINTS ON UNDERSIDE OF DECK, CENTER SPAN SHOWN

PHOTO #30 - DEBRIS AND SEDIMENT ACCUMULATION AT CENTER SPAN

PHOTO #31 - GENERAL VIEW OF SOUTH ABUTMENT

PHOTO #32 - TYPICAL DETERIORATION OF ABUTMENT BREASTWALL

MASONRY MORTAR JOINTS, WEST SIDE OF SOUTH ABUTMENT SHOWN

PHOTO #33 - WATER LEAKAGE THROUGH CENTER OF ABUTMENT,

SOUTH ABUTMENT SHOWN

PHOTO #34 - SCOUR ALONG UPSTREAM SIDE OF SOUTH ABUTMENT

PHOTO #35 - DEBRIS ACCUMULATION AT UPSTREAM END OF NORTH

PIER AND CENTER SPAN

PHOTO #36 - TYPICAL DETERIORATION OF MASONRY MORTAR JOINTS,

SOUTHEAST WINGWALL SHOWN

PHOTO #37 - UPSTREAM CHANNEL; NOTE FALLEN TREE FALLEN IN

CHANNEL

PHOTO #38 - DOWNSTREAM CHANNEL