About this file
Results of Bid Opening
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amend_0001-FW-JORI_10(1),_900(1).pdf | ||
| Report_Pavement_Core_Summary.pdf | ||
| Report_NEPA.pdf | ||
| VETS-4212.pdf | ||
| ADV_Bidder's_Qualifications_Form.doc | DOC document | |
| Permit_4_Natural_River.pdf | ||
| Permit_3_Soil_Erosion.pdf | ||
| Plan_Sheets.pdf | ||
| Permit_1_MDOT.pdf | ||
| FP14_Eng.pdf | ||
| Permit_2_Antrim_County.pdf | ||
| IFB_Solicitation_-_FW-JORI_10(1),_900(1).pdf | ||
| Synopsis_FW-JORI_10(1),_900(1).pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Federal Highway Administration
Eastern Federal Lands Highway Division
Bid Opening for
JORDAN RIVER NATIONAL
FISH HATCHERY
PROJECT: FW-JORI 10(1), 900(1)
SOLICITATION NO. DTFH71-17-B-00019
March 29, 2017 at 2:00 p.m.
Sterling, VA
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BID OPENING for SOLICITATION NO. DTFH71-17-B-00019, Project: FW-JORI 10(1), 900(1) March 29, 2017, 2:00 p.m. local time
The total calendar days bid to complete all contract work must be completed within 130 Calendar days.
BIDDER BID TOTAL CALENDAR DAYS TOTAL PRICE
Pavkov Contracting Co. SCHEDULE A $870,879.00
OPTION 1
$43,620.00
OPTION 2
$97,630.00
SCHEDULE A + OPTION 1 + OPTION 2
$1,012,129.00
Pranam GlobalTech, Inc. SCHEDULE A $872,716.63
OPTION 1
$47,236.67
OPTION 2
$105,546.70
$1,025,500.00
Engineer’s Estimate SCHEDULE A $1,375,000.00
OPTION 1
$60,000.00
OPTION 2
$160,000.00
SCHEDULE A – 110
OPTION 1 – 15
OPTION 2 - 20
$1,595,000.00