ROBO_-_NP-EVER_10(4).pdf
PDF 24 KB Posted
- Attached to
- Everglades National Park Federal contract opportunity
- Solicitation number
- DTFH71-17-B-00005
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ADV_Bidder's_Qualifications_Form.doc | DOC document | |
| VETS-4212.pdf | ||
| IFB_Solicitation_-_NP-EVER_10(4).pdf | ||
| Report_1_NEPA.pdf | ||
| Report_4_Bridge_Inspection_5280-003P.pdf | ||
| Plans_-_NP-EVER_10(4).pdf | ||
| Report_5_Bridge_Inspection_5280-004P.pdf | ||
| Report_3_Bridge_Inspection_5280-002P.pdf | ||
| FP14_Eng.pdf | ||
| Report_2_Pavement.pdf | ||
| Synopsis_-_NP-EVER_10(4).doc | DOC document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Federal Highway Administration Eastern Federal Lands Highway Division
Bid Opening for
Everglades National Park
PROJECT: NP-EVER 10(4)
SOLICITATION NO. DTFH71-17-B-00005
November 17, 2016 at 2:00 p.m.
Sterling, VA
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BID OPENING for SOLICITATION NO. DTFH71-17-B-00005 Project: NP-EVER 10(4) November 17, 2016, 2:00 p.m. local time
BIDDER’S BID TOTALS DAYS TOTAL PRICE
Central Southern Construction Corporation
SCHEDULE A
$3,090,390.00
OPTION 1
$1,425,690.00
OPTION 2
$526,800.00
SCHEDULE A SCHEDULE A + OPTION 1 + OPTION 2
$5,042,880.00
GC Works Inc. SCHEDULE A $1,419,048.60
OPTION 1
$1,071,302.00
OPTION 2
$354,656.60
SCHEDULE A SCHEDULE A + OPTION 1 + OPTION 2
$2,845,007.20
JVA Engineering Contractor Inc.
SCHEDULE A
$2,024,710.00
OPTION 1
$1,260,781.00
OPTION 2
$402,239.00
SCHEDULE A SCHEDULE A + OPTION 1 + OPTION 2
$3,687,730.00
PAC COMM INC. SCHEDULE A
$2,617,206.75
OPTION 1
$1,748,690.00
OPTION 2
$535,556.00
SCHEDULE A SCHEDULE A + OPTION 1 + OPTION 2
$4,901,452.75
ALL WORK MUST BE COMPLETED BY DECEMBER 22, 2017
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BID OPENING for SOLICITATION NO. DTFH71-17-B-00005 Project: NP-EVER 10(4) November 17, 2016, 2:00 p.m. local time
BIDDER’S BID TOTALS DAYS TOTAL PRICE
Engineer’s Estimate SCHEDULE A $1,500,000.00
OPTION 1
$1,000,000.00
OPTION 2
$330,000.00
SCHEDULE A - 230
OPTION 1 - 120
OPTION 2 - 90
SCHEDULE A + OPTION 1 + OPTION 2
$2,830,000.00
ALL WORK MUST BE COMPLETED BY DECEMBER 22, 2017