Bridge_Inspection_Report_Redacted.pdf
PDF 3 MB Posted
- Attached to
- Turpentine Run Bridge VI A30(001) Federal contract opportunity
- Solicitation number
- DTFH71-15-R-00006
About this file
Bridge Inspection Report_Redacted
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Shortlist_-_VI_A30(001)_Turpentine_Run_Bridge_DB.docx | DOCX document | |
| 1994_FHWA_Clearance.pdf | ||
| Draft_Utility_Agreements_Innovative-Turpentine_Bridge_Approaches.pdf | ||
| Draft_Utility_Agreement_WAPA-Turpentine_Bridge_Approaches.pdf | ||
| Draft_RFP_-_VI_A30(001)_Turpentine_Run.pdf | ||
| Relocated_Bolongo_Bay_3-Half.PDF | ||
| Relocated_Bolongo_Bay_1-Half.PDF | ||
| TR_Bridge_Full_Set.pdf | ||
| Turpentine_Run_Env_Study_March1994.pdf | ||
| VI_A30(001)_CE_Signed.pdf | ||
| Turpentine_Run_Bridge_Approaches_Design-Scoping-Report_Redacted.pdf | ||
| Relocated_Bolongo_Bay_2-Half.PDF | ||
| Questions_-_Licensing.docx | DOCX document | |
| Gas_Station_Plans_-_Complete_Set_-_Reduced.pdf | ||
| VI_A30(001)_-_Turpentine_Run_RFQ.docx | DOCX document |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BRIDGE INSPECTION REPORT
STT003
ROUTE 30 OVER TURPENTINE RUN
USVI (ST THOMAS) - DEPARTMENT OF PUBLIC WORKS
LN
STRUCTURE NO. 2901-003P
INSPECTION TYPE: ROUTINE
INSPECTION DATE: 6/25/13
Report prepared by: WU
Federal Highway Administration Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 http://www.efl.fhwa.dot.gov/FLHBO/BIP http://www.efl.fhwa.dot.gov/FLHBO/BIP
STRUCTURE SUMMARY STRUCTURE NO. 2901-003P
STT003 INSPECTION DATE: 6/25/13
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL:
MAIN SPAN TYPE:
# OF BEAMS, MAIN SPAN: ..
DECK TYPE:
WEARING SURFACE:
ABUT. FOUNDATIONS:
PIER FOUNDATION(S):
ABUTMENT / PIER MAT'L: ...
PROJ./PLAN REF. NO:
NPS ROAD CLASS:
STRUCTURE HISTORY:
PRESTRESSED CONCRETE
BOX BEAMS - MULTIPLE
NOT APPLICABLE
NONE
SPREAD FOOTING ON PILES
SPREAD FOOTING ON PILES
CONCRETE
NH-30(12) /
NO. OF MAIN SPANS:
NO. OF APPR. SPANS:
STRUCT. TOTAL LENGTH: ..
MAX. SPAN LENGTH:
DECK WIDTH:
CURB TO CURB WIDTH:
YEAR BUILT:
YEAR RECONSTRUCTED: ..
SKEW ANGLE:
FRACTURE CRITICAL:
154.0 FT (46.9 M)
60.0 FT (18.3 M)
44.5 FT (13.6 M)
32.5 FT (9.9 M)
1994 (EST.)
N/A
8 °
NO
LOCATION
USVI (ST THOMAS) - DEPARTMENT OF PUBLIC WORKS MILE POINT:
STATE: ................................. VIRGIN ISLANDS LOCATION:
FACILITY CARRIED: ............ ROUTE 30
FEATURE INTERSECTED: .. TURPENTINE RUN
STRUCTURE EVALUATION SUMMARY
This concrete box beam bridge is currently not in service, as no approach roadway has yet been constructed. The bridge is in fair to good condition overall. Problems at this time include lack of sealant material and debris accumulation in the expansion joints over the piers; water leakage through all expansion joints and through the longitudinal joints between the box beams; diagonal cracking with efflorescence from bearing seats at the end of the piers; and minor horizontal cracking at the web of the exterior beams. In addition, trees are growing adjacent to the northeast wingwall, and at the south end of the west sidewalk.
The deck joints should be cleaned and water-tight sealed, a waterproof membrane should be installed over the top surface of the box beams to avoid water intrusion, and an appropriate wearing surface should be installed, and the trees growing adjacent to the structure should be removed. The cracking of the structure will continue to be monitored during future inspection cycles.
INSPECTION TEAM: C. CASTRO, C. NEGLEY
CONDITION ASSESSMENT:
CARLOS CASTRO, P.E., FIELD TEAM LEADER 571-434-1546
REPORT REVIEW :
MARCUS MILLER, P.E., SENIOR INSPECTION ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 10/31/13
JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 2901-003P
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain in service at reduced loads or with frequent inspections.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
D226 PRIORITY OF IMPROVEMENT
ITEM
NO.
MAINTENANCE RECOMMENDATIONS
(GENERALLY NOT FLHP ELIGIBLE)
QTY. UNIT COST
UNIT
ESTIMATE
COST
PRELIM.
58.1 INSTALL WATERPROOF MEMBRANE AND WEARING SURFACE ON DECK TO
PREVENT WATER INTRUSION.
1 LS
58.2 REPLACE DECK JOINT SEAL MATERIAL. CLEAN AND SEAL DECK JOINTS OVER
PIERS.
1 LS
58.5, 60.6 REMOVE TREES GROWING ADJACENT TO NORTHEAST WINGWALL AND TO
SOUTH END OF WEST SIDEWALK. REMOVE VEGETATION GROWTH
ENCROACHING STRUCTURE.
1 LS
PRELIM. MAINTENANCE TOTAL :
ITEM
NO.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS)
QTY. UNIT
UNIT
COST ESTIMATES
PRELIM. COST
REHAB. RECONSTR.
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :
COST ESTIMATE SUMMARY
PRELIM. MAINTENANCE TOTAL:
PRELIM. REHABILITATION TOTAL:
PRELIM. RECONSTRUCTION TOTAL: ..
TOTAL ITEMIZED COSTS:
PRELIMINARY ESTIMATE TOTAL* :
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.
FIELD INSPECTION REPORT STRUCTURE NO. 2901-003P
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
Fatigue cracks in steel or shear cracks in concrete may be present.
CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
“IMMINENT” FAILURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.
FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
NOT APPLICABLE
EXCELLENT CONDITION
VERY GOOD CONDITION - no problems noted.
GOOD CONDITION - some minor problems.
SATISFACTORY CONDITION - structural elements show some minor deterioration.
FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
POOR CONDITION - advanced section loss, deterioration, spalling, or scour.
N
58. DECK
ITEM REFERENCE AND REMARKS
OTHER
ALIGNMENT
DEFLECTION AND/OR VIBRATION
FASCIA(E)
DIAPHRAGMS AND BRACING
TRUSSES
FLOOR BEAMS AND STRINGERS
ARCH(ES) OR SLAB(S)
GIRDERS OR BEAMS
BEARING DEVICES
59. SUPERSTRUCTURE
OTHER
DEFLECTION AND/OR VIBRATION
UTILITIES
DRAINS AND DRAINAGE
PARAPETS AND/OR RAILINGS
CURBS, SIDEWALKS, AND MEDIAN
RIDEABILITY
WEARING SURFACE
EXPANSION JOINTS
DECK SLAB
ABUTMENTS
60. SUBSTRUCTURE
1.
10.
2.
3.
4.
5.
6.
7.
8.
9.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
PAINT
11.
N
G F N N N N N G N
N G
F N G F N N
N
P
N
N
58.1,3, 222 NO DECK SLAB, NOR PAVEMENT OVER ADJACENT BEAMS.
58.2 POURABLE DECK JOINT SEALANT ALONG ABUTMENTS BACKWALLS
ARE NOT WATER-TIGHT AND ARE BEGINNING TO DETERIORATE.
DEBRIS ACCUMULATION AND VEGETATION GROWTH IN DECK
JOINTS OVER PIERS. NO JOINT SEALANT MATERIAL IN DECK
JOINTS OVER PIERS.
58.5, 60.6 TREES GROWING AT SOUTH END OF WEST SIDEWALK AND
ADJACENT TO NORTHEAST WINGWALL.
58.6 MINOR VERTICAL CRACKING AT PARAPETS.
59.2 MINOR HORIZONTAL CRACKING AT EXTERIOR WEB OF FASCIA
BEAMS.
EVIDENCE OF MINOR TO MODERATE JOINT LEAKAGE BETWEEN
BOX BEAMS.
60.4 SPALLING ALONG EXTERIOR EDGE OF ABUTMENT BACKWALLS.
60.13 DIAGONAL CRACKING EXTENDING FROM BEARING SEAT AT END OF
PIERS. EFFLORESCENCE AND RUSTING STAINS SHOWN FROM
SOME CRACKS.
BREASTWALLS OR COLUMNS1. G
PILE BENTS2. G
CAPS AND/OR BEARING SEATS3. G
BACKWALLS AND/OR BULKHEADS4. F
FOUNDATIONS5. G
WINGWALLS6. G
WEEP HOLES7. N
EXPANSION JOINTS8. N
EROSION AND/OR SCOUR9. N
SETTLEMENT OR DEFLECTION10. N
SLOPE PROTECTION11. G
OTHER 12. N
PIER(S)
WALLS AND/OR COLUMNS 13. G
PILE BENTS14. N
CAPS AND/OR BEARING SEATS15. F
FOUNDATIONS16. G
EROSION AND/OR SCOUR17. N
SETTLEMENT OR DEFLECTION18. N
OTHER 19. N
222 NO APPROACH ROADWAY PRESENT.
MODERATE VEGETATION GROWTH AT BOTH DECK ENDS.
9. STREAM BED COMPOSITION :
SAND
222. APPROACHES N
OTHER 9.
ALIGNMENT 8.
SIGNS7.
SETTLEMENT 6.
EROSION5.
SURFACING4.
APPROACH GUARDRAIL 3.
2. RELIEF JOINTS
APPROACH SLABS1.
223. RETAINING WALL N
OTHER 6.
SETTLEMENT OR DEFLECTION5.
EROSION AND/OR SCOUR4.
FOUNDATION3.
WEEP HOLES2.
1. WALL
36. TRAFFIC AND SAFETY FEATURES
APPROACH GUARDRAIL ENDSD.
APPROACH GUARDRAILSC.
TRANSITIONSB.
BRIDGE RAILINGSA. 1
N N N
TRAFFIC SAFETY RATING CODES
N
Does not meet standards or a safety feature is required and none is provided.
Meets currently acceptable standards.
Not applicable or a safety feature is not required.
INSPECTION DATE: 6/25/13
STRUCTURE NO. 2901-003P FIELD INSPECTION REPORT
STT003
ITEM REFERENCE AND REMARKS
AVERAGE CLEAR OPENING 8.
7. NORMAL VELOCITY
ADEQUACY OF OPENING 6.
5. OTHER
4. WATERWAY OBSTRUCTIONS
CHANNEL PROTECTION3.
EROSION AND/OR SCOUR2.
ALIGNMENT1.
61. CHANNEL 8
G N G G N
LOW
SUFF
15 FT.
STRUCTURE LOAD RATING STRUCTURE NO. 2901-003P
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 29 26 48 44
HS 36 33 60 55
TYPE 3 34 31 57 51
TYPE 3S2 47 43 79 71
TYPE 3-3 57 52 96 87
DESIGN LOADING: HS20 (MS18)
X CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION:
LOAD RATING CONTROLLED BY:
REMARKS: RATING IS BASED ON DESIGN LOAD OF STRUCTURE.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 2901-003P
STRUCTURE IDENTIFICATION
(201) PARK: USVI (ST THOMAS) - DEPARTMENT OF PUBLIC WORKS
(202) STRUCTURE NAME: .......... STT003
(203) STRUCTURE KIND: ............ 1 - BRIDGE
(204) STRUCTURE NUMBER: ..... 2901-003P
(205) NPS REGION:
(206) ROUTE CODE NUMBER: ... 30
(207) ROAD SECTION NO: .......... 003P
(208) NPS ROAD CLASS:
(209) WITHIN NPS BNDRY?: ....... YES
(210) OPERATING UNIT:
(211) PROJECT NO(S): ................ NH-30(12)
(212) DRAWING NUMBERS:
(21) MAINTAINED BY: ................. 01 - STATE HIGHWAY AGENCY
(22) OWNER: ............................... 01 - STATE HIGHWAY AGENCY
(1) STATE:
(2) STATE HWY. AGENCY DIST:
(3) COUNTY CODE:
(4) CITY/PLACE CODE:
(5) INVENTORY ROUTE:
(6) FEATURES INTERSECTED:
(7) FACILITY CARRIED:
(8) STATE STRUCTURE NO:
(9) LOCATION:
(10) INV. RTE. - MIN. VERT. CLR: ..
(11) MILE POINT:
(27) YEAR BUILT:
(106) YEAR RECONSTRUCTED:
(20) TOLL:
(37) HISTORICAL DESIGNATION: ..
781 - VIRGIN ISLANDS (VI)
110 - ST THOMAS
TURPENTINE RUN
ROUTE 30
STT003
99.99 FT (99.99 M)
N/A
3 - FREE ROAD
5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
5 - PRESTRESSED CONCRETE
05 - BOX BEAMS - MULTIPLE
60.0 FT (18.3 M)
154.0 FT (46.9 M)
3 - SPREAD FOOTING ON PILES
3 - SPREAD FOOTING ON PILES
3 - SPREAD FOOTING ON PILES
3 - SPREAD FOOTING ON PILES
N - NOT APPLICABLE
(44A) APPR. STR. MATERIAL:
(44B) APPR. STR. TYPE:
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. 0 - NONE
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION: .............. 0 - NONE
(218) IS SALT USED?: ..................... NO
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 5 - HS20 (MS18) (41) LOAD RESTRICTION: ......... K - BRIDGE CLOSED
(66) INVENTORY RATING: ...... 36.0 TONS (32.7 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED
(64) OPERATING RATING: ...... 60.1 TONS (54.5 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 6/13 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE:
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 2901-003P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE: ............................. 18°19'14.88" (51) CURB TO CURB WIDTH: ........... 32.5 FT (9.9 M)
(17) LONGITUDE: ......................... 64°52'40.82" (52) DECK WIDTH: ............................ 44.5 FT (13.6 M)
(19) DETOUR LENGTH: ............... 8 MI (13 KM) (32) APPR. ROADWAY WIDTH:
(28A) LANES ON STRUCT: .......... 02 (213) APPR. PAVEMENT WIDTH:
(28B) LANES UNDER STRUCT: ... 00 LEFT SHOULDER:
(42A) SERVICE ON: ..................... 1 - HIGHWAY RIGHT SHOULDER:
(42B) SERVICE UNDER: .............. 5 - WATERWAY (33) BRIDGE MEDIAN: ....................... 0 - NO MEDIAN
(29) AVG. DAILY TRAFFIC: .......... (34) SKEW ANGLE: ............................ 8 °
(30) YEAR OF ADT: ...................... (35) DECK FLARE?: ........................... NO
(114) FUTURE ADT: ..................... (47) TOTAL HORIZ. CLEARANCE: .... 42.5 FT (13.0 M)
(115) YEAR OF FUTURE ADT: ..... (50) SIDEWALKS:
(101) PARALLEL STRUCTURE: ... N - NONE LEFT : ...................................... 5.0 FT (1.5 M)
(38) NAVIGATION CONTROL?: ... RIGHT : ................................... 5.0 FT (1.5 M)
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M) (214) BRIDGE RAIL TYPE:
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M) RAIL CONFIGURATION: ......... 2 - MOUNTED ON PARAPET
(111) ABUT. OR PIER PROT: ....... 1 - NAV PROTECTION NOT REQUIRED MATERIAL: .............................. 1 - CONCRETE
DESIGN TYPE: ........................ 1 - CONTINUOUS RAIL
LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 0.0 FT (0.0 M) (215) BRIDGE RAIL HEIGHT: ............ 3.50 FT (1.07 M)
(56) LEFT: ......................... 0.0 FT (0.0 M) (53) MIN. VRT. CLEAR. OVER DECK: 99.99 FT (99.99 M)
(54) MIN. VRT. UNDERCLEARANCE: 0.00 FT (0.00 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK: ................................. N
(59) SUPERSTRUCTURE:
(60) SUBSTRUCTURE:
(61) CHANNEL:
(62) CULVERT: ........................... N
(222) APPROACHES: ................. N
(223) RETAINING WALL: ........... N
(36) TRAFFIC SAFETY FEAT: ... 1NNN
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
6 - Not yet evaluated for scour po
1 - MAINTENANCE
D - MINOR
$52,000
$0
$0
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
APPENDIX STRUCTURE NO. 2901-003P
PHOTOGRAPHS STRUCTURE NO. 2901-003P
PHOTO #1 - LOOKING SOUTH
FLOW
PHOTO #2 - EAST (DOWNSTREAM) SIDE
PHOTO #3 - GENERAL TOPSIDE VIEW LOOKING NORTH; NOTE GRAVEL
ACCUMULATION AND VEGETATION GROWTH
PHOTO #4 - GENERAL VIEW OF BRIDGE RAILING, EAST SIDE SHOWN
PHOTO #5 - TYPICAL CRACKING WITH
EFFLORESCENCE OF SIDEWALKS, WEST
SIDEWALK OVER NORTH PIER SHOWN
PHOTO #6 - GENERAL VIEW OF EXPANSION
JOINT OVER NORTH PIER; NOTE LACK OF
SEALANT AND DEBRIS AND VEGETATION
GROWTH IN JOINT
PHOTO #7 - GENERAL VIEW OF EXPANSION
JOINT OVER SOUTH PIER; NOTE LACK OF
SEALANT AND DEBRIS AND VEGETATION
GROWTH IN JOINT
PHOTO #8 - TYPICAL VERTICAL CRACKING
WITH EFFLORESCENCE OF PARAPET WALL,
WEST PARAPET NEAR MID-SPAN SHOWN
PHOTO #9 - TREE GROWING ADJACENT TO SOUTH END OF WEST
SIDEWALK
PHOTO #10 - TREE GROWING ADJACENT TO NORTHEAST WINGWALL
PHOTO #11 - GENERAL VIEW OF NORTH
APPROACH; NOTE DROP-OFF FROM BRIDGE
AND NO APPROACH ROADWAY
PHOTO #12 - GENERAL VIEW OF SOUTH
APPROACH; NOTE DROP-OFF FROM BRIDGE
AND NO APPROACH ROADWAY
PHOTO #13 - GENERAL UNDERSIDE VIEW OF CENTER SPAN LOOKING
SOUTH
PHOTO #14 - TYPICAL HORIZONTAL CRACKING IN SIDES OF BOX
BEAMS, WEST BEAM IN NORTH SPAN SHOWN
PHOTO #15 - GENERAL VIEW OF NORTH ABUTMENT; NOTE WATER
LEAKAGE BETWEEN BOX BEAMS AND AT ABUTMENT BREASTWALL;
NOTE ALSO RIPRAP FOR SLOPE PROTECTION
PHOTO #16 - WATER LEAKING ONTO NORTH PIER FROM DECK JOINT,
NORTH FACE SHOWN
PHOTO #17 - TYPICAL DIAGONAL CRACKING WITH EFFLORESCENCE
AND RUST STAINING IN PIER FROM BEARING SEAT AREA, EAST SIDE
OF NORTH PIER SHOWN
PHOTO #18 - GENERAL VIEW OF NORTH FACE OF SOUTH PIER; NOTE
WATER LEAKAGE FROM DECK JOINT ONTO PIER
PHOTO #19 - WATER LEAKAGE ONTO SOUTH PIER, SOUTH FACE
SHOWN; NOTE PONDING WATER ADJACENT TO PIER
PHOTO #20 - VERTICAL CRACKS WITH EFFLORESCENCE IN SOUTH
FACE OF SOUTH PIER
PHOTO #21 - GENERAL VIEW OF SOUTH ABUTMENT; NOTE WATER
LEAKAGE AT ABUTMENT BREASTWALL
PHOTO #22 - WATER LEAKING BETWEEN BEAMS #9 AND #10 NEAR
SOUTH ABUTMENT; NOTE WATER STAINING AND MOLD GROWTH
PHOTO #23 - LOOKING UPSTREAM FROM BRIDGE
PHOTO #24 - LOOKING DOWNSTREAM FROM BRIDGE