Amendment_0003_-_NY_ERFO_GATE_JABA_2013-1(2).pdf

PDF 2 MB Posted

Attached to
Gateway National Recreation Area 2013-1(2)
Solicitation number
DTFH71-15-R-00001
Issued by

About this file

Amendment 0003 - Revised proposal due date is May 13 2015 at 2 00 pm. Only the contractor listed on this notice is allowed to submit a proposal.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

DTFH7115R00001

x x

0 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Sterling VA 20166-6511

EFLHD-CO

21400 Ridgetop Circle Construction Office Eastern Federal Lands Highway Div.

Federal Highway Administration

Sterling VA 20166-6511

EFLHD-AC

21400 Ridgetop Circle Acquisitions Office Eastern Federal Lands Highway Div.

Federal Highway Administration

SEE BLOCK 1405/04/20150003

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

10/27/2014

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Project: NY ERFO GATE JABA 2013-1(2)

The purpose of this Amendment is to:

1) Revise the Special Contract Requirements (J Pages) to add removing material requirements at the dumpster enclosure area and removal of unsuitable asphalt pavers and asphalt bricks.

2) Revise the Plans to replace Sheets C01, D04, and S03.

3) Replace the B-Pages to update quantities for current bid item.

4) Reschedule the Proposal due date to May 13, 2015, at 2:00 p.m. EST.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Amendment No. 0003

Info Page 1 of 2

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

Project NY ERFO GATE JABA 2013-1(2)

Gateway National Recreation Area Solicitation: DTFH71-15-R-00001

The purpose of this Amendment is to:

1) Revise the Special Contract Requirements (J Pages) to add removing material requirements at the dumpster enclosure area and removal of unsuitable asphalt pavers and asphalt bricks.

2) Revise the Plans to replace Sheets C01, D04, and S03.

3) Replace the B-Pages to update quantities for current bid item.

4) Reschedule the Proposal due date to May 13, 2015, at 2:00 p.m. EST.

B Pages changes

Delete the Solicitation Bid Schedule pages B-1 through B-4, and substitute the amended Bid Schedule pages B-1 through B-4.

Special Contract Requirements (J Pages) changes

1. Add the following to the first paragraph of Subsection 203.04 of the Special Contract Requirements, page J-13:

At the dumpster enclosure area, remove all existing asphalt material and the top 4 inches of subgrade, to install the new pavement structure as shown on the plans.

2. Add the following to the last paragraph of Subsection 615.03 of the Special Contract Requirements, page J-18:

Remove, palletize, and salvage unsuitable asphalt pavers and asphalt bricks that cannot be reset due to residual leveling course. Deliver salvaged materials to the NPS maintenance facility at Building 58, Floyd Bennett Field, Brooklyn, NY 11234.

Info Page 2 of 2

Plans changes

Delete Plan Sheets C01, D04, and S03, and substitute the amended Plan Sheets C01, D04, and S03.

a) Sheet C01 (Tabulation of Quantities) updated to revise quantity.

b) Sheet D04 (Dumpster Enclosure Plan) updated to revise Section A-A.

c) Sheet S03 (Brick Paver Walkway) updated to revise callout for settlement area.

B - 1

Amendment Item No. Pay Item No. Description Quantity Unit Unit Price Amount

A0020 15101-0000 MOBILIZATION

ALL LPSM $___LPSM_____ $____________

A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING

ALL LPSM $___LPSM_____ $____________

A0060 15401-0000 CONTRACTOR TESTING

ALL LPSM $___LPSM_____ $____________

A0002 A0080 20302-0500 REMOVAL OF CURB, CONCRETE

65 LNFT $____________ $____________

A0100 20302-0700 REMOVAL OF FENCE (STEEL PICKET)

115 LNFT $____________ $____________

A0120 20303-1600 REMOVAL OF PAVEMENT, ASPHALT

100 SQYD $____________ $____________

A0140 20303-3100 REMOVAL OF SIDEWALK, BRICK

2,100 SQYD $____________ $____________

A0002 A0160 20815-0000 COFFERDAMS

ALL LPSM $___LPSM_____ $____________

A0180 30101-4000 AGGREGATE BASE GRADING C OR D

20 TON $____________ $____________

A0003 A0200 40401-0000 MINOR HOT ASPHALT CONCRETE

30 TON $____________ $____________

A0220 55207-0000 REPAIR CONCRETE

ALL LPSM $___LPSM_____ $____________

A0002 A0240 60901-1700 CURB, CONCRETE, 18-INCH DEPTH

65 LNFT $____________ $____________

A0002 A0260 61501-1000 SIDEWALK, BRICK

115 SQYD $____________ $____________

A0280 61508-0200 RESET BRICK SIDEWALK

2,100 SQYD $____________ $____________

Bid Schedule Schedule:A Schedule Type:Base

Project No:NY ERFO GATE JABA 2013-1(2)3rdAD

Project Name:CANARSIE PIER REHABILITATION

AMENDMENT # 3

B - 2

A0300 61901-0000 FENCE (STEEL PICKET)

115 LNFT $____________ $____________

A0002 A0320 62003-0000 STONE MASONRY

ALL LPSM $___LPSM_____ $____________

A0002 A0321 62002-0000 STONE MASONRY (Panel)

44 SQYD $____________ $____________

A0002 A0330 62011-5100 STONE MASONRY CAP

31 EACH $____________ $____________

A0340 62016-1000 MASONRY, BRICK, WALL

2 SQYD $____________ $____________

A0360 63501-0000 TEMPORARY TRAFFIC CONTROL

ALL LPSM $___LPSM_____ $____________

A0380 63701-0000 FIELD OFFICE

1 EACH $____________ $____________

A0400 64603-0300 FIXTURE, BENCH

4 EACH $____________ $____________

Submitted by:____________________________________ Schedule Total:____________

Bid Schedule Schedule:A Schedule Type:Base

Project No:NY ERFO GATE JABA 2013-1(2)3rdAD

B - 3

Amendment Item No. Pay Item No. Description Quantity Unit Unit Price Amount

A0002 B0020 15201-0000 CONSTRUCTION SURVEY AND STAKING

ALL LPSM $___LPSM_____ $____________

A0002 B0040 15401-0000 CONTRACTOR TESTING

ALL LPSM $___LPSM_____ $____________

A0002 B0060 20301-1500 REMOVAL OF LIGHT POLE

2 EACH $____________ $____________

A0002 B0080 63601-2000 SYSTEM INSTALLATION, LIGHTING

ALL LPSM $___LPSM_____ $____________

A0002 B0100 63610-0000 CONDUIT

100 LNFT $____________ $____________

A0002 B0120 63612-0000 LUMINAIRE (TYPE J)

3 EACH $____________ $____________

A0002 B0140 63612-0000 LUMINAIRE (TYPES K AND L)

6 EACH $____________ $____________

A0002 B0160 63612-0000 LUMINAIRE (REFURBISH)

50 EACH $____________ $____________

A0002 B0180 63620-0000 POLE

2 EACH $____________ $____________

Submitted by:____________________________________ Schedule Total:____________

Bid Schedule Schedule:B Schedule Type:Government Option 1

Project No:NY ERFO GATE JABA 2013-1(2)3rdAD

B - 4

BID SUMMARY

Project NY ERFO GATE JABA 2013-1(2)

(1) Schedule A (Base Contract) Bid Total (from Page B-2) = (1) $____________________

(2) Schedule B (Government Option 1) Bid Total (from Page B-3) = (2) $____________________

Total Price of Project = (1) + (2) $____________________

Total Calendar Days

If Schedule A (Base Contract) and Schedule B (Government Option 1) are awarded at the same time, input the number of calendar days necessary to complete all contract work (Schedule A and Schedule B) from

Notice to Proceed (or date specified in the Notice to Proceed) to the completion of all contract work.

The total calendar days bid to complete all contract work must be greater than or equal to ( > ) 125 and less than or equal to ( < ) 200.

All Contract Work (Schedules A and B) = calendar days

AMANDMENT # 3

Amendment 3 info.pdf
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Amendment No. 0003
Project NY ERFO GATE JABA 2013-1(2)
Gateway National Recreation Area
Solicitation: DTFH71-15-R-00001

File details come from the government source that posted it. Updated .