Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Opening_Results_-_PRA-BLRI_2F24.ppt | PPT presentation | |
| Amendment_0001_-_PRA-BLRI_2F24.pdf | ||
| FP03_Errata.pdf | ||
| Categorical_Exclusion_Form_(NEPA).pdf | ||
| Bridge_Inspection_Reports.zip | ZIP file | |
| Soils_and_Foundation_Report.pdf | ||
| VETS-100A-Form.pdf | ||
| IFB_Solicitation_PRA-BLRI_2F24.pdf | ||
| Plans_PRA-BLRI_2F24_Sch_A-E_ _G.pdf | ||
| ADV_Subcontracting_Plan.doc | DOC document | |
| ADV_Bidder's_Qualifications_Form.doc | DOC document | |
| Hydraulics_Report.pdf | ||
| Synopsis_-_PRA-BLRI_2F24.pdf | ||
| FP03_Eng_.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Structure Number
-A p r -2
:4
A M
M
P R
O J E
C T
S b lr i\ j B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
5140-106P
PROJECT TEAM LEADER BRIDGE DRAWING
of
DATESCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
4 CV AR
George Choubah BRP-1221
STATE PROJECT
SHEET
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BLUE RIDGE PARKWAY
REGION
BRP NO.
NO.
NPS
SE PRA-BLRI 2F24 NC
BRIDGE OVER LINVILLE RIVER
148036
PMIS NO.
120,966
SCHEDULE F
April 2015
A C
T U
A L F I L E P
E
D G
N -A p r -2
:4
A M
M
P R
O J E
C T
S b lr i\ j B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
NO. DATE BY REVISIONS NO. DATE BY REVISIONS
PLAN AND ELEVATION
No Scale BK
R02
#1 #2 #3
#1
#2 #3
#1
See Note 4
TYPICAL DITCH DETAIL TYPICAL RIPRAP DETAIL TYPICAL INLET AND RIPRAP DETAIL
geotextile type IV.
Place class 1 riprap with wrapped
Excavate 47' x 4' x 3' deep.
wrapped geotextile type IV.
Place class 1 riprap with additional details).
boxes (See "INLET" sheet for
Place four 3'-6" x 3'-6" x 3'-0"
Excavate 47' x 5' x 5' deep.
wrapped geotextile type IV.
Place class 1 riprap with
Excavate 47' x 3' x 3' deep.
cast iron pipe
6" Dia. existing cast iron pipe
6" Dia. existing cast iron pipe
6" Dia. existing geotextile type IV with wrapped
Class 1 riprap abutment/pier
Existing abutment/pier
Existing
Impermeable ditch additional details
See "INLET" sheet for to cover geotextile
Place class 1 riprap to cover geotextile
Place class 1 riprap abutment/pier
Existing wrapped geotextile type IV.
Place class 1 riprap with additional details).
boxes (See "INLET" sheet for
Place two 3'-6" x 3'-6" x 3'-0"
Excavate 47' x 5' x 4' deep.
wrapped geotextile type IV.
Place class 1 riprap with additional details).
boxes (See "INLET" sheet for
Place two 3'-6" x 3'-6" x 3'-0"
Excavate 47' x 5' x 4' deep.
Typical for all others.
corresponds with photo #1.
masonry achoring system to CO for approval.
concrete or approved equal. Submit stone plan view. Fill core holes with class D(AE)
The locations of the pictures are shown in the location shown in pictures number 1, 2, and 3.
by the CO and take concrete cores at the
Remove existing stone masonry as directed
Key:
as directed by the CO.
with rolled erosion control product, type 4 and establish turf along Abutment 2 as directed by CO. Stabilize disturbed areas
Place and regrade excavated material at southwest fill slope
4. Perform selective clearing and grubbing as directed by the CO.
riprap with wrapped geotextile and inlets.
3. Remove impermeable material after cleaning and before placing control filter bag, as directed by CO. (See "DETAIL E157-10") a minimum of 150 feet away from Linville River using soil erosion
2. Pump water collected within impermeable ditch to an area located layout of drainage pipe and video of the inside of the pipes.
and weep holes and assess any damages. Provide detailed is permitted. Insert camera to examine drainage pipes stream water to clean drainage pipes and weep holes
1. Unclog drainage pipes and clean weep holes. Use of
Notes:
STATE PROJECT
SHEET
NO.
REGION
NO.
NPS
SE PRA-BLRI 2F24 NC
148036
PMIS NO.
120,966
PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY
CV AR
George Choubah
Structure Number 5140-106P
BRIDGE DRAWING
of
DATE
4 BRP-1221
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BRP NO.
BRIDGE OVER LINVILLE RIVER
SCHEDULE F
April 2015
BRIDGE OVER LINVILLE RIVER
File details come from the government source that posted it. Updated .