Bid_Opening_Results_-_PRA-BLRI_2F24.ppt
PPT presentation 197 KB Posted
- Attached to
- Blue Ridge Parkway 2F24 Federal contract opportunity
- Solicitation number
- DTFH71-15-B-00034
About this file
Bid Results
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0001_-_PRA-BLRI_2F24.pdf | ||
| FP03_Errata.pdf | ||
| Plans_PRA-BLRI_2F24_Sch_F.pdf | ||
| Categorical_Exclusion_Form_(NEPA).pdf | ||
| Bridge_Inspection_Reports.zip | ZIP file | |
| Soils_and_Foundation_Report.pdf | ||
| VETS-100A-Form.pdf | ||
| ADV_Bidder's_Qualifications_Form.doc | DOC document | |
| Hydraulics_Report.pdf | ||
| Synopsis_-_PRA-BLRI_2F24.pdf | ||
| FP03_Eng_.pdf | ||
| IFB_Solicitation_PRA-BLRI_2F24.pdf | ||
| Plans_PRA-BLRI_2F24_Sch_A-E_ _G.pdf | ||
| ADV_Subcontracting_Plan.doc | DOC document |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Federal Highway Administration Eastern Federal Lands Highway Division
| Bid Opening |
| for |
PRA-BLRI 2F24
Blue Ridge Parkway
SOLICITATION NO. DTFH71-15-B-00034
August 11, 2015 at 2:00 p.m.
Sterling, VA
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BID OPENING for SOLICITATION NO. DTFH71-15-B-00034, PROJECT NUMBER: PRA-BLRI 2F24
August 11, 2015, 2:00 p.m. local time The total calendar days bid to complete all contract work must be greater than or equal to ( > ) 370 and less than or equal to ( < ) 890.
| BIDDER | BID TOTAL | DAYS | TOTAL PRICE |
| Maymead, Inc. | Schedule A $ 1,828,990.00 |
Schedule B $ 3,117,850.00 Schedule C $ 2,530,355.00 Schedule D $ 43,625.00 Schedule E $ 36,775.00 Schedule F $ 206,145.00 Schedule G $ 34,900.00 Calendar Days Schedules A through G $ 10,356,140.00 Estes Bros. Const., Inc. Schedule A $ 2,230,615.22 Schedule B $ 3,723,088.51 Schedule C $ 2,928,341.92 Schedule D $ 39,604.40 Schedule E $ 33,035.00 Schedule F $ 206,978.90
| Schedule G $ 36,470.25 | Calendar Days |
| 600 | Schedules A through G |
$ 11,178,734.20 Merry Technology, Inc. Schedule A $ 2,250,115.00 Schedule B $ 3,035,410.00 Schedule C $ 3,242,265.00 Schedule D $ 204,715.00 Schedule E $ 203,105.00 Schedule F $ 555,430.00
| Schedule G $ 184,150.00 | Calendar Days |
| 890 | Schedules A through G |
$12,612,190.00
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BID OPENING for SOLICITATION NO. DTFH71-15-B-00034, PROJECT NUMBER: PRA-BLRI 2F24
August 11, 2015, 2:00 p.m. local time The total calendar days bid to complete all contract work must be greater than or equal to ( > ) 370 and less than or equal to ( < ) 890.
| BIDDER | BID TOTAL | DAYS | TOTAL PRICE |
| Schedule A $ |
Schedule B $ Schedule C $ Schedule D $ Schedule E $ Schedule F $
| Schedule G $ | Calendar Days |
| Schedules A through G |
Schedule A $ Schedule B $ Schedule C $ Schedule D $ Schedule E $ Schedule F $ Schedule G $ Calendar Days Schedules A through G
| Engineer’s Estimate |
| Schedule A $ 2,380,000.00 |
Schedule B $ 4,145,000.00 Schedule C $ 3,190,000.00 Schedule D $ 33,000.00 Schedule E $ 31,000.00 Schedule F $ 415,000.00
| Schedule G $ 27,000.00 | Calendar Days |
| 890 | Schedules A through G |
$ 13,158,000.00