Amendment_0001_-_PRA-BLRI_2F24.pdf
PDF 121 KB Posted
- Attached to
- Blue Ridge Parkway 2F24 Federal contract opportunity
- Solicitation number
- DTFH71-15-B-00034
About this file
The Bid Opening date of August 11 2015 at 2 00 p.m. will remain the same.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Opening_Results_-_PRA-BLRI_2F24.ppt | PPT presentation | |
| FP03_Errata.pdf | ||
| Plans_PRA-BLRI_2F24_Sch_F.pdf | ||
| Categorical_Exclusion_Form_(NEPA).pdf | ||
| Bridge_Inspection_Reports.zip | ZIP file | |
| ADV_Bidder's_Qualifications_Form.doc | DOC document | |
| Hydraulics_Report.pdf | ||
| Synopsis_-_PRA-BLRI_2F24.pdf | ||
| FP03_Eng_.pdf | ||
| Soils_and_Foundation_Report.pdf | ||
| VETS-100A-Form.pdf | ||
| IFB_Solicitation_PRA-BLRI_2F24.pdf | ||
| Plans_PRA-BLRI_2F24_Sch_A-E_ _G.pdf | ||
| ADV_Subcontracting_Plan.doc | DOC document |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
DTFH7115B00034
x x
0 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Sterling VA 20166-6511
EFLHD-CO
21400 Ridgetop Circle Construction Office Eastern Federal Lands Highway Div.
Federal Highway Administration
Sterling VA 20166-6511
EFLHD-AC
21400 Ridgetop Circle Acquisitions Office Eastern Federal Lands Highway Div.
Federal Highway Administration
PRA-BLRI 2F2408/04/20150001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/10/2015
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this Amendment is to:
1) Revise Sections 109 and 401 of the Special Contract Requirements (J Pages) to add the
Asphalt Cement Price Adjustment Provision.
The Bid Opening date of August 11, 2015, at 2:00 p.m. will remain the same.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Amendment No. 0001
Info Page 1 of 1
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Project PRA-BLRI 2F24
Blue Ridge Parkway Solicitation: DTFH71-15-B-00034
The purpose of this Amendment is to:
1) Revise Sections 109 and 401 of the Special Contract Requirements (J Pages) to add the Asphalt Cement Price Adjustment Provision.
The Bid Opening date of August 11, 2015, at 2:00 p.m. will remain the same.
SCR_Changes Page 1 of 3
Special Contract Requirement (J Pages) changes
1. Add the following to Section 109 of the Special Contract Requirements, page J-10:
109.06. Add the following:
ASPHALT CEMENT PRICE ADJUSTMENT PROVISION
GENERAL The Asphalt Cement Price Adjustment Provision provides for a price adjustment in the form of a payment to the Contractor or a rebate to the Government for fluctuations in the cost of asphalt cement used in the performance of applicable construction work. The price adjustment provisions are applicable only to the asphalt cement, as defined in Subsection 702.01, and incorporated in the following eligible contract pay items:
40101 Superpave pavement 40102 Superpave pavement, wedge and leveling course
The price adjustment provisions are also applicable when the Government adds extra work to the eligible pay items already existing under the Contract.
The provision will remain in effect throughout the duration of the contract. Enactment of the Asphalt Cement Price Adjustment Provision will only be considered when the increase or decrease in the price of asphalt cement as defined herein exceeds 10 percent.
The Asphalt Cement Price Adjustment Provision is intended to reduce but not eliminate the cost effects of price uncertainty to the Contractor and the Government for asphalt cement used in the construction of this contract. It provides for sharing by the Government in a portion of the Contractor’s risk, which could result from unusual price fluctuations. The provision is not intended to compensate the Contractor for normal day-to-day fluctuations and seasonal changes or to serve as a guarantee of full compensation for asphalt cement price fluctuations.
PRICE INDEXES The Government will generate a monthly performance price index for asphalt cement using price data obtained from Poten and Partners, Inc. (PPI), which publishes a weekly report (Asphalt Weekly Monitor) on high and low selling prices for states in five regions throughout the United States including the East Coast/Northeast, the Mid-Continent/Midwest, the Gulf Coast/Mid South, the Rocky Mountains and the West Coast/Northwest. Weekly high and low selling price data reported for Boone, NC will be averaged and used to establish a base price index, BPI, for this project and a monthly performance price index, MPPI, for the duration of the contract. These indexes are defined as follows:
SCR_Changes Page 2 of 3
BASE PRICE INDEX The base price index, BPI, is the price index determined by the arithmetic average, as specified above, shown in the four weekly publications immediately preceding the bid opening. The BPI will be provided by the Government after contract award. It is as follows:
BASE PRICE INDEX (BPI) FOR ASPHALT CEMENT
PER SHORT TON (TON) (or PER METRIC TON) = $
MONTHLY PERFORMANCE PRICE INDEX The monthly performance price index, MPPI, is the monthly price index at the time of performance of applicable work as determined by the arithmetic average, as specified above, shown in the four weekly publications issued prior to the last Wednesday of the month (i.e. the monthly performance price index during which asphalt cement is used in the performance of applicable construction work).
PRICE ADJUSTMENTS Price adjustments are calculated by the Government for average conditions and are not intended to reflect the Contractor’s actual purchase price. The ratio of the monthly performance price index and the base price index (MPPI/BPI) is calculated and used to determine price adjustments for eligible pay items as follows:
No Price Adjustment – When the ratio MPPI/BPI falls within the range of 0.90 to 1.10, no price adjustment will be made for any asphalt cement used in construction work performed during the relevant month.
Government Rebate – When the ratio MPPI/BPI is calculated to be less than 0.90, the
Government is due a rebate determined in accordance with the following formula:
Government Rebate = [0.90 – (MPPI/BPI)] (BPI) (Q)
Contractor Payment – When the ratio MPPI/BPI is calculated to be greater than 1.10, the Contractor is due additional payment determined in accordance with the following formula:
Contractor Payment = [(MPPI/BPI) – 1.10] (BPI) (Q)
The following definitions are applicable to both the Government Rebate and the Contractor Payment formulas:
MPPI = Monthly Performance Price Index for the month during which asphalt cement is used in the performance of applicable construction work.
BPI = Base Price Index that is established immediately preceding the bid opening.
SCR_Changes Page 3 of 3
Q = Quantity in tons of asphalt cement for eligible pay items that were used on the project during the progress payment period. The quantity will be calculated using the asphalt content of the approved mix design and the following formula:
Q = Asphalt Concrete Pavement tons placed x (% Asphalt/100)
PRICE ADJUSTMENT COMPENSATION Monthly adjustments will be accrued. The final price adjustment will be paid, or rebated, after completion of all work for eligible pay items. The Contractor may request in writing a partial price adjustment payment once every 12 months, or when the unpaid accrued increase exceeds $10,000. The Government will take a rebate when the deductive accrual exceeds $10,000.
No price adjustments will be made for work performed beyond the Government-approved Contract completion date.
The maximum allowable monthly and final price adjustment to the Contractor or rebate to the Government is limited to a (MPPI/BPI) ratio of 1.6 and 0.4, respectively.
2. Add the following to Section 401 of the Special Contract Requirements, page J-55:
401.19. Add the following:
A price adjustment will be made for fluctuations in the cost of asphalt cement used in the performance of any eligible pay items according to Subsection 109.06 Pricing of Adjustments Asphalt Cement Price Adjustment Provision.
| Amendment 1 info.pdf |
| U.S. DEPARTMENT OF TRANSPORTATION |
| FEDERAL HIGHWAY ADMINISTRATION |
| EASTERN FEDERAL LANDS HIGHWAY DIVISION |
| Amendment No. 0001 |
| Project PRA-BLRI 2F24 |
| Solicitation: DTFH71-15-B-00034 |
File details come from the government source that posted it. Updated .