Plans_FTNP-GWMP_11(6).pdf
PDF 16 MB Posted
- Attached to
- Arlington Memorial Bridge 11(6) Federal contract opportunity
- Solicitation number
- DTFH71-15-B-00030
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ROBO_FTNP-GWMP_11(6).pdf | ||
| Amendment_0003_-_FTNP-GWMP_11(6).pdf | ||
| Amendment_0002-FTNP-GWMP_11(6).pdf | ||
| Amendment_0001_-_FTNP_-GWMP_11(6).pdf | ||
| Report_3_As_Built_Plans.pdf | ||
| Report_2_Bridge_Inspection.pdf | ||
| Synopsis_-_FNTP-GWMP_11(6).pdf | ||
| Report_4_Certification_Program_for_Bridge_Temporary_Works.pdf | ||
| FP14_Eng.pdf | ||
| VETS-100A-Form.pdf | ||
| ADV_Bidder's_Qualifications_Form.doc | DOC document | |
| IFB_Solicitation-FTNP-GWMP_11(6).pdf | ||
| Report_1_NEPA.pdf | ||
| ADV_Subcontracting_Plan.doc | DOC document |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Structure Number
1-
M a y -2
:4
A M
M
P R
O J E
C T
S g w m p (6
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
PROJECT TEAM LEADER
of
DATESCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
George Choubah BRP-1220
STATE PROJECT
SHEET
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
GEORGE WASHINGTON MEMORIAL PARKWAY
REGION
BRP NO.
NPS
NO.
NC FTNP-GWMP 11(6) DC
ARLINGTON MEMORIAL BRIDGE
127169
214695
PMIS NO.
BRIDGE PLAN
No Scale
3300-016P
28 May 2015
A C
T U
A L F I L E G
N
D G
N 1-
M a y -2
:4
M
P R
O J E
C T
S g w m p (6
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
NO. DATE BY REVISIONS NO. DATE BY REVISIONS
GENERAL NOTES AND INDEX
AF/CV LW/BK LW
Structural Steel:
Utilities:
GENERAL NOTES
CL Bascule span
West Leaf East Leaf
BASCULE SPAN KEY
Reinforcing Steel:
Miscellaneous:
Verify locations of utilities in field prior to any work.
Verify all dimensions and locations in the field prior to ordering materials.
R01
(East abutment)
Abutment 2
(West abutment)
Abutment 3
SCOPE OF WORK - NORTHWEST CORNER:
SCOPE OF WORK - NORTHEAST CORNER:
SCOPE OF WORK - SOUTHWEST CORNER:
SCOPE OF WORK - SOUTHEAST CORNER:
SCOPE OF WORK - INSIDE THE BASCULE SPAN:
INDEX OF PLANS
BRIDGE PLAN NO. PLAN TITLE
Furnish Paint System 1.
Paint all structural steel #26420 from the Federal 595B Colors.
to ASTM A490.
Provide high-strength anchor, nuts, and washers comforming
Galvanize all bolts and nuts in accordance with ASTM A153.
Furnish welds conforming to AASHTO/AWS D1.5 Bridge Welding Code.
unless otherwise noted on the plans.
with fasteners conforming to AASHTO M 164, Type 1 (ASTM A325)
All field connections are slip critical, friction type, Class A, made the longitudinal Charpy V-Notch test specified in Section 555.
Provide main load carrying beam members that meet
(ASTM A709, Grade 50) unless otherwise noted on the plans.
Furnish structural steel conforming to AASHTO M 270, Grade 50
Provide 2-in cover for reinforcing steel unless otherwise noted.
Lap splices 32 bar diameters unless otherwise shown.
epoxy-coated.
Furnish reinforcing steel conforming to AASHTO M 31, Grade 60, replace one floorbeam at a time.
Replace four existing floorbeams 12WF45;4.
column to shore the existing 12CB@34.
Install 6-in long HP12X53 on top of the existing3.
Repair sidewalk stringer bearing seats.2.
traffic control plans.
For maintenance of traffic, refer to the1.
Washington, DC 20019
Building 59
3400 Benning Rd, NE
PEPCO Engineering - DCPEPCO address:
concerns during construction.
Distribution - DC, at (202) 388 2563 for any problems or
Contact Mr. Abdulai Kangbo, Sr. Supervising Engineer, PEPCO any on-site support or consultation.
Maintenance and Construction, at (202) 388 2164 for
Contact Mr. Tony Duncan, General Supervisor, Underground construction.
at (202) 388 2137 for any problems or concerns during
Contact Mr. Kenny Payne, General Supervisor of Conduit, and conduits that contain cables.
in close proximity to exposed cables existing under the bridge
Provide protection and exercise extreme caution when working f’c = 5,000 psi at 3 days
Grout f’c = 4,500 psi at 28 days
Class HES
All dimensions are nominal.
Provide pressure treated Douglas Fir No. 1 or No. 2.
Timber:
Material:
HS20 Loading
Live Loads:
Design Loads:
Design: AASHTO LRFD Bridge Design Specifications, Seventh Edition, 2014 and Bridges on Federal Highway Projects, FP-14.
Construction: Standard Specifications for Construction of Roads
Specifications:
SCOPE OF WORK - TOP OF BRIDGE:
replace one floorbeam at a time.
Replace four existing floorbeams 12WF45;4.
column to shore the existing 12CB@34.
Install 6-in long HP12X53 on top of the existing3.
under existing 12CB@34.
Install steel bracket support assembly Type 22.
traffic control plans.
For maintenance of traffic, refer to the1.
East Leaf South Curb Stringer 4-6 Repair - 228
East Leaf South Curb Stringer 4-6 Repair - 127
Miscellaneous Details26
Pedestrian Bridge Timber Deck Plank Replacement25
Top of Sidewalk Repair Details24
Top of Sidewalk Repair Layout - 423
Top of Sidewalk Repair Layout - 322
Top of Sidewalk Repair Layout - 221
Top of Sidewalk Repair Layout - 120
Catwalks and Stairs Repair19
Bascule Span Sidewalk Support - 218
Bascule Span Sidewalk Support - 117
East Leaf - North Bascule Truss Gusset Plate Repair16
Bascule Span Abutment Stringer Supports15
Column Details14
Sidewalk Beam Repair and Replacement Details13
Bascule Span West Abutment Sidewalk Beam Replacement12
Bascule Span East Abutment Sidewalk Beam Replacement11
Northeast Corner Sidewalk Beam and Bearing Repairs10
Southeast and Southwest Corners Sidewalk Beam Repairs 9
Southeast Corner Temporary Support System 8
West Leaf North Curb Stringer 8-10 Repair 7
Northwest Corner Sidewalk Beam Repairs - 2 6
Northwest Corner Sidewalk Beam Repairs - 1 5
Northwest Sidewalk Corner Temporary Support System 4
East Leaf Upper Framing Plan 3
West Leaf Upper Framing Plan 2
General Notes and Index 1 the trunnion post base areas (Schedule B).
bascule trusses, on the trunnion posts, and
Remove debris on the truss members of all9.
and bottom of the deck at all four corners.
Install timber shims between trunnion pin8.
as shown on the plans.
Install steel shims at the south center lock7.
trusses of east and west leaf.
Install sidewalk support over the bascule6.
counterweights in both abutments.
Install roadway stringer supports on top of 5.
in both abutments.
Install new HP12x53 columns under counterweights 4.
and the north truss of east leaf.
Repair the gusset plate connecting brace T-113.
as shown on the plans.
Repair catwalks and stairs in both abutments2.
traffic control plans.
For maintenance of traffic, refer to the1.
the CO using concrete repair material.
Repair concrete deck at locations determined by7.
pedestrian bridges.
Replace damaged timber planks of all temporary6.
shown on the plans.
Repair expansion joints on sidewalks at locations5.
on the plans.
Replace catch basin grates at locations shown4.
the plans using HES concrete.
Repair concrete sidewalk at areas shown on3.
on the plans.
Remove and reset loose granite curb as shown2.
traffic control plans
For maintenance of traffic, refer to the1.
replace one floorbeam at a time.
Replace four existing floorbeams 12WF45;8.
and new 15C33.9 under sidewalk.
Install steel bracket support assembly Type 27.
column to shore the existing 12CB@34.
Install 6-in long HP12X53 on top of the existing6.
the existing 18CB@51.
Remove the temporary support system over5.
18CB@51.
W10x30 to provide support under the existing bracket support assembly Type 2, and new
Install steel bracket support assembly Type 1,4.
northwest sidewalk over the existing 18CB@51.
Install the temporary support system on the3.
any other work in this contract.
stringer 8-10. Perform this work prior to
Install double L3x3x3#8 on north curb2.
control plans.
For maintenance of traffic, refer to the traffic 1.
replace one floorbeam at a time.
Replace four existing floorbeams 12WF45;7.
column to shore the existing 12CB@34.
Install 6-in long HP12X53 on top of the existing6.
the existing 12CB@34.
Remove the temporary support system over5.
under the existing 12CB@34.
Install steel bracket support assembly Type 24.
southeast sidewalk over the existing 12CB@34.
Install the temporary support system on the3.
the repair of north curb stringer 8-10 completed.
points 4 and 6. Perform this work as soon as
Repair south curb stringer between panel2.
traffic control plans.
For maintenance of traffic, refer to the1.
-M a y -2
:0
M
P R
O J E
C T
S g w m p (6
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
PROJECT TEAM LEADER
SHEET
NO.
U.S. DEPARTMENT OF TRANSPORTATION
BRP NO.
NPS
NO.
NC FTNP-GWMP 11(6) DC
ARLINGTON MEMORIAL BRIDGE
127169
214695
PMIS NO.
BRIDGE PLAN
No Scale
3300-016P
28 May 2015
-M a y -2
M
P R
O J E
C T
S g w m p (6
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
Granite slab
CL
B B
VIEW A-A
CL
CL Joint
CL
A
A
Edge of granite slab railing
Granite
Existing 12CB@34
L
Embedment
Embedment
VIEW B-B
CL
Existing 18CB@51 concrete beam
End of existing
CL
–8’-6"
1’-6"
PL
8" Min.
CL
CL
8" Min.
Embedment
8" Min.
as required grout pad
Provide leveling
"16
CL
beam concrete
Face of
NORTHWEST SIDEWALK CORNER
FRAMING PLAN - BASCULE SPAN WEST ABUTMENT
18CB@51
Existing
18CB@51
Existing
15C33.9
Existing
18CB@51
Existing
12CB@34
Existing
6’-4"
"2
7"
C
C
–1’-3"
"2 column
Face of
SECTION C-C
CL
SIDEWALK BEAM REPAIRS - 1
NORTHWEST CORNER
R05 column
Existing concrete
(Typ.)
sidewall abutment
Face of
Face of abutment sidewall column existing
Top of
C9x20 as required
Install steel shims
C9x20
Column
(See Note 5)
HP12x53 - 6" long column
Existing concrete backwall abutment
Face of sidewall abutment
Face of
"2
(See Notes 1 to 5) support assembly Type 2
Proposed steel bracket
(See Notes 1 to 5) support assembly Type 1
Proposed steel bracket
(See Notes 1 to 5) assembly Type 2 bracket support
Proposed steel
(See Notes 1 to 5) support assembly Type 1
Proposed steel bracket(See Note 4) threaded anchor
1" Dia. high-strength
(See Note 4) threaded anchor
" Dia. high-strength 8
(See Note 4) threaded anchor
1" Dia. high-strength
A C
T U
A L F I L E S I D
E W
A L
K B
E A
M R
E P
A I R
S N
W C
O R
N E
R .D
G N
12CB@34
Existing
12CB@34
Existing
27CB@91
Existing
12CB@34
Existing
2C10x15.3
C10x15.3
" x 1"–2 1 1’-3" x 7
" x 1"–2 1P 1’-3" x 7
3" 3"
4 Spa. @ 2’-0" = 8’-0"
(Typ.)
" Dia. bolt8
Bracket assembly calculations for approval by the CO.
Splicing of beams is allowed. Submit details of splice and design7.
between the new 6-in long HP12x53 and the existing 12CB34 beam.
Provide steel shims as required to provide full contact and support6.
"SIDEWALK BEAM REPAIR AND REPLACEMENT DETAILS" sheet.
For proposed steel bracket support assembly details, see 5.
recommendations for installation procedure.
adhesives conforming to Subsection 725.19. Follow the manufacturer’s
Install high-strength threaded anchor bolts using resin anchoring4.
brackets and supported beams.
Shim as required to provide full contact between top of proposed
Center the steel brackets with centerline of the supported beams.3.
according to Section 563 Paint System 1.
areas where anchors are located. Field paint bracket assemblies support assemblies prior to installation. Finish only primer coat in
Clean beam’s surfaces in contact with the proposed steel bracket2.
any work at northwest corner.
sidewalk over the existing 18CB@51 is in place prior to
Ensure that the temporary support system on northwest 1.
Notes:
SHEET
NO.
REGION
NPS
NO.
NC FTNP-GWMP 11(6) DC
127169 214695
PMIS NO.
PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY
George Choubah No Scale of
DATE
BRP-1220
U.S. DEPARTMENT OF TRANSPORTATION
BRP NO.
ARLINGTON MEMORIAL BRIDGE
BRIDGE PLAN
3300-016P
28 May 2015
ARLINGTON MEMORIAL BRIDGE
-M a y -2
M
P R
O J E
C T
S g w m p (6
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
PROJECT TEAM LEADER
SHEET
NO.
U.S. DEPARTMENT OF TRANSPORTATION
BRP NO.
NPS
NO.
NC FTNP-GWMP 11(6) DC
ARLINGTON MEMORIAL BRIDGE
127169
214695
PMIS NO.
BRIDGE PLAN
No Scale
3300-016P
28 May 2015
-M a y -2
M
P R
O J E
C T
S g w m p (6
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
Granite slab
B B
VIEW A-A
27CB@91CL
12CB@34CL
12CB@34CL
CL Joint A
A
NORTH WEST SIDEWALK CORNER
Edge of granite slab railing
Granite
7" 9"
FRAMING PLAN - BASCULE SPAN WEST ABUTMENT
CL
1’-8"
C
C beam concrete
Face of
CL
(Typ.)
Embedment
8" Min.
Detail A
12CB@34
Existing
(Behind)
Existing 15C33.9
Existing 15C33.9
Existing 18CB@51
4" abutment wall
Top of bearing
CL Bracket assembly
SECTION C-C
3L4x4x
18CB51
Existing
D
D SECTION D-D
DETAIL A
Top of sidewalk slab
(See Note 5) sidewalk slab
Bottom of
(See Note 5) sidewalk slab
Bottom of
Top of sidewalk slab
S p a
(Behind)
Existing 15C33.9
" Dia. bolt (Typ.)8
3L4x4x radius
" Coping2
S p a granite slab
Edge of
"2
"2
SIDEWALK BEAM REPAIRS - 2
NORTHWEST CORNER
R06
–15’-6"
C15x33.9
C15x33.9
C15x33.9
C15x33.9 sidewall
Face of abutment backwall abutment
Face of sidewall abutment
Face of
C15x33.9
C15x33.9
18CB51
Existing
" Clr.2
C lr
SECTION B-B
15C33.9
Existing
(See Notes 1 to 4) support assembly Type 2
Proposed steel bracket
(See Notes 1 to 4) assembly Type 2 bracket support
Proposed steel
(See Note 3) threaded anchor
1" Dia. high-strength
A C
T U
A L F I L E S I D
E W
A L
K B
E A
M R
E P
A I R
S N
W C
O R
N E
R .D
G N
12CB@34
Existing
18CB@51
Existing calculations for approval by the CO.
Splicing of beams is allowed. Submit details of splice and design6.
C15x33.9 and the bottom of the sidewalk slab.
Provide shims as required to provide full contact between the new5.
"SIDEWALK BEAM REPAIR AND REPLACEMENT DETAILS" sheet.
For proposed steel bracket support assembly details, see 4.
recommendations for installation procedure.
adhesives conforming to Subsection 725.19. Follow the manufacturer’s
Install high-strength threaded anchors using resin anchoring3.
brackets and supported beams.
Shim as required to provide full contact between top of proposed
Center the steel brackets with centerline of the supported beams.2.
according to Section 563 Paint System 1.
areas where anchors are located. Field paint bracket assembly support assemblies prior to installation. Finish only primer coat in
Clean beam’s surfaces in contact with the proposed steel bracket1.
NO.
REGION
NPS
NO.
NC FTNP-GWMP 11(6) DC
127169 214695 of
DATE
BRP-1220
U.S. DEPARTMENT OF TRANSPORTATION
ARLINGTON MEMORIAL BRIDGE
BRIDGE PLAN
3300-016P
28 May 2015
-M a y -2
M
P R
O J E
C T
S g w m p (6
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
PROJECT TEAM LEADER
SHEET
NO.
U.S. DEPARTMENT OF TRANSPORTATION
BRP NO.
NPS
NO.
NC FTNP-GWMP 11(6) DC
ARLINGTON MEMORIAL BRIDGE
127169
214695
PMIS NO.
BRIDGE PLAN
No Scale
3300-016P
28 May 2015
-M a y -2
M
P R
O J E
C T
S g w m p (6
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
AF/CV LW LW
A
A
SECTION B-B
VIEW A-A
B
B
CL
CL
CL
12CB@34
Existing supported
12CB@34
Existing supported slab
Granite slab
Granite
Embedment slab granite
Edge of
8" Min.
(Typ.)
FRAMING PLAN - BASCULE SPAN EAST ABUTMENT
wall abutment
Face of
6’-4"
SOUTHEAST SIDEWALK CORNER
(Southeast corner shown, Southwest corner similar but opposite hand)
Existing 12CB@34
Bracket support
(See Notes 1 to 5) support assembly Type 2
Proposed steel bracket
C C
CL
CL
as required grout pad
Provide leveling
VIEW C-C
SIDEWALK BEAM REPAIRS
SOUTHEAST AND SOUTHWEST CORNERS
A C
T U
A L F I L E S I D
E W
A L
K B
E A
M R
E P
A I R
S S
E S
W C
O R
N E
R S .D
G N
R09
12CB@34
Existing supported sidewall abutment
Face of
(Typ.) (See Note 4) threaded anchor
1" Dia. high-strength
(See Note 6)
6" long
New HP12x53
Column between the new 6-in long HP12x53 and the existing 12CB34 beam.
Provide steel shims as required to provide full contact and support6.
"SIDEWALK BEAM REPAIR AND REPLACEMENT DETAILS" sheet.
For proposed steel bracket support assembly details, see5.
recommendations for installation procedure.
adhesives conforming to Subsection 725.19. Follow the manufacturer’s
Install high-strength threaded anchors using resin anchoring4.
brackets and supported beams.
Shim as required to provide full contact between top of proposed
Center the steel brackets with centerline of the supported beams.3.
according to Section 563 Paint System 1.
areas where anchors are located. Field paint bracket assembly support assemblies prior to installation. Finish only primer coat in
Clean beam’s surfaces in contact with the proposed steel bracket2.
corner. Temporary support system is not required at southwest corner.
over the existing 12CB34 is in place prior to any work at southeast
Ensure that the temporary support system on southeast sidewalk1.
NO.
REGION
NPS
NO.
NC FTNP-GWMP 11(6) DC
127169 214695 of
DATE
BRP-1220
U.S. DEPARTMENT OF TRANSPORTATION
ARLINGTON MEMORIAL BRIDGE
BRIDGE PLAN
3300-016P
28 May 2015
-M a y -2
M
P R
O J E
C T
S g w m p (6
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
PROJECT TEAM LEADER
SHEET
NO.
U.S. DEPARTMENT OF TRANSPORTATION
BRP NO.
NPS
NO.
NC FTNP-GWMP 11(6) DC
ARLINGTON MEMORIAL BRIDGE
127169
214695
PMIS NO.
BRIDGE PLAN
No Scale
3300-016P
28 May 2015
2.1
A
A
T y p
(Typ.)
SECTION A-A
SECTION C-C
L
"16
1"
L
(Typ.)
CL
COLUMN DETAILS
-M a y -2
CV BK AF
M
P R
O J E
C T
S g w m p (6
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n and washer
Leveling nut
New HP12x53
L
(Typ.)
New HP12x53
1" Min. grout pad
CL
4" 4"
CLCL
–4" –4"2’-10"
New HP12x53
R14 surface concrete
Existing
BASCULE WEST ABUTMENT - PLAN VIEW
CL
columns
Existing columns
Existing columns
Install new columns
Install new columns
Install new
CL
CL
CL Structure
Bascule truss
Bascule truss
(Typ.)
Trunnion post
CLColumns
See Note 1
Typ.
counterweight surface
Existing concrete
E m b e d m e n t
(East abutment similar but opposite) columns
Install new
(Typ.)
columns
Set of
M in threaded anchor (Typ.)
1" Dia. high-strength
"4 3P 1’-4" x 1’-4" x
–6"
"4 3P 1’-4" x 1’-4" x
B B "2 1P 1’-2" x 1’-2" x
C C
1’-4" 1’-4"
2"
M in threaded anchor (Typ.)
1" Dia. high-strength
ELEVATION - NEW COLUMNS
SECTION B-B
CL
threaded anchor (Typ.)
1" Dia. high-strength
CL
L (Typ.)
"2 1P 1’-2" x 1’-2" x
(Typ.)
New HP12x53
1" Min. grout pad
CL
(Typ.)
threaded anchor
1" Dia. high-strength
A C
T U
A L F I L E C
O L
U M
N D
E T
A I L S .D
G N
(Typ.)
Column
(Typ.)
Column
Concrete pedestal
Notes 2 and 3) pedestal (See
New concrete
Notes 2 and 3) pedestal (See
New concrete
Grout pad design calculations for approval by the CO.
Splicing of columns is allowed. Submit details of splice and5.
recommendations for installation procedure.
conforming to Subsection 725.19. Follow the manufacturer’s threaded anchor bolts using resin anchoring adhesives
Set new columns on grout pedestals and install high-strength4.
AASHTO M 55.
cover. Furnish welded wire reinforcement conforming to along all exposed pedestal faces. Provide 2-in concrete
Place welded wire reinforcement (4 in x 4 in, W2 x W2)3.
pedestal size and shape.
Form and place new concrete pedestals. Match existing2.
for removal of concrete.
the steel reinforcement during removal. See Section 203 max. to key in new concrete pedestal. Avoid damaging
Chip out existing concrete surface to a depth of 2 in1.
NO.
REGION
NPS
NO.
NC FTNP-GWMP 11(6) DC
127169 214695
PMIS NO.
PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY
George Choubah No Scale
Structure Number of
DATE
BRP-1220
U.S. DEPARTMENT OF TRANSPORTATION
ARLINGTON MEMORIAL BRIDGE
BRIDGE PLAN
3300-016P
28 May 2015
-M a y -2
M
P R
O J E
C T
S g w m p (6
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
PROJECT TEAM LEADER
SHEET
NO.
U.S. DEPARTMENT OF TRANSPORTATION
BRP NO.
NPS
NO.
NC FTNP-GWMP 11(6) DC
ARLINGTON MEMORIAL BRIDGE
127169
214695
PMIS NO.
BRIDGE PLAN
No Scale
3300-016P
28 May 2015
Counterweight
CLExisting expansion jt.
CLStructure
CL(Symmetrical about )
CLStructure
CL
HALF PLAN OF ABUTMENT 2
(Abutment 3 similar)
SECTION A-A
SECTION B-B
A
Abutment 2 or 3
End wall @
B
B beams extended between
Counterweight beams extended between
Counterweight
Notes:
CL
CL
V a r ie s
DETAIL A
See Detail A
30’-0"
4 Spa. @ 4’-1" = 16’-4"3 Spa. @ 3’-6" = 10’-6"3’-2"5’-11"
Place additional bearings
-M a y -2
CV AF/BK AF
P R
O J E
C T
S g w m p (6
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
1’-4"
"2 18" x 8" x 1
Bearing pad
C
SECTION C-C
Abutment 2 or 3
End wall @
CLExisting expansion jt.
Counterweight
A
CL
counterweight
Edge of
C
(See Note 3)
Steel support system
See Detail D
" Clr.2
(Typ.) as required
Steel shim specifications manufacturer’s
In accordance with
DETAIL D
STRINGER SUPPORTS
BASCULE SPAN ABUTMENT
R15
18" x 18"
Grout pad
4’-0"
(Typ.)
See Note 1
(Typ.)
See Note 1
See Note 1
(See Note 3)
Steel support system system support
SteelCL grout pads Bearings and counterweight
Edge of
(Typ.)
(See Note 4) threaded anchor
High-strength le v e li n g p a d
M in
A C
T U
A L F I L E S
T R I N
G E
R S
U P P
O R
T S .D
G N
12CB@34
(Typ.)
27CB@91
about )
(Symmetrical
Existing 27CB@91
Existing 27CB@91
27CB@91
to the CO for approval.
painted steel. Submit with elastomer and
Adhesive compatible recommendations for installation procedure.
Subsection 725.19. Follow the manufacturer’s resin anchoring adhesives conforming to high-strength threaded anchors using
Anchor base plate to counterweight with4.
flange using steel shims. No jacking required.
by the CO. Provide full contact with bottom capable of supporting 40 kips for approval
Submit details for a steel support system 3.
elastomeric bearing pad details.
See "MISCELLANEOUS DETAILS" sheet for2.
No jacking required.
Abutments 2 and 3 at the locations shown.
elastomeric bearing pads and grout pads in
Remove existing timber bearings and place1.
NO.
REGION
NPS
NO.
NC FTNP-GWMP 11(6) DC
127169 214695
PMIS NO.
PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY
George Choubah No Scale
Structure Number of
DATE
BRP-1220
U.S. DEPARTMENT OF TRANSPORTATION
ARLINGTON MEMORIAL BRIDGE
BRIDGE PLAN
3300-016P
-M a y -2
M
P R
O J E
C T
S g w m p (6
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
PROJECT TEAM LEADER
SHEET
NO.
U.S. DEPARTMENT OF TRANSPORTATION
BRP NO.
NPS
NO.
NC FTNP-GWMP 11(6) DC
ARLINGTON MEMORIAL BRIDGE
127169
214695
PMIS NO.
BRIDGE PLAN
No Scale
3300-016P
CV JG 18
SIDEWALK SUPPORT - 2
BASCULE SPAN
C
T U
A L F I L E S I D
E W
A L
K S
U P P
O R
T .D
G
R18
8 010
18’-7" 1" 1"
3’-1"6’-11"
(Typ.)
Bearing
Existing floor beam &
CL
1" 1" 18’-7"
46 2
1" 1" 18’-7" 18’-3"
(Typ.)
floor beam
Existing (Typ.)
"16 required (Typ.)
Steel plates as
9" 9"12 Spa. @ 2’-0" = 24’-0" 1’-3"1’-3" 1’-3"1’-3" 8"8" 10 Spa. @ 2’-0" = 20’-0" nut and washer (Typ.)
" Dia. bolts with8 grout or steel shims with sidewalk using
Provide full contact
(See Note 3)
CL
C7x9.8
"2
AF
ELEVATION VIEW - SIDEWALK SUPPORT BEAM
3’ Max. (Typ.)3’ Max. (Typ.)
(See Note 3)
Bascule span sidewalk
Top of existing
3L4x4x
VIEW B-B
3x2
1x42 1L3
–1’-11"
"2 1–8
Typ.
"16
Typ.
1" Plate
1" Plate
(Typ.)
" anchor2 1Hole for
D D
" Stiffener2
–1’-7"
2" 2"
T y p
T y p
T y p
" Web plate2
CLSupport beam
CL
TOP PLATE - VIEW D-D
E E
Typ.
BOTTOM PLATE - VIEW E-E
2C10X15.3
8"
V a r ie s
Steel blocking floorbeam of existing
Top member against existing deck to provide tight fit
Use steel shim deck concrete
Existing anchor
" dia.2 1Hole for
SECTION C-C
A C
T U
A L F I L E S I D
E W
A L
K S
U P P
O R
T .D
G N
M
P R
O J E
C T
S g w m p (6
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
NO. DATE BY REVISIONS
-M a y -2
CV JG
18 AF
ELEVATION
STEEL BLOCKING DETAIL
Diaphragm &
"16
"16
CL
CL
2’-0" = 16’-0"
8 Spa. @
2’-0" = 16’-0"
8 Spa. @
(Typ.)
threaded anchor high-strength
" Dia. 2
SIDEWALK SUPPORT - 1" sheet.
For location of View B-B and Section C-C, see "BASCULE SPAN7.
approval by the CO. Splicing is allowed.
design is proposed, submit design calculations and details for
Submit fabrication drawings for approval by the CO. If alternate6.
recommendations for installation procedure.
adhesives conforming to Subsection 725.19. Follow the manufacturer’s
Install high-strength threaded anchors using resin anchoring5.
on existing floor beams.
Use steel shims as required to provide level bearing surface4.
sidewalk stringer splices.
floorbeam to avoid interference with bolts and existing
Locate support beam diaphragms within 3 ft of nearest 3.
allowed.
along the length of the channels. Timber shims are not
Provide full contact with the existing sidewalk at the top2.
in the field before starting work.
All dimensions are approximate. Verify all dimensions1.
NO.
REGION
NPS
NO.
NC FTNP-GWMP 11(6) DC
127169 214695
PMIS NO.
PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY
George Choubah No Scale
Structure Number of
DATE
BRP-1220
U.S. DEPARTMENT OF TRANSPORTATION
ARLINGTON MEMORIAL BRIDGE
BRIDGE PLAN
3300-016P
-M a y -2
:5
P
M M
P R
O J E
C T
S g w m p (6
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s R
G W
M P
(6
S O
U T
H E
A S
T
C U
R B
S T
R
IN
G E
E
P A
IR
1.
d
LW LW
SOUTH CURB STRINGER 4-6 REPAIR - 1
EAST LEAF
NORTH ELEVATION CURB STRINGER 4-6 - TEMPORARY SUPPORT
stringer 4-6
Existing south curb beam (See Note 4)
Temporary support
18’-8"
19’-8"
–2’-6"–3’-0"
(Typ.)
Timber bearing
R27A
A
B
B
Top of sidewalk Top of sidewalk beam
Temporary support stringer 4-6
Existing south curb
(Typ.)
through double nuts
" Dia. threaded rod4 beam support
Temporary
Timber bearing stringer 4-6
Existing south curb
SECTION A-A SECTION B-B
1’-1"
"2 11 "2
1110"
STEEL PLATE
N
A C
T U
A L F I L E S
O U
T H
E A
S T C
U R
B S
T R I N
G E
R R
E P
A I R .D
G N
GC
anchor bolt (Typ.)
" Dia. min.2 as required timber bearing
Level concrete under
Top of deck
(Typ.)
steel plate
1’-1"x3"x1" Min.
nuts (Typ.)
rod with double
" Dia. threaded4
Top of deck
(Typ.)
steel plate
1’-1"x3"x1" Min.
stringer 4-6. No jacking is required.
Tension the threaded rods snug-tight to support the existing curb7.
curb reset details.
removed. See "TOP OF SIDEWALK REPAIR DETAILS" sheet for
Reset curb above the curb stringer after the temporary support is6.
support is removed.
grout and through the pavement with bitumen after the temporary
Fill hole through the concrete deck with high strength non-shrink5.
removal of temporary support system.
system. Avoid damaging existing members during installation and
The Contractor is responsible for stability of the temporary support4.
temporary support system to avoid damaging existing members.
Drill holes from the bottom of concrete deck when installing the3.
LAYOUT -3" sheet for curb removal approximate location.
temporary support system. See "TOP OF SIDEWALK REPAIR
Remove curb above the curb stringer before installing the2.
Submit plans for temporary support system to CO for approval.1.
NO.
REGION
NPS
NO.
NC FTNP-GWMP 11(6) DC
127169 214695 of
DATE
BRP-1220
U.S. DEPARTMENT OF TRANSPORTATION
ARLINGTON MEMORIAL BRIDGE
BRIDGE PLAN
3300-016P
28 May 2015
-M a y -2
1:
P
M
P R
O J E
C T
S g w m p (6
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
PROJECT TEAM LEADER
SHEET
NO.
U.S. DEPARTMENT OF TRANSPORTATION
BRP NO.
NPS
NO.
NC FTNP-GWMP 11(6) DC
ARLINGTON MEMORIAL BRIDGE
127169
214695
PMIS NO.
BRIDGE PLAN
No Scale
3300-016P
28 May 2015
A C
T U
A L F I L E X
X X
X
D G
N -M a y -2
1:
P
M
P R
O J E
C T
S g w m p (6
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
LW LW
5’-2"
"4 3–5’-7
S p a
3" 6"
"4 3–3
= 6" @ 3" 2 Spa.
Edge of filler plate
" Max.4
3Existing L6x6x
A B
A
B
NORTH ELEVATION CURB STRINGER 4-6
SOUTH CURB STRINGER 4-6 REPAIR - 2
EAST LEAFSECTION A-A SECTION B-B
(See Notes 1 to 3)
"dia. bolt8 7replace with new
Remove existing rivet and plate (See Note 4)
Cope strengthening
" Strengthening plate2 1" Strengthening plate2 as required
Install filler plate
" Coped strengthening plate2
(Typ.)
" Dia. bolt8
(Typ.)
" Dia. bolt8
Web of existing south curb stringer 4-6
GC
" Coped strengthening plate2
5 Spa. @ 9" = 3’-9"
" dia. bolt (Typ.)8
Bolt hole for
"2 14 9"
(Typ.) (Typ.)
" Strengthening plate2
1L5x3x
1L5x3x2
1L5x3x
(See Note 6) as required
Provide shims
1L5x3x
(See Note 6) as required
Provide shims
(See Note 6) as required
Provide shims
1L5x3x flange of existing curb stringer 4-6.
and the bottom 2 1to provide full contact between L5x3x
Remove all loose material and provide shims as required6.
sheet for curb reset details.
curb stringer. See "TOP OF SIDEWALK REPAIR DETAILS" strengthening plates is complete and reset curb above the
Remove the temporary support after the installation of 5.
Match coping dimensions as on existing curb stringer.4.
the next temporary pin.
with nut where a temporary pin is removed prior to removing
-in dia. bolt 8 7Slide out each temporary pin and install a 3.
Install strengthening plate by sliding on to temporary pins.2.
temporary headless pin prior to removing the next rivet.
-in dia8 7Remove each identified rivet and install a 1.
Notes:
" dia. bolt8 7replace with new
Remove existing rivet and
" dia. bolt8 7replace with new
Remove existing rivet and
" dia. bolt8 7replace with new
Remove existing rivet and
R28
STATE PROJECT
SHEET
NO.
REGION
NPS
NO.
NC FTNP-GWMP 11(6) DC
127169 214695 of
DATE
BRP-1220
U.S. DEPARTMENT OF TRANSPORTATION
ARLINGTON MEMORIAL BRIDGE
BRIDGE PLAN
3300-016P
28 May 2015
File details come from the government source that posted it. Updated .