Plans_revised.pdf

PDF 15 MB Posted

Attached to
Baltimore Washington Parkway
Solicitation number
DTFH71-10-B-00050
Issued by

About this file

Plans

View the file

Other files

File Type Posted
Amendment 002 - PRA-BAWA 1E19.pdf PDF
Amendment 001 - PRA-BAWA 1E19.pdf PDF
FP03 Errata.pdf PDF
Pavement Report.pdf PDF
ADV_Bidder's Qualifications Form.doc DOC document
FP03_Eng .pdf PDF
IFB Solicitation - PRA-BAWA 1E19.pdf PDF
Synopsis - PRA-BAWA 1E19.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P/E C/E

No Symbol

TB or TP

P P or

UD UD

W W

P/E C/E

No Symbol

TB or TP

P P or or

UD UD

W W

FOUND

36 31

6 1

36 31

6 1

No Symbol

No Symbol

FOUND

36 31

6 1

36 31

6 1

400 No Symbol x 99.9

T-45

2,645.9

T-3 x 99.9

T-45

2,645.9

T-3

26 25 69426 25 694

DBSF

c

Abutment Abut.

Aggregate aggr.

Ahead AH

Alternate alt.

Average daily traffic ADT

Back BK

Balance point BP

Bearing brg.

Begining beg.

Bench mark BM

Finish fin.

Flange flg.

Footing ftg.

Inside diameter ID

Mainline M.L.

Material matl.

Maximum max.

Mile[Kilometer] post M.P[K.P.]

Minimum min.

Monument mon.

Mechanically stabilized MSE embankment

West W

Centerline

Center to center cc, c-c or c. to c.

Centers ctrs.

Clear clr.

Column col.

Connection conn.

Construction joint Constr. jt.

Continuous cont.

Corrugated metal pipe CMP

Culvert culv.

Curve centeral angle

(spiral curve transitions)

Curve total angle

(curve delta or deflection)

Design hourly volume DHV

Design speed V

Diagonal diag.

Diameter D, dia., or

Diaphragm diaph.

Distance dist.

Drawing(s) dwg(s), or drwg(s)

Drop Inlet DI

East E

Edge of pavement EP or EOP

Elevation elev.

Elevation with number El. 94.161

[El. 94.16]

Embankment emb.

End section ES

Equation EQ or eq.

Excavation exc.

Expansion joint exp. jt.

Galvanized galv.

Gage(gauge) ga.

Headwall hdwl.

Hexagon hex.

High water HW

Joint jt.

Lamination lam.

Latitude lat.

Left lt., Lt. or LT

Length of curve(simple curve) L

Length of curve Lc

(spiral curve transision)

Length of spiral Ls

Longitudinal(longitude) long.

Low water LW

Original groung OG

Out to out o. to o.

Outside diameter OD

On centers o. c.

Normal crown NC or NCR

North N

Pavement pvmt.

Plate pl.

Point of compound curve PCC

Point of curve PC

Point of curve to spiral PCS or CS

Point of intersection PI

Point of spiral to curve PSC or SC

Point of spiral to reverse SRS spiral

Point of spiral to tangent PST or ST

Point of tangent PT

Point of tangent to spiral PS or TS

Point on curve POC

Point on spiral POS

Point on tangent POT

Radius R

Range R.

Reinforcement (reinforced) reinf.

Required reqd.

Right Rt., rt.or RT

Right-of-way R/W

Roadway Rdwy.

Route Rte.

Section Sec.

South S

Spacing, spaces or spaced spa.

Spiral central angle s

Standard std.

Station Sta.

Stiffener stiff.

Stringer stgr.

Structure struc.

Superelevation rate e

Symmetrical sym.

Tangent distance T

(tangent length)

Tangent distance Ts

(spiral curve transision)

Temporary benchmark TBM

Temporary construction TCE easement

Thread thd.

Township T.

Typical typ.

Vehicle per hour vph

Vertical point of intersection VPI

PAVEMENT REMOVAL/ROADWAY OBLITERATION

LAKE, POND or RESERVOIR; MARSHLAND

SLOPE STAKE

INTERSTATE U.S. STATE

AREA PATTERN

TREELINE; TREE

BUILDING

UNDERDRAIN

BOX CULVERT

CULVERT with DROP INLET

PIPE CULVERT with HEADWALL

PIPE CULVERT with END SECTION

PIPE CULVERT (arrow shows flow)

BRIDGE

STREET LIGHT

TELEPHONE BOOTH or PEDESTAL

SUPPORT POLE with ANCHOR

RETAINING WALL

SIGNS

PORTABLE

POST MOUNTED

GUARDRAIL

CATTLEGUARD

GATE with FENCE

FENCE

MATERIAL SOURCE

NORTH ARROW

wall facewall face

TB or TP or

P/LP/L

MEDIAN & SIDE (CONCRETE) BARRIER

NATIONAL PARK or

FOREST BOUNDARY

116 SECTION LINE

14 SECTION LINE

SECTION LINE

COUNTY BOUNDARY

CITY BOUNDARYCITY BOUNDARY

NATIONAL BOUNDARY

STATE BOUNDARY

TOWNSHIP or RANGE LINE

PROPERTY LINE

BRASS CAP

STEEL PIN

TRAVERSE POINT (Horizontal & Vertical)

Top of Triangle Points North

TRAVERSE POINT (Horizontal)

COORDINATE GRID TICK

SPOT ELEVATION

HUB & TACK

BORING LOCATION

RIPRAP/CULVERT RIPRAP

CHECK DAM

DIVERSION BERM

SILT FENCE

SIDEWALK ASPHALT/CONCRETE

FULL DEPTH PAVEMENT

OVERLAY

SECTION CORNER

14 SECTION CORNER

116 SECTION

PROPERTY CORNER

PARCEL NUMBER

EASEMENT (Permanent - Construction)

ROUTE NUMBERS

TOP OF CUT

TOE OF FILL

TRANSITION

SINGLE TRACK

ROADWAY, EXISTING

INTERMITTENT DRAINAGE/ SMALL CREEK

SPRING

LARGE CREEK/RIVER

RAILROAD

TRAIL

MULTIPLE TRACK

N

OVERHEAD(POWER POLE) UTILITIES

P=Electrical for transmission line

E=Electrical for distribution line

T=Telephone, E&T=Joint Electrical and Telephone

FO=Fibre optics

UNDERGROUND UTILITIES

G=gas, O=oil, P=power, SA=sanitary sewer, SS=storm sewer, T=telephone, W=water E=electrical, FO=fibre optics

PROJECT SPECIFIC SYMBOLS AND ABBREVIATIONS:-

DIVERSION CHANNEL

TEST PIT

B-1

TP-1

SYMBOLS AND

ABBREVIATIONS

NC MD

M

P ro je c ts

\b a w a \1 e \p ro j_ d e v \C

A D

D \A

-B

A W

A E s y m

.d g n

:0

:4

P

M /2

/2

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

REG STATE PROJECT SHEET NO.

BAWA 1E19 A2

NATIONAL PARK SERVICE

NPS

NO.

41924

89796

PMIS

NO.

PULVERIZE AND OVERLAY AT GRADE INLET PROTECTION AGIP

LIMIT OF DISTURBANCE

DBSF

N

NC MD

M

P ro je c ts

\b a w a \1 e

\p ro j_ d e v

\C A

D D

\A

-B

A W

A

E lo c .d g n

:4

:4

P

M

/8 /2

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

REG STATE PROJECT SHEET NO.

BAWA 1E19

NATIONAL PARK SERVICE

LOCATION MAP

A3

41924 89796

NPS

NO.

PMIS

NO.

R /W

TTTTTTTTTTT

N

SCALE IN FEET

0 50 100

A4

STAGING/STOCKPILE AREA

SF

SFSFSF

SF

SFSFSFXXXXXXXXXXX

P ro je c ts

\b a w a \1 e

\p ro j_ d e v

\C A

D D

\A

-B

A W

A

E lo c .d g n

:3

:3

P M

/8

/2

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

REG STATE PROJECT SHEET NO.

BAWA 1E19

NATIONAL PARK SERVICE

LOCATION MAP

A3

41924 89796

NPS

NO.

PMIS

NO.

R /W

TTTTTTTTTTT

XXXXXXXXXXX

2000 MON

TBAR

TBAR

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

SCALE IN FEET

0 150 300

TTTTTTTTTTTTTTTTTTTTT

Tele

Tele

PP

TT

STOP

N

N N

SPEED

LIMIT

W a ll

Drain holes

W a ll

N

XXXXXXXXXXXXXXXXXXXX

N

XXXXX

N N N

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

N

Curve = SPR-1

Curve = SPR-2

Curve = SPR-3

Curve = SPR-4

STATION

10+00.00

10+50.00

11+00.00

11+50.00

12+00.00

12+50.00

12+53.65

13+00.00

13+50.00

14+00.00

14+50.00

15+00.00

15+28.00

15+50.00

16+00.00

16+01.08

16+50.00

17+00.00

17+50.00

18+00.00

18+50.00

19+00.00

19+50.00

20+00.00

20+50.00

20+97.30

21+00.00

21+50.00

22+00.00

22+21.56

22+50.00

23+00.00

23+50.00

24+00.00

24+50.00

25+00.00

25+50.00

26+00.00

26+50.00

27+00.00

27+50.00

28+00.00

28+50.00

29+00.00

29+50.00

30+00.00

30+50.00

30+59.63

31+00.00

31+50.00

32+00.00

32+50.00

33+00.00

33+50.00

33+96.57

34+00.00

34+50.00

35+00.00

35+50.00

36+00.00

ELEV.

132.077

132.993

135.784

138.539

141.236

142.814

142.911

143.451

143.503

143.141

142.115

140.936

140.196

139.582

138.069

138.054

136.441

134.577

132.689

130.809

128.917

127.115

125.329

123.714

122.248

120.871

120.811

119.486

118.387

117.910

117.307

116.569

116.083

115.801

115.642

115.492

115.963

116.239

116.638

117.316

118.129

118.914

120.174

121.501

123.028

124.945

127.186

127.682

129.624

132.022

134.947

137.902

139.740

140.488

140.431

140.449

140.325

139.979

139.687

139.455

TYPE

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PROJECT STATION INFO

TBAR

TBAR

NAIL

Tele

Tele

PP

MON

TBAR

Drain holes

TBAR

TBAR

6" maple

NPS

TBAR

PRC

2" oaks

TBAR

4" oak

2" oak

TBAR

10"oak

10"oak

6" hickory 12" oak

PROJECT CONTROL POINTS REFERENCE

NAME

NORTHING

497445.465

497371.601

497636.560

497911.570

498427.420

498950.368

499506.773

499749.097

500096.449

497802.098

498102.590

498045.279

498730.659

498629.446

498940.176

498848.481

499290.377

499585.788

EASTING

1353924.896

1353864.438

1353535.153

1353678.503

1354156.117

1354400.064

1354594.176

1354456.853

1354156.195

1353631.041

1353887.386

1353795.306

1354313.470

1354224.262

1354347.704

1354362.281

1354487.104

1354610.182

139.808

137.565

132.922

143.056

121.980

116.319

136.190

139.618

145.156

141.545

136.269

140.004

114.909

118.994

108.500

114.614

122.559

140.020

MON

TBAR

TBAR

TBAR

TBAR

TBAR

TBAR

TBAR

NAIL

NAIL

NPS

NAIL

PRC

NPS

NAIL

MON 418

MON 409

PROJECT CONTROL POINTS

Project Coordinate System

Coordinate System : US State Plane 1983(at ground)

Zone : Maryland 1900

Datum : NAD 1983 (Conus)

Ellipsoid Name : Geodetic Ref System 1980

Geoid Model : Geoid 03(Conus)

TBAR

MUP

TBAR

MON

NPS

MARKER

MUP

TBAR

5194 NPS BOUNDARY

MUP

MUP

NPSMARKER

TBAR

TBAR

5363 409

TBAR

Not to ScaleNot to Scale Not to Scale Not to Scale Not to Scale

Not to ScaleNot to Scale

Not to Scale

Not to Scale

SURVEY INFORMATION SHEET

A5 NC MD

P ro je c ts

\b a w a \1 e \p ro j_ d e v \C

A D

D \A

-B

A W

A E s u r.

d g n

:0

:5

P

M /2

/2

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

REG STATE PROJECT SHEET NO.

BAWA 1E19

NATIONAL PARK SERVICE

LOCATION MAP

A3

41924 89796

NPS

NO.

PMIS

NO.

2000 MON

TBAR

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

TTTTTTTTTTTTTTTTTTTTT

Tele

Tele

PP

TT

STOP SPEED

LIMIT

W a ll

Drain holes

W a ll

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

STATION

10+00.00

10+50.00

11+00.00

11+50.00

12+00.00

12+50.00

12+53.65

13+00.00

13+50.00

14+00.00

14+50.00

15+00.00

15+28.00

15+50.00

16+00.00

16+01.08

16+50.00

17+00.00

17+50.00

18+00.00

18+50.00

19+00.00

19+50.00

20+00.00

20+50.00

20+97.30

21+00.00

21+50.00

22+00.00

22+21.56

22+50.00

23+00.00

23+50.00

24+00.00

24+50.00

25+00.00

25+50.00

26+00.00

26+50.00

27+00.00

27+50.00

28+00.00

28+50.00

29+00.00

29+50.00

30+00.00

30+50.00

30+59.63

31+00.00

31+50.00

32+00.00

32+50.00

33+00.00

33+50.00

33+96.57

34+00.00

34+50.00

35+00.00

35+50.00

36+00.00

132.077

132.993

135.784

138.539

141.236

142.814

142.911

143.451

143.503

143.141

142.115

140.936

140.196

139.582

138.069

138.054

136.441

134.577

132.689

130.809

128.917

127.115

125.329

123.714

122.248

120.871

120.811

119.486

118.387

117.910

117.307

116.569

116.083

115.801

115.642

115.492

115.963

116.239

116.638

117.316

118.129

118.914

120.174

121.501

123.028

124.945

127.186

127.682

129.624

132.022

134.947

137.902

139.740

140.488

140.431

140.449

140.325

139.979

139.687

139.455

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PK

PROJECT STATION INFO

TBAR

TBAR

NAIL

Tele

Tele

PP

MON

TBAR

Drain holes

TBAR

TBAR

6" maple

NPS

TBAR

PRC

2" oaks

TBAR

4" oak

2" oak

TBAR

10"oak

10"oak

6" hickory 12" oak

PROJECT CONTROL POINTS REFERENCE

NAME

NORTHING

497445.465

497371.601

497636.560

497911.570

498427.420

498950.368

499506.773

499749.097

500096.449

497802.098

498102.590

498045.279

498730.659

498629.446

498940.176

498848.481

499290.377

499585.788

EASTING

1353924.896

1353864.438

1353535.153

1353678.503

1354156.117

1354400.064

1354594.176

1354456.853

1354156.195

1353631.041

1353887.386

1353795.306

1354313.470

1354224.262

1354347.704

1354362.281

1354487.104

1354610.182

139.808

137.565

132.922

143.056

121.980

116.319

136.190

139.618

145.156

141.545

136.269

140.004

114.909

118.994

108.500

114.614

122.559

140.020

MON

TBAR

TBAR

TBAR

TBAR

TBAR

TBAR

TBAR

NAIL

NAIL

NPS

NAIL

PRC

NPS

NAIL

MON 418

MON 409

PROJECT CONTROL POINTS

Project Coordinate System

Coordinate System : US State Plane 1983(at ground)

Zone : Maryland 1900

Datum : NAD 1983 (Conus)

Ellipsoid Name : Geodetic Ref System 1980

Geoid Model : Geoid 03(Conus)

TBAR

MUP

TBAR

MON

NPS

MARKER

MUP

TBAR

5194 NPS BOUNDARY

MUP

MUP

NPSMARKER

TBAR

TBAR

5363 409

TBAR

Not to ScaleNot to Scale Not to Scale Not to Scale Not to Scale

Not to ScaleNot to Scale

Not to Scale

Not to Scale

SUMMARIES AND SCHEDULES

C2

SFR = Springfield Road

MD NC BAWA 1E19

PMIS

NO.

89796

NPS

NO.

41924

M

P ro je c ts

\b a w a \1 e

\p ro j_ d e v

\C A

D D

\C -B

A W

A

E q n t.

d g n

:1

:0

P

M /2

/2

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

REG STATE PROJECT SHEET NO.

NC

SFR = Springfield Road

MD C3 BAWA 1E19

PMIS

NO.

89796

NPS

NO.

41924

M

P ro je c ts

\b a w a \1 e

\p ro j_ d e v

\C A

D D

\C -B

A W

A

E q n t.

d g n

:1

:2

P

M /2

/2

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

C4

SFR = Springfield Road

P ro je c ts

\b a w a \1 e

\p ro j_ d e v

\C A

D D

\C -B

A W

A

E q n t.

d g n

:3

:4

A M

/1

/2

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

REG STATE PROJECT SHEET NO.

BAWA 1E19

41924 89796

NPS

NO.

C5

BD = Beverly Drive

SFR = Springfield Road

NC MD BAWA 1E19

PMIS

NO.

89796

NPS

NO.

41924

M

P ro je c ts

\b a w a \1 e

\p ro j_ d e v

\C A

D D

\C -B

A W

A

E q n t.

d g n

:1

:5

P

M /2

/2

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

C6 MD NC BAWA 1E19

PMIS

NO.

89796

NPS

NO.

41924

M

P ro je c ts

\b a w a \1 e

\p ro j_ d e v

\C A

D D

\C -B

A W

A

E q n t.

d g n

:1

:2

P

M /2

/2

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

EROSION CONTROL

NARRATIVE

(ADAPTED FROM MARYLAND EROSION AND SEDIMENT

CONTROL GUIDELINES)

6. All sediment basins, trap embankments and slopes, perimeter dikes, swales and all disturbed slopes steeper or equal to 3:1 shall be stabilized with sod or seed and anchored straw mulch, or other approved stabilization measures, as soon as possible but no later than seven (7) calendar days after establishment. All areas disturbed outside of the perimeter sediment control system must be minimized.

Maintenance must be performed as necessary to ensure continued stabilization.

(Requirement for stabilization may be reduced to three (3) days for sensitive areas.)

7. The contractor shall apply sod or seed and anchored straw mulch, or other approved stabilization measures to all disturbed areas and stockpiles within fourteen (14) calendar days after stripping and grading activities have ceased in the area. Maintenance shall be performed as necessary to ensure continued stabilization. (Requirement may be reduced to seven (7) days for sensitive areas.)

8. Prior to removal of sediment control measures, the contractor shall stabilize and have established permanent stabilization for all contributory disturbed areas using sod or an approved permanent seed mixture with required soil amendments and an approved anchored mulch. Wood fiber mulch may only be used in seeding season where the slope does not exceed 10% and grading has been done to promote sheet flow drainage. Areas brought to finished grade during the seeding season shall be permanently stabilized as soon as possible, but not later than fourteen (14) calendar days after establishment. When property is brought to finished grade during the months of November through

February, and permanent stabilization is found to be impractical, temporary seed and anchored straw mulch shall be applied to disturbed areas. The final permanent stabilization of such property shall be applied by March 15 or earlier if ground and weather conditions allow.

9. The site’s approval letter, approved Erosion and Sediment Control Plans, daily log books, and test reports shall be available at the site for inspection by duly authorized officials of WMA and the agency responsible for project.

10. Surface drainage flows over unstabilized cut and fill slopes shall be controlled by either preventing drainage flows from traversing the slopes or by installing protective devices to lower the water downslope without causing erosion. Dikes shall be installed and maintained at the top of a cut or fill slope until the slope and drainage area to it are fully stabilized, at which time they must be removed and final grading done to promote sheet flow drainage. Protective methods must be provided at points of concentrated flow where erosion is likely to occur.

11. Permanent swales or other points of concentrated water flow shall be stabilized with sod or seed with an approved erosion control matting, rip-rap, or by other approved stabilization measures.

Standard Erosion And Sediment Control Notes

The Water Management Administration requires that these notes, in their entirety, be included on the erosion and sediment control plan. It is recognized that every note may not apply to all projects. The requirement of any individual note not applicable to the subject project is not binding upon the applicant or the applicant’s contractor.

1. The contractor shall notify the Administration (WMA) at (410) 537-3510 seven (7) days before commencing any land disturbing activity and, unless waived by the Administration, shall be required to hold a pre-construction meeting between project representatives and a representative of WMA.

2. The contractor must notify WMA in writing and by telephone at the following points:

A. The required pre-construction meeting.

B. Following installation of sediment control measures.

C. During the installation of sediment basins (to be converted into permanent stormwater management structures) at the required inspection points (see Inspection Checklist on plan). Notification prior to commencing construction of each step is mandatory.

D. Prior to removal or modification of any sediment control structure(s).

E. Prior to removal of all sediment control devices.

F. Prior to final acceptance.

3. The contractor shall construct all erosion and sediment control measures per the approved plan and construction sequence and shall have them inspected and approved by the agency inspector or WMA Inspector prior to beginning any other land disturbances. Minor sediment control device location adjustments may be made in the field with the approval of the

WMA Inspector. The contractor shall ensure that all runoff from disturbed areas is directed to the sediment control devices and shall not remove any erosion or sediment control measure without prior permission from WMA Inspector and agency inspector. The contractor must obtain prior agency and WMA approval for changes to the

Sediment Control Plan and/or Sequence of Construction.

4. The contractor shall protect all points of construction ingress and egress to prevent the deposition of materials onto public roads. All materials deposited onto public roads shall be removed immediately.

5. The contractor shall inspect daily and maintain continuously in an effective operating condition all erosion and sediment control measures until such times as they are removed with prior permission from WMA

Inspector and agency inspector.

/2

/2

:2

:1

P

M M

P ro je c ts

\b a w a \1 e \p ro j_ d e v \C

A D

D \M

-B A

W A

E e s.

d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

/2

/2

:2

:1

P

M M

P ro je c ts

\b a w a \1 e \p ro j_ d e v \C

A D

D \M

-B A

W A

E e s.

d g n

REG STATE PROJECT SHEET NO.

PMIS

NO.

NPS

NO.

NC MD BAWA 1E19 41924

89796 M2

BALTIMORE WASHINGTON PARKWAY

SPRINGFIELD ROAD

PROJECT SHEET NO.

MD BAWA 1E19 M1

(ADAPTED FROM MARYLAND EROSION AND SEDIMENT

CONTROL GUIDELINES)

21. All water removed from excavated areas shall be passed through a WMA approved dewatering practice or pumped to a sediment trap or basin prior to discharge to a functional storm drain system or to stable ground surface.

22. Sediment control for utility construction for areas outside of designed controls or as directed by engineer or WMA Inspector:

A. Call "Miss Utility" at 1-800-257-7777 48 hours prior to the start of work.

B. Excavated trench material shall be placed on the high side of the trench.

C. Trenches for utility installation shall be backfilled, compacted, and stabilized at the end of each working day. No more trench shall be opened than can be completed the same day, unless;

D. Temporary silt fence shall be placed immediately downstream of any disturbed area intended to remain disturbed for more than one day.

23. Where deemed appropriate by the engineer or inspector, sediment basins and traps may need to be surrounded with an approved safety fence. The fence must conform to local ordinances and regulations. The developer or owner shall check with local building officials on applicable safety requirements. Where safety fence is deemed appropriate and local ordinances do not specify fencing sizes and types, the following shall be used as a minimum standard: The safety fence must be made of welded wire and at least 42 inches high, have posts spaced no farther apart than 8 feet, have mesh openings no greater than 2 inches in width and 4 inches in height with a minimum of 14 gauge wire. Safety fence must be maintained and in good condition at all times.

24. Off-site spoil or borrow areas on State or federal property must have prior approval by WMA and other applicable State, federal, and local agencies;

otherwise approval must be granted by the local authorities. All waste and borrow areas off-site must be protected by sediment control measures and stabilized.

25. Sites where infiltration devices are used for the control of stormwater, extreme care must be taken to prevent runoff from unstabilized areas from entering the structure during construction. Sediment control devices placed in infiltration areas must have bottom elevations at least two (2) feet higher than the finish grade bottom elevation of the infiltration practice. When converting a sediment trap to an infiltration device, all accumulated sediment must be removed and disposed of prior to final grading of infiltration device.

26. When a storm drain system outfall is directed to a sediment trap or sediment basin and the system is to be used for temporarily conveying sediment laden water, all storm drain inlets in non-sump areas shall have temporary asphalt berms constructed at the time of base paving to direct gutter flow into the inlets to avoid surcharging and overflow of inlets in sump areas.

12. Temporary sediment control devices may be removed, with permission of WMA

Inspector and agency inspectors, within thirty (30) calendar days following establishment of permanent stabilization in all contributory drainage areas.

Stormwater management structures used temporarily for sediment control shall be converted to the permanent configuration within this time period as well.

13. No permanent cut or fill slope with a gradient steeper than 3:1 will be permitted in lawn maintenance areas. A slope gradient of up to 2:1 will be permitted in nonmaintenance areas provided that those areas are indicated on the erosion and sediment control plan with a low-maintenance ground cover specified for permanent stabilization. Slope gradient steeper than 2:1 will not be permitted with vegetative stabilization.

14. For finished grading, the contractor shall provide adequate gradients to prevent water from ponding for more than twenty four (24) hours after the end of a rainfall event. Drainage courses and swale flow areas may take as long as forty-eight

(48) hours after the end of a rainfall event to drain. Areas designed to have standing water shall not be required to meet this requirement.

15. Sediment traps or basins are not permitted within 20 feet of a foundation that exists or is under construction. No structure may be constructed within 20 feet of an active sediment trap or basin.

16. The WMA Inspector has the option of requiring additional safety or sediment control measures, if deemed necessary.

17. All trap depth dimensions are relative to the outlet elevation. All traps must have a stable outfall. All traps and basins shall have stable inflow points.

18. Vegetative stabilization shall be performed in accordance with the Standards and

Specifications for Soil Erosion and Sediment Control. Refer to appropriate specifications for temporary seeding, permanent seeding, mulching, sodding, and ground covers.

19. Sediment shall be removed and the trap or basin restored to its original dimensions when the sediment has accumulated to one quarter of the total depth of the trap or basin. Total depth shall be measured from the trap or basin bottom to the crest of the outlet.

20. Sediment removed from traps (and basins) shall be placed and stabilized in approved areas, but not within a floodplain, wetland or tree-save area. When pumping sediment laden water, the discharge must be directed to a sediment trapping device prior to release from the site. A sump pit may be used if sediment traps themselves are being pumped out.

/8

/2

:4

:2

P

M M

P ro je c ts

\b a w a \1 e \p ro j_ d e v \C

A D

D \M

-B A

W A

E e s.

d g n

STERLING, VIRGINIA

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

/8

/2

:4

:2

P

M M

P ro je c ts

\b a w a \1 e \p ro j_ d e v \C

A D

D \M

-B A

W A

E e s.

d g n

PROJECT SHEET NO.

MD BAWA 1E19 M2

REG STATE PROJECT SHEET NO.

PMIS

NO.

NPS

NC MD BAWA 1E19 41924

89796 M3

BALTIMORE WASHINGTON PARKWAY

SPRINGFIELD ROAD

27. Site Information:

a. Total Area of Facility Acres

(base, campus, park, etc.)

b. Area Disturbed ___________ __________Acres

c. Area to be Roofed or Paved ____ Acres

d. Total Cut ______ Cubic Yards

e. Total Fill _________ Cubic Yards

f. Off-Site Waste / Borrow Area Location _____N/A___________

1.25

0 ___________________

710 ____________________

___________2.76__________

0___________

(ADAPTED FROM MARYLAND 1994 EROSION AND

SEDIMENT CONTROL GUIDELINES)

A. Site Preparation

i. Install erosion and sediment control structures (either temporary or permanent) such as diversions, grade stabilisation structures, berms, waterways, or sediment control basins.

ii . Perform all grading operations at right angles to the slope. Final grading and shaping is not usually necessary for temporary seeding.

iii. Schedule required soil tests to determine soil amendment composition and application rates for sites having disturbed area over 5 acres.

B. Soil Amendments (Fertilizer and Lime Specifications)

i. Soil tests must be performed to determine the exact ratios and application rates for both lime and fertilizer on sites having disturbed areas over 5 acres. Soil analysis may be performed by the

University of Maryland or a recognized commercial laboratory. Soil samples taken for engineering purposes may also be used for chemical analyses.

ii. Fertilizers shall be uniform in composition, free flowing and suitable for accurate application by approved equipment. Manure may be substituted for fertilizer with prior approval from the appropriate approval authority. Fertilizers shall all be delivered to the site fully labeled according to the applicable state fertilizer laws and shall bear the name, trade name or trademark and warrantee of the producer.

iii. Lime materials shall be ground limestone (hydrated or burnt lime may be substituted) which contains at least 50% total oxides (calcium oxide plus magnesium oxide). Limestone shall be ground to such fineness that at least 50% will pass through a #100 mesh sieve and 98 - 100% will pass through a

#20 mesh sieve.

iv. Incorporate lime and fertilizer into the top 3 - 5" of soil by disking or other suitable means.

C. Seedbed Preparation i . Temporary Seeding

a. Seedbed preparation shall consist of loosening soil to a depth of 3" to 5" by means of suitable agricultural or construction equipment, such as disc harrows or chisel plows or rippers mounted on construction equipment. After the soil is loosened it should not be rolled or dragged smooth but left in the roughened condition. Sloped areas (greater than 3 :1) should be tracked leaving the surface in an irregular condition with ridges running parallel to the contour of the slope.

b. Apply fertilizer and lime as prescribed on the plans.

c. Incorporate lime and fertilizer into the top 3 - 5" of soil by disking or other suitable means.

ii. Permanent Seeding

a. Minimum soil conditions required for permanent vegetative establishment:

1. Soil pH shall be between 6.0 and 7.0

2. Soluble salts shall be less than 500 parts per million (ppm).

3. The soil shall contain less than 40% clay but enough fine grained material ( > 30% silt plus clay) to provide the capacity to hold a moderate amount of moisture. An exception is if lovegrass or serecia lespedeza is to be planted, then a sandy soil ( < 30% silt plus clay) would be acceptable.

4. Soil shall contain 1.5% minimum organic matter by weight.

5. Soii must contain sufficient pore space to permit adequate root penetration.

6. If these conditions cannot be met by soils on site, adding topsoil is required in accordance with Section 21 Standard and Specification for Topsoil.

b. Areas previously graded in conformance with the drawings shall be maintained in a true and even grade, then scarified or otherwise loostened to a depth of 3 - 5" to permit bonding of the topsoil to the surface area and to create horizontal erosion check slots to prevent topsoil ftom sliding down a slope.

c. Apply soil amendments as per soil test or as included on the plans.

d. Mix soil amendments into the top 3 - 5" of topsoil by disking or other suitable means. Lawn areas should be raked to smooth the surface, remove large objects like stones and branches, and ready the area for seed application. Where site conditions will not permit normal seedbed prepataton, loosen surface soil by dragging with a heavy chain or other equipment to roughen the surface. Steep slopes (steeper than 3:l) should be tracked by a dozer leaving the soil in an irregular condition with ridges running parallel to the contour of the slope. The top 1 - 3" of soil should be loose and friable. Seedbed loosening may not be necessary on newly disturbed areas.

D. Seed Specifications

i. All seed must meet the requirements of the Maryland State Seed Law. All seed shall be subject to re-testing by a recognized seed laboratory. All seed used shall have been tested within the 6 months immediately preceeding the date of sowing such material on this job.

Note: Seed tags shall be made available to the inspector to verlfy type and rate of seed used.

ii. Inoculant - The inoculant for treating legume seed in the seed mixtures shall be a pure culture of nitrogen-fixing bacteria prepared specifically for the species. Inoculants shall not be used later than the date indicated on the container. Add fresh inoculant as directed on package. Use four times the recommended rate when hydmseeding. Note: It is very important to keep inoculant as cool as possible until used. Temperatures above 75-80^ F. can weaken bacteria and make the inoculant less effective.

/2

/2

:2

:2

P M

M

P ro je c ts

\b a w a \1 e \p ro j_ d e v \C

A D

D \M

-B A

W A

E e s.

d g n

STERLING, VIRGINIA

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

/2

/2

:2

:2

P M

M

P ro je c ts

\b a w a \1 e \p ro j_ d e v \C

A D

D \M

-B A

W A

E e s.

d g n

PROJECT SHEET NO.

MD BAWA 1E19 M3

REG STATE PROJECT SHEET NO.

PMIS

NO.

89796 M4

BALTIMORE WASHINGTON PARKWAY

SPRINGFIELD ROAD

E. Methods of Seeding

i. Hydroseeding: Apply seed uniformly with hydroseeder (slurry includes seed and fertilizer), broadcast or drop seeder, or a cultipacker seeder.

a. If fertilizer is beiig applied at the time of seeding, the application rates amounts will not exceed the following: nitrogen; maximum of 100 lbs. per acre total of soluble nitrogen; P205

(phosphorous): 200 lbs/ac; K20 (potassium): 200 lbs/ac.

b. Lime - use only ground agricultural limestone, (Up to 3 tons per acre may be applied by hydroseeding). Normally, not more than 2 tons are applied by hydroseeding at any one time.

Do not use burnt or hydrated lime when hydroseeding.

c. Seed and fertilizer shall be mixed on site and seeding shall be done immediately and without interruption.

ii. Dry Seeding: This includes use of conventional drop or broadcast spreaders.

a. Seed spread dry shall be incorporated into the subsoil at the rates prescribed on the Temporary or Permanent Seeding Summaries or Tables 25 or 26. The seeded area shall then be rolled with a weighted roller to provide good seed to soil contact.

b. Where practical, seed should be applied in two directions perpendicular to each other. Apply half the seeding rate in each direction.

(ADAPTED FROM MARYLAND 1994 EROSION AND

SEDIMENT CONTROL GUIDELINES)

iii. Drill or Cultipacker Seeding: Mechanized seeders that apply and cover seed with soil.

a. Cultipacking seeders are required to bury the seed in such a fashion as to provide at least 1/4 inch of soil covering. Seedbed must be firm after planting.

b. Where practical, seed should be applied in two directions perpendicular to each other. Apply half the seeding rate in each direction.

F. Mulch Specifications (In order of preference)

i. Straw shall consist of thoroughly threshed wheat, rye or oat straw, reasonably bright in color, and shall not be musty, moldy, caked, decayed, or excessively dusty and shall be free of noxious weed seeds as specified in the Maryland Seed Law.

ii. Wood Cellulose Fiber Mulch (WCFM)

a. WCFM shall comist of specially prepared wood cellulose processed into a uniform fibrous physical state.

b. WCFM shall be dyed green or contain a green dye in the package that will provide an appropriate color to facilitate visual inspection of the uniformly spread slurry.

c. WCFM, including dye, shall contain no germination or growth inhibiting factors.

H. Securing Straw Mulch (Mulch Anchoring): Mulch anchoring shall be performed immediately following mulch application to minimize loss by wind or water. This may be done by one of the following methods

(listed by preference), depending upon size of area and erosion hazard:

i. A mulch anchoring tool is a tractor drawn implement designed to punch and anchor mulch into the soil surface a minimum of two (2) inches. This practice is most effective on large areas, but is limited to flatter slopes where equipment can operate safely. If used on sloping Iand, this practice should be used on the contour if possible.

ii. Wood cellulose fiber may be used for anchoring straw. The fiber binder shall be applied at a net dry weight of 750 pounds/acre. The wood cellulose fiber shall be mixed with water and the mixture shall contain a maximum of 50 pounds of wood cellulose fiber per 100 gallons of water.

iii. Application of liquid binders should be heavier at the edges where wind catches mulch, such as in valleys and on crests of banks. The remainder of area should be appear uniform after binder application. Synthetic binders - such as Acrylic DLR (Agro-Tack), DCA-70, Petroset, Terra Tax II, Terra Tack AR or other approved equal may be used at rates recommended by the manufacturer to anchor mulch.

iv. Lightweight plastic nminp may be stapled over the mulch according to manufacturer’s remmmendations. Netting is usually available in rolls 4’ to 15’ feet wide and 300 to 3,000 feet long.

/2

/2

:2

:0

P

M M

P ro je c ts

\b a w a \1 e \p ro j_ d e v \C

A D

D \M

-B A

W A

E e s.

d g n

STERLING, VIRGINIA

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

PROJECT SHEET NO.

MD BAWA 1E19 M4

REG STATE PROJECT SHEET NO.

PMIS

NO.

89796 M5

BALTIMORE WASHINGTON PARKWAY

SPRINGFIELD ROAD

d. WCFM materials shall be manufactured and processed in such a manner that the wood cellulose fiber mulch will remain in uniform suspension in water under agitation and will blend with seed, fertilizer and other additives to form a homogeneous slurry. The mulch material shall form a blotter-like ground cover, on application, having moisture absorption and percolation properties and shall cover and hold grass seed in contact with the soil without inhibiting the growth of the grass seedlings.

e. WCFM material shall contain no elements or compounds at concentration levels that will be phyto-toxic.

f. WCFM must conform to the following physical requirements: fiber length to approximately 10 mm., diameter approximately 1 mm., pH range of 4.0 to 8.5, ash content of 1.6% maximum and water holding capacity of 90% minimum.

Note: Only sterile straw mulch should be used in areas where one species of grass is desired.

G. Mulching Seeded Areas - Mulch shall be applied to all seeded areas immediately after seeding.

i. If grading is completed outside of the seeding season, mulch alone shall be applied as prescribed in this section and maintained until the seeding season returns and seeding can be performed in accordance with these specifications.

ii. When straw mulch is used, it shall be spread over all seeded areas at the rate of 2 tons/acre. Mulch shall be applied to a uniform loose depth of between 1" and 2". Mulch applied shall achieve a uniform distribution and depth so that the soil surface is not exposed. If a mulch anchoring tool is to be used, the rate should be increased to 2.5 tons/acre.

iii. Wood cellulose fiber used as a mulch shall be applied at a net dry wight of 1,500 lbs. per acre. The wood cellulose fiber shall be mixed with water, and the mixture shall contain a maximum of 50 lbs.

of wood cellulose fiber per 100 gallons of water.

No.

Weeping RyegrassM

P ro je c ts

\b a w a \1 e \p ro j_ d e v \C

A D

D \M

-B A

W A

E e s.

d g n

/2

/2

:2

:0

P

M

I. Incremental Stabilization - Cut Slopes

i. All cut slopes shall be dressed, prepared, seeded and mulched as the work progresses. Slopes shall be excavated and stabilized in equal increments not to exceed 15 feet.

ii. Construciton sequence:

a. Excavate and stabilize all temporary swales, side ditches, or berms that will be used to convey runoff from the excavation.

b. Perform phase 1 excavation, dress, and stabilize.

c. Perform phase 2 excavation, dress, and stabilize. Overseed phase 1 areas as necessary.

d. Perform final phase excavation, dress and stabilize . Overseed previously seeded areas as necessary.

Note: Once excavation has begun the operation should be continuous from grubbing through the completion of grading and placement of topsoil (if required) and permanent seed and mulch. Any interruptions in the operation or completing the operation out of the seeding season will necessitate the application of temporary stabilization.

P ro je c ts

\b a w a \1 e \p ro j_ d e v \C

A D

D \N

-B A

W A

E

T c p .d g n

:1

:1

P

M /2

/2

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

REG STATE PROJECT SHEET NO.

BAWA 1E19 N1

P

0 1000 2000

NATIONAL PARK SERVICE

SPRINGFIELD ROAD

P

TEMPORARY TRAFFIC CONTROL

PMIS

NO.

NPS

NO.

41924

89796

SPRINGFIELD ROAD

CONSTRUCTION

(DATE) TO (DATE)

SPRINGFIELD ROAD

CONSTRUCTION

(DATE) TO (DATE)

P1

STOP

Pow der M ill R oad

SPEED

LIMIT

N

N

SCALE IN FEET

0 25 50

SCALE IN FEET

0 25 50

View A

4"

4"

4"

M a tc h lin e S ta . 1

M a tc h l in e S ta

M a tc h lin e S ta . 2

NC MD BAWA1E19

M

P ro je ct s\ b aw a\ e1

\p ro j_ d ev

\C A

D D

\P -B

A W

A

E ss p

.d g n :1

:2

P

M

/1

/2

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

REG STATE PROJECT

SHEET

NO.

SIGNING AND STRIPING

SPRINGFIELD ROAD

NATIONAL PARK SERVICE

PMIS

89796

NO.

41924

NPS

NO.

Po w de r M ill R d

Springfield Rd

0 1

0 1

0 1

P av em en t w id en in g area

S

Q F

T

P2

0 25 50

SCALE IN FEET

0 25 50

View A

4"

4"

4"

M a tc h l in e S ta

M a tc h lin e S ta . 2

M at ch l in e S ta

P ro je c ts

\b a w a \1 e \p ro j_ d e v \C

A D

D \P

-B A

W A

E ss p .d g n

:5

:2

A

M /2

/2

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

SHEET

NO.

SIGNING AND STRIPING

SPRINGFIELD ROAD

NATIONAL PARK SERVICE

PMIS

89796

NO.

41924

NPS

NO.

NC MD BAWA1E19

REG

STATE PROJECT

N

N

STANDARD

REG STATE PROJECT

SHEET NO.

U.S. CUSTOMARY STANDARD

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL LANDS HIGHWAY

SILT FENCE

157-1

S1 NC MD

BAWA 1E 19

NO. NO.

NPS

41924

89796

STANDARD APPROVED FOR USE

REVISED:

DRAFT:

E - 15 - 3

STANDARD SYMBOL

10’ MAXIMUM CENTER TO

CENTER

FLOW FLOW

FENCE POST SECTION

MINIMUM 20" ABOVE

GROUND

UNDISTURBED

GROUND

36" MINIMUM FENCE

POST LENGTH

FILTER

CLOTH

FLOW

POSTS

STAPLE

TOP VIEW

STAPLE

SECTION A

SECTION B

DETAIL 22 - SILT FENCE

PAGE MARYLAND DEPARTMENT OF ENVIRONMENT

WATER MANAGEMENT ADMINISTRATION

U.S. DEPARTMENT OF AGRICULTURE

SOIL CONSERVATION SERVICE

Construction Specifications

16" MINIMUM HEIGHT OF

GEOTEXTILE CLASS F

8" MINIMUM DEPTH IN

GROUND

FENCE POST DRIVEN A

MINIMUM OF 16" INTO

THE GROUND

36" MINIMUM LENGTH FENCE POST,

DRIVEN A MINIMUM OF 16" INTO

GROUND

EMBED GEOTEXTILE CLASS F

A MINIMUM OF 8" VERTICALLY

INTO THE GROUND

CROSS SECTION

JOINING TWO ADJACENT SILT

FENCE SECTIONS

PERSPECTIVE VIEW

1. Fence posts shall be a minimum of 36" long driven 16" minimum into the ground. Wood posts shall be 11/2" x 11/2" square (minimum) cut, or 13/4" diameter

(minimum) round and shall be of sound quality hardwood. Steel posts will be standard T or U section weighting not less than 1.00 pond per linear foot.

2. Geotextile shall be fastened securely to each fence post with wire ties or staples at top and mid-section and shall meet the following requirements for Geotextile Class F:

Tensile Strength 50 lbs/in (min.) Test: MSMT 509

Tensile Modulus 20 lbs/in (min.) Test: MSMT 509

Flow Rate 0.3 gal ft / minute (max.) Test: MSMT 322

Filtering Efficiency 75% (min.) Test: MSMT 322

3. Where ends of geotextile fabric come together, they shall be overlapped, folded and stapled to prevent sediment bypass.

4. Silt Fence shall be inspected after each rainfall event and maintained when bulges occur or when sediment accumulation reached 50% of the fabric height.

SILT FENCE

E - 15 - 3A

PAGE MARYLAND DEPARTMENT OF ENVIRONMENT

WATER MANAGEMENT ADMINISTRATION

U.S. DEPARTMENT OF AGRICULTURE

SOIL CONSERVATION SERVICE

Silt Fence Design Criteria

Slope Steepness

(Maximum)

Slope Length

(Maximum)

Silt Fence Length

Flatter than 50:1

50:1 to 10:1

10:1 to 5:1

5:1 to 3:1

3:1 to 2:1

2:1 and steeper unlimited

125 feet

100 feet

60 feet

40 feet

20 feet unlimited

1,000 feet

750 feet

500 feet

250 feet

125 feet

Note: In areas of less than 2% slope and sandy soils (USDA general classification system, soil Class A) maximum slope length and silt fence length will be unlimited. In these areas a silt fence may be the only perimeter control required.

SF

PAGE MARYLAND DEPARTMENT OF ENVIRONMENT

WATER MANAGEMENT ADMINISTRATION

U.S. DEPARTMENT OF AGRICULTURE

SOIL CONSERVATION SERVICE

6"

6" 6"

6"

6"

CROSS SECTION

PLAN/CUT AWAY VIEW

Construction Specifications

1. Lift grate and wrap with Geotextile Class E to completely cover all openings, then set grate back in place.

2. Place 3/4" to 11/2" stone, 4"-6" thick on the grate to secure the fabric and provide additional filtration.

STANDARD SYMBOL

E - 16 - 5A

GEOTEXTILE CLASS E

3/4" - 11/2" STONE

3/4" - 11/2" STONE

INLET GRATE

GEOTEXTILE CLASS E

WIRE TIES

6" OVERLAP

DETAIL 23B - AT GRADE INLET PROTECTION

MAX. DRAINAGE AREA = 1/4 ACRE

AGIP

2" X 4" FRAMING

WIRE MESH

E - 16 - 5

EDGE OF ROADWAY OR TOP

OF EARTH DIKE

FLOW

NAILING

STRIP

POST DRIVEN

INTO GROUND

FLOW

FLOW

6" MINIMUM

STANDARD SYMBOL

PAGE MARYLAND DEPARTMENT OF ENVIRONMENT

WATER MANAGEMENT ADMINISTRATION

U.S. DEPARTMENT OF AGRICULTURE

SOIL CONSERVATION SERVICE

DETAIL 23A - STANDARD INLET PROTECTION

Construction Specifications

3. Stretch the 1/2" x 1/2" wire mesh tightly around the frame and fasten securely. The ends must meet and overlap at a post.

7. The structure must be inspected periodically and after each

GEOTEXTILE CLASS E

18"

12"

EXCAVATE, BACKFILL AND

COMPACT EARTH

NOTCH ELEVATION

TOP ELEVATION

2. Drive the 2" x 4" construction grade lumber posts 1’ into the ground at each corner of the inlet. Place nail strips between the posts on the ends of the inlet. Assemble the top portion of the

2" x 4" frame using the overlap joint shown on Detail 23A. The top of the frame (weir) must be 6" below adjacent roadways where flooding and safety issues may arise.

1. Excavate completely around the inlet to a depth of 18" below the notch elevation.

4. Stretch the Geotextile Class E tightly over the wire mesh with the geotixtile extending from the top of the frame to 18" below the inlet notch elevation. Fasten the geotextile firmly to the frame.

The ends of the geotextile must meet at a post, be overlapped and folded, then fastened down.

5. Backfill around the inlet in compacted 6" layers until the layer of earth is level with the notch elevation on the ends and top elevation on the sides.

6. If the inlet is not in a sump, construct a compacted earth dike across the ditch line directly below it. The top of the earth dike should be at least 6" higher than the top of the frame.

rain and the geotextile replaced when it becomes clogged.

MAX. DRAINAGE AREA = 1/4 ACREMAX. DRAINAGE AREA = 1/4 ACRE

SIP

157-2

TEMPORARY

INLET PROTECTION

MD

BAWA 1E 19 S2 NC

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

FEDERAL LANDS HIGHWAY

U.S. CUSTOMARY STANDARD

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

FEDERAL LANDS HIGHWAY

STANDARDSTANDARD

REVISED:

PMIS NPS

41924

NO.

89796

STANDARD APPROVED FOR USE

B - 8 - 3

MIN.

MIN.

12"

18" y S

TOP OF BANK

SPACING

1’ THICK LAYER

3/4" TO 11/2"

CRUSHED AGGREGATE

(WASHED)

y

DETAIL 7 - STONE CHECK DAM

Sa

4’(MIN. WEIR)

STANDARD STONE CHECK DAM DESIGN

SLOPE SPACING

2% or less 80’

2.1% to 4% 40’

4.1% to 7% 25’

7.1% to 10% 15’ over 10% use lined waterway design

PAGE MARYLAND DEPARTMENT OF ENVIRONMENT

WATER MANAGEMENT ADMINISTRATION

U.S. DEPARTMENT OF AGRICULTURE

SOIL CONSERVATION SERVICE

GEOTEXTILE CLASS ’C’

(optional)

4" TO 7" STONE

CROSS SECTION

6" MIN.

DITCH PROFILE

STANDARD SYMBOL

Construction Specifications

1. Swales and ditches shall be prepared in accordance with the construction specifications described in Section A-2, Standards and Specifications for

Temporary Swale.

2. The check dam shall be constructed of 4"-7" stone. The stone shall be placed so that it completely covers the width of the channel and keyed into the channel banks.

3. The top of the check dam shall be constructed so the the center is approximately 6" lower than the outer edges, forming a weir that water can flow across.

4. The maximum height of the check dam at the center shall not exced 2".

5. The upstream sideof the check dam shall be lined with approximately 1" of 3/4" to 11/2" crushed aggregate.

E157-06

U.S. CUSTOMARY DETAIL

DETAILDETAIL APPROVED FOR USE

P ro je c ts

\b a w a \1 e

\p ro j_ d e v

\C A

D D

\S td

-D e t\

C h e c k

D a m

S

.d g n :0

:2

A

M

/2

/2

REG STATE PROJECT SHEET NO.

BAWA 1E19 S3

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

FEDERAL LANDS HIGHWAY

PMIS

89796

NO.

41924

NPS

CHECK DAM

P ro je c ts

\b a w a \1 e

\p ro j_ d e v

\C A

D D

\S td

-D e t\

S ta b il iz e d

E n tr a n c e S

.d g n

:0

:3

A

M

/7 /2

REG STATE PROJECT SHEET NO.

BAWA 1E19 S4

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

FEDERAL LANDS HIGHWAY

PMIS

89796

NO.

41924

NPS

STABILIZED CONSTRUCTION

ENTRANCE

F - 17 - 3

PROFILE

50’ MINIMUM

EXISTING GROUND

EXISTING PAVEMENT

10’ MINIMUM

WIDTH

10’ MIN.

EXISTING

PAVEMENT

10’ MIN.

10’ MIN.

EARTH FILL

PIPE AS NECESSARY

3’

5:1 5:1

STANDARD SYMBOL

PAGE MARYLAND DEPARTMENT OF ENVIRONMENT

WATER MANAGEMENT ADMINISTRATION

U.S. DEPARTMENT OF AGRICULTURE

SOIL CONSERVATION SERVICE

MOUNTABLE

BERM (6" MIN.)

** GEOTEXTILE CLASS ’C’

OR BETTER MINIMUM 6" OF 2"-3" AGGREGATE

OVER LENGTH AND WIDTH OF

STRUCTURE

* 50’ MINIMUM

LENGTH

Construction Specification

1. Length - minimum of 50’ (*30’ for single residence lot).

2. Width - 10’ minimum, should be flared at the existing road to provide a turning radius.

3. Geotextile fabric (filter cloth) shall be placed over the existing ground prior to placing stone. **The plan approval authority may not require single family residences to use geotextile.

equivalent shall be placed at least 6" deep over the length and width of the entrance.

entrances shall be piped through the entrance, maintaining positive drainage. Pipe installed through the stabilized construction entrance shall be protected with a mountable berm with 5:1 slopes and a minimum of 6" of stone over the pipe. Pipe has to be sized according to the drainage. When the SCE is located at a high spot and has no drainage to convey a pipe will not be necessary. Pipe should be sized according to the amount of runoff to be conveyed. A 6" minimum will be required.

6. Location - A stabilized construction entrance shall be located at every point where construction traffic enters or leaves a construction site. Vehicles leaving the site must travel over the entire length of the stabilized construction entrance.

PLAN VIEW

5. Surface Water - all surface water flowing to or diverted toward construction

DETAIL 24 - STABILIZED CONSTRUCTION ENTRANCE

4. Stone - crushed aggregate (2" to 3") or reclaimed or recycled concrete

SCE

157-7

E204-01

CUT AND FILL

SLOPE TRANSITIONS

REVISED: 02/08

S5

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

U.S. CUSTOMARY DETAIL

NC

M

P ro je c ts

\b a w a \1 e \p ro j_ d e v \C

A D

D \S td -D e t\

C u tS lo p e S

.d g n

:0

:5

A

M

/7 /2

REG STATE PROJECT SHEET NO.

MD BAWA 1E19

PMIS NPS

89796

NO.

41924

E401-01

DETAIL

REVISED: 07/07

DETAIL APPROVED FOR USE

PAVEMENT

TRANSITIONS

S6

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

NC

M

P ro je c ts

\b a w a \1 e \p ro j_ d e v \C

A D

D \S td -D e t\

P a v e m e n tT ra n s it io n S

.d g n

:0

1:

A M

/7

/2

REG STATE PROJECT SHEET NO.

MD BAWA 1E19

PMIS

89796

NO.

41924

NPS

G4 W-BEAM GUARDRAIL

STEEL POSTS

617-11

REG STATE PROJECT SHEET NO.REG STATE PROJECTREG STATE PROJECTREG STATE PROJECT

BAWA 1E 19 MD

NC

S7

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

FEDERAL LANDS HIGHWAY

U.S. CUSTOMARY STANDARD

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

FEDERAL LANDS HIGHWAY

STANDARDSTANDARD

REVISED: 4/1994 6/2005

DRAFT: 3/2007

STANDARD APPROVED FOR USE 1/1994

PMIS

89796 41924

NPS

NO.NO.

G4 W-BEAM GUARDRAIL

TYPE TANGENT TERMINAL

617-20

P

A T

H

D

A T

E

STANDARD APPROVED FOR USE 6/2005

REVISED:

DRAFT: 2/2007

REG STATE PROJECT SHEET NO.REG STATE PROJECTREG STATE PROJECTREG STATE PROJECT

MD BAWA 1E 19 S8 NC

PMIS

89796

NO.

41924

NPS

00 1010 2020 3030 40

C

O S

S S

E C

T

IO

N S

U .S

. D E

P A

R T

M E

N T

O F

T R

A N

S P

O R

T A

T

IO

N

F E

D E

R A

L H

IG

H

W A

Y A

D M

IN

IS

T R

A T

IO

N

E A

S T

E R

N F

E D

E R

A L

L A

N D

S H

IG

H

W A

Y D

IV

IS

IO

N

S T

E R

L

IN

G , V

IR

G

IN

IA

E

G S

T A

T E

P R

O J E

C T

S H

E E

T N

O

4/23/2010 9:13:08 AMM:\Projects\bawa\1e19\proj_dev\CADD\T01-BAWA1E19_xssA1.dgn

130 130

135 135

140 140

125 125

130 130

135 135

140 140

145 145

130 130

135 135

140 140

145 145

130 130

135 135

140 140

145 145

150 150

N C

B A

W A

E

M D

T

N A

T

IO

N A

L P

A R

K S

E R

V

IC

E

S P

R

IN

G F

IE

L

D R

O A

D

.0

T O

.0

P M

I S

N O

N P

S

N O

CL_SG

Sta. 10+50.0 R 1

Des. Grade = 133.16

Subgrade = 132.75

Orig. Grnd. = 133.16

CL

-1.46%

32SHLD_SGFM_SSG

-1.46% -4.76%

-4.76%

32SHLD_SGFM_SSGSSCCP_SG

E x c a v a ti o n L im it s

SSFCP_SG

E x c a v a ti o n L im it s

CL_SG

Sta. 11+00.0 R 1

Des. Grade = 136.11

Subgrade = 135.69

Orig. Grnd. = 135.91

CL

+2.27%

1:3

SHLD_SGFM_SSGHPF

SSFCP_SG

E x c a v a ti o n L im it s

+2.27% -5.38%

-5.38%

1:3

SHLD_SGFM_SSGBDTHPC

SSCCP_SG

E x c a v a ti o n L im it s

1:2

CL_SG

Sta. 11+50.0 R 1

Des. Grade = 139.04

Subgrade = 138.63

Orig. Grnd. = 138.61

CL

1:3

SHLD_SGFM_SSGHPF

SSFCP_SG

E x c a v a ti o n L im it s

1:3

SHLD_SGFM_SSGBDTHPC

SSCCP_SG

E x c a v a ti o n L im it s

1:2 +6% +6% -6% -6%

CL_SG

Sta. 12+00.0 R 1

Des. Grade = 141.44

Subgrade = 141.03

Orig. Grnd. = 141.10

CL

1:3

SHLD_SGFM_SSG

1:3

+6% +6% -6% -6%SSFCP_SG

E x c a v a ti o n L im it s

32SHLD_SGFM_SSGHPFCP_SGSSF

E x c a v a ti o n L im it s

O S

S S

E C

T

IO

N S

U .S

. D E

P A

R T

M E

N T

O F

T R

A N

S P

O R

T A

T

IO

N

F E

D E

R A

L H

IG

H

W A

Y A

D M

IN

IS

T R

A T

IO

N

E A

S T

E R

N F

E D

E R

A L

L A

N D

S H

IG

H

W A

Y D

IV

IS

IO

N

S T

E R

L

IN

G , V

IR

G

G S

T A

T E

P R

O J E

C T

S H

E E

T N

O

4/23/2010 9:13:19 AM M:\Projects\bawa\1e19\proj_dev\CADD\T01-BAWA1E19_xssA1.dgn

140 140

145 145

150 150

135 135

140 140

145 145

150 150

135 135

140 140

145 145

150 150

135 135

140 140

145 145

150 150

N C

B A

W A

E

M D

T

N A

T

IO

N A

L P

A R

K S

E R

V

IC

E

S P

R

IN

G F

IE

L

D R

O A

D

.0

T O

.0

N O

P M

I S

N O

N P

S

CL_SG

Sta. 12+50.0 R 1

Des. Grade = 143.04

Subgrade = 142.62

Orig. Grnd. = 142.76

CL

+4.22%

1:3

SHLD_SGFM_SSG

+4.22% -4.22%

-4.22%1:3SSFCP_SG

E x c a v a ti o n L im it s

32SHLD_SGFM_SSGHPFCP_SGSSF

E x c a v a ti o n L im it s

CL_SG

Sta. 13+00.0 R 1

Des. Grade = 143.83

Subgrade = 143.41

Orig. Grnd. = 143.44

CL

+1.49%

1:3

SHLD_SGFM_SSG

+1.49%

1:3

SHLD_SGFM_SSG

-2% -2%

SSFCP_SG

E x c a v a ti o n L im it s

CP_SGSSF

E x c a v a ti o n L im it s

CL_SG

Sta. 13+50.0 R 1

Des. Grade = 143.81

Subgrade =…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .