Amendment 001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Plans.pdf | ||
| FP03 Errata.pdf | ||
| Pavement Report.pdf | ||
| FP03_Eng .pdf | ||
| Solicitation - PRA-GUIS 12(1).pdf | ||
| SB Subcontracting Plan.doc | DOC document | |
| Bidder's Qualifications Form.doc | DOC document | |
| Synopsis Notice PRA-GUIS 12(1).doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
���������������������������� !"#$%�&��'&#$� ()*&+"%,-%.%*/�/&��%�$%(%!0%,� /� /1%�2" (%�,%3!-* /%,��&$�/1%�$%(%!2/�&��&��%$3�2$!&$�/&�/1%�1&#$� *,�, /%�32%(!�!%,�. '�$%3#"/�!*�$%4%(/!&*�&��'&#$�&��%$���!
����6����������������������������������������������6� ��5 �����������6�����
| 5��� | � |
| ����������� | �� |
| ������������������ | �� |
0 ��123� ��4�5��6��6�������
| ����� | ���� |
| � | ������������ |
| ��� |
| ���� | �� |
| ���� |
78�� ((&#*/!*-� *,� 22$&2$! /!&*�, / ��������
����������6�
!�����9�����7:6�����������
| ������������ | � |
| ������������������������� | �� |
����������������6��������� /������5�������������� ��!����7<���/������������������ ��
7=���, /%,��
7= ��.&,!�!( /!&*�&��(&*/$ (/>&$,%$�*&�
? �� .%*,.%*/�&��3&"!(!/ /!&*�*&�
9��* .%� *,� ,,$%33�&��(&*/$ (/&$����������������� �����
@�� ,.!*!3/%$%,��'������� ���� ������!�"�(&,%�A��!33#%,��'
2 -%���&���2 -%3
<��$%B#!3!/!&*>2#$(1 3%�$%B��*&�C��%��%(/!0%�, /%8�� .%*,.%*/>.&,!�!( /!&*��*&�� :��2$&4%(/�*&�������##$
7���(&*/$ (/�!,�(&,%��
��6��6����
(1%()�&*% ��/1!3�(1 *-%�&$,%$�!3�!33#%,�2#$3# */�/&;�� �����/1%�(1 *-%3�3%/��&$/1�!*�!/%.�7<� $%�. ,%�!*�/1%�(&*/$ (/
���/1%� �&0%�*#.�%$%,�(&*/$ (/>&$,%$�!3�.&,!�!%,�/&�$%�"%(/�/1%� ,.!*!3/$ /!0%�(1 *-%3��� � ����� ��&���
(��/1!3�3#22"%.%*/ "� -$%%.%*/�!3�%*/%$%,�!*/&�2#$3# */�/&� #/1&$!/'�&�;
,��&/1%$��
����������������3%/��&$/1�!*�!/%.�7<6�2#$3# */�/&�/1%� #/1&$!/'�&��� $�<C�7=C����
�����6� ����D�
�&$,%$�*&��!*�!/%.�7= �
7<��,%3($!2/!&*�&�� .%*,.%*/>.&,!�!( /!&*��'�&��
�"7
48�0(��%5-
�9:
�7��
7A ��* .%�� *,�/!/"%�&��(&*/$ (/!*-�&��!(%$����#�����#� ���7: ��* .%� *,�/!/"%�&��3!-*%$����#�����#�
7:(��, /%�3!-*%, 7A���#*!/%,�3/ /%3�&�� .%$!( �7:���(&*/$ (/&$>&��%$&$ 7A(��, /%�3!-*%, 3/ *, $,��&$.�C=��$%0��7=E9C� 2����� �������-3 � $��<9�(�$��:C�8<C
*3*�@:<=E=7E7:8E9=@= 2��5
%��� ����� ��5 �6������������������� ��!����? ����7= 6���������� �����������6�����
J-1
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
SPECIAL CONTRACT REQUIREMENTS
Project PRA-GUIS 12(1) Gulf Islands National Seashore
The following Special Contract Requirements amend and supplement the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-03) U. S. Customary Units, U. S. Department of Transportation, Federal Highway Administration.
J-2
Section 101.—TERMS, FORMAT, AND DEFINITIONS
101.01. Delete the last paragraph.
Section 102.—BID, AWARD, AND EXECUTION OF CONTRACT
102.04. Add the following:
Furnish documentary evidence as to the ownership and value of the assets pledged in support of the bond and details of the security interest in the assets by the individual sureties for the apparent low bidder within 14 calendar days after the opening of bids. Failure to submit evidence within the time required will be grounds for declaring the surety unacceptable.
In addition, the CO may, after reviewing the Affidavit of Individual Surety and documentary information on the security interest and the assets pledged, by certified mail to the surety's business or residence address (as shown on the bond), request the surety to provide further information and/or documents with respect to any of the documents provided. The CO may require such information to be furnished under oath. Failure of the surety to accept such mail, or failure of the surety to respond with the requested information or documents within 7 business days of receipt of the request, will be cause for rejection of the surety.
These requirements are in addition to the requirements in FAR Subpart 28.203, except where in conflict with the requirements in the FAR, in which case the FAR controls.
102.06. Add the following after the last paragraph:
Submit the documentary evidence for individual sureties at the same time as the Affidavit of Individual Surety and security interest in assets pledged. A Contractor submitting an unacceptable individual surety in satisfaction of a performance or payment bond before the issuance of the Notice to Proceed will be permitted one opportunity to substitute an acceptable surety or sureties within 7 business days of receipt of notification that the surety is unacceptable.
The Government's right to direct the substitution of sureties to ensure the continuing acceptability of the bonds during the performance of the Contract according to FAR Clause 52.228-2, Additional Bond Security, is not restricted.
These requirements are in addition to the requirements in FAR Subpart 28.203, except where in conflict with the requirements in the FAR, in which case the FAR controls.
J-3
Section 104. — CONTROL OF WORK
104.03(a). Add the following to the third paragraph:
Drawings will be reviewed in the order they are received.
104.03(b). Add the following after 104.03(b):
(c) As-built working drawings. Furnish 2 sets of as-built working drawings. The Government will provide 2 sets of contract drawings to be used exclusively for recording the as-built details of the project.
Keep the as-built working drawings current on a weekly basis and have at least 1 set available on the jobsite at all times. Accurately and neatly record changes from the contract plans, which are made in the work, or additional information, which might be uncovered in the course of construction, as they occur by means of details and notes. Maintain a log of all changes made to the as-built working drawings, and monthly, at the estimate cutoff date, make the as-built working drawings and log available for review by the CO.
Note all additions or revisions to the location, character, and dimensions of the prescribed work shown on the contract drawings. Line out all details shown that are not applicable to the completed work. Use the red-line process (red pencil or red ink) to record on the as-built working drawings and final as-built drawings, as a minimum, but not limited to, the information described below:
(1) Typical section(s)
(a) Revisions in dimensions; and
(b) Revisions in materials.
(2) Plan and profile
(a) Plan
(1) Revisions to the alignment;
(2) Changes in the construction limits;
(3) Revisions in location, type, and grade of road approaches;
(4) Location and type of utilities;
(5) Location, size, and type of underdrains;
(6) Skew of culverts;
J-4
(7) Channel changes;
(8) Location of monuments and permanent references;
(9) Elevations for all aerial and underground crossings of utilities; and
(10) Location, length, and type of fencing.
(b) Profile
(1) Revisions to grades, elevations, and stationing of intersection PIs;
(2) Equations;
(3) Culvert diameter, length, type, and stationing;
(4) Length of culvert extension, and length of existing culvert;
(5) Location, length, stationing, and type of retaining walls; and
(6) Location, length, stationing, and end treatment of guardrail.
(3) Miscellaneous
(a) Revisions to parking areas or turnouts;
(b) Final location, type and length of curbs, sidewalks, etc.;
(c) Fencing type and limits; and
(d) Landscaping and planting.
(4) Special Contract Procedures
(a) Method of excavation, concrete placement, girder erection, structure repairs, etc.
Prepare final as-built drawings after the completion of each definable feature of work as listed in the Contractor Quality Control Plan (Foundations, Utilities, Structural Steel, etc., as appropriate for the project). The as-built working drawings and final as-built drawings will be jointly reviewed for accuracy and completeness by the CO and the Contractor prior to submission of each monthly pay estimate.
If the monthly review finds that the Contractor is not maintaining the as-built working drawings, payment of the Contractor’s invoice will be withheld until the as-built working drawings are brought up to date.
J-5
Furnish the as-built working drawings to the CO before the final inspection. Correct all details found during the final inspection that are not shown on the as-built working drawings and return to the CO within 5 working days for approval.
Once final as-built working drawings have been approved by the CO, provide final as-built drawings in the latest version of Adobe Acrobat (PDF) format (at the time of submission) on two sets of CD-R or DVD-R. Include the latest version Adobe Acrobat reader on the CD-R or DVD-R. Provide the final as-built drawings with a resolution quality such that the redlined drawings and notations are clearly discernable. Final payment per Subsection
109.09 will not be made until the CD-R or DVD-R of the final as-built drawings have been reviewed and approved by the CO.
No direct payment will be made for maintaining and furnishing as-built working drawings.
104.05. Add the following:
When hauling on National Park Service roads, do not exceed the following load restrictions:
Single Units Gross Vehicle Weight – pounds 2 axles 40,000 3 axles 48,000 4 or more axles 52,000
Combination Units 3 axles 57,000 4 axles 62,000 5 or more axles 66,000
Where the ground is saturated with water or during periods of freezing and thawing, the CO may impose further load restrictions or suspend hauling.
Operate loaded vehicles hauling material at speeds not exceeding 40 miles per hour, or the posted speed limit whichever is lower, and spaced at 500-foot minimum intervals. Do not exceed 25 miles per hour, or the posted speed limit whichever is lower, or operate more than 1 loaded hauling vehicle at a time on a bridge.
Section 105. — CONTROL OF MATERIAL
105.02(b). Add the following:
If any material is to be excavated from any material source outside the construction limits, other than commercially operated sites, provide a certification from the State Historic Preservation Officer or Indian Tribal Council, if applicable, before work begins that states:
J-6
(1) A cultural resource survey (a survey for historical sites and archeological remains) has been performed at the proposed site; and
(2) No significant cultural resources exist in the area that will be disturbed by the Contractor.
Section 106.—ACCEPTANCE OF WORK
106.03. Delete the first sentence of the second paragraph and substitute the following:
Other than references in or to the FAR or Federal Law, when these Standard Specifications or Supplemental Contract Requirements reference certifications; certificates; or certified documents, equipment, or individuals, these references are not certifications under Section 4301 of Public Law 104-106, National Defense Authorization Act for Fiscal Year 1996.
Section 107.—LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC
107.01. Delete the second sentence of the third paragraph and substitute the following:
Obtain all additional permits or agreements and modifications to Government-obtained permits or agreements that are required.
107.02. Add the following after the third paragraph:
For the full duration of construction, protect the existing trees that are tagged by the CO in the following manner:
(a) Install and maintain a 4-foot high wood slat fence with steel posts around the perimeter of the root protection area, per Subsection 619.06. The root protection area is defined as an area equal to 10 feet outside the dripline.
(b) All construction which takes place within the root protection area must be approved by the CO. Do not store or locate construction materials, vehicles, staging areas, topsoil, disposal areas, or trailers within the root protection area. Protect the area from flooding, erosion, sedimentation, and potentially harmful materials through run-off or spillage.
(c) Remove all tree protection prior to final acceptance.
107.02. Add the following after the sixth paragraph:
Notify the CO in writing at least 48 hours in advance of any scheduled utility shutdown, investigation, and /or related work.
J-7
107.05. Add the following after the second paragraph:
Submit all claims to the insurance company for investigation, regardless of deductible, unless the Contractor has chosen to pay the claim directly. Provide the results of any investigations and subsequent actions to the CO within 1 week of receipt from the insurance company or of action.
Determination by the insurance company that the claim is not covered by the policy is not an adequate basis for the Contractor to fail to meet its obligations under the requirements of this Section.
Section 108.—PROSECUTION AND PROGRESS
108.01. Add the following:
Construction operations are limited as follows:
No work will be permitted from Friday through Sunday, National legal holidays, or from April 1 to September 30 of any year.
Occasional Friday work is allowed with the approval of the CO. Submit a schedule of upcoming closures to the CO at least 14 days in advance for distribution to the NPS and the public.
The location of this project has a high risk for hurricanes. Prior to start of construction, submit a hurricane evacuation and recovery plan. De-mobilize and remove all equipment from Santa Rosa Island at least 72 hours prior to hurricane landfall.
Section 109. — MEASUREMENT AND PAYMENT
109.06 Pricing of Adjustments. Add the following:
ASPHALT CEMENT PRICE ADJUSTMENT PROVISION
GENERAL The Asphalt Cement Price Adjustment Provision provides for a price adjustment in the form of a payment to the Contractor or a rebate to the Government for fluctuations in the cost of asphalt cement used in the performance of applicable construction work. The price adjustment provisions are applicable only to the asphalt cement, as defined in Subsection 702.01, and incorporated in the following eligible contract pay items:
• 40101 Superpave pavement
The price adjustment provisions are also applicable when the Government adds extra work to the eligible pay items already existing under the Contract.
The provision will remain in effect throughout the duration of the contract. Enactment of the Asphalt Cement Price Adjustment Provision will only be considered when the increase or
J-8 decrease in the price of asphalt cement as defined herein exceeds 10 percent.
The Asphalt Cement Price Adjustment Provision is intended to reduce but not eliminate the cost effects of price uncertainty to the Contractor and the Government for asphalt cement used in the construction of this contract. It provides for sharing by the Government in a portion of the Contractor’s risk, which could result from unusual price fluctuations. The provision is not intended to compensate the Contractor for normal day-to-day fluctuations and seasonal changes or to serve as a guarantee of full compensation for asphalt cement price fluctuations.
PRICE INDEXES The Government will generate a monthly performance price index for asphalt cement using price data obtained from Poten and Partners, Inc. (PPI), which publishes a weekly report (Asphalt Weekly Monitor) on high and low selling prices for states in five regions throughout the United States including the East Coast/Northeast, the Mid-Continent/Midwest, the Gulf Coast/Mid South, the Rocky Mountains and the West Coast/Northwest. Weekly high and low selling price data reported for PADD 3/ Pensacola will be averaged and used to establish a base price index, BPI, for this project and a monthly performance price index, MPPI, for the duration of the contract. These indexes are defined as follows:
• BASE PRICE INDEX The base price index, BPI, is the price index determined by the arithmetic average, as specified above, shown in the four weekly publications immediately preceding the bid opening. The BPI will be provided by the Government after contract award. It is as follows:
BASE PRICE INDEX (BPI) FOR ASPHALT CEMENT
PER SHORT TON (TON) (or PER METRIC TON) = $
• MONTHLY PERFORMANCE PRICE INDEX The monthly performance price index, MPPI, is the monthly price index at the time of performance of applicable work as determined by the arithmetic average, as specified above, shown in the four weekly publications issued prior to the last Wednesday of the month (i.e. the monthly performance price index during which asphalt cement is used in the performance of applicable construction work).
PRICE ADJUSTMENTS Price adjustments are calculated by the Government for average conditions and are not intended to reflect the Contractor’s actual purchase price. The ratio of the monthly performance price index and the base price index (MPPI/BPI) is calculated and used to determine price adjustments for eligible pay items as follows:
• No Price Adjustment – When the ratio MPPI/BPI falls within the range of 0.90 to 1.10, no price adjustment will be made for any asphalt cement used in construction work performed during the relevant month.
• Government Rebate – When the ratio MPPI/BPI is calculated to be less than 0.90, the
Government is due a rebate determined in accordance with the following formula:
Government Rebate = [0.90 – (MPPI/BPI)] (BPI) (Q)
J-9
• Contractor Payment – When the ratio MPPI/BPI is calculated to be greater than 1.10, the Contractor is due additional payment determined in accordance with the following formula:
Contractor Payment = [(MPPI/BPI) – 1.10] (BPI) (Q)
The following definitions are applicable to both the Government Rebate and the Contractor Payment formulas:
MPPI = Monthly Performance Price Index for the month during which asphalt cement is used in the performance of applicable construction work.
BPI = Base Price Index that is established immediately preceding the bid opening.
Q = Quantity in tons of asphalt cement for eligible pay items that were used on the project during the progress payment period. The quantity will be calculated using the asphalt content of the approved mix design and the following formula:
Q = Asphalt Concrete Pavement tons placed x (% Asphalt/100)
PRICE ADJUSTMENT COMPENSATION Monthly adjustments will be accrued. The final price adjustment will be paid, or rebated, after completion of all work for eligible pay items. The Contractor may request in writing a partial price adjustment payment once every 12 months, or when the unpaid accrued increase exceeds $10,000. The Government will take a rebate when the deductive accrual exceeds $10,000.
No price adjustments will be made for work performed beyond the Government-approved Contract completion date.
The maximum allowable monthly and final price adjustment to the Contractor or rebate to the Government is limited to a (MPPI/BPI) ratio of 1.6 and 0.4, respectively.
109.08(b). Add the following:
Submit invoices by the 7th day after the closing date. Invoices received after the 16th day following the closing date will not be accepted for payment processing that month. Include late, unprocessed invoice submittals in the following month’s invoice.
J-10
109.08(c). Add the following:
The government’s designated billing office is:
Federal Highway Administration Eastern Federal Lands Highway Division Loudoun Tech Center 21400 Ridgetop Circle Room 200 Sterling, Virginia 20166-6511
ATTN: CONSTRUCTION DIVISION
Section 152. — CONSTRUCTION SURVEY AND STAKING
152.02. Delete the first four paragraphs and substitute the following:
Include staking activities in the construction schedule submitted according to Section 155.
Include the dates and sequence of each staking activity. Establish initial reference lines and control points, and horizontal and vertical control points as necessary to perform the construction survey and staking.
152.02. Delete the second sentence of the second paragraph and substitute the following:
Reestablish any missing initial reference lines, control points, and stakes set by the Government.
152.03. Delete the text of paragraphs (h), (i), and (j).
152.03(a). Add the following:
Set benchmarks a maximum spacing of 1,000 feetalong the length of the roadway.
152.03(l)(9) and (10). Delete the Subsections and substitute the following:
(9) Permanent and temporary traffic control signs, signals, markings, delineators, object markers, etc.
(10) Excavation limits for various drainage, walls, structures, and other pertinent items.
Section 154.—CONTRACTOR SAMPLING AND TESTING
154.03. Add the following:
Furnish test results to the CO immediately after completing the test. The requirements for furnishing test results do not include sample aging or curing time; therefore, reporting times will
J-11 be extended accordingly.
Submit proposals for using alternate AASHTO or State approved test methods in writing for approval. Alternate methods may be allowed based on documented equivalence to the method specified.
154.04. Add the following:
On a weekly basis, submit a copy of all current Contractor test results and pay factor calculations based on those tests for items accepted under Subsection 106.05. When large quantities are produced, calculate pay factors as soon as possible. Use this information to make any necessary adjustments to operations to achieve acceptable pay factors. The Government may use the Contractor's test results to determine final pay factors for acceptance according to Subsection 154.05.
Section 155.—SCHEDULES FOR CONSTRUCTION CONTRACTS
155.02. Add the following after the third paragraph:
155.02A Weather Delays.
(a) Weather Delay Definitions.
(1) Reasonably Predictable Weather. The number of workdays that can expected to be lost in any month due to rainfall based on 10-year historical weather data.
(2) Rain Day. A potentially lost workday on which rainfall is equal to or greater than
0.10 inches
(3) Drying Day. A work day(s) immediately following a rainfall equal to or greater than
1.00 inch which is potentially lost because of wet ground conditions.
(4) Workday. A day not excluded from work by Section 108 of the Special Contract Requirements.
(5) Unusually Severe Weather. When the number of Actual Workdays Lost is greater than the calculated Total Lost Days for the month in question.
(b) Reasonably Predictable Weather. Determine Reasonably Predictable Weather for this contract by completing Table 155-1. Calculate data for Table 155-1 as follows:
(1) Using the last 10 years of historical weather data from the nearest NOAA weather data collection station, compute the average number of workdays lost (rain days plus drying days) for each month and the standard deviation from the average. Add the average number of workdays lost to the standard deviation.
J-12
(2) The Total number of Lost Days (Average Workdays Lost plus 1 Standard Deviation, rounded to whole days) will be considered normal for each month.
(3) Submit a completed Table 155-1 with the initial construction schedule.
(c) Unusually Severe Weather Under FAR Clause 52.249-10, Default (Fixed-Price Construction), the Contractor can request time for a delay due to Unusually Severe Weather.
The number of Actual Workdays Lost is calculated by first totaling the actual Rain Days plus the actual Drying Days occurring in the month in question. From this total, deduct any workdays meeting the following conditions:
(1) The Rain Day or Drying Day occurred on a non-work weekday such as a holiday.
(2) Rainfall occurred at a time when no weather dependent work was in progress or occurred during planned or unplanned shutdowns due to other circumstances such as equipment failure, strikes, material supplies, delays, etc.
(3) The Contractor was still working or able to work on weather dependent activities to the extent that less than 50 percent of the workday was lost due to weather.
If the net number of Actual Workdays Lost is greater than the Total Lost Days, then Unusually Severe Weather occurred during the month in question.
(d) Time Adjustments for Rain Delays. If the net number of Actual Workdays Lost to rain is less than the Total Lost Days for the month in question, no time adjustments will be made.
If the net number of Actual Workdays Lost is more, then an excusable time extension may be granted. The Contractor must submit a Weather Time Impact Analysis supporting any alleged delays due to Unusually Severe Weather.
(e) Delays Due To Other Weather Conditions. Delays due to other unusually severe weather conditions (snow, extreme cold or heat, hurricanes, high winds, etc.) must be supported with a Weather Time Impact Analysis using historical weather data.
155.02. Delete the last paragraph and substitute the following:
The Construction Contract Time shown on the construction schedule for contract completion or for any interim completion dates shall be the calendar dates established in the contract.
155.04. Add the following to the first paragraph:
For a computer-generated CPM, use Primavera software or software that is file-compatible with Primavera.
J-13
Add the following at the end of the Subsection:
TABLE 155-1
Project Number__________________________
Location of NOAA Data Collection Station__________________________
Data Years (10-year history): 20___ through 20___
REASONABLY PREDICTABLE WEATHER
MONTH AVERAGE WORKDAYS
LOST
STANDARD
DEVIATION
TOTAL LOST
DAYS
JANUARY
FEBRUARY
MARCH
APRIL
MAY
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
NOVEMBER
DECEMBER
Section 156. — PUBLIC TRAFFIC
156.03. Add the following:
Hauling will only be permitted from the nearest point of public access to the work site.
Minimize hauling over completed pavement.
Use a single lane closure on all roadways during construction with the exception of the Langdon Beach Access, Battery 234 Access Road, and Fort Pickens Loop Road. Close Langdon Beach Access Road and Battery 234 Access Road where there is insufficient width for single lane closures; open all roads on weekends and when construction is stopped for any reason.
J-14
Close Fort Pickens Loop Road in stages so that access to the Visitor Center is maintained. Close no more than one parking lot at a time.
156.04. Add the following:
(g) Ensure that all drains and inlets within the project limits are fully functional throughout the duration of the project.
156.06(i). Delete the text and substitute the following:
(i) Limit construction caused delays to public traffic to a maximum of 15 minutes per passage through the project.
156.07. Delete the Subsection and substitute the following:
156.07 Nighttime Operations. Nighttime operations are not permitted. Perform construction operations during the hours of daylight (½ hour after sunrise to ½ hour before sunset).
156.08. Delete the second sentence of the first paragraph and substitute the following:
The traffic safety supervisor may be the superintendent.
Section 203.—REMOVAL OF STRUCTURES AND OBSTRUCTIONS
203.05(b). Delete the Subsection and substitute the following:
(b) Burn. Burning is prohibited. Dispose of material according to Subsection 203.05(a).
203.05(c). Delete the Subsection and substitute the following:
(c) Bury. Burying debris is prohibited. Dispose of material according to Subsection 203.05(a).
Section 251. — RIPRAP
251.07. Delete the second sentence and substitute the following:
Rock for riprap will be evaluated under Subsections 106.02 and 106.04.
Verify that rock for riprap delivered to the placement site meets the applicable class size specified in Table 705-1 through sampling as specified in Table 251-1 and testing the size characteristic as follows:
Verify that production rock for riprap meets the applicable class gradation specified in Table 705-1 through sampling and testing the gradation characteristic as specified in Table 251-1.
J-15
Provide the CO a minimum 7-day advance notice of the sampling and testing schedule and location.
251.07 Table 251-1. Delete Table 251-1 and substitute the following:
Ta bl e
1-
Sa m pl in g an d Te st in g R eq ui re m en ts
R ep or tin g T im e
B ef or e us in g in w or k
B ef or e us in g in w or k
Sp lit
Sa m pl e
Y es
“ “ N o N o
Y es
, w he n re qu es te d
Po in t o f
Sa m pl in g
So ur ce o f m at er ia l
Pl ac em en t s ite
Pr od uc tio n st oc kp ile
Sa m pl in g F re qu en cy pe r m at er ia l t yp e
O ne p er cu bi c ya rd s (4 cu bi c m et er s)
O ne p er cu bi c ya rd s (8 c ub ic m et er s) pe r m ix d es ig n
T es t M et ho ds
Sp ec ifi ca tio ns
A
SH
TO
T
A A
SH
TO
T
SH
TO
T
Su bs ec tio n
1.
FL
H
T
-0
A A
SH
TO
T
T
C at eg or y
C ha ra ct er is tic pp ar en t s pe ci fic gr av ity ab so rp tio n
So di um su lfa te so un dn es s
LA
a br as io n
Si ze
G ra da tio n
M ak in g te st sp ec im en s
C om pr es si ve
St re ng th
T yp e of
A cc ep ta nc e
(S ub se ct io n)
M ea su re d an d te ed fo r c on fo rm an ce
(1
.0
4) ea su re d an d te ed fo r c on fo rm an ce
(1
4) at er ia l o r
Pr od uc t
R ip ra p
R oc k (7
2)
G ro ut
J-16
Section 301.—UNTREATED AGGREGATE COURSES
301.03. Add the following after the second paragraph:
Submit the representative 300-pound sample to the EFLHD Central Laboratory in Sevierville, Tennessee.
Section 401. — SUPERPAVE HOT ASPHALT CONCRETE PAVEMENT
401.01. Add the following:
Asphalt binder is designated as performance grade PG 64-22.
401.03. Add the following:
At the option of the Contractor, a State Department of Transportation Superpave hot asphalt concrete pavement mixture may be submitted for approval that has the same nominal maximum size aggregate, traffic level (design ESAL), and asphalt binder grade as specified.
401.03(a). Delete the first sentence and substitute the following:
Do not use mixes with over 15 percent recycled asphalt pavement in the top lift.
401.03(b). Add the following after the first sentence:
Submit all job-mix formula materials and information to the EFLHD Central Laboratory in Sevierville, Tennessee, with a copy to the CO as directed.
401.03(b). Add the following:
For State Department of Transportation mixes, submit a job-mix formula that is currently approved and has been tested by the State within a year of the date of intended use. Include documentation from a State Department of Transportation official certifying that it is an approved State mix.
For job-mix formulas with percentages of recycled asphalt pavement greater than 15 percent, submit a quality control plan showing sufficient control of the recycled asphalt pavement.
401.03(c). Add the following:
Allow a minimum of 21 calendar days for verification of each job-mix formula after receipt of all materials and information at the EFLHD Central Laboratory.
401.13. Add the following:
Begin paving operations at the furthest location from the asphalt plant and proceed towards the
J-17 plant.
401.16. Delete the Subsection and substitute the following:
401.16 Pavement Smoothness/Roughness. Measure the smoothness/roughness of the final paved surface course after final rolling, within 14 days of completing roadway paving, before placing a surface treatment, and according to the designated type below. In addition, construct all pavement surfaces to meet the requirements of (c) below.
(a) Profile ride index (PRI). For type I or II pavement smoothness, furnish a California type profilograph and personnel to operate the profilograph. The CO will direct and observe its operation. Operate the profilograph in the “mode” such that the continuous plot produced can be reduced according to FLH T 504. Measure in the middle portion of each lane and exclude areas according to FLH T 504. Measure excluded areas according to (c) below.
Submit the trace to the CO.
A PRI will be calculated for each 0.1-mile lane of traveled way using a zero blanking-band.
The PRI will be determined according to FLH T 504. Bumps will be located using a 0.4-inch bump template.
(1) Type I pavement smoothness (PRI measurements for reconstructed and new roads). Measure the smoothness of the final paved surface course. The upper specification limit is 24 inches per mile for reconstructed and new roads. Defective areas are bumps in excess of 0.4 inches in 25 feet, 0.1-mile profile ride index greater than 28.5 inches per mile, or surfaces with a pay factor less than 0.75 as determined under Subsection 106.05.
(2) Type II pavement smoothness (PRI measurements for overlay, recycle with overlay, or milling with overlay projects). Before construction traffic, measure the smoothness of the existing surface. The existing surface is the original surface before overlaying, recycling, or milling. The existing profile ride index and standard deviation will be used to determine the upper specification limit.
For one-lift placement of the final surface:
USL1 = 0.71 * PRI0 + 0.39 * Sd0, but not less than 24 inches per mile
For two-lift placement of the final surface:
USL2 = 0.50 * PRI0 + 0.30 * Sd0, but not less than 24 inches per mile
Where:
USL1 = Upper specification limit for one lift rounded to the nearest whole number (inches per mile)
J-18
USL2 = Upper specification limit for two lifts rounded to the nearest whole number (inches per mile)
PRI0 = Existing surface profile ride index (inches per mile)
Sd0 = Existing surface profile standard deviation
Measure the smoothness of the final paved surface course. Defective areas are bumps in excess of 0.4 inches in 25 feet, 0.1-mile profile ride index greater than 1.5 times the calculated upper specification limit, or surfaces with a pay factor less than 0.75 as determined under Subsection 106.05.
(b) International Roughness Index (IRI). For type III, IV, V, or VI pavement roughness, furnish an inertial profiler conforming to AASHTO MP 11 and capable of meeting certification requirements of AASHTO PP 49. Provide a trained and qualified operator to operate the inertial profiler equipment. All equipment will be validated against a government profiler at the time of use. A cross correlation value will be determined for at least one random segment of at least 0.1-mile in length. Contractor and Government profilers will be cross correlated on the same day prior to the start of paving operations. Coordinate the profile verification date through the CO. At the preconstruction conference, provide the CO with a list of three or more possible dates in three or more different weeks that the profiler and operator will be available for cross correlation verification. The CO will determine the cross correlation segments. The minimum acceptable cross correlation value is 0.90.
Equipment failing to obtain a cross correlation value of at least 0.90 shall not be used.
Operate the inertial profiler in accordance with manufacturer’s recommendations and AASHTO PP 50. Provide a lead-in distance, after reaching the testing speed, of at least 150 feet. Furnish personnel to provide flagging operations as may be required.
For all pavement roughness types measure the pavement profile in both wheel paths and use an average IRI value. Immediately after obtaining the profile measurements provide the CO with an electronic file containing the profile data in an ERD format per AASHTO PP 50.
Analysis of the profile data will be made using the latest version of the Profile Viewer and Analysis (ProVAL) software. The most current version can be downloaded at http://www.roadprofile.com.
Areas of localized roughness will be identified using a report of continuous IRI with a base length of 25 feet. This will yield the IRI of every possible 25-foot segment. Any area for which the continuous report exceeds an IRI of 170 inches/mile will be considered a defective area requiring correction in accordance with Subsection 401.16(d).
A report of continuous IRI is defined as the roughness profile from “Profiles from Roughness”, TRR 1260, by M.W. Sayers. Its use for detection of localized roughness, as required here, is demonstrated in “Using a Ride Quality Index for Construction Smoothness Specifications”, TRR 1861, by M. Swan and S. Karamihas.
An IRI value will be determined for each 0.1- mile of traveled way. Cattle guards, bridges, driveways, parking areas, and turning or passing lanes, side roads and ramps less than 350 http://www.roadprofile.com/�
J-19 feet in length will be excluded from the calculation of IRI and determination of localized roughness. Straightedge excluded areas according to Subsection 401.16(c).
(1) Type III pavement roughness (IRI measurements for reconstructed and new roads). Measure the roughness of the final paved surface course. Defective areas are 0.1-mile segments with IRI values greater than 95 inches per mile or areas of localized roughness.
The pay adjustment factor for each 0.1-mile segment will be determined from Table 401- 3.
Table 401-3 Type III Pavement Roughness
IRI (inches per mile) Pay Factor for Roughness
(PFIRI)
Less than 30.0 PFIRI = 1.050
30.1 to 59.9 PFIRI = )(00161.009744.1 IRI−
60.0 PFIRI = 1.000
60.1 to 94.9 PFIRI = )(00713.042764.1 IRI−
Greater than 95.0 Defective Area
PFIRI = Pay factor for roughness. (Rounded to three decimal places)
IRI = International Roughness Index. (Rounded to one decimal place)
(2) Type IV, V, and VI pavement roughness (IRI measurements for overlay, recycle with overlay, or milling with overlay projects). Measure the roughness of the existing surface no more than 30-days prior to the start of construction. The existing surface is the original surface before overlaying, recycling, or milling. The existing IRI will be used to determine the percent improvement for each 0.1-lane mile segment. Measure the roughness of the final paved surface course. Defective areas are areas of localized roughness, 0.1-lane mile segments having IRI values greater than the defective limits in Table 401-4, and surfaces with a pay factor less than 0.750 as determined under Subsection 401.19.
Table 401-4
Pavement Roughness Pavement Roughness
Type
IRI – inches/mile
Upper Specification Limit (USL) Defective Limit
IV
V
VI
60.0 70.0 80.0
95.0 100.0 105.0
J-20
The pay factor for roughness will be determined for each 0.1-mile segment length according to the following formula:
PFIRI = -0.00625(IRI) + (0.00625(USL) + 1.0) ≤ 1.050
PFIRI = Pay factor for roughness (rounded to three decimal places)
IRI = International Roughness Index (rounded to one decimal place)
USL = Upper Specification Limit
The maximum pay factor for roughness for any 0.1-lane mile segment will be 1.050. For overlay, recycle with overlay and milling with overlay projects determine the percent improvement. The percent improvement in IRI for each 0.1-lane mile segment length will be determined according to the following formula:
Percent Improvement = [(Original IRI – Final IRI) / Original IRI] x 100
Round percent improvement to one decimal place for each 0.1-lane mile segment. If the percent improvement for a 0.1-lane mile segment is less than zero then the maximum pay factor for roughness will be 1.000. When only one lift of asphalt concrete pavement is placed, if the percent improvement for a 0.1-lane mile segment is 25.0 percent or greater then the minimum pay factor for roughness for that segment will be 1.000. When multiple lifts of asphalt concrete pavement is placed, if the percent improvement for a 0.1-lane mile segment is 35.0 percent or greater then the minimum pay factor for roughness for that segment will be 1.000. Round Percent Improvement to one decimal place.
(c) Type VII pavement smoothness/roughness (straightedge measurement). Use a 10-foot metal straight edge to measure at right angles and parallel to the centerline. Defective areas are surface deviations in excess of 1/4 inch in 10 feet between any two contacts of the straightedge with the surface.
(d) Defective area correction. Correct defective areas from (a), (b), and (c) above. Obtain approval for the proposed method of correction. If no corrections are allowed, then bumps as defined by Subsection 401.16(a) and areas of localized roughness as defined by Subsection 401.16(b) will be assessed an additional deduction of $200 per incident. For areas of localized roughness and bumps within 25-feet of each other longitudinally and in the same lane, only one deduction of $200 will be assessed. If corrections of the defective areas defined in Subsection 401.16(b) are not allowed, then the pay factor will be 0.750. No other adjustments or deductions will be made if corrections are not allowed.
J-21
Re-measure corrected areas according to the specified type of pavement smoothness/roughness. The smoothness/roughness value obtained will replace the original value obtained will replace the original.
401.19. Delete the last paragraph and substitute the following:
When the bid schedule contains a pay item for Superpave hot asphalt concrete pavement type III, IV, V, or VI pavement roughness, a separate adjustment will be made for pavement roughness according to the following formula:
A2 = 40,000(PFAVE – 1.000)(L)
A2 = Adjustment to contract payment in dollars for pavement roughness.
L = Total project length in lane miles of traveled way minus excluded areas. Measure the project length to 3 decimal places.
PFAVE = Average Pay Factor for determined according to Subsection 401.16(b) after completion of corrective work. The formula for PFAVE is as follows:
PFAVE = (PFIRI1 + PFIRI2 + PFIRI3 + ….PFIRIn)/n
PFIRI# = Pay Factor for roughness for each 0.1-lane mile segment determined according to Subsection 401.16(b) n = Number of 0.1-lane mile segments tested
J-22
401.19. Delete Table 401-5 and substitute the following:
Table 401-5 Asphalt Binder Pay Factor Table
(1) Use Direct Tension for payment if the creep stiffness values from the Bending Beam Rheometer are between 301 and 600 Mpa.
Tests on Original Specifications (See 702.01)
Pay Factor =
1.01 1.00 0.95 0.90 0.75 Reject
Dynamic shear, G*/sinδ, kPa > 1.00 > 1.17 1.16 to 1.00 0.99 to 0.89 0.88 to 0.77 0.76 to 0.50 < 0.50
Tests after Rolling Thin Film Oven (RTFO)
Dynamic shear, G*/sinδ, kPa > 2.20 > 2.69 2.68 to 2.20 2.19 to 1.96 1.95 to 1.43 1.42 to 1.10 < 1.10
Tests on Pressure Aging Vessel (PAV)
Bending Beam, Creep stiffness, MPa < 300 < 247 248 to 300 Use Direct Tension > 600
Bending Beam, m-value > 0.300 > 0.320 0.319 to 0.300 0.299 to 0.294 0.293 to 0.278 0.277 to 0.261 < 0.261
Direct Tension, Failure strain 1 , % > 1.00 ___ > 1.00 0.99 to 0.56 ___ ___ < 0.56
J-23
401.19. Table 401-6 Change the following:
In the last row of the table under the Characteristics column, change Type III & IV roughness to Type III, IV, V, & VI roughness.
401.19. Add the following:
A price adjustment will be made for fluctuations in the cost of asphalt cement used in the performance of any eligible pay items according to Subsection 109.06 Pricing of Adjustments Asphalt Cement Price Adjustment Provision.
Section 601.—MINOR CONCRETE STRUCTURES
601.03. Delete the first sentence and substitute the following:
Conform to Table 601-1 or furnish a concrete mix used locally by either a Federal or State agency for the construction of minor concrete structures, that also meets the minimum 28-day compressive strength requirement of Table 601-1.
Section 602.—CULVERTS AND DRAINS
602.03. Add the following:
Furnish reinforced concrete, class II (minimum), culvert pipe.
Furnish pipe culvert to match existing pipe invert elevation, length, and diameter.
Section 609.—CURB AND GUTTER
609.03. Add the following:
Furnish black wheelstops to match existing. Submit sample to the CO for approval prior to installation.
Section 634.—PERMANENT PAVEMENT MARKINGS
634.03. Add the following to the first paragraph:
Place traffic markings before a seasonal suspension of paving operations. Stripe each roadway upon completion of paving operations.
J-24
Section 635. — TEMPORARY TRAFFIC CONTROL
635.02. Delete the Construction sign panels Section reference and substitute the following:
Construction sign panels 633.02
635.03. Add the following:
For all signs and other devices requiring orange color, use fluorescent orange, fluorescent red-orange, or fluorescent yellow-orange color.
635.03(i). Add the following:
Submit a certification that the devices have been successfully crash tested to meet the requirements of NCHRP Report 350 and/or have been accepted by the FHWA.
635.07. Delete the last sentence of the first paragraph and substitute the following:
Remove or completely cover all unnecessary signs, or signs that conflict with the construction signing or Traffic Control Plan. Cover signs that are not removed so that no part of the covered sign is visible to traffic. Provide sign covers for temporary signs meeting the following requirements:
(a) Large enough to completely cover the sign.
(b) Easy to attach to and remove from the sign without damaging the sign face. Do not use adhesives, glues, tapes, or mechanical fasteners that mar the sign face.
(c) Black, non-reflective, and opaque.
(d) Made of plywood (minimum of 3/8-inches thick), aluminum (minimum of 0.040 inches thick), or sheet metal of a sufficient thickness that the covering will not be lifted, bent, or damaged by wind.
(e) Durable enough to resist deterioration due to weathering and atmospheric conditions for the duration of the project.
635.07. Add the following:
Furnish 16-inch by 16-inchflags for high level warning devices that are fluorescent orange, fluorescent red-orange, or fluorescent yellow-orange in color.
635.17. Add the following:
Patch the travel way after milling to provide a smooth, uniform traveling surface before reopening travel lanes to traffic as directed by the CO.
J-25
Section 637. — FACILITIES AND SERVICES
637.02. Add the following:
Locate the Government field office as directed by the CO where high-speed Internet access, as described in Subsection 637.03(a)(7), is available. For urban projects locate the field office within 5 miles of the project site. For rural projects locate the field office within 15 milesof the project site. In remote locations where high-speed Internet service is not available, the field office distance range may be extended or waived by the CO. All field office locations are subject to approval by the CO.
637.03. Delete the third and fourth sentences of the first paragraph and substitute the following:
Provide local and long distance telephone services. The Government will be responsible for the cost of long distance calls made by Government employees for Government business and charged against this phone service. Bill the Government separately for these charges.
637.03(a). Add the following:
Divide the field office into 3 areas by permanent walls with hinged doors. If window air conditioning is provided, provide a separate unit for each room.
Clean the field office weekly to the approval of the CO.
Supply the following equipment in the field office:
(1) Copy machine. One self-feeding plain paper photo copying machine with the following minimum capabilities:
(a) Automatic document feeder capable of making at least 8 copies per minute;
(b) Reproducing copies at standard sizes up to and including 11 x 17 inches; and
(c) Reducing 11 x 17 inches plan sheets to 8 ½ x 14 inches legal size and to 8 ½ x 11 inches letter size.
Furnish all necessary supplies, except paper. Paper will be supplied by the Government.
(2) Printer. One plain paper printing machine with printing capabilities of standard sizes up to and including 11 x 17 inches. The printer must be capable of printing from direct personal computer (PC) and local area network (LAN) hookups. The printer may be one machine in combination with the copy machine. Furnish all necessary supplies, except paper. Paper will be supplied by the Government.
J-26
(3) Facsimile (FAX) machine. One FAX machine with the following minimum capabilities:
(a) Automatic document feeder with a minimum capacity of 20 pages;
(b) Sending standard size documents up to and including 11 x 17 inches;
(c) Printing on plain paper; and
(d) Automatic dial/redial.
The FAX machine may be one machine in combination with the copy machine. Furnish all necessary supplies, except paper. Paper will be supplied by the Government.
(4) Telephone. Two dual line telephones (touch tone, hold button, intercom, and conference calling capabilities) with 2 separate lines, for the exclusive use of the CO.
(5) Answering machine. One digital answering device capable of answering, recording, storing, and playing back messages at least 30 minutes in length.
(6) Cellular telephone. One durable, hand held digital/cellular wireless telephone(s) for the use of the CO. Furnish cellular telephone(s) that are similar or compatible with the Contractor’s key field personnel (Project Superintendent, Traffic Control Supervisor, etc.) to enable the direct communication between the CO and the Contractor’s key field personnel. Furnish each cellular telephone(s) with the following minimum capabilities:
(a) Direct Connect feature, or equivalent, to communicate onsite with Contractor’s key field personnel;
(b) Voicemail capable of answering, recording, storing, and playing back messages at least 30 minutes in length;
(c) Hands free device that can be used safely and effectively while driving, and is acceptable by the local law enforcement agencies;
(d) Customized communication configuration, independent of the other units, so that the CO may limit any features if necessary;
(e) Carrying case that can be worn on the belt and is appropriate for use on construction projects; and
(f) Other necessary cellular telephone accessories including a cigarette lighter power adapter/charger.
The cellular telephone plan shall provide the necessary amount of monthly Direct Connect airtime and monthly Digital/Cellular airtime for use on the project. Ensure that
J-27 each unit has unlimited Direct Connect capabilities and each unit is equipped with unlimited airtime, roaming, and local and long distance airtime necessary per month for official business only. Provide phones that work properly at the project site and at the Contractor’s and Government field office locations.
(7) High-speed Internet access. Provide, install, and maintain high-speed Internet access service having at least 768 kilobit per second download and 256 kilobit per second upload speed. The high-speed Internet access service can be provided via DSL, FIOS, a dedicated T1 line, or cable. Alternate Internet access service options may be submitted to the CO for approval. The system must include a modem and a router with a firewall or a router and a firewall appliance. The system must have the capability to support simultaneous Internet access of at least 3 workstations connected by Category 6 RJ45 LAN office drop cables. The firewall configuration must be submitted to the CO for approval and cannot be changed after it is approved, unless a change request is submitted and approved in advance. Only U.S. DOT equipment is to be connected to the system.
If any equipment supplied becomes defective, is stolen, or for any other reason does not function as intended, replace the equipment with an equal or better unit at no additional cost to the Government. Replace any defective equipment within eight hours after being notified by the CO.
The Contractor will retain ownership of all equipment supplied by the Contractor.