Tunnel Inspection Report
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ADV_Bidder's Qualifications Form.doc | DOC document | |
| ARRA Sign Pictographs.pdf | ||
| FP03 Errata.pdf | ||
| FP03_Eng .pdf | ||
| IFB Solicitation - BLRI 2T13.pdf | ||
| Plans.pdf | ||
| ARRA Sign Placement Guidance.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TUNNEL INSPECTION REPORT
BUCK SPRING TUNNEL
BLUE RIDGE PARKWAY THROUGH BUCK SPRING MOUNTAIN
BLUE RIDGE PARKWAY
NP
STRUCTURE NO. 5140-150P
INSPECTION TYPE: ROUTINE
INSPECTION DATE: 6/23/07
Report prepared by: SP
MILE POINT: 407.25
Federal Highway Administration KILOMETER POINT: 655.39 Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 http://www.efl.fhwa.dot.gov/FLHBO/BIP
STRUCTURE SUMMARY STRUCTURE NO. 5140-150P
BUCK SPRING TUNNEL INSPECTION DATE: 6/23/07
TUNNEL IDENTIFICATION AND DESCRIPTION
LINING MATERIAL: ............... CONCRETE / NOT APPLICABLE MINIMUM VERTICAL CLR: .... 13.5 FT (4.1 M)
SPRINGLINE LENGTH: ........ 0.0 FT (0.0 M) STRUCT. TOTAL LENGTH: ... 468.0 FT (142.6 M)
CURB TO CURB WIDTH: ..... 29.7 FT (9.1 M) YEAR BUILT:
PROJ./PLAN REF. NO: ......... 2T5,2T2,2T10 / 00000 YEAR RECONSTRUCTED:
NPS ROAD CLASS: .............. PRINCIPAL PARK ROAD
STRUCTURE HISTORY: ...... 1985-LINING REHABILITATION.
LOCATION
BLUE RIDGE PARKWAY MILE POINT: ..................... 407.25 (KM PT 655.39)
STATE: .................................. NORTH CAROLINA LOCATION: 4.6 MILES TO U.S. ROUTE 276
FACILITY CARRIED: ............. BLUE RIDGE PARKWAY
FEATURE INTERSECTED: ... BUCK SPRING MOUNTAIN
STRUCTURE EVALUATION SUMMARY
This tunnel is in fair condition overall. The most serious problem at this time is water leakage from a moderate spall over the roadway at the south end of the tunnel, causing an ice patch to form on the roadway when temperatures fall below freezing, creating hazardous driving conditions. Other problems include moderate cracking with efflorescence and water leakage at several drain chases, minor deterioration of the portal masonry mortar joints and 5 missing and 10 damaged reflectors along the tunnel lining. Rehabilitation should remain a moderately high priority. There have been no significant changes in the structural condition since the last inspection.
With rehabilitation as outlined in this report, as well as regular maintenance, a useful life of 25-30 years can be expected for this tunnel under current operating conditions.
INSPECTION TEAM: R. PARKER, P. SWANN (VOLKERT & ASSOCIATES, INC.)
CONDITION ASSESSMENT:
RICHARD W. PARKER, P.E., FIELD TEAM LEADER
REPORT REVIEW:
MARCUS MILLER, P.E., LEAD STRUCTURAL ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 10/29/07
JOHN R. THIEL, P.E., BRIDGE MANAGEMENT ENGINEER 703-404-6251
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5140-150P
226 PRIORITY OF IMPROVEMENT C
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain in service at reduced loads or with frequent inspections.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
ITEM
NO.
MAINTENANCE RECOMMENDATIONS
(GENERALLY NOT FLHP ELIGIBLE)
QTY. UNIT
COST
UNIT
ESTIMATE
COST
PRELIM.
59.1 REPAIR SPALLS ON TUNNEL LINING. 1 LS $4,000 $4,000
59.8 REPLACE MISSING AND DAMAGED REFLECTORS. 15 EA $250 $4,000
PRELIM. MAINTENANCE TOTAL : $8,000
ITEM
NO.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS)
QTY. UNIT UNIT
COST ESTIMATES
PRELIM. COST
REHAB. RECONSTR.
59.4 REPAIR FAILED DRAIN CHASES AND REPAIR LEAKING CHASES. 58 LF $500 $30,000 $0
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL : $30,000 $0
COST ESTIMATE SUMMARY
PRELIM. MAINTENANCE TOTAL:
PRELIM. REHABILITATION TOTAL:
PRELIM. RECONSTRUCTION TOTAL:
TOTAL ITEMIZED COSTS: ..................... $38,000
$0 $30,000
$8,000 PRELIMINARY ESTIMATE TOTAL* :
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
$76,000
REMARKS: Maintenance cost estimates assume that recommended actions will be combined with similar work being performed on other structures.
FIELD INSPECTION REPORT STRUCTURE NO. 5140-150P
INSPECTION DATE: 6/23/07
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
N
NOT APPLICABLE
EXCELLENT CONDITION
VERY GOOD CONDITION - no problems noted.
GOOD CONDITION - some minor problems.
SATISFACTORY CONDITION - structural elements show some minor deterioration.
FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
POOR CONDITION - advanced section loss, deterioration, spalling, or scour.
SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
Fatigue cracks in steel or shear cracks in concrete may be present.
CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
“IMMINENT” FAILURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.
FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
59. TUNNEL 5
F1. LINING
G2. PORTALS
N3. CURBS AND SIDEWALKS
F4. DRAINS AND DRAINAGE
G5. WEARING SURFACE
G6. RIDEABILITY
N7. LIGHTING
F8. OTHER (Reflectors)
9. ADEQUACY OF OPENING SUFF
222. APPROACHES 8
N1. APPROACH SLABS
N2. RELIEF JOINTS
N3. APPROACH GUARDRAIL
G4. SURFACING
G5. EROSION
G6. SETTLEMENT
G7. SIGNS
G8. ALIGNMENT
N9. OTHER
223. RETAINING WALL N
1. WALL
2. WEEP HOLES
3. FOUNDATION
4. EROSION AND/OR SCOUR
5. SETTLEMENT OR DEFLECTION
6. OTHER
36. TRAFFIC AND SAFETY FEATURES
NA. BRIDGE RAILINGS
NB. TRANSITIONS
NC. APPROACH GUARDRAILS
ND. APPROACH GUARDRAIL ENDS
ITEM REFERENCE AND REMARKS
59.1 MODERATE SPALL WITH WATER LEAKAGE OVER ROADWAY, 150'
FROM SOUTH END OF TUNNEL WHICH IS CAUSING AN ICE PATCH
ON ROADWAY WHEN TEMPERATURE FALLS BELOW FREEZING.
MODERATE CRACKING THROUGHOUT LINING WITH
EFFLORESCENCE AND MINOR WATER LEAKAGE. MINOR SPALL
WITH EXPOSED REBAR ON UNDERSIDE OF CROWN
APPROXIMATELY MIDWAY THROUGH. VOID IN CROWN WITH
EXPOSED REBAR 120' FROM NORTH PORTAL. ROCK/SOIL EXPOSED
ABOVE TUNNEL LINING. SEVERE SPALL WITH EXPOSED REBAR
AND ROCK 150' FROM SOUTH PORTAL, EAST LINING. 18" DIA. HOLE
WITH EXPOSED REBAR AND ROCK 100' IN FROM SOUTH PORTAL,
EAST LINING.
59.2 MINOR DETERIORATION OF PORTAL MASONRY MORTAR. MINOR
EFFLORESCENCE ON MASONRY OF BOTH PORTALS. MINOR
VEGETATION GROWTH ON WEST SIDE OF NORTH PORTAL.
59.4 MODERATE CRACKING WITH EFFLORESCENCE AND MINOR WATER
LEAKAGE AT DRAIN CHASES. PARTIAL FAILURE OF SOME
PREVIOUS REPAIRS AT DRAIN CHASES. DRAIN CHASE BLOWN OUT
120' FROM SOUTH PORTAL, 4' X 8" AREA ON EAST LINING. FAILED
REPAIR AREA ON WEST SIDE LINING, APPROXIMATELY 30' FROM
NORTH PORTAL.
59.8 5 MISSING AND 10 DAMAGED REFLECTIVE DEVICES THROUGHOUT
TUNNEL.
222.7 13'-2" VERTICAL CLEARANCE SIGNS AT NORTH AND SOUTH
APPROACHES.
TRAFFIC SAFETY RATING CODES
N
Does not meet standards or a safety feature is required and none is provided.
Meets currently acceptable standards.
Not applicable or a safety feature is not required.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-150P
STRUCTURE IDENTIFICATION
(201) PARK: BLUE RIDGE PARKWAY (1) STATE: ....................................... 374 - NORTH CAROLINA (NC)
(202) STRUCTURE NAME: .......... BUCK SPRING TUNNEL (2) STATE HWY. AGENCY DIST:
(203) STRUCTURE KIND: ............ 3 - TUNNEL (3) COUNTY CODE: ........................ 087 - HAYWOOD
(204) STRUCTURE NUMBER: ..... 5140-150P (4) CITY/PLACE CODE:
(205) NPS REGION: .................... 4 - SOUTHEAST (5) INVENTORY ROUTE:
(206) ROUTE CODE NUMBER: ... 1 (6) FEATURES INTERSECTED:....... BUCK SPRING MOUNTAIN
(207) ROAD SECTION NO: .......... 150P (7) FACILITY CARRIED: .................. BLUE RIDGE PARKWAY
(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 5140150P0000000
(209) WITHIN NPS BNDRY?: ....... YES (9) LOCATION: ................................ 4.6 MILES TO U.S. ROUTE 2
(210) OPERATING UNIT: ............. BALSAM (10) INV. RTE. - MIN. VERT. CLR: .. 13.33 FT (4.06 M)
(211) PROJECT NO(S): ................ 2T5,2T2,2T10 (11) MILE POINT: ............................. 407.25 (KM PT 655.39)
(212) DRAWING NUMBERS: ....... 00000 (27) YEAR BUILT:
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED:
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................ 3 - FREE ROAD
(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
1 - CONCRETE
18 - TUNNEL
29.7 FT (9.1 M)
468.0 FT (142.6 M)
6 - N/A
6 - N/A
6 - N/A
6 - N/A
N - NOT APPLICABLE
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. 6 - BITUMINOUS
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION: .............. 0 - NONE
(218) IS SALT USED?: ..................... YES
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 0 - OTHER OR UNKNOWN (41) LOAD RESTRICTION: ......... R - POSTED (OTHER)
(66) INVENTORY RATING: ...... 0.0 TONS (0.0 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED
(64) OPERATING RATING: ...... 0.0 TONS (0.0 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 6/07 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-150P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE: ............................. 35°25'04.00" (51) CURB TO CURB WIDTH: ........... 29.7 FT (9.1 M)
(17) LONGITUDE: ......................... 82°44'48.00" (52) DECK WIDTH: ............................ 0.0 FT (0.0 M)
(19) DETOUR LENGTH: ............... 50 MI (80 KM) (32) APPR. ROADWAY WIDTH: ........ 38.0 FT (11.6 M)
(28A) LANES ON STRUCT: .......... 00 (213) APPR. PAVEMENT WIDTH: ..... 22.0 FT (6.7 M)
(28B) LANES UNDER STRUCT: ... 02 LEFT SHOULDER: .................. 8.0 FT (2.4 M)
(42A) SERVICE ON: ..................... 1 - HIGHWAY RIGHT SHOULDER: ................ 8.0 FT (2.4 M)
(42B) SERVICE UNDER: .............. 0 - OTHER (33) BRIDGE MEDIAN: ....................... 0 - NO MEDIAN
(29) AVG. DAILY TRAFFIC: .......... 5007 (34) SKEW ANGLE: ............................ 0 °
(30) YEAR OF ADT: ...................... 2003 (35) DECK FLARE?: ........................... NO
(114) FUTURE ADT: ..................... 5507 (47) TOTAL HORIZ. CLEARANCE: .... 22.5 FT (6.9 M)
(115) YEAR OF FUTURE ADT: ..... 2023 (50) SIDEWALKS:
(101) PARALLEL STRUCTURE: ... N - NONE LEFT : ...................................... 0.0 FT (0.0 M)
(38) NAVIGATION CONTROL?: ... 0 RIGHT : ................................... 0.0 FT (0.0 M)
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M) (214) BRIDGE RAIL TYPE:
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M) RAIL CONFIGURATION: ......... 0 - N/A
(111) ABUT. OR PIER PROT: ....... MATERIAL: .............................. 0 - N/A
DESIGN TYPE: ........................ 0 - N/A
LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 3.0 FT (0.9 M) (215) BRIDGE RAIL HEIGHT: ............ 0.00 FT (0.00 M)
(56) LEFT: ......................... 0.0 FT (0.0 M) (53) MIN. VRT. CLEAR. OVER DECK: 13.50 FT (4.11 M)
(54) MIN. VRT. UNDERCLEARANCE: 13.50 FT (4.11 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK: ................................. N
(59) SUPERSTRUCTURE: ......... N
(60) SUBSTRUCTURE: .............. N
(61) CHANNEL: .......................... N
(62) CULVERT: ........................... N
(222) APPROACHES:
(223) RETAINING WALL: ........... N
(224) EST. REMAINING LIFE: .... 20 YEARS
(36) TRAFFIC SAFETY FEAT: ... NNNN
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
N
N
N - N
2 - REHAB/RECONSTRUCTION
C - MODERATE
$8,000
$30,000
$0
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
1985-LINING REHABILITATION.
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
APPENDIX STRUCTURE NO. 5140-150P
PHOTOGRAPHS STRUCTURE NO. 5140-150P
PHOTO #1 - NORTH PORTAL
PHOTO #2 - SOUTH PORTAL
PHOTO #3 - GENERAL ROADWAY VIEW LOOKING SOUTH
PHOTO #4 - GENERAL UNDERSIDE VIEW LOOKING SOUTH
PHOTO #5 - CRACKING WITH
EFFLORESCENCE ON EAST TUNNEL LINING
NEAR NORTH PORTAL
PHOTO #6 - GENERAL VIEW OF 2ND DRAIN
CHASE ON WEST SIDE OF TUNNEL LINING,
APPROXIMATELY 25' FROM NORTH PORTAL
PHOTO #7 - CRACKING AND SPALLING ALONG
WEST SIDE DRAIN CHASE, APPROXIMATELY
25' FROM NORTH PORTAL
PHOTO #8 - SPALLING WITH EXPOSED REBAR
ALONG WEST TUNNEL LINING,
APPROXIMATELY 120' FROM NORTH PORTAL
PHOTO #9 - MISSING REFLECTIVE DEVICE ON WEST TUNNEL LINING,
APPROXIMATELY HALF WAY THROUGH TUNNEL
PHOTO #10 - SPALL WITH EXPOSED REBAR ON CROWN OF TUNNEL
LINING, APPROXIMATELY HALF WAY THROUGH TUNNEL
PHOTO #11 - SPALL WITH EXPOSED REBAR IN
CROWN OF TUNNEL LINING, APPROXIMATELY
HALF WAY THROUGH TUNNEL
PHOTO #12 - CRACKING AND LEAKAGE ON
EAST SIDE DRAIN CHASE, APPROXIMATELY
175' FROM SOUTH PORTAL
PHOTO #13 - GENERAL VIEW OF SPALLING ON
EAST TUNNEL LINING, APPROXIMATELY 150'
FROM SOUTH PORTAL
PHOTO #14 - CRACKING AND LEAKAGE ON
DRAIN CHASE ON EAST SIDE,
APPROXIMATELY 150' FROM SOUTH PORTAL
PHOTO #15 - HOLE IN LINING WITH EXPOSED REBAR, APPROXIMATELY
150' FROM SOUTH PORTAL
PHOTO #16 - PATCHING ALONG WEST TUNNEL LINING,
APPROXIMATELY 140' FROM SOUTH PORTAL
PHOTO #17 - SPALL WITH LEAKAGE ON EAST
TUNNEL LINING, APPROXIMATELY 140' FROM
SOUTH PORTAL
PHOTO #18 - EXPOSED DRAIN CHASE ON
EAST TUNNEL LINING, APPROXIMATELY 120'
FROM SOUTH PORTAL
PHOTO #19 - DETERIORATED AND EXPOSED
DRAIN CHASE ON EAST TUNNEL LINING,
APPROXIMATELY 100' FROM SOUTH PORTAL
PHOTO #20 - MISSING REFLECTOR ALONG
WEST SIDE OF TUNNEL, APPROXIMATELY 100'
FROM SOUTH PORTAL
PHOTO #21 - GENERAL VIEW OF DETERIORATED AND EXPOSED DRAIN
CHASE ON EAST TUNNEL LINING, APPROXIMATELY 100' FROM SOUTH
PORTAL
PHOTO #22 - PATCHING ALONG EAST TUNNEL LINING,
APPROXIMATELY 15' FROM SOUTH PORTAL