IFB Solicitation.pdf

PDF 900 KB Posted

Attached to
Natchez Trace Parkway Multi-Use Trail
Solicitation number
DTFH71-08-B-00030
Issued by

About this file

Solicitation

View the file

Other files

File Type Posted
SF 30 Amend 002.pdf PDF
SF 30 Adding Clause 52-203-13-14.pdf PDF
REV__SB subcontract plan revised.doc DOC document
FP03_Eng .pdf PDF
ADV_Bidder's Qualifications Form.doc DOC document
Plans_Adv_S-V Sheets.pdf PDF
FP03 Errata.pdf PDF
Plans_Adv_A-R Sheets.pdf PDF
Soils Foundation Report.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract No.:

U S DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

PROJECT PRA-NATR 3O16

NATCHEZ TRACE PARKWAY

MULTI-USE TRAIL

PMIS NO. 55898

SOLICITATION

IFB NO. DTFH71-08-B-00030

This Contract Cites Standard Specifications FP-03

U. S. Customary Units

CONTRACTOR:

ADDRESS:

STATE: Mississippi

COUNTY: Madison

PARK: Natchez Trace Parkway

ROADWAYS: STATIONS FEET

Multi-use Trail Mainline 1+00 to 120+17.70 11917.70

Post Road Connector 1+00 to 2+77.37 177.37

PROJECT LENGTH TOTAL: 12095.07

2.29 miles

TYPE OF IMPROVEMENT:

Construction of a multi-use trail adjacent to the Natchez Trace Parkway that has a ten foot wide travel way with 2 foot shoulders and 1V:3H cut and fill slopes. Three trail bridges: one bridge adjacent to the parkway over Brashear Creek, one bridge adjacent to the parkway over Rice Road, and one bridge over two unnamed streams.

TABLE OF CONTENTS

Revised 07/16/2008

Page

Notice to Bidders 1 through 2

Checklist for Bid Submission 1 through 2

*New Questionnaire Form on Calendar Days 1 Page

*SF-1442 Solicitation, Offer, and Award A-1 through A-2

Continuation of SF 1442 A-3 through A-4

Bid Schedule Instructions 1 through 2

*Bid Schedule B-1 through B-7

*SF-24 Bid Bond C-1 through C-2

FEDERAL ACQUISITION REGULATION & TRANSPORTATION ACQUISITION

REGULATION SOLICITATION PROVISIONS & CONTRACT CLAUSES

Index to Federal and Transportation Acquisition Regulations 1 through 6

Representations and Certifications (OCRA online) D-1

Instructions to Bidders E-1

*Socioeconomic Program Requirements F-1 through F-8

Minimum Wage Schedule F-9 through F-11

*General Contract Requirements G-1 through G-4

Construction Contract Requirements H-1

SPECIFICATIONS

Special Contract Requirements J-1 through J-45

Permits Obtained for this Project Not available

Plans Sheet A-R 1 through 100 Plans Sheet S-V 1 through 107

Soils and Foundation Report 1 through 32

*BOLD FACED ITEMS ARE TO BE INCLUDED WITH THE BID SUBMITTAL PACKAGE

NOTICE TO BIDDERS

CONTRACT FORMAT:

Bidders should note that the format of this contract is in accordance with Federal Acquisition Regulations (FAR), promulgated by the General Services Administration (GSA), effective April 1, 1984, including all applicable revisions. Applicable FAR provisions and clauses are incorporated in this contract by reference or full text as indicated in the INDEX before the D-page in this booklet.

FAR provisions and clauses incorporated by reference can be accessed on the Internet on the GSA website at www.arnet.gov/far/. Bidders are encouraged to review the documents thoroughly before bidding.

PROPOSAL BOOKLET AND OFFER SUBMITTAL:

It is the responsibility of the Bidder to verify that this proposal is complete as listed in the Table of Contents. The Bidder is responsible for submitting all required forms and documents with the offer.

Offerors should use the Checklist for Bid Submittal included in this booklet to check that their bids are complete. New Questionnaire Form on Calendar Days with required signature.

CONSTRUCTION CONTRACTS:

As stated in FAR Clause 52.236-1, the Contractor shall perform on the site, and with its own organization, work equivalent to at least 50%. Additional guidance is given in FAR Subpart

35.005 where the majority of the project work is complex and specialized such as restoration work, bridge painting, and proprietary construction techniques (i.e. proprietary Cintec arch strengthening.)

There are exceptions and they will be reviewed on a case-by-case basis.

HAZARDOUS MATERIALS IDENTIFICATION AND MATERIAL SAFETY DATA:

As required by FAR Clause 52.223-3, Hazardous Materials Identification and Safety Data, the apparent low Offeror must submit prior to award a Material Safety Data Sheet (MSDS's) for all hazardous materials that the Offeror identifies in paragraph (b) of this clause in the D-pages of this booklet. Failure to submit MSDS's may render the Offeror ineligible for award of contract. The apparent low Offeror should submit their MSDS's within two weeks after bid opening.

ATTENTION LARGE BUSINESSES - UTILIZATION OF SMALL BUSINESS CONCERNS:

Large business Offerors should note their responsibilities in the awarding of subcontracts in accordance with FAR Clause 52.219-8, Utilization of Small Business Concerns. The offeror, if a large business concern, should note its responsibility to establish and conduct a Subcontracting Plan in accordance with FAR Clause 52.219-9, Alternate I, Small Business Subcontracting Plan. If the apparent Low Offeror is a LARGE BUSINESS it will be required to submit a Subcontracting Plan within 2 weeks of receipt of request from the Contracting Officer. If the apparent low offeror fails to submit a subcontracting plan acceptable to the Contracting Officer within the allowable time, the offeror may be ineligible for award of the contract. PLEASE NOTE: A sample plan is included in this solicitation package as a separate document for your use.

FINANCING ASSISTANCE: Minority, Women-owned, and Disadvantaged Business Enterprises (DBE's). The Department of Transportation (DOT) offers working capital financing assistance for transportation related contracts. DOT's Short-Term Lending Program (STLP) offers lines of credit to finance accounts receivable. Maximum line of credit is $750,000 with interest at the prime rate. For further information, call (800) 532-1169. Internet address: http://osdbuweb.dot.gov.

INTERNET BASED DATA BASES - REQUIRED INPUT: According to the FAR Subpart

4.1102 contractors MUST be registered in Central Contractor Registration (CCR) prior to the award of any contract. Access the following web site to register: www.ccr.gov According to the FAR Subpart 4.1201 contractors MUST complete their Online Annual Representations and Certifications Application (ORCA) prior to the closing date of the bid on line at http://orca.bpn.gov/.

According to the FAR Subpart 22.1302 (b) contractors and sub-contractors MUST complete the required Annual Vets-100 Form in order to be eligible for a contract award. It can be completed on-line at https://vets100.vets.dol.gov/.

NOTICE TO BIDDERS - (CONT'D.)

This should be completed before submitting a bid package.

PAYMENT:

Offerors are advised to review the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP), subsection 109.05, concerning direct and indirect payment included under a pay item in the bid schedule.

PROGRESS PAYMENTS:

ALL payments will be made via Electronic Funds Transfer (EFT) as such; the payment information in the CCR must be accurate in order for contractors' invoices to be considered proper invoices for the purpose of prompt payment under DOT contracts. Contractors must input and maintain (update as necessary) their EFT information in the CCR database. Offerors are advised that under FAR Clause 52.232-5, Payments Under Fixed Price Construction Contracts, upon request, progress payments will include premiums paid by the Contractor to obtain performance and payment bonds as required under this contract. These payments shall not be made in addition to the contract price. As specified in the FP, “Section 151 - MOBILIZATION", payments for performance and payment bond premiums shall be included in mobilization.

WELFARE-TO-WORK INITIATIVE:

The President’s Welfare Reform Bill was initiated to assist welfare recipients and hopefully aid welfare recipients to find gainful employment. In support of this bill, Contractors are encouraged to hire welfare recipients whenever possible and to use welfare recipients in performance of duties on Government contracts.

INCREASING SEAT BELT USE IN THE UNITED STATES:

The President’s Executive Order 13043 dated April 16, 1997, was issued to increase the use of seat belts in the United States. In support of this Order, contractors and subcontractors are encouraged to adopt and enforce on-the-job seat belt policies for their employees when operating company-owned, rented, or personally owned vehicles.

OBTAINING BID DOCUMENTS:

Bid documents will not be mailed. All bid documents are available for direct download from the Federal Business Opportunities (FBO) website:

https://www.fbo.gov/index?s=opportunity&mode=list&tab=list&cck=1&au=&ck= Type DTFH71 in Keywords/Sol. # Block then click on GO, or the Eastern Federal Lands Highway Division website: http://www.efl.fhwa.dot.gov/contracting/Documents.aspx Contractors are encouraged to register on the FBO website (for this specific project) in order to receive Email Notifications automatically when a document is added or updated for this specific project. All questions about this construction project must be emailed to the following address:

eflhd.contracts@fhwa.dot.gov.

THE CONTRACTOR IS SOLELY RESPONSIBLE FOR MONITORING THE WEB PAGES

NOTED ABOVE FOR ALL CHANGES TO THE SOLICITATION AND ACTING ON SAID

CHANGES.

PLEASE NOTE: for security reasons, individuals requiring access to all government buildings must present a valid photo ID and be escorted to their destination by a Government employee.

All visitors attending bid openings are urged to arrive at least 1 hour prior to schedule bid opening. All visitors must register with the receptionist in Room 100. A Government employee will collect all bids. Prior to bid opening, a Government employee will escort all bidders to the bid opening. Unescorted visitors will be denied entry and no exceptions will be made.

CHECKLIST FOR BID SUBMISSION

The following is a checklist of items included in the proposal/bid package that are required to be completed and returned (or filled in on-line) to the address in Block 8 of the Standard Form 1442, Solicitation, Offer, and Award (page A-1). This checklist is for informational purposes only and is not required to be filled out by the bidder. Failure to submit a complete bid may be cause to reject your bid.

Revision Date: 09/06/07

1. Bid Envelope:

a. Addressed as shown in Block 8 of Page A-1

b. In lower left corner, indicate Solicitation No., Project Name & Number, time for Receipt of Offers and send to Room 105.

2. Standard Form 1442: Solicitation, Offer and Award (Pages A-1 and A-2)

a. Block 14: Name and Address of Bidder.

b. Block 15: Telephone Number of Bidder.

c. Block 16: Remittance Address if different from Block 14.

d. Block 19: All Amendments Acknowledged, with dates of Amendments.

e. Block 20: Bid is signed and dated.

3. Bid Schedule - (Pages B-1 through B-7)

a. Unit bid price and bid amount provided for each pay item in numbers.

b. Corrections initialed.

c. Price Evaluation eligibility is indicated on the Bid Summary page.

4. Standard Form 24, Bid Bond (Pages C-1 through C-2) (Required if bid guarantee is bid bond)

a. Date executed

b. Legal name and address of bidder.

c. Type of organization.

d. State of incorporation (if applicable).

e. Name and business address of Treasury approved surety.

f. Penal sum of bond (not less than 20% of bid total).

g. Bid identification.

h. Signature of Bidder

i. Seal, if corporation

j. Signature of Surety

k. Seal, if corporation

BIDS RECEIVED WITHOUT A VALID BID BOND WILL BE REJECTED.

5. Power of Attorney.

a. Dated on or before execution date of bond

b. Power has original signature of surety, or is embossed with surety's seal in the certification section

BIDS RECEIVED WITHOUT A VALID POWER OF ATTORNEY WILL BE REJECTED.

CHECKLIST FOR BID SUBMISSION

6. Fill In's. The following full text Clauses and/or Provision numbers shall be checked or filled in and return with the bid package:

a. 52.219-4 – HubZone ONLY - See Section F, Clause 52-219-4, paragraph "C", check block if wavier is applicable.

7. Bidder's Qualifications form (provided separately as part of the Bid Documents Package).

Form completed, signed and submitted with bid

8. Bidder’s Questionnaire on Calendar Days signature required (if not completed bid shall be found non-responsive).

9. Sub-Contracting Plan - Large Businesses Only: Submittal with the bid is not mandatory, but it is encouraged, as it will speed up the award process should your firm be the apparent low bid.

Legislated subcontracting goals: (15 USC 644 (g)(1)

• 24% - Small Businesses (SB)

• 5% - Small Disadvantaged Businesses (SDB)

• 3% - HUBzones

• 5% - Small Woman Owned Business Entities (SWBE)

• 3% - Service-Disabled Veteran-Owned Small Businesses (SDVOSB)

THE FOLLOWING THREE ITEMS ARE NOT TO BE SUBMITTED WITH THE

BID; BUT FAILURE TO COMPLETE THE REQUIREMENTS WILL BE CAUSE

TO REJECT THE BID.

10. Central Contractor Registration (CCR): The Contractor is currently registered in the Internet-Based CCR database at http://www.ccr.gov.

11. Online Representations and Certifications Application (ORCA): The Contractor's Representations and Certifications have been input online via the Internet-Based ORCA electronic database at http://orca.bpn.gov.

12. Vets100 Reporting: The Contractor has completed the annual Internet-Based reporting requirement online at https://vets100.vets.dol.gov.

NOTE: THE CONTRACTOR IS FULLY RESPONSIBLE TO VERIFY THAT ALL

DATA IN THE THREE DATABASES IS CORRECT EACH TIME A BID

PACKAGE IS SUBMITTED. FAILURE PROPERLY INPUT AND/OR UPDATE

YOUR DATA MAY CAUSE THE BID TO BE REJECTED.

Revision Date: 09/06/07

Bidders Qualification questionnaire regarding the preparation of the bid for time:

1) Does the bid for time include the impact of normal weather conditions on the work of the Contract?

2) Does the bid for time include the impact of the terms of the Contract Specifications regarding work restrictions - including all identified delays, suspensions, and shut-downs?

3) Does the bid for time include sufficient time to allow that all contract work can be completed within contract time without the imposition of liquidated damages?

4) Does the bid for time include time for the review and approval process for all submittals required by the Contract?

5) Does the bid for time include time for the review and approval process for required drawings submitted under Subsection 104.03 of the Specifications?

6) Does the bid for time include the lead time required for the procurement, manufacture, and delivery of materials that are to be incorporated into the Contract work?

7) Does the bid for time include sufficient time to accommodate the fact that the date of Notice to Proceed is conditional upon the Government awarding the contract up to 60 days after the bid opening?

8) Does the bid for time include the 14 days after the award of the Contract that the Contractor has to provide Performance and Payment bonds?

9) Does the bid for time include sufficient time to accommodate the fact that the Contracting Officer has up to 30 days after receipt of acceptable Performance and Payment bonds to issue the Notice to Proceed?

I hereby certify that the answer to each and every one of the questions listed above is yes.

Signature of Authorized Representative Title Date

Note: If the questionnaire is not signed the bid shall be found non-responsive and rejected.

A-1

1. Solicitation No. 2. Type of Solicitation 3. Date Issued Page of Pages SOLICITATION, OFFER, AND AWARD

(Construction, Alteration, or Repair)

DTFH71-08-B-00030 ⌧ Sealed Bid (IFB) Negotiated (RFP) 10/08/2008 1 OF 4

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. Contract No. 5. Requisition/Purchase Request No. 6. Project No.

PRA-NATR 3O16

7. Issued By: CODE: N/A: 8. Address Offer To:

Federal Highway Administration Eastern Federal Lands Highway Division Loudoun Tech Center, Room 105 21400 Ridgetop Circle Sterling, Virginia 20166-6511

See Block 7

9. FOR INFORMATION A. Name: B. Telephone No. (Include area code) (NO COLLECT CALLS) See Blocks 9A & 9B Peggy Schaad Email All Questions/Inquiries To: eflhd.contracts@fhwa.dot.gov

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder"

10. The Government requires performance of the work described in these documents (title, identifying no., date):

This Invitation for Bids is for the Natchez Trace Parkway Multi-Use Trail located in Madison County, MS in strict accordance with the Solicitation/Contract instructions, notices, clauses, provisions, ∗items listed below, and for the quantities of work actually performed at the unit prices as bid in the Bid Schedule, including all applicable Federal, State, and local taxes.

∗ FP - Standard Specification for Construction of Roads & Bridges on Federal Highway Projects.

∗ Bid Schedule, Section B - pages B-1 through B-7.

∗ Special Contract Requirements, Section J - pages J-1 through J-45.

∗ Plans (Drawings), Sheets 1 through 100 (A to R) and Sheets 1 through 107 (S to V), total 207.

∗ Soils and Foundation Report, pages 1 – 32.

11. The Contractor shall begin performance within 10 calendar days and complete it within ∗ calendar days after receiving

Award, ⌧ Notice to Proceed. This performance period is ⌧ mandatory, negotiable. (See ∗Continuation Sheet)

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND

PAYMENT BONDS? (If "YES," indicate within how many calendar days after award in Item

12B.) ⌧ YES NO SEE SUBSECTION 102.06 OF FP.

12B. CALENDAR DAYS

Within 14 calendar days after Notice of Award

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Offers in original and 0 copies to perform the work required are due at the place specified in Item 8 by 2:00 PM local time 11/13/2008. If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

b. An offer guarantee ⌧ is, is not required.

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212 STANDARD FORM 1442 (REV. 4-85)

Help Desk

See Continuation of SF 1442

A-2 OFFER (Must be fully completed by offeror)

15. Telephone No. (Include area code) 14. Name and Address of Offeror (Include ZIP code)

DUN: FACILITY CODE

16. Remittance Address (Include only if different than Item 14)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation if this offer is accepted by the Government in writing within _ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.

AMOUNTS See Bid Schedule - Section "B" Pages

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)

AMENDMENT NO.

DATE

20a. Name and title of person authorized to sign offer (Type or print)

20B. Signature 20C. Offer Date

AWARD (To be completed by Government)

21. Items Accepted:

22. Amount

23. Accounting and appropriation data

24. SUBMIT INVOICES

TO ADDRESS SHOWN

IN (4 copies unless otherwise specified)

ITEM

See Block 26

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

15 USC 637(a) ) 41 USC 253(c) ( )

26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY:

Federal Highway Administration Eastern Federal Lands Highway Division 21400 Ridgetop Circle Sterling, Virginia 20166-6511

Federal Highway Administration Eastern Federal Lands Highway Division Finance Division, Room 357 21400 Ridgetop Circle Sterling, Virginia 20166-6511

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed.

This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. Name and Title of Contractor or Person Authorized to Sign (Type or print)

31a. Name of Contracting Officer (Type or print)

30b. Signature

30C. Date 31b. United States of America

BY

31C. Date

GPO : 1985 0 - 469-796 STANDARD FORM 1442 BACK (REV. 4-85)

A-3

CONTINUATION OF SF 1442

Revised 10/07/08

Block 2:

This project is UN-RESTRICTED - Bids will be accepted from ALL eligible business concerns.

This procurement falls under North American Industry Classification System (NAICS) code 237310 - Highway, Street, and Bridge Construction (see FAR Subpart 19.10)

The award of this project is subject to a 10% price evaluation preference for eligible HubZone Small Business Concerns (must be on the SBA listing) (see FAR Clause 52.219-4).

Facsimile and electronic bids will not be accepted.

PHYSICAL DATA AVAILABLE FOR REVIEW

1. Manual on Uniform Traffic Control Devices for Streets and Highways, 2003 Edition, published by the Federal Highway Administration. http://mutcd.fhwa.dot.gov.

2. National Park Service Sign Manual, revised - January 1988, United States Department of the Interior. http://www.nps.gov/npsigns.

3. Soils and Foundation Report

4. Permits (Not Available)

Block 9:

In accordance with FAR Provision 52.236-27, Site Visit, a Government representative can be available to show the project to prospective bidders. All requests for site visits see Section E of the solicitation and e-mail all questions concerning this construction project to the following e-mail address eflhd.contracts@fhwa.dot.gov. Interested parties must provide the Solicitation Number and the relevant project name with all requests and questions.

∗Block 11:

The maximum time for completion of the contract is 419 calendar days.

The completion time for the contract will be the time offered by the successful bidder, not to exceed the maximum time above.

Notice to Proceed will be issued within 30 days following receipt of acceptable performance and payment bonds. (Actual Notice to Proceed date will be 10 days from issuance or the date specified in the Notice.)

Contract Award/NTP is subject to receipt of permits.

A-4

CONTINUATION OF SF 1442

Revised 10/07/08

Block 12A:

Furnish performance and payment bonds in accordance with FAR Clause 52.228-15.

Block 13:

A bid guarantee in the amount of not less than 20 percent of the bid price or $3 million, whichever is less, is required with this bid. If the bidder fails to provide the required bid guarantee, such failure may require rejection of the bid. Reference FAR Provision 52.228-1, Bid Guarantee.

Other:

The estimated price is expected to fall within the price range of $4,000,000 to $8,000,000.

Responsibility of bidders shall be evaluated in accordance with the information provided on the Bidder's Qualification Form, which can be downloaded from FHWA web site. FP-96 or FP-03 versions can be downloaded at the FHWA web site. FHWA web site is http://www.efl.fhwa.dot.gov/contracting/Documents.aspx.

Subcontracting Goals

Required from all other than Small business when the requirement is expected to exceed $500,000 [FAR 19.702]. The Contracting Officer, along review and advisory comments from the Office of Small Disadvantaged Business Utilization (OSDBU), is responsible for approving a reasonable and realistic plan [FAR 19.705-4] [TAM 1219.201(e)(6)]. The legislated subcontracting goals are as shown below. A copy of each subcontracting plan (or contractor statement that no subcontracts are to be awarded) must be provided to OSDBU prior to close of negotiations [TAM 1219.705-5 and - 6].

Legislated subcontracting goals: (15 USC 644 (g)(1)

• 24% - Small Businesses (SB)

• 5% - Small Disadvantaged Businesses (SDB)

• 3% - HUBZones

• 5% - Small Woman Owned Business Entities (SWBE)

• 3% - Service-Disabled Veteran-Owned Small Businesses (SDVOSB)

BID SCHEDULE INSTRUCTIONS

PROJECT: PRA-NATR 3O16

BIDDERS PLEASE NOTE: Before preparing the bid, carefully read the Instructions to Bidders. While preparing the bid, comply with the following:

COMPLETING THE BID SCHEDULE

Complete the Bid Schedule(s) by handwriting in ink or typing. Specify a Unit Bid Price, in figures with cents to only two decimal places, for each pay item in the Unit Bid Price column for which a quantity is given. Do not enter or tender a Unit Bid Price for any pay item for which no estimated quantity appears in the Bid Schedule. Determine the products of the respective unit prices and quantities, and show them, in figures, in the Amount Bid column. If a Unit Bid Price and Amount Bid have been inserted by the Government for a pay item, do not change the Unit Bid Price and Amount Bid for the pay item. Determine the Bid Total by adding the amounts of the several items, and show in the block provided on Page B-6. In case of multiplication errors, the Amount Bid for the item will be based on the Unit Bid Price.

To be eligible for award, bidders must submit prices for each pay item.

Review Subsection 109.05 of the FP regarding scope of payment for direct and indirect payment work.

SCHEDULE OF WORK

The Bid Schedule is comprised of the following:

Schedule A – Construction of a multi-use trail adjacent to the Natchez Trace Parkway from Old Canton Road to the Reservoir Overlook Parking Area.

BIDDING OF CALENDAR DAYS

Determine the number of calendar days necessary to complete Schedule A work from Notice To Proceed to contract completion. Specify the number of calendar days (NOT to exceed the maximum number of calendar days shown in Block 11 of the SF-1442) in the space provided on the Bid Summary page. Failure to specify a number of calendar days for contract completion indicates the bidder accepts the maximum contract completion time provided in Block 11 of the SF-1442.

In developing a construction schedule to determine the number of calendar days included in their bid, bidders should include the work limitations shown in the Special Contract Requirements

(SCR’s). Specific work limitations may be (but are not limited to): holidays, weekends; rush hours; night work; no work periods; work or traffic control phasing. Bidders are advised to consider those work items that are weather sensitive and when those work items will be performed. Specific work items are (but not limited to): those that require a minimum ambient air temperature (asphalt paving and surface treatment, pavement striping, stone masonry); those that require maintaining a minimum surface temperature (concrete pavement, structural concrete, painting); and those that have specific planting seasons (turf establishment, sod, trees and plants). Bidders are also advised to consider time required for preparing material and drawing submittals, and the allowable Government review times for those submittals (Subsection 104.03 of the FP and SCR’s). The total calendar days bid should also include any work limitations and any delay days or contractor winter shutdowns required due to weather sensitive work items.

When evaluating the bids, the Government will consider the Contract Administrative Cost for the project to be $2,700.00 per calendar day bid. The Contract Administrative Cost is only used to determine the Evaluation Total Price of Project.

Add the Bid Total and the Contract Administrative Cost for Schedule A as directed on the Bid Summary page. Show the Evaluation Total Price of Project in the space provided on the Bid Summary page.

BASIS FOR AWARD

The contract will be awarded to the responsive, responsible bidder with the lowest Evaluation Total Price of Project, which is defined as:

Bid Total of Schedule A + Contract Administrative Cost of Schedule A.

The number of calendar days specified by the successful bidder for the completion of Schedule A work will become the performance period for the contract.

NOTE: Contract Administration Cost is used for evaluation and ranking purposes only.

Project: PRA-NATR 3O16

MULTI-USE TRAIL, OLD CANTON ROAD TO RESERVOIR OVERLOOK PA

B- 1

Bid Schedule

Pay Item No.

Estimated Quantity Unit Bid Price Amount Bid

15101-0000 MOBILIZATION

ALL Lump Sum $___________________

15201-0000 CONSTRUCTION SURVEY AND STAKING

ALL Lump Sum $___________________

15401-0000 CONTRACTOR TESTING

ALL Lump Sum $___________________

15705-0100 SOIL EROSION CONTROL, SILT FENCE

7,600

LNFT $_______________ $___________________

15706-0200 SOIL EROSION CONTROL, CHECK DAM

EACH $_______________ $___________________

15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION ENTRANCE

EACH $_______________ $___________________

20101-0000 CLEARING AND GRUBBING

13.0

ACRE $_______________ $___________________

20301-1400 REMOVAL OF INLET

EACH $_______________ $___________________

20401-0000 ROADWAY EXCAVATION

16,600

CUYD $_______________ $___________________

20402-0000 SUBEXCAVATION

CUYD $_______________ $___________________

20701-1000 EARTHWORK GEOTEXTILE, TYPE III-A (trail only) 43,000

SQYD $_______________ $___________________

Project: PRA-NATR 3O16

Bid Schedule A

Pay Item No.

Estimated Quantity Unit Bid Price Amount Bid

B- 2

20801-0000 STRUCTURE EXCAVATION

CUYD $_______________ $___________________

25102-2000 PLACED RIPRAP, CLASS 2

TON $_______________ $___________________

25102-3000 PLACED RIPRAP, CLASS 3

TON $_______________ $___________________

25801-0000 REINFORCED CONCRETE RETAINING WALL (sw quadrant)

SQFT $_______________ $___________________

25801-0000 REINFORCED CONCRETE RETAINING WALL (se quadrant)

SQFT $_______________ $___________________

30101-0000 AGGREGATE BASE , grading MDOT, class 5, group C 68,000

TON $_______________ $___________________

30202-0000 CEMENT TREATED AGGREGATE COURSE , GRADING MDOT, CLASS 5,

GROUP C, 6-INCH DEPTH

23,300

SQYD $_______________ $___________________

30205-0000 CEMENT

TON $_______________ $___________________

30502-0500 AGGREGATE-TOPSOIL COURSE, 3-INCH DEPTH

5,200

SQYD $_______________ $___________________

40101-0100 SUPERPAVE PAVEMENT, 3/8-INCH NOMINAL MAXIMUM SIZE

AGGREGATE, <0.3 MILLION ESAL (type 5 pavement smoothness)

2,200

TON $_______________ $___________________

55101-0600 PRECAST PRESTRESSED CONCRETE PILES, 14-INCH X 14-INCH, IN

PLACE

2,176

LNFT $_______________ $___________________

Project: PRA-NATR 3O16

Estimated Quantity Unit Bid Price Amount Bid

B- 3

55101-0700 PRECAST PRESTRESSED CONCRETE PILES, 16-INCH X 16-INCH, IN

PLACE

LNFT $_______________ $___________________

55104-1000 DYNAMIC PILE LOAD TEST , PDA

EACH $_______________ $___________________

55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)

CUYD $_______________ $___________________

55201-0800 STRUCTURAL CONCRETE, CLASS D (AE) - LIGHTWEIGHT CONCRETE

CUYD $_______________ $___________________

55301-3300 PRECAST, PRESTRESSED CONCRETE AASHTO GIRDER , TYPE IV

EACH $_______________ $___________________

55302-3500 PRECAST, PRESTRESSED CONCRETE SLABS (PRECAST PANEL)

LNFT $_______________ $___________________

55401-1000 REINFORCING STEEL

38,793

LB $_______________ $___________________

55401-2000 REINFORCING STEEL, EPOXY COATED

5,790

LB $_______________ $___________________

55503-0000 BRIDGE EXPANSION JOINTS

LNFT $_______________ $___________________

55504-0000 PRE-FABRICATED STEEL BRIDGE

ALL Lump Sum $___________________

55601-0300 BRIDGE RAILING, ALUMINUM, TWO RAIL

LNFT $_______________ $___________________

55601-0900 BRIDGE RAILING, STEEL , (APPROACH RAIL)

LNFT $_______________ $___________________

Project: PRA-NATR 3O16

Estimated Quantity Unit Bid Price Amount Bid

B- 4

56401-1000 BEARING DEVICE, ELASTOMERIC

EACH $_______________ $___________________

60103-0100 CONCRETE, HEADWALL FOR 18-INCH PIPE CULVERT

EACH $_______________ $___________________

60103-0140 CONCRETE, HEADWALL FOR 24-INCH PIPE CULVERT

EACH $_______________ $___________________

60103-0180 CONCRETE, HEADWALL FOR 36-INCH PIPE CULVERT

EACH $_______________ $___________________

60201-0600 18-INCH PIPE CULVERT

LNFT $_______________ $___________________

60201-0800 24-INCH PIPE CULVERT

LNFT $_______________ $___________________

60201-1000 36-INCH PIPE CULVERT

LNFT $_______________ $___________________

60210-0600 END SECTION FOR 18-INCH PIPE CULVERT

EACH $_______________ $___________________

60210-0800 END SECTION FOR 24-INCH PIPE CULVERT

EACH $_______________ $___________________

60212-0800 ELBOW, 24-INCH

EACH $_______________ $___________________

60220-0350 4 FEET SPAN, 4 FEET RISE PRECAST REINFORCED CONCRETE BOX

CULVERT

8.25

LNFT $_______________ $___________________

60220-1200 6 FEET SPAN, 4 FEET RISE PRECAST REINFORCED CONCRETE BOX

CULVERT

LNFT $_______________ $___________________

Project: PRA-NATR 3O16

Estimated Quantity Unit Bid Price Amount Bid

B- 5

60222-1250 6 FEET SPAN, 5 FEET RISE REINFORCED CONCRETE BOX CULVERT,

DOUBLE BARREL

LNFT $_______________ $___________________

60223-3050 10 FEET SPAN, 6 FEET RISE REINFORCED CONCRETE BOX CULVERT,

TRIPLE BARREL

LNFT $_______________ $___________________

60401-1000 MANHOLE, TYPE 1

EACH $_______________ $___________________

60403-1300 INLET, TYPE 5A MODIFIED

EACH $_______________ $___________________

60403-1900 INLET, TYPE 6B

EACH $_______________ $___________________

60403-2200 INLET, TYPE 7A

EACH $_______________ $___________________

60801-0400 PAVED WATERWAY, TYPE 4

1,250

SQYD $_______________ $___________________

61504-1000 ACCESSIBILITY RAMP, CONCRETE

SQYD $_______________ $___________________

61901-2900 FENCE, SPLIT RAIL, 7 RAIL

LNFT $_______________ $___________________

61904-0000 BOLLARD POST

EACH $_______________ $___________________

62402-0300 FURNISHING AND PLACING TOPSOIL, 4-INCH DEPTH

9.4

ACRE $_______________ $___________________

62501-0000 TURF ESTABLISHMENT

9.4

ACRE $_______________ $___________________

Project: PRA-NATR 3O16

Estimated Quantity Unit Bid Price Amount Bid

B- 6

62603-0300 CERCIS CANADENSIS, EASTERN REDBUD 'MULTI-STEM', 6 FEET TO 8

FEET HEIGHT, BALLED AND BURLAPPED

EACH $_______________ $___________________

62606-0100 FRAXINUS PENNSYLVANICA, MARSHALL'S SEEDLES ASH, 1 1/2-INCH TO

2-INCH CALIPER, BALLED AND BURLAPPED

EACH $_______________ $___________________

62608-0250 HYDRANGEA QUERCIFOLIA, OAKLEAF HYDRANGEA, 36-INCH -

42-INCH, BALLED AND BURLAPPED

EACH $_______________ $___________________

62610-0100 JUNIPERUS VIRGINIANA, EASTERN RED CEDAR, 60-INCH TO 72-INCH

HEIGHT, BALLED AND BURLAPPED

EACH $_______________ $___________________

63302-0000 SIGN SYSTEM

191.00

SQFT $_______________ $___________________

63401-1500 PAVEMENT MARKINGS, TYPE H, SOLID

LNFT $_______________ $___________________

63403-0800 PAVEMENT MARKINGS, TYPE H

SQFT $_______________ $___________________

63501-0000 TEMPORARY TRAFFIC CONTROL

ALL Lump Sum $___________________

63701-0000 FIELD OFFICE

EACH $_______________ $___________________

64502-0000 LOCATE UTILITIES

EACH $_______________ $___________________

$_____________________TOTAL

Submitted by:

Name of Bidder

Project: PRA-NATR 3O16

B - 7

BID SUMMARY

Project PRA-NATR 3O16

(Complete for Pages B-1 through B-6)

(1) Schedule A Bid Total (from Page B-6) $__________________ Contract Administrative Cost for Schedule A

Number of calendar days necessary to complete all Schedule A work from Notice to Proceed (or date specified in the Notice to Proceed) to completion of Schedule A.

(2) calendar days x $2,700.00 per calendar day =

Total Price of Project (for evaluation purposes only)

(1) Bid Total for Schedule A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (1) + (2) Contract Administrative Cost for Schedule A . . . . . . . . . . . . . . . . . (2)

= EVALUATION TOTAL PRICE OF PROJECT

Does the Bidder claim the Price Evaluation Preference for HUBZone Small Business Concerns as defined in FAR Clause 52.219-4?

Yes No

20%�12�� ���������

2%/,*$7,21�

:H�� WKH�3ULQFLSDO� DQG�6XUHW\�LHV�� DUH� ILUPO\�ERXQG�WR�WKH�8QLWHG�6WDWHV�RI�$PHULFD��KHUHLQDIWHU�FDOOHG�WKH�*RYHUQPHQW��LQ�WKH�DERYH�SHQDO�VXP���)RU SD\PHQW� RI� WKH� SHQDO� VXP�� ZH� ELQG� RXUVHOYHV�� RXU� KHLUV�� H[HFXWRUV�� DGPLQLVWUDWRUV�� DQG� VXFFHVVRUV�� MRLQWO\� DQG� VHYHUDOO\�� � +RZHYHU�� ZKHUH� WKH 6XUHWLHV�DUH�FRUSRUDWLRQV�DFWLQJ�DV�FR�VXUHWLHV��ZH��WKH�6XUHWLHV��ELQG�RXUVHOYHV�LQ�VXFK�VXP��MRLQWO\�DQG�VHYHUDOO\��DV�ZHOO�DV��VHYHUDOO\��RQO\�IRU�WKH SXUSRVH�RI�DOORZLQJ�D� MRLQW�DFWLRQ�RU�DFWLRQV�DJDLQVW�DQ\�RU�DOO� RI�XV�� �)RU�DOO�RWKHU�SXUSRVHV��HDFK�6XUHW\�ELQGV�LWVHOI��MRLQWO\�DQG�VHYHUDOO\�ZLWK�WKH 3ULQFLSDO��IRU�WKH�SD\PHQW�RI�WKH�VXP�VKRZQ�RSSRVLWH�WKH�QDPH�RI�WKH�6XUHW\�� �,I�QR�OLPLW�RI�OLDELOLW\�LV�LQGLFDWHG��WKH�OLPLW�RI�OLDELOLW\�LV�WKH�IXOO�DPRXQW

RI�WKH�SHQDO�VXP�

&21',7,216�

7KH�3ULQFLSDO�KDV�VXEPLWWHG�WKH�ELG�LGHQWLILHG�DERYH�

7+(5()25(�

7KH�DERYH�REOLJDWLRQ�LV�YRLG�LI�WKH�3ULQFLSDO����D��XSRQ�DFFHSWDQFH�E\�WKH�*RYHUQPHQW�RI�WKH�ELG�LGHQWLILHG�DERYH��ZLWKLQ�WKH�SHULRG�VSHFLILHG�WKHUHLQ�IRU DFFHSWDQFH� �VL[W\������GD\V�LI�QR�SHULRG�LV�VSHFLILHG���H[HFXWHV�WKH�IXUWKHU�FRQWUDFWXDO�GRFXPHQWV�DQG�JLYHV�WKH�ERQG�V��UHTXLUHG�E\�WKH�WHUPV�RI�WKH ELG�DV�DFFHSWHG�ZLWKLQ�WKH�WLPH�VSHFLILHG��WHQ������GD\V�LI�QR�SHULRG�LV�VSHFLILHG��DIWHU�UHFHLSW�RI�WKH�IRUPV�E\�WKH�SULQFLSDO��RU��E��LQ�WKH�HYHQW�RI�IDLOXUH WR� H[HFXWH� VXFK� IXUWKHU� FRQWUDFWXDO� GRFXPHQWV�DQG�JLYH�VXFK�ERQGV��SD\V� WKH�*RYHUQPHQW� IRU�DQ\�FRVW�RI�SURFXULQJ� WKH�ZRUN�ZKLFK�H[FHHGV� WKH

DPRXQW�RI�WKH�ELG�

(DFK� 6XUHW\�H[HFXWLQJ� WKLV� LQVWUXPHQW�DJUHHV� WKDW� LWV�REOLJDWLRQ� LV�QRW� LPSDLUHG�E\�DQ\�H[WHQVLRQ�V��RI� WKH� WLPH� IRU� DFFHSWDQFH�RI� WKH�ELG� WKDW� WKH 3ULQFLSDO�PD\�JUDQW�WR�WKH�*RYHUQPHQW���1RWLFH�WR�WKH�VXUHW\�LHV��RI�H[WHQVLRQ�V��DUH�ZDLYHG���+RZHYHU��ZDLYHU�RI�WKH�QRWLFH�DSSOLHV�RQO\�WR�H[WHQVLRQV DJJUHJDWLQJ�QRW�PRUH�WKDQ�VL[W\������FDOHQGDU�GD\V�LQ�DGGLWLRQ�WR�WKH�SHULRG�RULJLQDOO\�DOORZHG�IRU�DFFHSWDQFH�RI�WKH�ELG�

:,71(66�

7KH�3ULQFLSDO�DQG�6XUHW\�LHV��H[HFXWHG�WKLV�ELG�ERQG�DQG�DIIL[HG�WKHLU�VHDOV�RQ�WKH�DERYH�GDWH�

67$1'$5'�)250�����5(9��������

3UHVFULEHG�E\�*6$���)$5�����&)5���������D�

$87+25,=('�)25�/2&$/�5(352'8&7,21

3UHYLRXV�HGLWLRQ�LV�XVDEOH

35,1&,3$/

6,*1$785(�6�

1$0(�6�� 7,7/(�6�

�7\SHG�

6,*1$785(�6�

1$0(�6��

�7\SHG�

&RUSRUDWH

6HDO

�6HDO� �6HDO� �6HDO�

,1',9,'8$/�685(7<�,(6�

�6HDO� �6HDO�

3.�� ��

%,'�%21'

�6HH�LQVWUXFWLRQ�RQ�UHYHUVH�

'$7(�%21'� (;(&87('��0XVW�QRW�EH�ODWHU� WKDQ�ELG

RSHQLQJ�GDWH�

7<3(�2)�25*$1,=$7,21� ��;��RQH�

,1',9,'8$/

-2,17� 9(1785(

3$571(56+,3

&25325$7,21

67$7(�2)� ,1&25325$7,21

35,1&,3$/��/HJDO�QDPH�DQG�EXVLQHVV�DGGUHVV�

685(7<�,(6���1DPH�DQG�EXVLQHVV�DGGUHVV�

PENAL SUM OF BOND

3(5&(17 2)�%,' 35,&(

$02817� 127� 72�(;&(('

0,//,21�6� 7+286$1'�6� +81'5('�6� &(176

%,'�,'(17,),&$7,21

%,'�'$7(

)25��&RQVWUXFWLRQ�

6XSSOLHV��RU�6HUYLFHV�

,19,7$7,21� 12�

&25325$7(�685(7<�,(6�

1$0(� $''5(66

6,*1$785(�6�

1$0(�6�� 7,7/(�6�

�7\SHG�

&RUSRUDWH

6HDO

67$7(�2)� ,1&� /,$%,/,7<�/,0,7� ���

3XEOLF�UHSRUWLQJ�EXUGHQ�IRU�WKLV�FROOHFWLRQ�RI�LQIRUPDWLRQ�LV�HVWLPDWHG�WR�DYHUDJH����PLQXWHV�SHU�UHVSRQVH��LQFOXGLQJ�WKH�WLPH�IRU�UHYLHZLQJ�LQVWUXFWLRQV��VHDUFKLQJ�H[LVWLQJ�GDWD VRXUFHV��JDWKHULQJ�DQG�PDLQWDLQLQJ�WKH�GDWD�QHHGHG��DQG�FRPSOHWLQJ�DQG�UHYLHZLQJ�WKH�FROOHFWLRQ�RI�LQIRUPDWLRQ�� �6HQG�FRPPHQWV�UHJDUGLQJ�WKLV�EXUGHQ�HVWLPDWH�RU�DQ\�RWKHU DVSHFW�RI�WKLV�FROOHFWLRQ�RI�LQIRUPDWLRQ��LQFOXGLQJ�VXJJHVWLRQV�IRU�UHGXFLQJ�WKLV�EXUGHQ��WR�WKH�)$5�6HFUHWDULDW��095���)HGHUDO�$FTXLVLWLRQ�3ROLF\�'LYLVLRQ��*6$��:DVKLQJWRQ��'& debbie C-1

INSTRUCTIONS

1. This form is authorized for use when a bid guaranty is required. Any deviation from this form will require the written approval of the Administrator of General Services.

2. Insert the full legal name and business address of the Principal in the space designated "Principal" on the face of the form. An authorized person shall sign the bond. Any person signing in a representative capacity (e.g., an attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved.

3. The bond may express penal sum as a percentage of the bid price. In these cases, the bond may state a maximum dollar limitation (e.g., 67$1'$5'�)250�����5(9���������%$&.

1$0(� $''5(66

6,*1$785(�6�

1$0(�6�� 7,7/(�6�

�7\SHG�

67$7(�2)� ,1&� /,$%,/,7<�/,0,7� ���

&RUSRUDWH

6HDO

1$0(� $''5(66

6,*1$785(�6�

1$0(�6�� 7,7/(�6�

�7\SHG�

67$7(�2)� ,1&� /,$%,/,7<�/,0,7� ���

&RUSRUDWH

6HDO

1$0(� $''5(66

6,*1$785(�6�

1$0(�6�� 7,7/(�6�

�7\SHG�

67$7(�2)� ,1&� /,$%,/,7<�/,0,7� ���

&RUSRUDWH

6HDO

1$0(� $''5(66

6,*1$785(�6�

1$0(�6�� 7,7/(�6�

�7\SHG�

67$7(�2)� ,1&� /,$%,/,7<�/,0,7� ���

&RUSRUDWH

6HDO

1$0(� $''5(66

6,*1$785(�6�

1$0(�6�� 7,7/(�6�

�7\SHG�

67$7(�2)� ,1&� /,$%,/,7<�/,0,7� ���

&RUSRUDWH

6HDO

1$0(� $''5(66

6,*1$785(�6�

1$0(�6�� 7,7/(�6�

�7\SHG�

67$7(�2)� ,1&� /,$%,/,7<�/,0,7� ���

&RUSRUDWH

6HDO

(e.g., 20% of the bid price but the amount not to exceed dollars).

4. (a) Corporations executing the bond as sureties must appear on the Department of the Treasury's list of approved sureties and must act within the limitation listed therein. where more than one corporate surety is involved, their names and addresses shall appear in the spaces (Surety A, Surety B, etc.) headed "CORPORATE SURETY(IES)." In the space designed "SURETY(IES)" on the face of the form, insert only the letter identification of the sureties.

(b) Where individual sureties are involved, a completed Affidavit of Individual surety (Standard Form 28), for each individual surety, shall accompany the bond. The Government may require the surety to furnish additional substantiating information concerning its financial capability.

5. Corporations executing the bond shall affix their corporate seals. Individuals shall execute the bond opposite the word "Corporate Seal";

and shall affix an adhesive seal if executed in Maine, New Hampshire, or any other jurisdiction requiring adhesive seals.

6. Type the name and title of each person signing this bond in the space provided.

7. In its application to negotiated contracts, the terms "bid" and "bidder" shall include "proposal" and "offeror."

debbie C-2

CONTRACT CLAUSES INDEX

FEDERAL ACQUISITION REGULATION (FAR) & TRANSPORTATION ACQUISITION REGULATION (TAR)

(Updated thru FAC 2005-27 on 09/17/2008)

52.252-2 Clauses Incorporated By Reference (Feb 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address: www.arnet.gov/far/

(End of Clause)

FAR & TAR CLAUSES INCORPORATED BY REFERENCE

CLAUSE TITLE DATE REMARKS

52.202-01 DEFINITIONS Jul-04 52.203-03 GRATUITIES Apr-84 52.203-05 COVENANT AGAINST CONTINGENT FEES Apr-84 52.203-07 ANTI-KICKBACK PROCEDURES Jul-95 52.203-8 CANCEL. & RECOVERY OF FUNDS FOR ILLEGAL OR IMPROPER ACTIVITY Jan-97 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY Jan-97 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS Sep-07 52.204-04 PRINTING/COPYING DOUBLE-SIDED ON RECYCLED PAPER Aug-00 52.204-07 CENTRAL CONTRACTOR REGISTRATION Apr-08 Contractor Mandatory Internet Data Input 52.209-06 PROTECTING GOV. INTEREST WHEN SUBCONTRACTING W/ CONT. DEB. SUSP. OR PROP. FOR DEB. Sep-06 52.214-26 AUDIT AND RECORDS--SEALED BIDDING Oct-97 52.214-27 PRICE REDUCTION FOR DEFECT. COST OR PRICING DATA-MODIFICATIONS -SEALED BIDDING Oct-97 52.214-28 SUBCONTRACTOR COST OR PRICING DATA--MODIFICATIONS--SEALED BIDDING Oct-97 52.219-08 UTILIZATION OF SMALL BUSINESS CONCERNS May-04 52.219-09 ALT 1 SMALL BUSINESS SUBCONTRACTING PLAN (ALT 1 - (Oct 01)) Apr-08 Large Business Mandatory Submittal Requirement 52.219-14 LIMITATIONS ON SUBCONTRACTING Dec-96 52.219-16 LIQUIDATED DAMAGES - SUBCONTRACTING PLAN Jan-99 52.222-03 CONVICT LABOR Jun-03 52.222-04 CONTRACT WORK HOURS AND SAFETY STANDARDS ACT--OVERTIME COMPENSATION Jul-05 52.222-06 DAVIS-BACON ACT Jul-05 Contractor Mandatory Wage Rates Posting 52.222-07 WITHHOLDING OF FUNDS Feb-88 52.222-08 PAYROLLS AND BASIC RECORDS Feb-88 Contractor Weekly Payroll Submittals 52.222-09 APPRENTICES AND TRAINEES Jul-05 52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS Feb-88 52.222-11 SUBCONTRACTS (LABOR STANDARDS) Jul-05 52.222-12 CONTRACT TERMINATION--DEBARMENT Feb-88 52.222-13 COMPLIANCE WITH DAVIS-BACON AND RELATED ACT REGULATIONS Feb-88 52.222-14 DISPUTES CONCERNING LABOR STANDARDS Feb-88 52.222-15 CERTIFICATION OF ELIGIBILITY Feb-88 52.222-21 PROHIBITION OF SEGREGATED FACILITIES Feb-99 52.222-26 EQUAL OPPORTUNITY Mar-07 52.222-27 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR CONSTRUCTION Feb-99 52.222-35 EQUAL OPPORTUNITY FOR SPECIAL DISABLED VETERANS, VETERANS OF THE VIETNAM ERA, & OTHER

ELIGIBLE VETERANS.

Sep-06

Revision 05/03/2005 1

52.222-36 AFFIRMATIVE ACTION FOR WORKERS WITH DISABILITIES Jun-98 52.222-37 EMPLOYMENT. REPORTS ON SPECIAL DISABLED VETS, VETS OF THE VIETNAM ERA, ETAL. Sep-06 Contractor Annual Mandatory Reporting Requirement 52.222-39 NOTIFICATION OF EMPLOYEE RIGHTS CONCERNING PAYMENT OF UNION DUES OR FEES Dec-04 Contractor Mandatory Postings 52.223-05 POLLUTION PREVENTION AND RIGHT TO KNOW INFORMATION Aug-03 52.223-06 DRUG-FREE WORKPLACE May-01 52.223-14 TOXIC CHEMICAL RELEASE REPORTING Aug-03 Contractor Annual Contractor Reporting Requirement 52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES Jun-08 52.227-01 AUTHORIZATION AND CONSENT Dec-07 52.227-02 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT INFRINGEMENT Dec-07 52.227-04 PATENT INDEMNITY-CONSTRUCTION CONTRACTS Dec-07 52.227-14 RIGHTS IN DATA - GENERAL Dec-07 52.227-17 RIGHTS IN DATA – SPECIAL WORKS Dec -07 52.228-02 ADDITIONAL BOND SECURITY Oct-97 52.228-5 INSURANCE - WORK ON A GOVERNMENT INSTALLATION Jan-97 Contractor Submittal Requirement 52.228-11 PLEDGES OF ASSETS Feb-92 52.228-12 PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS Oct-95 52.228-14 IRREVOCABLE LETTER OF CREDIT Dec-99 52.228-15 PERFORMANCE AND PAYMENT BONDS - CONSTRUCTION Nov-06 Contractor Submittal Requirement 52.229-03 FEDERAL, STATE, AND LOCAL TAXES Apr-03 52.232-05 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS Sep-02 Contractor Submittal Requirement 52.232-17 INTEREST Oct-08 52.232-23 ASSIGNMENT OF CLAIMS Jan-86 52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS Oct-08

52.232.33 PAYMENT BY ELECTRONIC FUNDS TRANSFER - CENTRAL CONTRACTOR REGISTRATION Oct-03 52.233-01 ALT I DISPUTES (Alt-I, Dec-91) Jul-02 52.233-03 PROTEST AFTER AWARD (Alt-I, Jun 85) Aug-96 52.233-04 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM Oct-04 52.236-02 DIFFERING SITE CONDITIONS Apr-84 52.236-03 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK Apr-84 52.236-05 MATERIAL AND WORKMANSHIP Apr-84 52.236-06 SUPERINTENDENCE BY THE CONTRACTOR Apr-84 52.236-07 PERMITS AND RESPONSIBILITIES Nov-91 52.236-08 OTHER CONTRACTS Apr-84 52.236-09 PROTECTION OF EXIST. VEGETATION., STRUCTURES., EQUIPMENT., UTILITIES, & IMPROVEMENTS Apr-84 52.236-10 OPERATIONS AND STORAGE AREAS Apr-84 52.236-11 USE AND POSSESSION PRIOR TO COMPLETION Apr-84 52.236-12 CLEANING UP Apr-84 52.236-13 ACCIDENT PREVENTION Nov-91

Revision 05/03/2005 2

52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS Apr-84 Contractor Submittal Requirement 52.236-17 LAYOUT OF WORK Apr-84 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION Feb-97 52.236-26 PRECONSTRUCTION CONFERENCE Feb-95 52.242-13 BANKRUPTCY Jul-95 52.242-14 SUSPENSION OF WORK Apr-84 52.243-04 CHANGES Jun-07 52.244-06 SUBCONTRACTS FOR COMMERCIAL ITEMS Mar-07 52.245-02 GOVERNMENT PROPERTY (FIXED-PRICE CONTRACTS) Jun -07 52.246-12 INSPECTION OF CONSTRUCTION Aug-96 52.248-03 ALT 1 VALUE ENGINEERING-CONSTRUCTION (Alt-I, Apr-84) Sep-06 52.249-01 ALT I TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED PRICE)(SHORT FORM) (Alt-I, Apr-84) Apr-84 52.249-02 ALT I TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED PRICE) (Alt-I, Sep-96) May-04 52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION) Apr-84 52.253-01 COMPUTER GENERATED FORMS Jan-91

TAR CLAUSES INCORPORATED BY REFERENCE

CLAUSE TITLE DATE REMARKS

1252.211-70 INDEX FOR SPECIFICATIONS Apr-05 1252.242-73 CONTRACTING OFFICERS TECHNICAL REPRESENTATIVE Oct-94

FAR & TAR PROVISIONS INCORPORATED BY REFERENCE

PROVISION TITLE DATE REMARKS

52.217-03 EVALUATION EXCLUSIVE OF OPTION Apr-84 52.217-04 EVALUATION OF OPTIONS EXERCISED AT TIME OF CONTRACT AWARD Jun-88 52.217-05 EVALUATION OF OPTIONS Jul-90

Revision 05/03/2005 3

Revision 05/03/2005 4

FAR & TAR CLAUSES INCORPORATED BY FULL TEXT

CLAUSE TITLE DATE SECTION SECTION TYPE REMARKS

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK Apr-84 H CONSTR. CONTRACT REQS. Government Fill In 52.211-12 LIQUIDATED DAMAGES-CONSTRUCTION Sep-00 H CONSTR. CONTRACT REQS. Government Fill In 52.211-18 52.219-4

VARIATION IN ESTIMATED QUANTITY

NOTICE OF PRICE EVALUATION. PREFERENCE FOR HUBZONE SB CONCERNS

Apr-84 Jul-05

H F

CONSTR. CONTRACT REQS

SOCIOECON PROG REQS

Contractor Fill-In

52.222-23 NOTICE OF REQ. FOR AFFIRMATIVE ACTION TO ENSURE E.E.O. Feb-99 F SOCIOECON PROG REQS Contractor Reporting Requirements 52.223-03 ALT I HAZARDOUS MAT. IDENT. & MATERIAL SAFETY DATA (Alt-I, Jul-95) Jan-97 G GEN'L CONTRACT REQS. Contractor Submittal Requirements 52.223-09 EST. OF % OF REC. MAT. CONTENT FOR EPA DESIGN. PRODUCTS May 08 G GEN'L CONTRACT REQS Contractor Reporting Requirement 52.225-09 BUY AMERICAN ACT-CONSTRUCTION MATERIALS Jan 05 F SOCIOECON PROG REQS Government & Contractor Fill In's 52-236-01 PERFORMANCE OF WORK BY THE CONTRACTOR Apr -84 H CONSTR. CONTRACT REQS Government Fill In 52.236-04 PHYSICAL DATA Apr-84 H CONSTR. CONTRACT REQS. Government Fill In

TAR CLAUSES INCORPORATED BY FULL TEXT

CLAUSE TITLE DATE SECTION SECTION TYPE REMARKS

FAR PT 22.9 NONDISCRIMINATION BECAUSE OF AGE POLICY Feb-64 F SOCIOECON PROG REQS Policy Statement - Not A Clause

(End of Clauses Index)

CONTRACT PROVISIONS INDEX

52.252-1 Solicitation Provisions Incorporated by Reference (Feb 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer.