SWPPP_MT_FLATHEAD_917(2)_Blacktail_Rd_Surface_.pdf

PDF 11 MB Posted

Attached to
MT FLATHEAD 917(2), Blacktail Road Surface Improvement Phase 2 Federal contract opportunity
Solicitation number
DTFH7017B00004
Issued by
Department of Transportation Federal Highway Administration

About this file

SWPPP MT FLATHEAD 917(2) Blacktail Rd Surface

View the file

Other files for this federal contract opportunity

Other files attached to MT FLATHEAD 917(2), Blacktail Road Surface Improvement Phase 2, newest first.
File Type Posted
Q&A_10-25-17.pdf PDF
A001_Blacktail.pdf PDF
Q&A_10-19-17.pdf PDF
Q&A_10-5-17.pdf PDF
IFB_Blacktail.pdf PDF
Blacktail_XS_100_.pdf PDF
Blacktail_100__Plan_Set.pdf PDF
Blacktail_Earthwork.pdf PDF
Blacktail_Mt._Road_Final_Geotechnical_Memorandum_GM37-16_Final.pdf PDF
Plan_Request_form_Blacktail_Rd.pdf PDF
PROJECT_DESCRIPTION.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TAB 1: SWPPP/ESCP Narrative

TAB 2: NPDES Permit (Construction General Permit or Corresponding State Permit)

TAB 3: NOI, EPA/State Acknowledgement, Other Applicable EPA/State Correspondence

TAB 4: Delegation of Authority

TABS: Maps

TAB 6: Erosion/Sediment Control Plan Sheets (plan set and BMP typical details)

TAB 7: Permanent Stabilization and Revegetation Phm (phm sets and details)

TAB 8: SWPPP Amendment Log

TAB 9: Erosion/Sediment Control Inspection Reports and Requirements

TAB 10: Corrective Action Log

TAB 11: Water Quality Monitoring, Reporting Requirements, and Reports

TAB 12: Training Log

TAB 13: Waste and/or Borrow Site Information

TAB 14: Grading and Stabilization Log

TAB 15: Hazardous Spill Plan

TAB 16: Other Applicable Permits(§ 404, § 401, Oregon Remove-Fill Permit)

TAB 17: NPDES Quality Assurance Checklist

TAB 18: NPDES Notice of Termination (NOT)

7:

r I ? ··~

-~.I.-.

r

'1 f.

···1 · J• _.;

! l.'

I • ·~ . ;

l r· , ) t

) : .J T ~· " -..:.

Tah7·

FHWA:

Insert Revegetation Plan (FS, NPS, Consultant) IF APPLICABLE.

If revegctation is being performed by others, inform the Contractor here

CONTRACTOR:

ALL STATES

This revegetation plan is for SWPPP documentation only.

The Contractor's responsibility for revegetation is specified in the Contract.

lease~~~~

Structures from Sheets

Inspection Requirements for NPDES Compliance

EPA Construction General Permit Part 4 inspection requirements for NPDES compliance:

Inspection Frequency: You must conduct inspections in accordance with one of the two schedules listed below.

You must specify in your SWPPP which schedule you will be following.

1. At least once every 7 calendar days, OR

2. At least once every 14 calendar days and within 24 hours of the end of a storm event of 0.5 inches or greater. (If this option is chosen, a rain gauge is required to be on-site~ The SWPPP should also include a daily rainfall log.)

Case-by-Case Reductions in Inspection Frequency: You may reduce your inspection frequency to at least once every month if:

1. The entire site is temporarily stabilized, 2~ Runoff is unlikely due to winter_conditions (e.g., site is covered with snow, ice, or the ground is frozen), or

3. Construction is occurring during seasonal arid periods in arid areas and semi-arid areas.

Inspection Waiver for Frozen Conditions: A waiver of the inspection requirements is available until one month before thawing conditions are expected to result in a discharge if all of the following requirements are met:

· 1. The project is located in an area where frozen conditions are anticipated to continue for extended periods of time (i.e., more than one month);

2. Land disturbance activities have been suspended; and

3. The beginning and ending dates of the waiver period are documented in the SWPPP.

Qualified Personnel: Inspections must be .cond.ucted by qualified personnel (provided by the operator or cooperatively by multiple operators). "Qualified personnel" means a person knowledgeable in the principles and practice of erosion and sediment controls who possesses the skills to assess conditions at the construction site that could impact storm water quality and to assess the effectiveness of any sediment and erosion control measures · selected to control the quality of stormwater discharges from the construction activity.

Scope of Inspections: Inspections must include all areas of the site disturbed by construction activity and areas used for storage of materials that are exposed to precipitation. Inspectors must look for evidence of, or the. potential for, pollutants entering the stormwater conveyance system. Sedimentation and erosion control measures must be observed to ensure proper operation. Discharge locations must be inspected to ascertain whether erosion control measures are effective in preventing significant impacts to waters of the United States, where accessible. Where discharge locations are inaccessible, nearby downstream locations must be inspected to the extent that such inspections are practicable. Locations where vehicles enter or exit the site must be inspected for evidence of off-site sediment tracking.

All reports required by this permit, including the SWPPP, S.WPPP amendments, and inspection reports must be signed by a person described in Appendix G, Subsection 11.A (below) or by a duly authorized representative of that person.

l. For a corporation: By a responsible corporate officer. For the purpose of this Part, a responsible corporate officer means: (i) a president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy- or decision-making functions for the corporation, or (ii) the manager of one or more manufacturing, production, or operating facilities, provided, the manager is authorized to make management decisions which govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long term environmental compliance with environmental laws and regulations; the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for permit application requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures.

2. For a partnership or sole proprietorship: By a general partner or the proprietor, respectivyly; or

· 3. For a municipality, state, federal, or other public agency: By either a principal executivy officer or ranking elected official. For purposes of this Part, a principal executive officer of a federal agency includes (i) the chief executive officer of the agency, or (ii) a senior executive officer having responsibility for the overall operations of a principal geographic unit ofthe agency (e.g., Regional Administrator of EPA). ·

A person is a duly authorized representative only if:

The authorization is made in writing by a person described in Appendix G, Subsection I I.A;

the authorization specifies either an individual or a position having responsibility for the overall operation of the regulated facility or activity such as the position of plant manager, operator of a well or a well field, superintendent, positfon of equivalent responsibility, or an individual or position having overall responsibility for environmental matters for the company. (A duly authorized representative may thus be either a named individual or any individual occupying a named position); and ·

The signed and dated written authorization is included in the SWPPP. A copy must be submitted to EPA, if requested. ·

FEDE'ailL mGBW.AY .ADMINISTL~fION ' WUTJmN~LLANDS

BJGllWAY lltvl&lON

SWP\"P CONSTRUCTION SITE INSPECTJON REPO:QT

Typie oifl!llli§]pledioll11:

0Regular D Post-storm.event D Reduced inspection frequency period

Hmi tihleire lbieel!ll lll stoiirl)Jill eveJ111t sillllce tihle fas(lil!ll!l]plect:fol!ll? 0 Yes D No If ye!l, JPliroivliiille:

Estimated Stonn Start Date & Time:_·-----~- Estimaied Sto~ Duratio11 (hrs):

Approximate Amount of Precipitation (in): _____ _

Wellltihler lllt IDillJ11le ®ftlhiiis il!llsJPiedfoIDl?

0 Clear 0Cloudy 0 Rain 0 Sleet 0Fog D Snowing D High Winds D Other:

Temperature: ______ _

WFJLlID 157-2 (5/2®1i)

Site-specific BMPs

• BMP - Describe and give the location of the structural and non-structural BMPs identified in your SWPPP in the BMP column below (add as many BMPs as necessary on the continuation sheets. Include areas that are required to be inspected by the CGP, such as material storage areas that are exposed to precip"itation.

• BMP Installed - If a BMP should be installed at the current phase of the project and you marked "No" in the "BMP Installed" column, then you must check "Yes" in the "BMP Action Required?" column

• BMP Action Required? - .If a BMP needs repair, modification, replacement, maintenance or a new BMP is needed or a SWPPP amendment is needed, then a BMP Action is required.

• BMP Action Required, Complete by Date - Before certifying the report, fill in the date when the BMP Action can reasonably be expected to be completed. When a BMP Action is NOT required, leave the "Complete by Date" blank.

• Describe BMP Action, if Needed - Anytime you check "Yes" for "BMP Action Required", then you must also fill in the "Describe BMP Action" column.

• Delay~d Action Item Report - When a BMP Action is required and the Complete by Date is not met, you must then fill out the Delayed Action Item Report to explain why the date was not met Keep the Delayed A9tion Item Report in the SWPPP. ·

• Corrective Action Log- When a BMP Action is required as noted in this report, you must also enter all the

· information for this action in the Corrective Action Log.

BMP & Location BMP BMP Action Describe BMP Action, if Needed Installed? Required?

0Yes 0No 0Yes 0No

Complete by Date:

0Yes 0No 0Yes 0No

Complete by Date:

0Yes 0No 0Yes 0No

Complete by Date:

0Yes 0No 0Yes 0No

Complete by Date:

0Yes 0No 0Yes 0No

Complete by Date:

0Yes 0No 0Yes 0No

Complete by Date:

0Yes 0No 0Yes 0No

Complete by Date:

0Yes 0No 0Yes 0No

Complete by Date:

Page2 Project Name:

Inspection Date:

BMP & Location BMP BMPAction Describe BMP Action, if Needed Installed? Required?

9 0Yes 0No 0Yes 0No

Complete by Date:

10 0Yes QNo 0Yes 0No

Complete by Date:

11 0Yes 0No 0Yes 0No

Complete by Date.:

12 0Yes 0No LJYesONo

Complete by

Date:

13 0Yes 0No 0Yes 0No

Complete by Date:

14 0Yes 0No 0Yes 0No

Complete by' Date:

15 0Yes 0No 0Yes 0No

Complete by Date:

16 0Yes 0No 0Yes 0No

Complete by Date:

17 0Yes 0No 0Yes 0No

Complete by Date:

18 0Yes 0No 0Yes 0No

Complete by Date:

19 0Yes 0No 0Yes 0No

Complete by Date:

20 0Yes 0No 0Yes 0No

Complete by Date:

21 0Yes 0No 0Yes 0No

Complete by Date:

• Please use continuation sheets if there are additional BMPs to list.

Page 3 Project Name:

Overall Site Issues

• BMP or Activity · -- These are some general ~ite issues that must be assessed during inspections.

• Implemented? - If a BMP or activity should be implemented at the current phase· of the project and you check "No", then you must mark "Yes" in the "Corrective Action Required?" column.

• Corrective Action Required? - When maintenance or some other corrective action is required, check

"Yes" in this column.

• Corrective Action Required, Complete by Date - When a corrective action is required, before certifying the report, fill in the date when the corrective action can reasonably be expected to be completed. When a corrective action is NOT required, leave the, "Complete by Date" blank.

• Describe Corrective Action, if Needed-Anytime you check "Yes" in the "Corrective Action Required?"

column, you must fill in the "Describe Corrective Action" column as well.

• Delayed Action Item Report - When a Corrective Action is required and the Complete by Date is not met, you must then fill out the Delayed Action Item Report to explain why the date was not met. Keep the Delayed.Action Item Report in the SWPPP.

• Corrective Action Log - When a Corrective Action is required as noted in this report, you must also enter all the information for this action in the Corrective Action Log.

BMP or Activity Implemented? Corrective Describe Corrective Action and Location, if Needed Action Required?

Have stabilization 0Yes 0No 0Yes 0No measures been initiated on slopes and disturbed Complete.by areas not actively being Date:

worked?

Are natural resource 0Yes 0No 0Yes 0No areas (e.g., streams, wetlands, mature trees, Complete by etc.) required by the Date:

SWPPP to be delineated in the field, identified with barriers or markings?

Are perimeter controls LJYes 0No 0Yes 0No and sediment barriers adequately installed Complete by (keyed into substrate) .Date:

and maintained?

Are .storm drain inlets 0Yes 0No 0Yes 0No properly protected? Complete by

Date:

Are the construction LJYes 0No 0Yes LJNo exits preventing sediment from being Complete by tracked into the street? Date:

Is trash/litter from work 0Yes LJNo 0Yes 0No areas collected and placed in covered Complete by dumpsters? Date:

Are washout facilities 0Yes 0No 0Yes 0No (e.g., paint, concrete) available, clearly Complete by marked, and maintained? Date:

Page4 Project Name:

BMP or Activity Implemented? ' Corrective Describe Corrective Action and Location, if Needed Action Required?

8 Arn vehicle and 0Yes 0No 0Yes 0No equipment fueling, cleaning, and Complete by maintenance areas free Date:

of spills, leaks, or any other deleterious material?

9 Are materials that are 0Yes 0No 0Yes 0No potential stormwater Complete by contaminants stored Date:

inside or under cover?

10 Are non-stormwater 0Yes 0No 0Yes 0No discharges (e.g., wash Complete by water, dewatering) Date:

properly controlled?

Overall Site Issue Answer to Corrective Question Action Describe Corrective Action and Location, if Needed

Required?

1 At the time of 0Yes 0No 0Yes 0No inspection, ate the Complete by discharge points and Date:

receiving waters free of pollutant discharges (sediment deposits, sediment plume or oil sheen)? (See continuation page for list of discharge points)

2 Since the last inspection, 0Yes 0No 0Yes 0No are the discharge points Complete by and receiving waters free Date:

of evidence that pollutants had left the project site (for example, sediment deposits, oily residue)? (See continuation page for list of discharge points)

3 Has Spill Response kit 0Yes 0No 0Yes 0No been used since the last Complete by inspection? If yes, has Date:

stock been maintained?

4 . Ate any additional 0Yes 0No OYes 0No BMPs ne.eded? Complete by

Date:

5 (Other) 0Yes QNo 0Yes 0No

0 Complete by Date:

Page 5 Project Name:

Scope of Inspection

Did you inspect all areas of the project that are 0Yes 0No If you did not inspect any required. areas, list those required to be inspected by the CGP (areas locations here and explain why they weren't inspected.

disturbed by construction activity, areas used for storage of materials that are exposed to precipitation, discharge locations and locations .where vehides enter or exit the site)?

• Check the box below if the project is in compliance with the CGP and the SWPPP:

D I certify that on the date of this inspection, this project was found to be in compliance with the terms of its Storm Water·Pollution Prevention Plan and the current Construction General Permit.

• If there are incidences of non-compliance, then do not check the box above.

• When you don't check the box above, then you must describe each incident of non-compliance and the actions that are needed to bring the project into compliance.

• If there is an Action Item described in the non-compliance box' that does not already have a "Complete by

Date " assigned elsewhere in this report, then add a completion date within the box.

Non-Compliance

Incidence of Non-compliance:

Action Item and Complete by Date:

CERTIFICATION STATEMENT

"I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is,. to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations."

Contractor's Duly Authorized Representative FHW A's Duly Authorized Representative

Print name: Print Name:

Title: Superintendent Title: Project Engineer

Signature: Signature:

Page6 Project Name:

IDe§cr~be .pre§elll11t plhia§e ®f ~Olllt§1tll"lfficti:n1mm: ·

NPDES Quality Assurance, Checklist l§ 1tlhie SWPlP'lP' siglillage pnpedy ~mid! c@llll§JPlfolffi®lffi§ly po§foldl? DYes ONo (Siguage should i:t:iclude where the SWPPf is located, who to contact for viewing f4e SWPP:P, and a co y of the NOI(s jfa. 'licab!e)

All"e 1tlhie SWPF'P llltanafrve altlld\ pfalill §Jhlee1t§ lbiei\llllg lffiJ[lHdkdeidl fo acc11m1nl:ely !l"elflled tl!ne JPlll"OglJ."e§§ @f 11:be JPlll"®]ed?

DYes DlNo .

Ji:Jill§pedfollll FiellJ[mHelillcy Reqlffii\Jr'ed by SWPJP'P: D Atleast once every 14 calendar days and within 24 hours of the end of a stonnev.ent of 0.5 inches or reater,.

Aire illill§J[lledi\oJffi§ lbiei\lillg pedoll"meidl alillidl docllllmel!llfoidl a1t 1tlhle above 1:ilfa1teidl Jfrnq\lllltel!llcy? DY es DNo

. Aire illllspedfollll ll"epl[Jlirt§ il!llcllm:!leidl illll 1i:lhle SWPPP? DYes DNo Aire b@rirnw mmHdlfoll" w21s1i:e sli11:e§ trlletrllk:aitedl fo due pir@jed illllspedetdl ms p21irt of 1tlhie SWlP'PlP' col!lls1tiructfollll site · illl1spedliolllt? DYes ONo .

Aire sformw21teir olhnti\11m C®fill1tll"l{))ls ·effectiiveli illll lace a1t b@now amrnll/®ll" wa§te §~1te1:il? DY es CJINo Aire :i.l!ll§jpHedfollJl§ alllld\ SWPPP dommfofa1tfolill §i\gl!lleidl by t!lne §i\gllllafoiry Officb1li? DYes DNo (Ensure all SWPPP documentation is signed by the Signatory Official designated in Tab 4 of the SWPPP)

Are tempornll"y .aiffitill JpHeirmmllllelll\t ero!ilfollll Cl[]lll1ltrl[]ll piradices piropedy i\JlllsfaRkidl alllld eff edively m21i11t:ar.iID1.edi wiiliillll tlhle. ireqllllilre<Ql timefirame?DYes IJINo

Aire fompl[Jlrn:iry mmd peirm3llll\ellll1t setdlimellll1t.colllltrnl prndkes prnpedy :i.mifaID\etdl llll!llllll effectively mab11:fai\lllletdl?

CW es IJINo · .

·Is the SWPPP be:i.l!llg IDlJ[lli!llated allllil! revised as lllleteded to address prnblems and ire:lt1led chm:llges in the contractoiri§ operntirnms? CJIYes DNo (SWPPP must be updated within 7 days of revisions, amendments, and modifications)

Aire the BMPs adeqIDtate.fo millllim.ize pollufanfa in sfo:rmwateir discharge lllltecessary to meet water qmiali,ty sfandairds as sfated by the State Water Quality Ceirtificatiollll and/illir NPDES? OYes IJINo (S~ate Water Quality Cert\:ijcation found in Tab 16 of the SWPPP; NPDES permit found in Ta~ 2 of the SWPPP)

WFLHD 157-1 (2/2011)

Table of Contents
Tab 1
Tab 2
Tab 3
Tab 4
Tab 5
Tab 6
Tab 7
Tab 8
Tab 9
Tab 10
Tab 11
Tab 12
Tab 13
Tab 14
Tab 15
Tab 16
Tab 17
Tab 18

File details come from the government source that posted it. Updated .