Q&A_10-5-17.pdf
PDF 74 KB Posted
- Attached to
- MT FLATHEAD 917(2), Blacktail Road Surface Improvement Phase 2 Federal contract opportunity
- Solicitation number
- DTFH7017B00004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q&A_10-25-17.pdf | ||
| A001_Blacktail.pdf | ||
| Q&A_10-19-17.pdf | ||
| IFB_Blacktail.pdf | ||
| Blacktail_XS_100_.pdf | ||
| Blacktail_100__Plan_Set.pdf | ||
| Blacktail_Mt._Road_Final_Geotechnical_Memorandum_GM37-16_Final.pdf | ||
| Plan_Request_form_Blacktail_Rd.pdf | ||
| Blacktail_Earthwork.pdf | ||
| SWPPP_MT_FLATHEAD_917(2)_Blacktail_Rd_Surface_.pdf | ||
| PROJECT_DESCRIPTION.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project No. MT FLATHEAD 917(2) Project Blacktail Road Surface Improvements Phase 2
# General Technical Question Answer Date 1 x
Regarding the above project and the bid item for “Turf Establishment” ( 62501‐0000 ) and quantity of 8 Acre, which according to the specs ( Section 625 and pages F‐24 to F‐25 ) requires the placement of 4” of topsoil. Since there is very little excavation or clearing ( 0.6 Acre ), please clarify the need for the 4” of topsoil or add a bid item for topsoil import since you will be looking at over 5,000 of topsoil needed for this item.
The 4” of furnished topsoil is subsidiary to the Turf Establishment pay item as outlined in Section 625. Please bid accordingly.
9/28/17
Check General or Technical
File details come from the government source that posted it. Updated .