Q&A_10-5-17.pdf

PDF 74 KB Posted

Attached to
MT FLATHEAD 917(2), Blacktail Road Surface Improvement Phase 2 Federal contract opportunity
Solicitation number
DTFH7017B00004
Issued by
Department of Transportation Federal Highway Administration

View the file

Other files for this federal contract opportunity

Other files attached to MT FLATHEAD 917(2), Blacktail Road Surface Improvement Phase 2, newest first.
File Type Posted
Q&A_10-25-17.pdf PDF
A001_Blacktail.pdf PDF
Q&A_10-19-17.pdf PDF
IFB_Blacktail.pdf PDF
Blacktail_XS_100_.pdf PDF
Blacktail_100__Plan_Set.pdf PDF
Blacktail_Mt._Road_Final_Geotechnical_Memorandum_GM37-16_Final.pdf PDF
Plan_Request_form_Blacktail_Rd.pdf PDF
Blacktail_Earthwork.pdf PDF
SWPPP_MT_FLATHEAD_917(2)_Blacktail_Rd_Surface_.pdf PDF
PROJECT_DESCRIPTION.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project No. MT FLATHEAD 917(2) Project Blacktail Road Surface Improvements Phase 2

# General Technical Question Answer Date 1 x

Regarding the above project and the bid item for “Turf Establishment” ( 62501‐0000 ) and quantity of 8 Acre, which according to the specs ( Section 625 and pages F‐24 to F‐25 ) requires the placement of 4” of topsoil. Since there is very little excavation or clearing ( 0.6 Acre ), please clarify the need for the 4” of topsoil or add a bid item for topsoil import since you will be looking at over 5,000 of topsoil needed for this item.

The 4” of furnished topsoil is subsidiary to the Turf Establishment pay item as outlined in Section 625. Please bid accordingly.

9/28/17

Check General or Technical