PROJECT_DESCRIPTION.pdf
PDF 18 KB Posted
- Attached to
- MT FLATHEAD 917(2), Blacktail Road Surface Improvement Phase 2 Federal contract opportunity
- Solicitation number
- DTFH7017B00004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q&A_10-25-17.pdf | ||
| A001_Blacktail.pdf | ||
| Q&A_10-19-17.pdf | ||
| Q&A_10-5-17.pdf | ||
| IFB_Blacktail.pdf | ||
| Blacktail_XS_100_.pdf | ||
| Blacktail_100__Plan_Set.pdf | ||
| Blacktail_Earthwork.pdf | ||
| SWPPP_MT_FLATHEAD_917(2)_Blacktail_Rd_Surface_.pdf | ||
| Blacktail_Mt._Road_Final_Geotechnical_Memorandum_GM37-16_Final.pdf | ||
| Plan_Request_form_Blacktail_Rd.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MT FLATHEAD 917(2), Blacktail Road Surface Improvement Phase 2, Flathead County, MT
The work consists of paving and drainage improvements and other small items of work.
Project length: 3.57 miles
Tentative Fixed Completion Date: Summer 2018 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: Between $3 million and $5million
Location: 2 miles west of Lakeside, MT.
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14 Base Schedule
DIVISION 150 – Project Requirements 152 Construction Survey & Staking Yes 153 Contractor Quality Control and Assurance
Yes 154 Contractor Sampling & Testing Yes 155 Schedules for Construction Contracts (construction schedules) Select 157 Soil Erosion & Sediment Control (erosion control devices)
SOIL EROSION CONTROL, MULCHING, HYDRAULIC METHOD
SOIL EROSION CONTROL, CHECK DAM
SOIL EROSION CONTROL, FIBER ROLL
SOIL EROSION CONTROL, TEMPORARY DIVERSION BERM
3 ACRE
82 EACH
8,810 LNFT
80 LNFT
DIVISION 200 – Earthwork 201 Clearing & Grubbing .25 ACRE 203 Removal of Structures & Obstructions (structures, demolition)
REMOVAL OF PIPE CULVERT
REMOVAL OF GUARDRAIL, CONCRETE BARRIER
13 EACH
1,555 LNFT
204 Excavation & Embankment
ROADWAY EXCAVATION 305 CUYD
208 Structure Excavation
STRUCTURE EXCAVATION
DEWATERING
7267 CUYD
1 LPSM
DIVISION 250 – Slope Reinforcement and Retaining Walls 251 Riprap
PLACED RIPRAP, METHOD A, CLASS 2
PLACED RIPRAP, METHOD A, CLASS 3
76 CUYD
364 CUYD
DIVISION 300 – Aggregate and Base Courses 301 Untreated Aggregate Courses (crushed aggregate)
AGGREGATE BASE GRADING D 22,223 TON
DESCRIPTION OF WORK in US CUSTOMARY UNITS FP-14 Base Schedule
303 Road Reconditioning
ROADWAY RECONDITIONING 38,605 SQYD
DIVISION 400 – Asphalt Pavements & Surface Treatments 401 Asphalt Concrete Pavement By Gyratory Mix Design Method
ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH
NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL
ANTISTRIP ADDITIVE, TYPE 3
TACK COAT
5,890 TON
58 TON
15 TON
DIVISION 600 – Incidental Construction 602 Culverts & Drains (indicate one or both)
18-INCH PIPE CULVERT
24-INCH PIPE CULVERT
30-INCH PIPE CULVERT
21-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT
123 LNFT
414 LNFT
41 LNFT
45 LNFT
603 Structural Plate Structures (culverts & drains)
180-INCH STRUCTURAL PLATE PIPE
216-INCH STRUCTURAL PLATE PIPE
104 LNFT
84 LNFT
617 Guardrail
GUARDRAIL SYSTEM G4, TYPE 2, CLASS A STEEL POSTS
TERMINAL SECTION TYPE TANGENT
1,274 LNFT
6 EACH
624 Topsoil (landscaping & related items) Yes 625 Turf Establishment (indicate seeding or mulching separately)
TURF ESTABLISHMENT 3 ACRE
629 Rolled Erosion Control Products & Cellular Confinement Systems
ROLLED EROSION CONTROL PRODUCT 12,345 SQYD
634 Permanent Pavement Markings (traffic pavement markings) PAVEMENT MARKINGS, TYPE B, SOLID (Yellow) PAVEMENT MARKINGS, TYPE B, SOLID (white)
14,410 LNFT
28,820 LNFT
635 Temporary Traffic Control 1 LPSM 647 Environmental Mitigation (use pay item description)
MITIGATION, ROCK WEIR
MITIGATION, STREAMBED MATERIAL
10 EACH
420 CUYD