AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A001 10/05/2016 N/A MT FERGUS 2016(1), Horse Ranch Road Bridge Replacement
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X
DTFH70-16-B-00026
9B. DATED (SEE ITEM 11)
10/03/2016
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A
N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
(__ ) is extended, ( x ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D OTHER (Specify type of modification and authority)
N/A
E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
MT FERGUS 2016(1), Horse Ranch Road Bridge Replacement
Amendment A001 is issued to add the Plans to www.fbo.gov
ENCLOSURES: MT Fergus 2016(1)_Plans_100%
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Sheet and Description
Section C Section F Section S
Civil Erosion Control Bridge ALLOWANCE Bid
Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM ALL
A0060 15301-0010 CONTRACTOR QUALITY CONTROL
AND ASSURANCE LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15702-1000 SOIL EROSION CONTROL,
TEMPORARY DIVERSION CHANNEL LPSM ALL ALL
A0140 15705-0100 SOIL EROSION CONTROL, SILT
FENCE LNFT 500 25 525
A0160 15801-0000 WATERING FOR DUST CONTROL MGAL 500 25 525
A0180 20101-0000 CLEARING AND GRUBBING ACRE 1.0 1.0 Contract Quantity
A0200 20304-1000 REMOVAL OF STRUCTURES AND
OBSTRUCTIONS LPSM ALL ALL
A0220 20401-0000 ROADWAY EXCAVATION CUYD 2,570 130 2,700
A0240 20420-0000 EMBANKMENT CONSTRUCTION CUYD 2,460 140 2,600
A0260 20701-0100 SEPARATION-STABILIZATION
GEOTEXTILE, CLASS 1, TYPE A SQYD 2,920 180 3,100
A0280 25101-2600 PLACED RIPRAP, METHOD B,
CLASS 6 CUYD 740 40 780
A0300 30202-2000 ROADWAY AGGREGATE, METHOD 2
(base course) TON 1,650 80 1,730
A0320 30202-2000 ROADWAY AGGREGATE, METHOD 2
(surface course) TON 650 30 680
A0340 30202-2000 ROADWAY AGGREGATE, METHOD 2
(surface course, bridge) TON 90 5 95
A0360 30210-0000 BEDDING AND BACKFILL AGGREGATE CUYD 60 5 65
A0380 55101-0200 CONCRETE FILLED STEEL PIPE
PILE, IN PLACE LNFT 474 474
A0400 55201-0200 STRUCTURAL CONCRETE, CLASS A Contract Quantity
(AE) CUYD 66 66
A0420 55302-3700 PRECAST, PRESTRESSED CONCRETE Contract Quantity
DECKED BULB TEE GIRDER LNFT 307 307
A0440 55401-1000 REINFORCING STEEL LB 7,150 7,150
A0460 55601-1100 BRIDGE RAILING, STEEL, TWO Contract Quantity
RAIL LNFT 194 194
A0480 56401-0000 BEARING DEVICE EACH 8 8 Contract Quantity
A0500 60503-0000 GEOCOMPOSITE PAVEMENT EDGE
DRAIN SYSTEM LNFT 200 200
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
7- S ep
-2
:1
A M c:
\m yf ile s\ pw
_p ro du ct io n\ d0
Es tim at e-
_M T_
Fe rg us _2
6(
1) .x ls x]
S he et
STATE PROJECT
B.1FERGUS 2016(1)MT
SHEET
NUMBER
Sheet and Description
Section C Section F Section S
Civil Erosion Control Bridge ALLOWANCE Bid
Schedule
A0520 61702-0000 TERMINAL SECTION EACH 4 4
A0540 62201-0300 DUMP TRUCK, 12 CUBIC YARD
MINIMUM CAPACITY HOUR 40
A0560 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT
MINIMUM RATED CAPACITY
BUCKET, 24-INCH WIDTH HOUR 40
A0580 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM
BLADE HOUR 40
A0600 62301-0000 GENERAL LABOR HOUR 80
A0620 62405-0400 PLACING CONSERVED TOPSOIL, Contract Quantity
6-INCH DEPTH SQYD 4,098 202 4,300
A0640 62502-0000 TURF ESTABLISHMENT SQYD 4,098 202 4,300
A0660 62901-0800 ROLLED EROSION CONTROL
PRODUCT, TYPE 2.D SQYD 1,066 54 1,120
A0680 63308-3000 OBJECT MARKER, TYPE 3 EACH 4 4
A0700 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL ALL
A0720 63509-1000 TEMPORARY TRAFFIC CONTROL,
FLAGGER FXHR 100 10 110
A0740 64704-1500 MITIGATION, STREAMBED CHANNEL
REALIGNMENT CUYD 500 25 525
A0760 65001-1000 CONSTRUCT AND MAINTAIN
DIVERSION LPSM ALL ALL
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
7- S ep
-2
:1
A M c:
\m yf ile s\ pw
_p ro du ct io n\ d0
Es tim at e-
_M T_
Fe rg us _2
6(
1) .x ls x]
S he et
2)
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B.2FERGUS 2016(1)MT
SHEET
NUMBER
GENERAL NOTES:
SCALING NOTES
NEW
LEGEND (PLAN VIEW)
EXISTING DESCRIPTION
ABBREVIATIONS
COORDINATE TABLES
C3.0
STATE PROJECT
NUMBER
SHEET
I n t_ ft
D c m y fi le s p w p r o d u c ti o n d C .0
R e v is e d .d g n
MT FERGUS 2016(1)
A
M
A u g u s t
K
H A
R R I S
O N
B
S T
O K
E S
C h e c k e d b y
D e s ig n e d b y
AND DEMO PLAN
EXISTING SURVEY, CONTROL
0 50' 100' 150'
S C A L E
DEMOLITION NOTES
SCALE: 1" = 50'
C P
C P
C P
C P
X STANDING X TRAIL
15" CMP FL ELEV= 3305.60
15" CMP FL ELEV= 3304.98
36" CMP FL ELEV= 3300.28
36" CMP FL ELEV= 3300.07
ROCK DAM
6"PVC
DO NOT
DISTURB FENCE
24"
18"
LOWEST OVERHEAD
ELECTRIC WIRE
22.6' ABOVE
EXISTING GROUND
RIGHT OF WAY LINE INSERTED FROM
DOCUMENT SE-RE-1014 TO BEST FIT
MONUMENTS FOUND DURING
TOPOGRAPHIC SURVEY
(NO PROPERTY SURVEY PERFORMED)
18"
24"
24"
24"
24"
8"
8"
8" 8"
8"
8"
8" 8"
24"
PROJECT
CONSTRUCTION
LIMITS
BRIDGE
BRIDGE
TEMPORARY
CONSTRUCTION
EASEMENT
TEMPORARY
CONSTRUCTION
EASEMENT
3305330
1148529.93
SURVEY CONTROL DATA
POINT NORTHING EASTING DESCRIPTION
CP-2
CP-3
CP-4
CP-5
5/8" REBAR
FOUND NGS MARK, DESIGNATION A195.
VERTICAL DATUM IS NAVD88, U.S. SURVEY FEET, AND WAS PROJECTED WITH SURVEY QUALITY GPS FROM THE
ZONE 2500, MULTIPLY TIMES THE COMBINED SCALE FACTOR OF 0.999258128. ABOUT AN ORIGIN OF (0,0).
GPS FROM THE FOUND NGS MARK, DESIGNATION A195. TO CONVERT TO MONTANA STATE PLANE COORDINATES, HORIZONTAL COORDINATES ARE GROUND, INTERNATIONAL FEET, AND WERE PROJECTED WITH SURVEY QUALITY
2061358.83
1148033.82 2061145.28
1147538.49 2060884.75
1147490.20 2060964.33
5/8" REBAR
5/8" REBAR
5/8" REBAR
CONSTRUCTION
FERGUS ELECTRIC PRIOR TO
UTILITY POLE RELOCATED BY
REMOVE TREE
REMOVE EXISTING BRIDGE
C4.0
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d C .0
R e v is e d .d g n
MT FERGUS 2016(1)
P
A u g u s t
H A
R R I S
S T
O K
C h e c k e d b y
D e s ig n e d b y
0 50' 100' 150'
S C A L E
B E
G
IN
R
O J E
C T
A
B E
IN
F U
T U
N N
E C
T
IO
N
E
O J E
A
E
U
T U
N N
E C
T
IO
N
S T
A
STA. START STA. END SECTION NOTES
8+25 12+19.5 SECTION 1
12+19.5 12+94.5 BRIDGE
12+94.5 15+00 SECTION 1
ROADWAY SECTION TABLE
SCALE: 1" = 50'
RIGHT OF WAY LINE INSERTED FROM DOCUMENT
SE-RE-1014 TO BEST FIT MONUMENTS FOUND
DURING TOPOGRAPHIC SURVEY
(NO PROPERTY SURVEY PERFORMED)
TEMPORARY
CONSTRUCTION
EASEMENT
TEMPORARY
CONSTRUCTION
EASEMENT
SEE DETAIL 3
C5.0
EROSION CONTROL
SEE DETAIL 1
C5.0
OBJECT MARKERS
SEE DETAIL 1
C5.0
OBJECT MARKERS
7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00
+0
20+00
P C : 1
.0
P T : 1
.4
P C : 1
.4
32803280
33003300
N24°49'14"E N22°58'53"E
7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00
+0
20+00
P C : 1
.0
P T : 1
.4
P C : 1
.4
32803280
33003300
N24°49'14"E N22°58'53"E
7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00
+0
20+00
P C : 1
.0
P T : 1
.4
P C : 1
.4
32803280
33003300
N24°49'14"E N22°58'53"E
7+00
8+00
13+00
0 3
TP
TP
ELEV = 3273.82100Q
5'
50'
EXISTING GROUND
FINISHED GRADE
EXISTING GROUND
FINISHED GRADE
GROUND
22.6' ABOVE EXISITNG
OVERHEAD ELECTRICAL
7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00
LVC: 320.00
K: 39.73
PVI ELEV: 3276.20
PVI STA: 11+90.00
B
V C
S
.0
B V
C E
.4
E V
C S
.0
E V
C E
.8
LOW PT ELEV: 3276.40
LOW PT. STA: 10+34.97
LVC: 300.00
K: 38.98
PVI ELEV: 3310.05
PVI STA: 19+00.00
B V
C S
.0
B V
C E
.6
E V
C S
.0
E V
C E
.0
LOW PT ELEV: 3310.60
LOW PT. STA: 17+65.05
LVC: 160.00
K: 38.52
PVI ELEV: 3276.74
PVI STA: 7+60.00
B V
C S
.0
B V
C E
.1
E V
C S
.0
E V
C E
.6
LVC: 170.00
K: 20.44
PVI ELEV: 3311.09
PVI STA: 16+30.00
B V
C S
.0
B V
C E
.3
E V
C S
.0
E V
C E
.7
HIGH PT ELEV: 3310.78
HIGH PT. STA: 17+07.11
7.93%
-0.39%
-0.13%
.3
.7
.8
.2
.9
.1
.6
.1
.5
.5
.5
.2
.4
.2
.4
.4
.9
.8
.0
.4
.8
.4
.2
.4
.2
.0
.8
.2
.8
.5
.8
.0
.7
.7
.7
.4
.9
.4
.9
.6
.7
.7
.6
.5
.7
.6
.5
.9
.9
.8
.9
.7
.6
.6
.0
.1
.6
ELEV= 3280.68
STA: 12+19.50
BENT NO. 1
CENTERLINE BEARING
ELEV= 3284.88
STA: 12+94.50
BENT NO. 2
CENTERLINE BEARING
:1
:1
7.14 '
TYPICAL SECTION
COMPACTED SUBGRADE
3.00 ' 3.00 '7.14 '
24.00 '
'12.00
METHOD 2 (base course)
6" ROADWAY AGGREGATE,
METHOD 2 (surface course)
12" ROADWAY AGGREGATE,
PROFILE
ROAD APPROACH PLAN &
FILLS 6' OR LESS = 4H:1V
FILLS OVER 6' = 2H:1V
4H:1V 4H:1V
4H:1 V
4H:1 V
2H:1V
5±0.5% 5±0.5%
GEOTEXTILE, CLASS 1, TYPE A
SEPATATION-STABILIZATION
R=365.000' Δ=67°3
L=430.173'
CB=N10°46'54.82"W
CL=405.71'
R=4000.000' Δ=1°5
L=128.409'
CB=N23°54'03.30"E
CL=128.40'
0 30' 60' 90'
S C A L E
REMOVED AT COMPLETION OF PROJECT
ALL EARTHWORK, GRADING AND STRUCTURE TO BE
10% GRADE MAX
18' TOP WIDTH
95' MINIMUM RADIUS WITH 5% SUPER
DESIGN SPEED = 15 MPH
DETOUR DESIGN CRITERIA
HYDRAULIC REQUIREMENTS
STA. START STA. END TRANSITION AREA SECTION NOTES
1+00 1+69.77 DETOUR SECTION 2
1+69.77 TO 2+52.96
2+52.96 4+62.68 DETOUR SECTION 1
4+62.68 TO 5+38.48
5+38.48 6+13.57 DETOUR SECTION 2
ROADWAY SECTION TABLE
SCALE: 1" = 30'
RIGHT OF WAY LINE INSERTED FROM
DOCUMENT SE-RE-1014 TO BEST
FIT MONUMENTS FOUND DURING
TOPOGRAPHIC SURVEY
(NO PROPERTY SURVEY PERFORMED)
TEMPORARY CONSTRUCTION
EASEMENT
1+00
3+00 4+00
5+
6+006+14
P T : 1+
79.37
P C : 2
.3
P T : 3
.7
P C : 3
.7
P T : 4
.5
P C : 5
.5
1+00
2+
3+00 4+00
5+
6+006+14
P T : 1+
79.37
P C : 2
.3
P T : 3
.7
P C : 3
.7
CL=77.31'
CB=N1°47'36.88"E
L=79.375' Δ=45°2
R=100.000'
CL=70.69'
CB=N1°00'55.84"E
L=72.376' Δ=42°5
R=96.462'
CL=76.78'
CB=N45°05'09.10"E
L=78.804' Δ=45°0
R=100.000'
CL=77.92'
CB=N44°43'53.37"E
L=80.041' Δ=45°5
R=100.000'
5'
50'
EXISTING GROUND
EXISTING GROUND
FINISHED GRADE
1+00 2+00 3+00 4+00 5+00 6+00 6+14
.1
.7
.8
.8
.3
.4
.0
.0
.9
.5
.1
.6
LVC: 160.00
K: 17.43
PVI ELEV: 3277.99
PVI STA: 4+47.27
B V
C S
.2
B V
C E
.3
E V
C S
.2
E V
C E
.9
P V
IS
.0
P V
IE
.1
5 P V
IS
.5
P V
IE
.6
0.82%
.0
0%
9.00 '
18.00 '
DETOUR SECTION 1
COMPACTED SUBGRADE
5.00 '
9.00 '
18.00 '
DETOUR ROAD CLEAR ZONE 1
4.2
CLEAR ZONE AREAS; NO
OBJECTS, INCLUDING SIGNS,
TO BE PLACED IN THIS AREA.
.0
.5
.0
'6.00 '
9.00 '
NO SCALE
NO SCALE
5.00 '
9.00 '
18.00 '
DETOUR SECTION 2
COMPACTED SUBGRADE
NO SCALE
5.00 '
3.33 '
5.00 '
3.33 '
4H:1 V
4H:1V
4H:1V
4H:1 V
.5
6.00 '
10 YEAR DESIGN DISCHARGE =1040 CFS
2 YEAR DESIGN DISCHARGE =199 CFS
culvert crossing temporary bridge or
Design and install culvert crossing temporary bridge or
Design and install
& PROFILE
DETOUR ROAD PLAN
C4.2
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d C .2
R e v is e d .d g n
MT FERGUS 2016(1)
A u g u s t
H A
R R I S
S T
O K
C h e c k e d b y
D e s ig n e d b y
FOR INFORMATION ONLY QUANTITIES
EMBANKMENT CONSTRUCTION: 3925 CY
ROADWAY AGGREGATE, METHOD 2: 1025 TONS
METHOD 2
AGGREGATE,
4" ROADWAY
METHOD 2
8" ROADWAY AGGREGATE,
5±0.5% 5±0.5%
FILLS 6' OR LESS = 4H:1V
FILLS OVER 6' = 2H:1V
2H:1V
5±0.5% 5±0.5%
METHOD 2
8" ROADWAY AGGREGATE,
METHOD 2
AGGREGATE,
4" ROADWAY
FILL
S 6
' OR L
ESS
4H:1 V
FILL
S OVER 6
2H:1
V
2H:
1V
C5.0
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d C .0
R e v is e d .d g n
MT FERGUS 2016(1)
A u g u s t
H A
R R I S
S T
O K
C h e c k e d b y
D e s ig n e d b y
15'10'5'0
S C A L E
RIPRAP EMBANKMENT PROTECTION 2
C5.0NOT TO SCALENOT TO SCALE
NOT TO SCALE
EROSION PROTECTION DETAIL 3
C5.0
SEE DETAIL 5
C5.0
16 L.F. VALLEY
GUTTER
VALLEY GUTTER DETAIL 5
C5.0NOT TO SCALE
SEE DETAIL 5
C5.0
13 L.F. VALLEY
GUTTER
EDGE OF NEW
GRAVEL ROAD
EDGE OF NEW
GRAVEL ROAD
3280 CONTOUR
SCALE: 1" = 5'
3279.56'
EL=3274.78
OFFSET=15.40
STA.=12+21.00
EL=3279.56'
EL=3279.06
OFFSET=15.40
STA.=12+08.50
EL=3279.06
OFFSET=-15.40
STA.=12+08.50
EL=3274.93
OFFSET=15.40
STA.=12+19.00
12+00
12+00
12+00
3"
3"
STEEL U-POST
SIGN PANEL
S T
R E
A M
TYPICAL USE AND PLACEMENT
OF OBJECT NEAREST TRAVELED WAY.
PANEL EDGE IS FLUSH WITH FACE
PLACE POST AND PANEL SO THAT*
3'-0"
1'-0"
(TYP.)
1•" R
5 1/8"
THE POST PRIOR TO GALVANIZING
ON 1" CENTERS FROM THE TOP OF
DIA. HOLES DRILLED OR PUNCHED
MINIMUM OF FORTY-TWO 3/8" MAX.
(MIN. OF 2.0 LB./FT.) WITH A
STEEL U-POST, 10' IN LENGTH
LOCKWASHER AND NUT
HEX HEAD BOLT, WASHER,
5/16" DIA. CADMIUM PLATED
OBJECT MARKER DESIGN AND PLACEMENT DETAIL 1
C5.0
5 1/8"
3'-0" MIN.
4'-0" MIN.
1'-0"
(TYP.)
4.00 '
EXISTING GROUND
CONSERVED
STREAMBED
MATERIAL,
TYP.
TOP RIPRAP EL. = 3274.80' ±
(SEE PLAN)
TYPICAL CHANNEL CROSS SECTION 4
C5.0
CONSERVED STREAMBED
MATERIAL, SEE NOTE 1
4.00 '
CHANNEL WIDTH = 17.33 '
EXCAVATE CHANNEL
BOTTOM EL. = 3264.75±
EXISTING GROUND
Q
100 ELEV.= 3273.82'
NOTES:
1.
2. IN CHANNEL REALIGNMENT SEGMENTS OUTSIDE THE RIPRAP
LIMITS, PLACE CONSERVED STREAMBED MATERIAL TO THE
FULL CHANNEL BOTTOM WIDTH TO A DEPTH OF 3.5 FEET.
SALVAGE ADEQUATE STREAMBED MATERIAL TO PLACE
CONSERVED STREAMBED MATERIAL TO THE REQUIRED
1'-9"'
(TYP.)
3"
COMPACTED
SUBGRADE
6" CRUSHED
AGGREGATE
BASE COURSE
CONCRETE
VALLEY GUTTER
#4 BARS @ 12" O.C.
EACHWAY
4"'
SQUARE
OUTSIDE
CURB
CONCRETE
WING WALL
1" DROP
2" WIDE x 1" DEEP
EXPANSION JOINT
FILL WITH SEALANT
MATERIAL
.0
.0
.0 '4 .0
AND DETAILS
CIVIL SECTIONS
TOPSOIL AND SEED PER
SCR SECTION 625
PLACE TOPSOIL WITHIN
OPENINGS AND HAND
BROADCAST SEED PER
SCR SECTION 625
6" BEDDING AND BACKFILL AGGREGATE
PLACED RIPRAP, METHOD B, CLASS 6
PLACE TOPSOIL WITHIN
OPENINGS AND HAND
PER SECTION 625
BROADCAST SEED
2H:1V
BACKFILL AGGREGATE
6" BEDDING AND
PLACED RIPRAP, METHOD B, CLASS 6
2H:
1V
THE CONTRACTOR WILL REMOVE THE EXISTING STREAMBED
GRAVELS TO A DEPTH OF 3.5 FEET, STOCKPILE SEPARATELY
FROM OTHER MATERIAL AND PLACE IN THE NEW STREAM
CHANNEL TO A THICKNESS OF 3.5 FEET. NO COMPACTION
NECESSARY
3. VALLEY GUTTER IS INCIDENTAL TO ABUTMENT CONSTRUCTION.
DO NOT MEASURE FOR PAYMENT.
NO SCALE
POST AND GEOTEXTILE INSTALLATION DETAIL
SILT FENCE INSTALLATION AT TOE OF FILL
Fi ll slo pe
T o e o f s lo p e
PLAN
ELEVATION
4.
3.
2.
1.
T o e o f s lo p e
Fi ll sl op e
ELEVATION
PLAN
PLAN
PLAN
END DETAIL
END POSTS DETAIL
POSTS AT JOINTS
Varies
Varies
Geotextile
Steel or wood post
Backfilled and compacted soil fo r s p a c in g
S e e N o te
Limits of clearing
(undisturbed)
Existing ground
Silt fence reinforcement
REVISED: 7/2016
DETAIL APPROVED FOR USE --/----
WESTERN FEDERAL LANDS HIGHWAY DIVISION
SILT FENCE
W157-1
U.S. CUSTOMARY DETAIL
DETAIL
STATE PROJECT
NUMBER
SHEET
F.1
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FERGUS 2016(1) MT
U S
C c m y fi le s p w p r o d u c ti o n d
M T F E
R G
U S fa .d g n
A u g u s t
NOTE:
Staple or tie
Section B
Geotextile fabric, Tie top of posts together driven tightly together.
Steel or wood posts
Steel or wood post
Staple or tie
Geotextile fabric
Fasten fabric to posts around each post one full turn.
Fold geotextile fabric See Note 3
End Posts Detail
End posts, see
End Posts Detail
End posts, see
See Note 3 fabric, Section A
Geotextile
Flow
Flow
Flow running around the ends.
Curve ends of silt fence upgrade to prevent water from as possible.
Install silt fence to follow the ground contours as closely does not slide down, supporting posts.
All types must ensure silt fence remains attached to, and manufacturer's recommendations for installation procedures.
as long as specified dimensions are satisfied. Follow
Alternate preassembled silt fence options will be allowed m in m in m in
6-foot (max.) spacing without silt fence reinforcement.
10-foot (max.) spacing with silt fence reinforcement.
4" min.
6" min. trench
Existing ground
Water surface elevation
OPTION B
OPTION A
OPTION C
OPTION D
Existing ground
Sandbag (typ.)
Sandbag (typ.)
Sandbag (typ.)
Sandbag (typ.)
Concrete barrier
Concrete barrier
Concrete barrier
Water surface elevation membrane
Waterproof
Water surface elevation membrane
Waterproof
Water surface elevation
Existing abutment or pier elevation (min.)
Top of berm
Existing ground at time of construction
Diverted water level at time of construction
Diverted water level
Existing ground at time of construction
Diverted water level
Limit of work zone
Limit of work zone
Limit of work zone elevation (min.)
Top of berm elevation (min.)
Top of berm at time of construction
Diverted water level
(anchoring method to be approved)
Waterproof membrane
REVISED: 7/2016
DETAIL APPROVED FOR USE --/----
WESTERN FEDERAL LANDS HIGHWAY DIVISION
m in
4'-6"
W157-17
METHODS
TEMPORARY DIVERSION BERM
m in m in
6" (min.) freeboard. Submit temporary stream diversion m in
U.S. CUSTOMARY DETAIL
DETAIL
STATE PROJECT
NUMBER
SHEET
F.2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FERGUS 2016(1) MT
U S
C c m y fi le s p w p r o d u c ti o n d
M T F E
R G
U S fb .d g n
A u g u s t
NOTE:
1 4.
3.
2.
1.
membrane
Waterproof height of the sandbag barrier.
directed. Remove sediment when deposits reach half the berm daily. Repair as needed after rainfall events or as
While in use, inspect and maintain the temporary diversion given time.
Place a maximum of one diversion in the stream at any upper rows of sandbags above the joints in lower rows.
of bottom rows as there are vertical course. Overlap the
Place sandbags to form a pyramid by laying equal numbers plans for approval prior to installation.
minimum height equal to the water surface elevation with
As a minimum, provide a temporary diversion berm with a prefabricated or portable diversion berms, dams, etc.).
methods may be chosen (including any approved during construction operations. Alternate stream diversion
These options suggest configurations for diverting a stream
PLASTIC LINED DIVERSION CHANNEL
RIPRAP LINED DIVERSION CHANNEL
TEMPORARY CULVERT
DIVERSION CHANNEL
SECTION B-B
SECTION A-A
SECTION A-A SECTION B-B
SECTION B-B
PLAN
W
B
W
B
W
B B
W
T T
Ø when scheduled)
Silt fence (typ.
embankment
Roadway embankment
Roadway
Temporary culvert backfill
Subgrade
Bedding
Sandbags
Riprap lining Riprap lining backflow into natural channel
Use sandbags to prevent
Permanent natural channel
Earthwork limits when scheduled)
Silt fence (typ.
See Note 5
Permanent culvert
Roadway centerline temporary barrier
Use sandbags to construct
SandbagsPlastic liner
SSSS
SS SS
D
D D
D
SS
SS
SS SS
5.
4.
3.
2.
1.
FlowFlow
FlowFlow
Plastic liner when scheduled)
Silt fence (typ.
using one of the methods listed in Subsection 204.11(a).
temporary culvert. Compact temporary culvert backfill channel through the roadway embankment with
When specified replace the portion of the diversion liner. Bury the upstream edge of the liner a minimum of
Do not construct with longitudinal joints if using a plastic
Construct channel at a minimum grade of 0.5 percent.
width of the temporary diversion channel.
Use plastic liner or riprap along the entire length and diameter, riprap class, channel dimensions and quantities.
See Erosion Control Section for temporary culvert
A
A
BB
GeotextileGeotextile
Flow
Natural ground and secure with sandbags (typ.)
157-5
STANDARD APPROVED FOR USE 6/2005
DRAFT: 3/2014
REVISED: 6/2007
DIVERSION CHANNELS
TEMPORARY
6" deep and secure with riprap or sandbags.
2'2'
Bury plastic liner 6" deep
2'2'
STATE PROJECT
NUMBER
SHEET
F.3
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FERGUS 2016(1) MT
U S
C c m y fi le s p w p r o d u c ti o n d
M T F E
R G
U S fc .d g n
A u g u s t
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
NOTE:
with plastic liner or riprap
Temporary diversion channel
GENERAL NOTES
AXLE 1 2 3 4 5 6 7 8 9
MAX WEIGHT (LBS) 12,000 12,000 17,500 17,500 17,500 17,500 17,500 17,500 17,500
TRANSPORTER ERECTOR (T-E) VEHICLE
4'-10" 10'-0" 5'-0" 5'-0" "2
14'-5 8'-10" 5'-0" 5'-0"
MATERIALS
1. CAST-IN-PLACE CONCRETE
CEMENT TYPE: TYPE II, LOW ALKALI
MINIMUM CEMENT CONTENT: 580 PCY
MAXIMUM W/C RATIO: 0.42
AIR CONTENT RANGE:
COARSE AGGREGATE GRADATION: PER AASHTO M 43 (ASTM D 448) 1.0 TO NO. 4
28-DAY COMPRESSIVE STRENGTH:
CHAMFER EXPOSED EDGES OF ALL CONCRETE 34", UNLESS NOTED OTHERWISE ON THE PLANS
2. REINFORCING STEEL
ALL REINFORCING STEEL SHALL CONFORM TO AASHTO M31, GRADE 60 DEFORMED. MINIMUM CONCRETE
COVER TO THE FACE OF ANY BAR SHALL BE 2", UNLESS SHOWN OTHERWISE ON THE PLAN.
MINIMUM BAR LAP SPLICE LENGTHS:
#4 BARS 1'-6"
#5 BARS 1'-10"
#6 BARS 2'-4"
#7 BARS 2'-9"
#8 BARS 3'-9"
#9 BARS 4'-9"
3. PRE-STRESSING STEEL
PRE-STRESSING STRANDS SHALL BE AASHTO M 203/M 203M (ASTM A 416/A 416M), GRADE 270 KSI
0.5 OR 0.6-INCH DIA., SEVEN-WIRE, UNCOATED, LOW RELAXATION STRANDS.
4. PRE-STRESSED CONCRETE GIRDERS
BROOMED FINISH ON THE TOP SURFACE OF THE GIRDERS. CHAMFER EXPOSED EDGES 34" UNLESS
SHOWN OTHERWISE ON THE PLANS.
STRUCTURAL METAL FOR WELDED CONNECTIONS SHALL CONFORM TO ASTM A36. WELDED ANCHORS
SHALL CONFORM TO ASTM A 36. WELDING FOR WELDED ANCHORS SHALL CONFORM TO
ANSI/AASHTO/AWS D1.5, CHAPTER 7. WELDED TIE CONNECTIONS SHALL BE FURNISHED IN BLACK IRON
FINISH. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE STABILITY OF THE GIRDERS DURING ALL
PHASES OF CONSTRUCTION.
5. STEEL PIPE PILES
STEEL PIPE PILES SHALL CONFORM TO ASTM A 252, GRADE 2.
ALL PILES SHALL HAVE INSIDE FITTING, PREFABRICATED, CAST STEEL CLOSED-END DRIVING POINT
CONFORMING TO ASTM A27. THE MINIMUM TIP ELEVATIONS SHOWN IS FOR ESTIMATING QUANTITIES
ONLY.
ESTIMATED BRIDGE PLAN QUANTITIES
: SPECIAL VEHICLE DATA PROVIDED FOR USE IN STRENGTH II LOAD COMBINATION.NOTE
SPECIFICATIONS
1. DESIGN: AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, 7TH EDITION, 2016 INTERIMS
2.
ON FEDERAL HIGHWAY PROJECTS, FP-14
CONSTRUCTION: STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES
DESIGN & STRUCTURAL CRITERIA
1. DEAD LOADS
1.1. CAST-IN-PLACE CONCRETE: 150 PCF
1.2. PRE-STRESSED GIRDERS: 155 PCF
1.3. STRUCTURAL STEEL: 490 PCF
1.4. SOIL: 150 PCF
1.5. GRAVEL: 120 PCF
2. LIVE LOAD SURCHARGE
2.1. EQUIVALENT HEIGHT OF SOIL FOR ABUTMENT = 4 FT
2.2. EQUIVALENT HEIGHT OF SOIL FOR WINGWALL = 2 FT
3. LIVE LOAD
3.1. HL-93. MAXIMUM DYNAMIC LOAD ALLOWANCE (IMPACT), IM = 33%
3.2. SPECIAL VEHICLE: T-E = 73.25 TONS
4. RETAINING WALLS LATERAL EARTH PRESSURE
4.1. AT REST PRESSURE: EQUIVALENT FLUID WEIGHT OF 70 PCF
5. DRIVEN PIPE PILES
5.1. MAXIMUM ALLOWABLE END BEARING PRESSURE: 30 KSF
5.2. SKIN FRICTION, OVERBURDEN: 150 PSF
5.3. SKIN FRICTION, WEATHERED SHALE: 600 PSF
5.4. BEDROCK LOCATION, NORTH ABUTMENT: ELEVATION 3,264 FT
5.5. BEDROCK LOCATION, SOUTH ABUTMENT: ELEVATION 3,255 FT
6. SEISMIC
6.1. SITE CLASS: C
6.2. SHORT PERIOD ACCELERATION, Ss = 0.081 g
6.3. SITE COEFFICIENT, Fa = 1.2
6.4. LONG PERIOD ACCELERATION AT 1.0 SECONDS S1 = 0.034 g
6.5. SITE COEFFICIENT, FV = 1.7
6.6. SHORT PERIOD SPECTRUM ACCELERATION, SDS = 0.065 g
6.7. SHORT PERIOD SPECTRUM ACCELERATION, SD1 = 0.039 g
MISCELLANEOUS
1. VARIATIONS: VARIATIONS IN THE GENERAL SHAPE OR IN THE DECK WIDTH SPAN LENGTHS FROM THOSE
SHOWN ON THE BRIDGE DRAWINGS ARE NOT ALLOWED WITHOUT THE APPROVAL OF THE CONTRACTING
OFFICER. OBTAIN APPROVAL FROM THE CONTRACTING OFFICER OF ANY VARIATION REQUIRING THE
ALTERATION OF BACKWALL, DIAPHRAGM AND SLEEVE SPACES AS SHOWN ON THE BRIDGE DRAWINGS.
2. ALL OMISSIONS OR CONFLICTS BETWEEN THE VARIOUS ELEMENTS OF THE DRAWINGS AND/OR
SPECIFICATIONS SHALL BE BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER BEFORE
PROCEEDING WITH RELATED WORK.
3. IF A DISCREPANCY EXISTS BETWEEN PLANS AND SPECIFICATIONS, THE GOVERNING RANKING IS:
DIMENSIONS INFORMATION
1. PLAN 1. SPECIAL CONTRACT REQUIREMENTS
2. CALCULATED 2. PLANS
3. SCALED 3. SPECIFICATIONS
4.5 KSI
7,000 PSI AND COMPRESSIVE STRENGTH AT RELEASE f'ci = 5,000 PSI.
LOCATION
(NOTE 1) (FT)
TEE GIRDERS
DECK BULB
(CU. YDS)
CONCRETE
REGULAR (LB)
REINFORCING STEEL
STEEL (LB)
STRUCTURAL
STEEL PIPE PILE (NOTE 2)
THICKNESS
" WALL 2
(LN.FT.)
W740
BRIDGE RAIL
REMOVAL
MISCELLANEOUS WORK -
(LN. FT.)
FURNISHED
(LN. FT.)
DRIVE
SOUTH ABUTMENT -- 27 2950 -- 244.5 207
APPROX. 3500 CU. FT. TIMBER
DEMOLISH EXISTING BRIDGE
NORTH ABUTMENT -- 29 3050 -- 229.5 192
SUPERSTRUCTURE 307 10 1150 1440 -- --
TOTAL 307 66 7150 1440 474 399 194 --
NOTES:
1.
2.
WAVE EQUATION ANALYSIS.
GENERAL NOTES
19.5
22.5
CLASS A(AE) CONCRETE
AND ASSOCIATED HARDWARE, AND ANY OTHER MATERIALS REQUIRED FOR THE MANUFACTURE AND ERECTION OF THE GIRDERS.
INCLUDES CONCRETE, REINFORCING STEEL, PRESTRESSING STEEL, INSERTS, WELDED CONNECTIONS, GROUT, LIFTING DEVICES, DIAPHRAGMS
INCLUDES FURNISHING AND INSTALLING PIPE PILE, CONCRETE FOR PIPES, FURNISHING AND ATTACHING PILE TIPS, PRE-BORING AND
S1.0
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d S .0
R e v is e d .d g n
MT FERGUS 2016(1)
e p te m b e r
H A
R R I S
S T
O K
C h e c k e d b y
D e s ig n e d b y
CONCRETE SHALL BE CLASS P (PRESTRESSED) WITH A MINIMUM 28-DAY COMPRESSIVE STRENGTH f'c =
0 4'2'
0 4'2'
SCALE 1/4"=1'
SCALE 1/4"=1'
F
A
IL
IL
FACE OF RAIL
℄ ROADWAY & STRU
S .0
W740 GUARDRAIL &
POST, SEE SHEET S11.0
(TYP)
℄ EXISTING B
GUARDRAIL TERMINAL
TYPE 5 TREATMENT;
SEE SHEET S12.0
(TYP)
7'-2"
5'-8" 1'-6"6'-2"
1'-6"
9'-2" (TYP)
4'-8"
ALIGNMENT TANGENT BEARING
TO RURAL AREA
TO HIGHWAY 191
EXISTING BRIDGE
S2.0
PLAN VIEW
5'-8" 75'-0" ℄ BEARING TO ℄ BEARING (HORIZONTAL DI
3273.82
HIGH WATER ELEVATION
PRE-CAST PRE-STRESSED CONCRETE
DECK BULB TEE GIRDERS
FINISHED GRADE
@ ℄ RO
STA. 12+19.50
ELEV. 3280.68
STA. 12+94.5
ELEV. 3284.88
W740 GUARDRAIL
CAST-IN-PLACE
CONCRETE WING
WALL
FINISHED GRADE
@ EDGE OF
ROADWAY
CAST-IN-PLACE
CONCRETE WING WALL
ELEVATION 3271.36
BOTTOM OF CAP
ELEVATION 3275.56
BOTTOM OF CAP
GUARDRAIL TERMINAL
TYPE 5 TREATMENT
(TYP)
6'-6"
8'-0"5'-4"
FINISHED GRADE
@ ℄ RO
TOP OF CURB
16"Ø x 12" WALL THICKNESS
PIPE PILES (TYP)
℄ SOUTH ABU ℄ NORTH ABU
ELEVATION 3264.60
BOTTOM OF CHANNEL
5'-4"
COMPACTED
NATIVE SOIL
S2.0
DOWNSTREAM ELEVATION VIEW
BRIDGE DECK DRAIN OUTLET,
SEE DETAIL 5/S6.0
ELEVATION VIEW
BRIDGE PLAN &
6" GEOCOMPOSITE PAVEMENT
EDGE DRAIN SYSTEM
6" GEOCOMPOSITE PAVEMENT
EDGE DRAIN SYSTEM
2H:1V
10H:1V
2H:1V SLOPE
2H:
1V
SLOPE
10H:1V
2H:
1V
SEE SHEET C5.0
4' PLACED RIPRAP, METHOD B, CLASS 6
S2.0
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d S .0
R e v is e d .d g n
MT FERGUS 2016(1)
e p te m b e r
H A
R R I S
S T
O K
C h e c k e d b y
D e s ig n e d b y
S3.0
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d S .0
R e v is e d .d g n
MT FERGUS 2016(1)
e p te m b e r
H A
R R I S
S T
O K
C h e c k e d b y
D e s ig n e d b y
PER PROJECT SPECIFICATIONS.
EXISTING BRIDGE COMPONENTS SHALL BE DEMOLISHED
EXISTING BRIDGE SHOWN FOR REFERENCE ONLY. ALL 2.
FOR NORTH ABUTMENT.
DIMENSIONS SHOWN FOR SOUTH ABUTMENT ARE TYPICAL 1.
NOTES:
0 8'4'
SCALE 3/16"=1'
B-1
B-2 75'-0" ℄ BEARING TO ℄ BEARING (HORIZONTAL DI
FOOTING PLAN
℄ ROADWAY & STRU
16"Ø x 12" WALL STEEL PIPE
PILES FILLED WITH CONCRETE,
TYP
S T
A
.5
S O
U
H
U T
M E ℄ EXISTING B
S T
A
.5
N O
R
U T
M E
1'-8"
3'-4"
1'-8"
S3.0
(7) 14"Ø TIMBER
PILES, TYP EA.
EXISTING BENT
EXISTING 8"x8"
TIMBER PILES IN
WINGWALLS, TYP
.0 ℄ STEEL PIPE
INSIDE-FIT CONICAL
DRIVING POINT
CONICAL DRIVING POINT WELD DETAIL
7018 SMAW ROD.
SLIP DRIVING POINT INSIDE PIPE. USE
℄ STEEL PIPE
3"x14" BACKING RING TO FIT
INSIDE DIAMETER OF PIPE
" ROOT LANDING8
0" TO
PIPE WALL DETAIL
SUBSEQUENT PASSES,
8" THICK (MAX)
ROOT PASS,
8" THICK (MAX)
BEVEL TOP
MEMBER ONLY
PILE EXTENSION AFTER DRIVING
(PILE VERTICAL)
JOINT DESIGNATION B-U4A.
REFER TO AWS D1.1 FOR PREQUALIFIED
NOTE:
℄ STEEL PIPE
T H
IC
K
M A
X
R
O
" ROOT OPENING4
0" TO
3"x14" BACKING RING TO FIT
INSIDE DIAMETER OF PIPE
JOINT DESIGNATION B-U2A.
REFER TO AWS D1.1 FOR PREQUALIFIED
NOTE:
PIPE WALL DETAIL
SUBSEQUENT PASSES,
8" THICK (MAX)
PILE EXTENSION BEFORE DRIVING
NO SCALE
S3.0
DETAILS FOR STEEL PIPE PILES
PERMISSIBLE WELDED SPLICE
GREASE, MOISTURE AND OTHER MATERIAL THAT WOULD PREVENT PROPER WELDING.
SMOOTH, UNIFORM FINISH. REMOVE ALL FINS, TEARS, LOOSE SCALE, SLAG, RUST,
USE ONLY E7018 SERIES ELECTRODES. PREPARE THE WELD SURFACES TO A
NOTE:
PILE NOTES
BRIDGE FOOTING PLAN
1. INSTALL PILES WITH TIP ELEVATIONS SHOWN BELOW:
SOUTH ABUTMENT: 3235'
NORTH ABUTMENT: 3244'
2. DRIVE PILES TO ULTIMATE (NOMINAL) CAPACITY SHOWN BELOW:
SOUTH ABUTMENT: 267 KIPS
NORTH ABUTMENT: 271 KIPS
4. DETERMINE PILE CAPACITY USING WAVE EQUATION ANALYSIS.
45.00°
MINIMUM OF ONE DAY BEFORE PLACING THE PILE CAP CONCRETE.
3. FILL THE STEEL PIPE PILES WITH CLASS AE CONCRETE. WAIT A
S4
.0
S5
.0
S4
.0
S4.0
S4.0
PILE CAP SECTION - BETWEEN PILES
S4.0
PILE CAP SECTION - THROUGH PILE
S4.0
PILE SECTION
S4.0
PILE CAP PLAN
S4.0
PILE CAP ELEVATION
S5.0
ABUTMENT DIAPHRAGM
0 2'1'
S5.0
FIXED SHOE DETAIL 3
S5.0
WATERSTOP DETAIL
NO SCALE
S5.0
METAL EXPANSION CAP DETAIL
0 6"3"0 1'6"
S5.0
ABUTMENT ENDWALL ELEVATION
0 2'1'
NORTH ABUTMENT - AHEAD ON LINE)
(SOUTH ABUTMENT - BACK ON LINESCALE 1/2"=1'
SCALE 1 1/2"=1' SCALE 3"=1'
SCALE 1/2"=1'
℄ BE
END OF TOP FLANGE
PRESTRESSED
CONCRETE BULB
TEE GIRDER
#4 STIRRUPS
@ 1'-0" O.C.
6" 4" 6" 4"
B U
L
P T
H
A P
P R
O X
D
IA
P H
R A
P T
H
R
(3) #5 BARS N.F.
BETWEEN BEAMS
(2) 2"Ø SLEEVES
W/ #6 BAR x
3'-0" PER BEAM
1" CHAMFER
BEND TOP FLANGE REINF.
BARS INTO DIAPHRAGM PER
MANUFACTURER'S
RECOMMENDATIONS
(4) #5 BARS CONTINUOUS F.F.
2" CLR
(TYP)
END OF BEAM WEB
6"
6"
1'-4"
5 "
FIXED BEARING SHOE;
SEE 2/S5.0
BOND BREAKER 2
LAYERS TAR PAPER
PILE CAP
F.F. DENOTES FILL FACE
N.F. DENOTES NEAR FACE
BEAM. (DEPTH VARIES EA. ABUTMENT)
* TOP OF DIAPHRAGM TO MATCH TOP OF
NOTE:
4"Ø x 3'-6" SMOOTH BAR W/
METAL EXPANSION CAP. EMBED
1'-8" INTO CAP, SEE 5/S5.0
BLOCK OUT CONCRETE IN
FRONT OF BEARING SHOE
4"x3" LAYER OF EXPANSION
JOINT FILLER AT N.F.
(BREAK AT SHOES)
1'-8"
3"
S5.0
NEAR FACE
27'-6"
4" MIN GRAVEL WEARING
SURFACE, VARIABLE OVER SPAN
W740 RAIL (TYP)
BULB TEE, SEE DETAIL 2/S9.0
5% CROWN
2% CROWN
FILL CONTINUOUS KEYWAY
WITH NON-SHRINK GROUT,
TYP
2% SLOPE
℄ ROAD
STRUCTURE
G E
N T E
R
V A
R
IE
S
V A
R
IE
S
AT EDGE OF ROAD
BE 6" ABOVE GRADE
CONCRETE CURB TO
CAST-IN-PLACE
*** NOTE: T.O.
FOR WINGWALL AND FASCIA
WALL REINFORCING STEEL
SEE SHEET S6.0
FIXED BEARING SHOE.
SEE DETAIL 2/S5.0
F.F. DENOTES FILL FACE
N.F. DENOTES NEAR FACE
: NOTE
ROADWAY & ℄ BE FINISHED GRADE @
ELEVATION A :
E
A R
5% CROWN
2% CROWN
#4 STIRRUPS @1'-0"
O.C. BETWEEN BEAMS
(TYP)
(3) #5 BARS N.F.
BETWEEN BEAMS (TYP)(4) #5 BARS
CONTINUOUS F.F.
(2) #6 BARS x 3'-0"
LONG THROUGH BEAM
WEB (TYP)
3"
(2) 11
4" Ø SMOOTH
BARS PER BEAM
(1'-8" EMBEDMENT)
W/ METAL
EXPANSION CAP
(DETAIL 5/S5.0)
P
4" EXPANSION JOINT FILLER &
WATERSTOP BETWEEN ENDWALL
AND WINGWALL
1'-5"
(ABUTMENT)
T
Y P
E M
B E
D
ELEVATION B
(@ ℄ BEA
ELEV. C
ELEV. D
ELEV. E
S .0
TABLE OF ELEVATIONS
ELEVATION
ABUTMENT
SOUTH
ABUTMENT
NORTH
A 3280.68 3284.88
B 3279.23 3283.43
C 3275.63 3279.83
D 3275.36 3279.56
E 3271.36 3275.56
S11.0
SEE "t" DIMENSION ON 2/S10.0
2% SLOPE
S7.0
24'-8"
ELEV. D
ANSI 250
ANSI 250
END VIEW
2'-10"
2'-5" "2 12"2
6"
5""2
"2
R
LC
G
SIDE VIEW
C BEARING L
")4
1OF EXPANSION CAP PLUS
(DIAMETER OF HOLE EQUALS SIZE
℄ HOLE FOR SMOOTH
SHEAR STUDS (STAGGERED)
5(3)
(ANSI 250) REQUIREMENTS.
STRAIGHTENING AND SURFACE ROUGHNESS
SEE PROJECT SPECIFICATIONS FOR PLATE 2.
NECESSARY TO AVOID PRESTRESSING STEEL.
ADJUST SHEAR STUD SPACING AS 1.
NOTE:
ON ALL SIDES)
THAN BEARING PLATE
" LARGER 2
1PAD (
FIBER REINFORCED
6" 6"
(SEE DETAIL 5/S5.0)
METAL EXPANSION CAP
℄ SMOOTH BA
(STRAIGHTENED)
PL 1"x5"x2'-10"
SOLE PLATE
(STRAIGHTENED)
PL 1 1/2 "x5"x2'-10"
MASONRY BEARING PLATE
(STRAIGHTENED)
PL 1"x6"x2'-0"
1/2 4"
(TYP)
(2)
GRADE OF BEAM
PERPENDICULAR TO
T.O. CONCRETE
250 4
FILL FACE
OF PILE CAP
CONTINUOUS WITH WINGWALL WATERSTOP.
POSITION WHILE PLACING CONCRETE. MAKE
NOTE: HOLD WATERSTOP IN ACCURATE
FILLER
JOINT
EXPANSION
"x3" WIDE4
" MIN "T"32
MIN "T""16
FILL FACE OF
DIAPHRAGM
3"
BOND BREAKER
N O
U
T A
L
"1
" I.D. FOR8
4"Ø x 3'-6" LONG
SMOOTH BAR (2
REQ'D PER BEAM END)
SOFT
WIRE
DOWEL
STOP
CLOSE ENDS
BY PINCHING
SIDE WALLS
TOGETHER
6" GEOCOMPOSITE
PAVEMENT EDGE
DRAIN SYSTEM
6" GEOCOMPOSITE
PAVEMENT EDGE
DRAIN SYSTEM
SHEET 2 OF 2
ABUTMENT DETAILS
S5.0
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d S .0
R e v is e d .d g n
MT FERGUS 2016(1)
e p te m b e r
H A
R R I S
S T
O K
C h e c k e d b y
D e s ig n e d b
S6.0
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d S .0
R e v is e d .d g n
MT FERGUS 2016(1)
e p te m b e r
H A
R R I S
S T
O K
C h e c k e d b y
D e s ig n e d b y
S6.0
SOUTH ABUTMENT WINGWALL ELEVATION - NEAR FACE
S6.0
FASCIA WALL DETAIL
S6.0
WINGWALL SECTION
S6.0
WINGWALL TIE-IN SECTION
0 2'1'
0 2'1'
0 2'1'
0 2'1'
CONSTRUCTION JOINT ASSUMED AT TOP OF PILE CAP. ASSUMED CONCRETE
PLACEMENT AND ORDER OF CONSTRUCTION:
1. PILE CONCRETE TO BOTTOM OF CAP ELEVATION
2. PILE CAP (SHEET S4.0) AND LOWER PORTION OF WINGWALL
3. PLACE PRE-CAST GIRDERS
4. WINGWALLS (SHEET S6.0 & S7.0) & FASCIA WALLS
5. ABUTMENT DIAPHRAGMS (BACKWALL PER SHEET S5.0)
NOTE:
ANY REBAR SHOWN CONTINUOUS BETWEEN WINGWALL & PILE CAP TO BE
CAST-IN-PLACE. NO DRILL/EPOXY ALLOWED.
NOTE ON CONSTRUCTION SEQUENCING
S6.0 0 2'1'
SCALE 3/4"=1'
SCALE 3/4"=1'
SCALE 3/4"=1'
SCALE 3/4"=1' SCALE 3/4"=1'
2'-2"
ELEVATION 3271.36
BOTTOM OF CAP
6'-6" 3'-4"
4 SPA. @ 1'-6" = 6'-0"
FASCIA WALL
EL = 3280.11
2'-0"
9'-8"
PILE CAP
(REINFORCEMENT
NOT SHOWN)
BEAM
TOP
FLANGE
#5 BOTTOM
BAR
S P
A
O W
N
EL=3280.54
3'-4"
5 SPA. @ 8" =
CLR
2"
C L
R
BEAM TOP FLANGE & CURB TERMINATION
POINT (REINF. NOT SHOWN FOR CLARITY)
#5 TOP BAR
C L
R
A
#4 HOOPS #4 HOOPS
C E
R S S6.0
S .0
S .0
3" RECESSED LINE
4" DOUBLE CHAMFER
3" GAP
2" EXPANSION JOINT FILLER
SOUTH ABUTMENT
℄ BEA
S .0
CONSTRUCTION JOINT
EL = 3278.49
EL = 3278.59
BRIDGE DRAIN OUTLET
APPROX. 1'-0" ABOVE
PILE CAP
1'-6" FILLET
#7 FILLET BARS @ 6" O.C.
SEE SHEET S11.0 FOR DETAILS
V A
R
IE
S
2% SLOPE
CURB PER
DETAIL 2/S9.0
2"CLR
#4 BARS FULL
EMBED INTO PILE
CAP BELOW
(8) #5 BARS HORIZ
1'-5"
#4 U-BARS @ 12" O.C.
PILE CAP
REINFORCEMENT
NOT SHOWN
FOR CLARITY
BACKWALL
BEYOND
3" 3"
GAP
1'-8"
T O
P
C L
R
#7 FILLET BARS @
6" O.C. (8 TOTAL)
#5 BARS
HORIZ. @
1'-0" O.C.
(12 TOTAL)
#5 BARS HORIZ. @
6" O.C. (18 TOTAL)
#4 HOOPS &
U-BAR PAIR
V A
R
IE
S
S
E
V A
T
IO
N
4" CHAMFER (TYP) 2" RADIUS
(MATCH CURB)
1'-5"
SIDES
2" CLR.
4" DOUBLE
CHAMFER LINE
EXTENDING FROM
BRIDGE CURB
N.F. OF WINGWALL
F.F. OF WINGWALL
S7.0
B O
T T
O M
R
EXTEND HORIZONTAL BARS
FROM WINGWALL INTO PILE
CAP
PILE CAP HORIZ.
#8 BARS, AS
SHOWN ON S4.0
EXTEND VERTICAL
BARS FROM FASCIA
WALL ABOVE INTO
PILE CAP
PILE CAP #5 HOOPS
@ 1'-0" O.C. (TYP)
3'-4"
F.F. OF
WINGWALL
N.F. OF PILE CAP
F.F. OF PILE CAP
℄ BEARING AND PIL
N.F. OF
WINGWALL
1'-5"
#7 FILLET BARS @ 6" O.C.
1'-6" FILLET
1'-5"1'-6"
A P
P R
O X
TOP OF PILE CAP
(1) 90° ELBOW
F.F. ABUTMENT DIAPHRAGM
GRAVEL ROAD SURFACING
4"Ø SCH 40
PVC PIPE
CONCRETE
WINGWALL (REINF
NOT SHOWN FOR
CLARITY)
F.F. PILE CAP
1'-6" FILLET
4"Ø OUTLET
PIPE THROUGH
WINGWALL
SECTION A-A
TEE OUTLET TRANSITION
FITTING TO PVC
8"Ø WALL
PENETRATION,
FILL WITH
GROUT AFTER
PIPE INSTALL
TEE OUTLET TRANSITION
FITTING TO PVC
℄ BRG
ABUTMENT
4" SCH 40 PVC
(1) 90° ELBOW
DOWNSPOUT
COVER
A
A
PLAN VIEW
N.F. WINGWALL
F.F. ABUTMENT DIAPHRAGM
F.F. PILE CAP
N.F. PILE CAP
6" GEOCOMPOSITE PAVEMENT
EDGE DRAIN SYSTEM (TYP
BOTH SIDES OF ROADWAY)
WINGWALL DETAILS
FOOTNOTE:
Incidental to geocomposite pavement edge drain system.
SLOTTED GRATE
AND HINGED
SECURING FLANGE
COVER W/
DOWNSPOUT
STAINLESS STEEL
FABRICATED
TYPE 304
BOTH SOUTH ABUTMENT WINGWALLS
SYSTEM & TERMINATION DETAIL TYPICAL @
GEOCOMPOSITE PAVEMENT EDGE DRAIN
NOTE:
DRAIN SYSTEM TERMINATION DETAIL
GEOCOMPOSITE PAVEMENT EDGE
[1]
[1]
[1]
[1]
[1]
[1]
[1] [1][1]
[1]
[1]
S7.0
NORTH ABUTMENT WINGWALL DETAIL - NEAR FACE
S7.0
DOUBLE CHAMFER DETAIL 3
S7.0
WINGWALL WATERSTOP DETAIL
S8.0
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d S .0
R e v is e d .d g n
MT FERGUS 2016(1)
e p te m b e r
H A
R R I S
S T
O K
C h e c k e d b y
D e s ig n e d b y
ERECTION PLAN
NO SCALE
S8.0
FLANGE KEY BETWEEN CONNECTIONS
S .0
W740 GUARDRAIL
& POST, SEE
SHEET S11.0
76'-8" BEAM LENGTH
0 4'2' ℄ INTERMEDIATE STEEL DIAP ℄ BEAR
SOUTH ABUTMENT
℄ BEAR
NORTH ABUTMENT
EXTEND LONGITUDINAL TOP
FLANGE REINFORCING BARS
OUT 2'-0" FROM BEAM
END. FIELD BEND INTO
BACKWALL (TYP BOTH ENDS)
WELD TIE CONNECTION
(TYP)
CONTINUOUS KEYWAY (TYP)
ALIGNMENT TANGENT BEARING
ï â
P
R E
S T
R E
S S
N
B U
L B
T
A M
S
M
E A S
U R
R
IZ
O N
T A
L L
Y
A M
7 SPACES AT 9'-2" O.C. = 64'-2" RAIL POST SPACING
75'-0" â„„ BRG TO â
25'-0" 25'-0" 25'-0"
10"
10"
4'-2" 4'-2"
10 SPACES @ 6'-8"=66'-8" WELD TIE SPACING
℄ ROAD ℄ STRU
4"
4"
S .0
S .0
S .0
S10.0
END DETAIL
TYP BEAM
4'-8"6'-2"
S8.0
ERECTION PLAN
SCALE 1/4"=1'
PLAN VIEWSECTION VIEW
"8
L 2x2x3 8"x6"
NO SCALE
S8.0
WELD TIE CONNECTION DETAIL
WELDED CONNECTIONS ARE REQUIRED.
INTERRUPT LONGITUDINAL FLANGE KEY WHERE
:NOTE
WITH NON -SHRINK GROUT)
CONTINUOUS KEYWAY (FILL
TYP
6"
"2 13 "4
11"4
(BEND AS SHOWN)
PLAN FOR SPACING)
(SEE ERECTION
" 2 1"x2"X34
3BAR
"2 1"x2"x34
3BAR L7"x4"x1/2"x10" LONG
LC DIAPHRAGM
C10x30
L
L
L
PL 10"x4"x1/2"
L7"x4"x1/2" (SEE NOTE 5)
HOLES IN C10x30, C (2) - 1"x1 1/2" SLOTTED
A325 BOLTS W/FLAT WASHERS,
C10x30
PL 10"x4"x1/2"
3"
"4
"4
L
A325 BOLTS (SEE NOTE 4)
NO SCALE
S8.0
STEEL DIAPHRAGM DETAIL
DIAPHRAGM NOTES:
1.
2. INSTALL DIAPHRAGM IMMEDIATELY AFTER SETTING THE BEAMS IN PLACE. TIGHTEN THE BOLTS
THROUGH THE BEAM WEB AND HAND TIGHTEN THE CHANNEL TO THE CLIP ANGLE BOLTS. PERFORM
THE FINAL TIGHTENING OF THE CHANNEL TO THE CLIP ANGLE BOLTS AFTER FIELD LEVELING AND
WELDING TIE CONNECTIONS, BUT PRIOR TO WELDING BEARINGS AND GROUTING THE KEY WAY.
3. CENTER BEAM DIAPHRAGM CONNECTIONS: USE SLOTTED HOLES TO ADJUST FOR THE BULB TEE
BEING OUT OF PLUMB WHILE THE C10x30 IS LEVEL. PROVIDE A MINIMUM 38" GAP BETWEEN THE
END OF THE C10X30 AND THE L7X4X1/2. SHOW THE ASSEMBLED DETAIL ON THE SHOP DRAWINGS.
4.
5.
TO THE FULL VALUE SPECIFIED IN THE TABLE,
8"Ø GALVANIZED
SLEEVE INSERTS BY
BULB TEE
MANUFACTURER
8"Ø GALVANIZED
SLEEVE INSERTS BY
BULB TEE
MANUFACTURER
EXTERIOR BEAM SHOWN, INTERIOR BEAM SIMILAR
NOTE:
"8
" GAP8
GIRDER
FLANGE
8"Ø CLOSED CELL
BACKER ROD
FILL LONGITUDINAL FLANGE KEYS WITH
HIGH STRENGTH NON-SHRINK GROUT.
KEEP KEYWAYS MOIST FOR 24 HOURS
PRIOR TO PLACING GROUT. AFTER
POURING GROUT, KEYWAY GROUT
SHALL BE WATER CURED FOR 72
HOURS OR UNTIL GROUT REACHES
DESIGN STRENGTH, WHICHEVER IS
GREATER. KEYWAYS SHALL BE
SANDBLASTED AT THE FABRICATION
FACILITY AND BE THOROUGHLY
CLEANED PRIOR TO GROUTING.
"8
GALVANIZE STEEL DIAPHRAGMS IN ACCORDANCE WITH AASHTO M 111.
TIGHTEN BOLTS IN ACCORDANCE WITH THE TURN-OF-THE-NUT INSTALATION METHOD IN SECTION 555
TO HALF THE VALUE SPECIFIED IN THE TABLE.
TIGHTEN BOLTS IN ACCORDANCE WITH THE TURN-OF-THE-NUT INSTALLATION METHOD IN SECTION 555
PRE-STRESSED CONCRETE BULB TEE FABRICATION NOTES:
1. FABRICATE THE PRE-STRESSED CONCRETE BULB TEE BEAMS IN ACCORDANCE WITH THE DETAILS SHOWN ON
THIS DRAWING. MAXIMUM f'c (COMPRESSIVE STRENGTH OF CONCRETE IN 28 DAYS) FOR DESIGN IS 7000 PSI.
ALL VALUES SHOWN IN THE TABLE ARE BASED ON THE BEAM SECTIONS SHOWN ON THIS SHEET.
2. BEAM LENGTH: INCREASE THE OVERALL LENGTH OF THE BEAM 0.0075 INCHES PER FOOT OF LENGTH TO
ALLOW FOR ELASTIC SHORTENING, SHRINKAGE AND CREEP.
3. HARDWARE: OBTAIN APPROVAL OF THE ENGINEER FOR ALL EMBEDDED PLATES, THREADED INSERTS, HOLD
DOWN DEVICES, LIFTING DEVICES AND ANY OTHER HARDWARE INCORPORATED IN THE BEAM PRIOR TO
FABRICATION.
4. ERECTION: HOLD ALL GALVANIZED PIPE SLEEVES IN ACCURATE POSITION WHILE PLACING CONCRETE FOR THE
BEAM.
5. APPLY RAIL LOADS TO THE EXTERIOR BEAM ONLY. BROOM FINISH THE TOP SURFACE OF BEAM IN
ACCORDANCE WITH THE SPECIFICATIONS.
6. DESIGN AND FABRICATE THE BEAM TO SUPPORT THE DEAD AND LIVE LOADS AND PROVIDE A MINIMUM
ULTIMATE MOMENT CAPACITY SHOWN ON THIS SHEET. SHOW STRESSES IN THE BEAM UNDER EACH LOADING
CONDITION THAT IS ANTICIPATED IN THE MANUFACTURE, HANDLING AND SERVICE LIFE OF THE BEAM.
S9.0
BULB TEE SECTIONS
0 2'1'
0 1'6"
0 2'1'
S9.0
ELEVATION
SCALE 1/2"=1'SCALE 1/2"=1'
SCALE 1"=1'
24'-8"
28'-0" DECK WIDTH
S9.0
TRANSVERSE SECTION
GRAVEL WEARING SURFACE
W740 RAIL
BULB TEE, SEE DETAIL 2/S9.0
5% CROWN
2% CROWN
7'-0" 7'-0" 7'-0"7'-0"
FILL CONTINUOUS KEYWAY
WITH NON-SHRINK GROUT,
TYP
SEE DIAPHRAGM
DETAILS, SHEET S8.0
C10x30
DIAPHRAGM (TYP)
℄ RO
S11.0
1"
"8 56'-11
"2
6"
2"
1'-7"
2'-0"
4" CHAMFER
"16 131'-5
1"
"16 136'-11
"2
6"
2"
1'-7"
2'-0"
4" CHAMFER (TYP)
1'-6"
"4
�»1
2" CONTINUOUS
DRIP GROOVE
℄
"16 133'-5 3'-6"
V A
R
IE
S
HOOP LEG DIMENSION PER 2/S10.0.
DIMENSIONS AS SHOWN. VARY #5 CURB
MAINTAIN MIN. 10" CURB HEIGHT
LEVEL TOP OF CURB IN FINAL POSITION.
CURBS TO BE CAST-IN-PLACE. PROVIDE
BEAM. SEE CORRECTION DIAGRAM S10.0.
CURB THICKNESS VARIES OVER LENGTH OF
*** NOTE:
ANCHOR ASSEMBLY
FOR RAIL
CONNECTIONS. SEE
S11.0
#5 BARS @
9" O.C.
(2) #4
LONGITUDINAL BARS
EXTERIOR BEAMINTERIOR BEAM REINFORCING PLACEMENT DETAIL
" O.C.2
**(10) #5 BARS AT ABOUT 8
(8) #4 BARS (SPACED AS SHOWN)
#4 BARS @ 1'-6" O.C.
SHEAR REINFORCEMENT.
PLACE AS NEEDED BY
DESIGN OF FABRICATOR
1" CLR
R
C L
R
R
EXTERIOR BEAM REINFORCING SIMILAR.
INTERIOR BEAM REINFORCING SHOWN.
:NOTE
#5 BARS AT 6" O.C
RECOMMENDATIONS.
MANUFACTURER'S
BEND INTO DIAPHRAGM PER
BEYOND END OF BEAM.
LONGITUDINAL BARS 2'-0"
EXTEND TOP NOTE:**
4" CHAMFER
(TYP)
4" CHAMFER
T
Y P
R
R
"16 133'-5 "16
133'-5
6" 6"
1'-4"
V A
R
IE
S
V A
R
IE
S
1'-8"
"4
2'-0" 6"
10"
2'-0"
10"
6"
(TYP)
4"
T
Y P
75'-0"
25'-0"
LOOPS (TYP)
STRAND LIFT
(TYP. AT EACH DIAPHRAGM)
DETAILS ON SHEET S8.0
DIAPHRAGM
SLEEVE INSERTS (SEE
HOLE (TYP)
DIAPHRAGM
℄ INTERME ℄ ℄DIAPHRAGM ℄ INTERME
25'-0" 25'-0"
NOT EXCEEDING ALLOWABLE STRESSES.
MANNER TO PROVIDE SAFE LIFTING AND
LOCATE ALL LIFTING HARDWARE, IN SUCH A
* NOTE: FABRICATOR TO DESIGN AND
RECESS CONCRETE 1" BELOW TOP
OF FLANGE AROUND LIFT HOOPS
(TYP). CONTRACTOR TO GROUT
FLUSH ONCE BEAM IS SET.
BRIDGE BEAM DETAILS
PARAMETERS
PRESTRESSED BEAM DESIGN
AASHTO SPECIFICATIONS LRFD 7TH EDITION WITH 2016 INTERIMS
STRUCTURE TYPE SIMPLE SPAN
DECK CONCRETE STRENGTH N/A
DECK CONCRETE DENSITY N/A
PRESTRESSING STRAND 270 KSI LOW RELAXATION
SHEAR REINFORCING AASHTO M 31 GRADE 60
ALTERNATE SHEAR REINFORCING WELDED WIRE FABRIC -ASTM A1064
SECTION PREPERTY CALCULATIONS TRANSFORMED SECTION
PRESTRESS LOSS METHOD REFINED LOSSES PER LRFD 5.9.5.4
SHEAR COMPUTATION METHOD SECTIONAL MODEL PER LRFD 5.8.3
BEAM / SLAB INTERFACE N/A
LOAD RATING REQUIREMENTS AASHTO LRFR DESIGN LOAD
PRESTRESSED BEAM LOAD TABLE
LOAD TYPE LOADS APPLICATION METHOD
RAIL LOAD 0.039 KIP/FT PER RAIL EXTERIOR BEAM ONLY
CURB LOAD
0.209 KIP/FT @ CENTER
VARIES ALONG SPAN FROM 0.322 KIP/FT @ ENDS TO
EXTERIOR BEAM ONLY
4" GRAVEL WEARING SURFACE 52 LB/FT² APPLIED BETWEEN CURBS TRIBUTARY AREA
INTERIOR DIAPHRAGM 0.20 KIP/DIAPHRAGM AT POINT LOAD
EXTERIOR DIAPHRAGM 0.10 KIP/DIAPHRAGM AT POINT LOAD
ADDITIONAL DEAD LOADS
ZERO AT CENTER OF SPAN (SEE NOTE 1)
50 PSF AT SUPPORTS AND LINEARLY DECREASES TO
EQUALLY TO ALL BEAMS
FACTORED MOMENT AT SECTION Mu = 4093 KIP-FT SEE NOTE 2
LIVE LOAD
LRFD - HL 93
SEE S1.0 - T-E VEHICLE
PER AASHTO LRFD - STRENGTH I
PER AASHTO LRFD - STRENGTH II
NOTES:
1. THE ADDITIONAL DEAD LOAD ACCOUNTS FOR THE ADDITIONAL GRAVEL DUE TO THE BEAM CAMBER/ROAD PROFILE.
2. FACTORED MOMENT PROVIDED TO VERIFY DESIGN ASSUMPTIONS AND DEMANDS. DEMAND SHOWN IS FOR EXTERIOR
BEAM.
Mu = 1.0[1.25 DC + 1.50 DW + 1.75(LL+IM)] FOR STRENGTH I
Mu = 1.0[1.25 DC + 1.50 DW + 1.35(LL+IM)] FOR STRENGTH II
6" GEOCOMPOSITE
PAVEMENT EDGE
DRAIN SYSTEM
6" GEOCOMPOSITE
PAVEMENT EDGE
DRAIN SYSTEM
S9.0
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d S
R e v is e d .d g n
MT FERGUS 2016(1)
e p te m b e r
H A
R R I S
S T
O K
C h e c k e d b y
D e s ig n e d b
S10.0
BEAM END DETAIL 2
S10.0
CURB CORRECTION DIAGRAM
S12.0
ELEVATION AT TERMINAL TYPE 5
S12.0
PLAN AT TERMINAL TYPE 5
S12.0
VIEW C-C
S12.0
DETAIL
RAIL NOTES
STANDARD SLEEVESLEEVE FABRICATION OPTIONS
SECTION A-A VIEW B-B (STANDARD SLAB) VIEW B-B (U-TYPE BENT)
B B
A A
STANDARD SPLICEELEVATION AT BOX BEAM GUARDRAIL CONNECTION
S11.0
INSIDE ELEVATION OF RAIL
S11.0
RAIL SLEEVE DETAILS
S11.0
POST ASSEMBLY DETAIL
S11.0
POST DETAILS
S11.0
RAIL BOLT DETAIL 6
S11.0
REFLECTOR DETAIL