OR_BAKER_520(1)PROJECT_DESCRIPTION.pdf

PDF 13 KB Posted

Attached to
OR BAKER 520(1) Granite Hill Highway Reconstruction Federal contract opportunity
Solicitation number
DTFH70-15-B-00008
Issued by
Department of Transportation Federal Highway Administration

About this file

Project Description

View the file

Other files for this federal contract opportunity

Other files attached to OR BAKER 520(1) Granite Hill Highway Reconstruction, newest first.
File Type Posted
BidSum_GraniteHill.pdf PDF
A001_GraniteHill.pdf PDF
OR_BAKER_520(1)_PlanSet.pdf PDF
GM19-15_Final_GT_Recommendations.pdf PDF
IFB_Granite.pdf PDF
Sumpter_-_Granite_Road_Asbuilt.pdf PDF
SWPPP_OR_Baker_520(1)_Granite_Hill_Reconstruction.pdf PDF
Plan_Request_form_GraniteHill.pdf PDF
OR_BAKER_520(1)_Prelim_Plans.pdf PDF
OR_BAKER_520(1)_Prelim_Letter.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OR BAKER 520(1) Granite Hill Highway Reconstruction, Baker County, Oregon

The work consists of asphalt milling, roadway reconditioning, reinforced shoulder stabilization, cold in-place recycled asphalt base, paving, striping and other small items of work.

Project length: 6.34 Miles

Tentative Fixed Completion Date: Fall 2016 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: $3 million to $5 million

Location: 25 Miles W of Baker City, Oregon

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-14

DIVISION 150 – Project Requirements 151 Mobilization Yes 152 Construction Survey & Staking Yes 153 Contractor Quality Control and Assurance Yes 154 Contractor Sampling & Testing Yes 155 Schedules for Construction Contracts (construction schedules) Yes 157 Soil Erosion & Sediment Control Yes DIVISION 200 – Earthwork 204 Excavation & Embankment 1,350 CUYD 207 Earthwork Geosynthetics 3,100 CUYD DIVISION 250-Slope Reinforcement and Retaining Walls 261 Reinforced Soil Slopes Reinforced Shoulder Stabilization 2,400 SQFT DIVISION 300 – Aggregate and Base Courses 302 Minor Crushed Aggregate 3,300 TON 303 Road Reconditioning 10,560 LNFT 308 Recycled Aggregate Base 3,800 TON 310 Cold In-Place Recycled Asphalt Base Course 71,000 SQYD DIVISION 400 – Asphalt Pavements & Surface Treatments 401 Asphalt Concrete Pavement By Gyratory Mix Design Method 13,000 TON 403 Asphalt Concrete 150 TON 406 Fog Seal 30 TON 412 Asphalt Tack Coat(asphalt surface treatment) 44 TON 412 Asphalt Pavement Milling 36,800 SQYD DIVISION 600 – Incidental Construction 622 Rental Equipment yes 623 General Labor yes 633 Permanent Traffic Control, Sign System 258 SQFT 633 Permanent Traffic Control- Remove and Reset Sign 2 EACH 634 Permanent Pavement Markings, Type B, Solid 260,300 LNFT 635 Temporary Traffic Control-flagger 4,000 FXHR