OR_BAKER_520(1)_PlanSet.pdf
PDF 11 MB Posted
- Attached to
- OR BAKER 520(1) Granite Hill Highway Reconstruction Federal contract opportunity
- Solicitation number
- DTFH70-15-B-00008
About this file
Plans
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BidSum_GraniteHill.pdf | ||
| A001_GraniteHill.pdf | ||
| GM19-15_Final_GT_Recommendations.pdf | ||
| IFB_Granite.pdf | ||
| Sumpter_-_Granite_Road_Asbuilt.pdf | ||
| SWPPP_OR_Baker_520(1)_Granite_Hill_Reconstruction.pdf | ||
| Plan_Request_form_GraniteHill.pdf | ||
| OR_BAKER_520(1)PROJECT_DESCRIPTION.pdf | ||
| OR_BAKER_520(1)_Prelim_Plans.pdf | ||
| OR_BAKER_520(1)_Prelim_Letter.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
culv. culvert drwg(s).
dist.
diaph.
diag.
dia.
DHV
D drawing(s) distance diaphragm diagonal diameter design hourly volume diameter exp. jt.
exc.
EW
ER
EQ or eq.
EP
emb.
elev.
El. 94.061 m e
E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east ftg.
flg.
fin.
footing flange finish galv.
ga.
galvanized gage (gauge)
HW
hex.
hdwl.
high water hexagon headwall
K.P.
jt.
ID
kilometer post joint inside diameter
LW
lt. or LT
Ls
LPSM
long.
lat.
lam.
L low water left length of spiral lump sum longitudinal latitude lamination length of curve
NC
N normal crown north
OG
OD
o. to o.
o. c.
original ground outside diameter out to out on center pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W
R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed
W west sym.
STS
struc.
stiff.
stgr.
std.
Sta.
ST
SS
SRS
spa.
slry shldr.
sec.
SC
SADT
S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south mon.
min.
max.
matl.
m3 m2 monument minimum maximum material cubic meter square meter
NOTE:
1.
Trail
Lake, Pond or Reservoir; Marshland
Spring or Seep θs Ø
∆c spiral central angle diameter curve central angle total central angle appr.
AH
ADT
abut.
brg.
br.
BP
BM
BK
approach ahead average daily traffic abutment bearing bridge balance point bench mark back
LC
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend
BH
CP GPS
JH
TP
Control Point (Terestrial and GPS); Jump Hub
Material Source; Bore Hole; Test Pit
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
Section Line
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
BLM Lands Boundary
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Section Line4
Section Line16
36 31
6 1
Section Corner (Found, Projected)
36 31
6 1
Section Corner (Found, Projected)4
Section Corner (Found, Projected)16
SEC.
SEC.
Property Line w/Found Property Corner
400Parcel Number
Railroad
Large Creek or River
Intermittent Drainage or Small Creek
EL. 1234.56
N
E
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Treeline; Individual Trees
RIP
Boulder; Well; Satellite Dish; Grave
G G
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
W W ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center
Silt Fence
Wattle
M.P.
M.L.
mile post main line
PROPOSEDEXISTING
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Building
Riprap
N
Transition
Toe of Fill
Top of Cut
Concrete Barrier
DI
Slope Stake Limits
Pipe Culvert with Drop Inlet
Miscellaneous Utility Features
Box Culvert
Right-of-Way Line with Monument
Delineators
Signs (Single, double post; portable)
Underground Utilities
Overhead/Above Ground Utilities
Permanent Easement
Construction Easement - no symbol -wall face
DI
T T
Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use, UP = transformer or junction box, WF = water fountain, MH = unknown utility
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, SS = storm sewer, STEAM = steam, T = telephone, TV = CATV, W = water
P = power, P&T = Power and Telephone, SA= sanitary sewer, SD = storm drain, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, NO SCALE
AND ABBREVIATIONS
PLAN SYMBOLS
A.2
STATE PROJECT
NUMBER
SHEET
OR BAKER 520(1)
A
M
A u g u s t
U
S S u r ft
D c m y fi le s p w p r o d u c ti o n d o r a a b b .d g n
S la n in a
K
M il le r
C h e c k e d b y
D e s ig n e d b y
SUMPTER STOCKADE
SUMPTER
Granite Hill Rd.
END PROJECT
BEGIN PROJECT
d
R k e e r
C r e k c ar
C d
R e g di
R g ni dl u a p
S
Carey Gulch
Bear GulchGrays Gulch
Blue Spring d
R
7-
F N d
R k r oF y llu
Cc M
SCALE IN MILES
0 11 2
N k e er C kc u
B el tt iL
27+41.18
OR BAKER 520(1)
RECONSTRUCTION
GRANITE HILL HIGHWAY
361+42.30
OR BAKER 520(1)
RECONSTRUCTION
GRANITE HILL HIGHWAY
d
R yr at e me
C r et p m u
S
10 m iles
To G ranite
Pow d er
R iver
7-
F N
5-
F N
Sumpter Valley
M cE w en V a lley
1-
F N
Loop
Iron Horse
DREDGE STATE PARK
SUMPTER VALLEY
RAILROAD
SUMPTER VALLEY
Silver Creek
County Pit
Baker
26 miles
To Baker City
Powder River
VICINITY MAP
NATIONAL FOREST
WILLOWA WHITMAN
N A
T I O
N A
L F
O R
E S
T B
O U
N D
A R
Y
WILLOWA WHITMAN
WILLOWA
WHITMAN
N A
T I O
N A
L
B O
U N
D A
R Y
FOREST
A.3
STATE PROJECT
NUMBER
SHEET
OR
BAKER 520(1)
P u g u s t
I n t_ ft m y fi le s p w p r o d u c ti o n d o r a a c .d
S la n
M il
C h e c k e d b y
D e s ig n e d b
Sheet and Description
SECTION C SECTION E SECTION F SECTION L SECTION M
TYPICAL
SECTIONS
APPROACH
ROADS
EROSION
CONTROL
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
ALLOWANCE Bid Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM ALL
A0060 15301-0010 CONTRACTOR QUALITY CONTROL
AND ASSURANCE LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15701-0000 SOIL EROSION CONTROL (Baker
County Pit) LPSM All ALL
A0140 15701-0000 SOIL EROSION CONTROL (project) LPSM All ALL
A0160 15701-0000 SOIL EROSION CONTROL (200+00
LT staging area) LPSM All ALL
A0180 20401-0000 ROADWAY EXCAVATION CUYD 984 270 96 1,350
A0200 20402-0000 SUBEXCAVATION CUYD 446 24 470
A0220 20410-0000 SELECT BORROW CUYD 303 47 350
A0240 20702-0900 GEOTEXTILE FILTER, CLASS 2,
TYPE D SQYD 810 40 850
A0260 20703-2000 GEOGRID, STABILIZATION SQYD 2,234 66 2,300
A0280 26105-0000 REINFORCED SHOULDER
STABILIZATION SQFT 2,418 82 2,500
A0300 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 2,771 378 151 3,300
A0320 30302-5000 AGGREGATE SURFACE
RECONDITIONING LNFT 10,560 10,560
A0340 30801-0000 RECYCLED AGGREGATE BASE SQYD 3,837 63 3,900
A0360 31002-2000 COLD IN-PLACE RECYCLED
ASPHALT BASE COURSE, TYPE B
(3-inch depth) SQYD 71,321 71,321
A0380 31010-0000 EMULSIFIED ASPHALT TON 404 404
A0400 31011-0000 LIME TON 116 116
A0440 40101-5600 ASPHALT CONCRETE PAVEMENT,
GYRATORY MIX, 1/2-INCH OR
3/4-INCH NOMINAL MAXIMUM SIZE
AGGREGATE, 0.3 TO <3 MILLION
ESAL (type IV pavement roughness) TON 13,018 282 13,300
A0460 40105-3000 ANTISTRIP ADDITIVE, TYPE 3 TON 132 132
A0480 40301-0000 ASPHALT CONCRETE PAVEMENT TON 152 8 160
A0500 40601-0000 FOG SEAL TON 30 30
A0520 41201-0000 TACK COAT TON 44 44
MileStone: Sign-Off Date Completed: 08/31/15 Report Date: 08/31/15
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES
-A ug
-2
:0
A M
Remarks and/or Determination of
Estimated Quantity Pay Item Description Unit
Estimated Quantities c:
\m yf ile s\ pw
_p ro du ct io n\ d0
O
R B
AK
ER
(1
EE
B A C S _s um m ar y-w fl.
xl sm
]S he et
STATE PROJECT
BAKER 520(1) B.1OR
Sheet and Description
SECTION C SECTION E SECTION F SECTION L SECTION M
TYPICAL
SECTIONS
APPROACH
ROADS
EROSION
CONTROL
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
ALLOWANCE Bid Schedule
A0540 41301-0800 ASPHALT PAVEMENT MILLING,
3-INCH DEPTH (conserved) SQYD 3,837 3,837
A0560 41301-0800 ASPHALT PAVEMENT MILLING,
3-INCH DEPTH SQYD 33,010 33,010
A0580 62201-0250 DUMP TRUCK, 10 CUBIC YARD
MINIMUM CAPACITY HOUR 20
A0600 62201-0600 BACKHOE LOADER, 8 CUBIC FOOT
MINIMUM RATED CAPACITY
BUCKET, 30-INCH WIDTH HOUR 20
A0620 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM
BLADE HOUR 40
A0640 62301-0000 GENERAL LABOR HOUR 40
A0660 63316-1000 REMOVE AND RESET SIGN EACH 2 2
A0680 63401-0300 PAVEMENT MARKINGS, TYPE B,
SOLID (4-inch, white) LNFT 132,844 132,844
A0700 63401-0300 PAVEMENT MARKINGS, TYPE B,
SOLID (4-inch, yellow) LNFT 104,587 104,587
A0720 63401-0400 PAVEMENT MARKINGS, TYPE B,
BROKEN (4-inch, yellow) LNFT 21,518 21,518
A0740 63401-0450 PAVEMENT MARKINGS, TYPE B,
DOTTED (4-inch, white) LNFT 1,406 1,406
A0760 63502-1050 TEMPORARY TRAFFIC CONTROL,
TUBULAR MARKER EACH 100 100
A0780 63504-1000 TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGN SQFT 258 258
A0800 63509-1000 TEMPORARY TRAFFIC CONTROL,
FLAGGER FXHR 4,000 4,000
-A ug -2
:0
A M
MileStone: Sign-Off Date Completed: 08/31/15 Report Date: 08/31/15 c:
\m yf ile s\ pw
_p ro du ct io n\ d0
O
R B
AK
ER
(1
EE
B A C S _s um m ar y-w fl.
xl sm
]S he et
2)
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of
Estimated Quantity
STATE PROJECT
BAKER 520(1) B.2OR
SECTION QUANTITIES
TABULATION OF TYPICAL
C.1
STATE PROJECT
A u g u s t
I n t_ ft m y fi le s p w p r o d u c ti o n d o r a c a .d
S la n
M il
C h e c k e d b y
D e s ig n e d b y
FOOTNOTE:
Safety Edge Detal on sheet C.2 and C.3.
Material to be used for shoulder aggregate as shown in [1]
NO SCALE
FOOTNOTE:
Traveled wayTraveled way
Slope Slope
27+41.18 to 133+01.18
12' 12'
ShdrShdr
2' 2'
LC
CONNECTION DETAIL
Existing surface
Saw cut elevation and cross slope
Match existing pavement pavement surface
Existing
Tack existing surface
Limits of Construction
TYPICAL SECTION
MILLING
GRANITE HILL HIGHWAY
Existing ground
Traveled wayTraveled way
Slope Slope
27+41.18 to 133+01.18
12' 12'
ShdrShdr
2' 2'
LC
SAFETY EDGE DETAIL
Detail, this sheet
See Safety EdgeDetail, this sheet
See Safety Edge
Limits of Construction
TYPICAL SECTION
ASPHALT
GRANITE HILL HIGHWAY
27+41.18 TO 133+01.18
TYPICAL SECTION
[1] [1]
[2]
[1] [1]
27+41.18
Existing base course
133+01.18
.1
" 2
.1
New surface course
DETAIL
PAVEMENT TRANSITION
Existing ground
Tack coat
Tack coat between lifts
1:2 (typ.)
Profile grade
Profile grade
3" depth
Asphalt pavement milling, [3]
Aggregate surface reconditioning method 2
Roadway aggregate, Aggregate surface reconditioning
Aggregate surface reconditioning
4" aggregate base (typ.)
" asphalt (typ.), 2
Existing pavement structure, C.2
STATE PROJECT
A u g u s t
I n t_ ft m y fi le s p w p r o d u c ti o n d o r a c c .d
S la n
M il
C h e c k e d b y
D e s ig n e d b y milling Asphalt pavement
[4]
50' see sheet C.3 for details New asphalt surface, see sheet C.3 for details asphalt base, Cold in-place recycled
Tack coat between existing and overlay
DETAIL A
Aggregate surface reconditioning
Tack coat between lifts
See Detail A
See Detail A place in two equal compacted lifts
3" compacted depth, (type IV pavement roughness) size aggregate, 0.3 to <3 million esal
1/2-inch or 3/4-inch nominal maximum
Asphalt concrete pavement, gyratory mix, (type IV pavement roughness) size aggregate, 0.3 to <3 million esal
1/2-inch or 3/4-inch nominal maximum
Asphalt concrete pavement, gyratory mix, (type IV pavement roughness) size aggregate, 0.3 to <3 million esal
1/2-inch or 3/4-inch nominal maximum
Asphalt concrete pavement, gyratory mix, (type IV pavement roughness) size aggregate, 0.3 to <3 million esal
1/2-inch or 3/4-inch nominal maximum
Asphalt concrete pavement, gyratory mix, Mill Cold In-Place Recycled Asphalt Base Course.[4]
Remove asphalt pavement millings according to SCR section 413.[3]
Sawcut vertical according to Subsection 203.04(b).[2]
Match existing superelevation or crown.[1]
Traveled wayTraveled way
Slope Slope
133+01.18 to 361+42.30
12' 12'
ShdrShdr
Existing ground
Turnout Turnout
147+55.00 to 148+05.00 12' to 0'
146+55.00 to 147+05.00 0' to 12'
147+55.00 to 148+05.00 12' to 0'
146+65.00 to 147+15.00 0' to 12'
LC
Existing ground
Limits of Construction
Turnout Turnout
147+15.00 to 147+55.00
12' 12'
2' 2'
147+05.00 to 147+55.00
SAFETY EDGE DETAIL
Detail, this sheet
See Safety Edge
Detail, this sheet
See Safety Edge
Detail, this sheet
See Safety Edge
133+01.18 TO 361+42.30
TYPICAL SECTION
FOOTNOTE:
Existing surface course
Existing base course
Saw cut
Mill pavement surface New asphalt
CONNECTION DETAIL
361+42.30
.3
" 2
Cold In-Place
[1]
[2]
[1]
Edge Detail, this sheet
See Safety
Edge Detail, this sheet
See Safety
Edge Detail, this sheet
See Safety
Existing ground type B, 3" compacted depth
Cold in-place recycled asphalt base course, Tack coat type B, 3" compacted depth
Cold in-place recycled asphalt base course, 1:2 (typ.)
Profile grade
VariedVaried method 2
Roadway aggregate, Existing 4" aggregate base (typ.)
50'
3" asphalt (typ.)
Existing pavement structure, DETAIL B
Existing aggregate type B, 3" compacted depth asphalt base course, Cold in-place recycled
Cold in-place and Tack coat
Fog seal between and Asphalt concrete pavement
Tack coat between Fog seal
See Detail BSee Detail B
See Detail B
See Detail B
See Detail B
See Detail B and Asphalt concrete pavement
Tack coat between Fog seal Cold in-place and Tack coat
Fog seal between
TYPICAL SECTION
GRANITE HILL HIGHWAY
2" compacted depth
(type IV pavement roughness), size aggregate, 0.3 to <3 million esal
1/2-inch or 3/4-inch nominal maximum
Asphalt concrete pavement, gryatory mix, (type IV pavement roughness) size aggregate, 0.3 to <3 million esal
1/2-inch or 3/4-inch nominal maximum
Asphalt concrete pavement, gryatory mix, (type IV pavement roughness) size aggregate, 0.3 to <3 million esal
1/2-inch or 3/4-inch nominal maximum
Asphalt concrete pavement, gryatory mix, Sawcut vertical according to Subsection 203.04(b).[2]
Match existing superelevation or crown.[1]
C.3
STATE PROJECT
S e p te m b e r
I n t_ ft m y fi le s p w p r o d u c ti o n d o r a c d .d
S la n
M il
C h e c k e d b y
D e s ig n e d b
2:1
LC
Conserved backfill
4"
4"
Geogrid, Stabilization
12" Bottom course
C to C spacing (max.)
Support struts 24"
5' lap (min.)
Existing slope
Hardware cloth
7.7'
8.7'
6" compacted depth
Roadway Aggregate, Method 2, Welded wire form
4 x 4 - W4.0 x W4.0 form course
18" Welded wire
[1]
[2]
Saw cut
[3]
[3]
P a y L im it s
S ta b il iz a ti o n
R e in fo r c e d S h o u ld e
STABILIZATION
REINFORCED SHOULDER
TYPICAL SECTION
TYPICAL SECTION - REINFORCED SHOULDER STABILIZATION
1.0'8.5' 4.5'
9.85'
[4]
Select granular backfill extend lap to back of excavation
Geogrid stabilization, Existing aggregate
Existing asphalt
3" compacted depth
Recycled aggregate base, 2:1
LC
Existing slope
[2]
1.0'8.5' 4.5'
Existing aggregate
Existing asphalt
TYPICAL SECTION - MILLING
Existing aggregate base
Slope [1]
344+50.00 to 346+00.00 LT
326+50.00 to 327+50.00 LT
317+50.00 to 318+00.00 LT
304+40.00 to 305+10.00 LT
281+78.00 to 283+60.00 LT
237+80.00 to 238+50.00 LT
235+75.00 to 236+20.00 LT
233+00.00 to 234+40.00 LT
190+50.00 to 192+10.00 LT
344+50.00 to 346+00.00 LT
326+50.00 to 327+50.00 LT
317+50.00 to 318+00.00 LT
304+40.00 to 305+10.00 LT
281+78.00 to 283+60.00 LT
237+80.00 to 238+50.00 LT
235+75.00 to 236+20.00 LT
233+00.00 to 234+40.00 LT
190+50.00 to 192+10.00 LT
(conserved), 3-inch depth
Asphalt pavement milling
TransitionTransition
346+00.00 to 346+04.00 LT
344+46.00 to 344+50.00 LT
327+50.00 to 327+54.00 LT
326+46.00 to 326+50.00 LT
318+00.00 to 318+04.00 LT
317+46.00 to 317+50.00 LT
305+10.00 to 305+14.00 LT
304+36.00 to 304+40.00 LT
283+60.00 to 283+64.00 LT
281+74.00 to 281+78.00 LT
238+50.00 to 238+54.00 LT
237+76.00 to 237+80.00 LT
236+20.00 to 236+24.00 LT
235+71.00 to 235+75.00 LT
234+40.00 to 234+44.00 LT
232+96.00 to 233+00.00 LT
192+10.00 to 192+14.00 LT
190+46.00 to 190+50.00 LT
Ramp Ramp
Limits
Stabilization
Shoulder
Reinforced
TRANSITION RAMP DETAIL
PROFILE
Existing ground
[2]
Saw cut
Saw cut
[2]
Saw cut
Excavation limits Conserve material
Conserve material
See sheet C.6 for details.[4] granular backfill.
Cover reinforcement geogrid with 4-inch depth select [3]
Sawcut vertical according to Subsection 203.04(b).[2]
Match existing superelevation or crown.[1]
C.4
STATE PROJECT
S e p te m b e r
I n t_ ft m y fi le s p w p r o d u c ti o n d o r a c e .d
S la n
M il
C h e c k e d b y
D e s ig n e d b
STABILIZATION
REINFORCED SHOULDER
TYPICAL SECTION
FOOTNOTE:
Do not measure for payment. Incidental to Item 26105-0000.[2]
Width includes wrapping the face and lap minimum.[1]
C.5
STATE PROJECT
S e p te m b e r
I n t_ ft m y fi le s p w p r o d u c ti o n d o r a c e .d
S la n
M il
C h e c k e d b y
D e s ig n e d b
WELDED WIRE FORM
spaced 24" C. to C. (max.)
No. 4 wire support struts
Longitudinal wires
Butt geogrid, no overlap
Reinforcement length
Transverse wires Top of form
96"
30"
4 x 4 - W4.0 x W4.0 direction
Machine (roll)
4' min.
NO SCALE
Geogrid, Stabilization
P a r a ll e l to s lo p e f a c e
Geogrid, Stabilization
Geogrid, Stabilization reinforcement length (L)
Form return (see detail this sheet)
Welded wire form
[1]
[2][5]
[6]
[3][7]
[4] to form return
Connect form facing
[3]
[8]
[9] welded wire forms
Connect adjacent
Bottom course
[10]
GEOGRID DETAILS
STABILIZATION FACING AND
REINFORCED SHOULDER
REINFORCEMENT LAYOUT
REINFORCED SHOULDER STABILIZATION
FORM RETURN DETAIL
FORM COURSE AND
REINFORCED SHOULDER STABILIZATION
Typical Section detail on Sheet C.4.
Hardware cloth not shown. Install hardware cloth according to[10] on Sheet C.4.
Geogrid lap is not shown. Lap according to Typical Section [9]
Except as allowed under 261.05A.[8] bend longitudinal wire 90 degrees.
Connect welded wire form facing to form return. Alternative, [7] of 720.01(k).
Provide welded wired forms that meet the requirements [6]
Provide support struts that meet the requirements of 720.01(l).[5]
See Sheet C.4 for dimensions.[4] permanent fasteners that meet the requirements of 720.01(m).
or the manufacturers recommended method). Provide with permanent fasteners (hog rings, wire ties, spiral binders, Connect adjacent welded wire reinforcement facing elements [3] support strut length.
The contractor is responsible for determining the appropriate[2] requirements.
Field cut transverse wires to meet welded wire form layout [1]
C.6
STATE PROJECT
S e p te m b e r
I n t_ ft m y fi le s p w p r o d u c ti o n d o r a c e .d
R
K r ig
M il
C h e c k e d b y
D e s ig n e d b
TYPICAL SECTION - SUBEXCAVATION
ShdrTraveled way
Slope
Select borrow
333+00.00 to 335+00.00 RT
277+00.00 to 280+00.00 RT
239+60.00 to 240+50.00 RT
226+50.00 to 227+50.00 RT
Geotextile filter, Class 2, Type D
FOOTNOTE:
Existing ground
SUBEXCAVATION
TYPICAL SECTION
[3]
[1]
2:
LC
6" compacted depth
Roadway Aggregate, Method 2, Existing aggregate
Existing asphalt
3" compacted depth
Recycled aggregate base, LC
3'
7'
2'
2'5'
1'
6'
1'
6'
ShdrTraveled way
Slope [2]
Existing ground
Saw cut[1]
2:
LC
Existing aggregate
Existing asphalt
2'5'
1'
6'
TYPICAL SECTION - MILLING
Existing aggregate base
(conserved), 3-inch depth
Asphalt pavement milling
333+00.00 to 335+00.00 RT
277+00.00 to 280+00.00 RT
239+60.00 to 240+50.00 RT
226+50.00 to 227+50.00 RT
TransitionTransition
Ramp Ramp
TRANSITION RAMP DETAIL
PROFILE
Existing ground
[2]
Saw cut
[2]
Saw cut
Excavation limits
335+00.00 to 335+04.00 RT
323+96.00 to 333+00.00 RT
280+00.00 to 280+04.00 RT
276+96.00 to 277+00.00 RT
240+50.00 to 240+54.00 RT
239+56.00 to 239+60.00 RT
227+50.00 to 227+54.00 RT
225+96.00 to 226+50.00 RT
Limits
Subexcavation
Conserve material
Conserve material
Line entire excavation with geotextile filter, Class 2, Type D.[3]
Sawcut vertical according to Subsection 203.04(b).[2]
Match existing superelevation or crown.[1]
C.7
STATE PROJECT
S e p te m b e r
I n t_ ft m y fi le s p w p r o d u c ti o n d o r a c e .d
S la n
M il
C h e c k e d b y
D e s ig n e d b
SUBEXCAVATION
TYPICAL SECTION
C.8
STATE PROJECT
S e p te m b e r
I n t_ ft m y fi le s p w p r o d u c ti o n d o r a c e .d
S la n
M il
C h e c k e d b y
D e s ig n e d b
Slope
Shdr Traveled way
TYPICAL SECTION - SUBGRADE REINFORCEMENT
NO SCALE
Stabilization geogrid
[1]
[2]
Existing ground
Saw cut
SUBGRADE REINFORCEMENT
TYPICAL SECTION
241+00.00 to 241+35.00 LT
194+00.00 to 196+50.00 LT
187+80.00 to 189+80.00 LT
173+50.00 to 178+00.00 LT
138+00.00 to 143+00.00 LT
2:1
LC
6" compacted depth
Roadway Aggregate, Method 2, 3" compacted depth
Recycled aggregate base, 12'2'
14'
Shdr Traveled way
Existing ground
2:1
LC
12'2'
TYPICAL SECTION - MILLING
Existing aggregate base
(conserved), 3-inch depth
Asphalt pavement milling
241+00.00 to 241+35.00 LT
194+00.00 to 196+50.00 LT
187+80.00 to 189+80.00 LT
173+50.00 to 178+00.00 LT
138+00.00 to 143+00.00 LT
Sawcut vertical according to Subsection 203.04(b).[2]
Match existing superelevation or crown.[1]
C.9
STATE PROJECT
S e p te m b e r
I n t_ ft m y fi le s p w p r o d u c ti o n d o r a c e .d
S la n
M il
C h e c k e d b y
D e s ig n e d b
446044604460
B C
P T
.4
P C
.6
P T
.4
P C
.1
P T
.2
P C
.4
P T
.3
B O
U N
D A R
Y
M
A R
K E R
B O
U N
D A R
Y
M
A R
K E R
BEGIN CONSTRUCTION
GPS
CP
CP
CP
14104 14102
14101
Line to be constructed
27+41.18
OR BAKER 520(1)
D
R= 2,000.00'
T= 53.88'
L= 107.74'
141033
.2
.6
.9
.4 edge of traveled way
Proposed
27+41.18 TO 75+00
PLAN AND PLAN
100 200050100
Scale in feet
N
N
CP
14105
CP
14106
L= 789.06'
T= 396.82'
R= 3,000.00'
D
Line to be constructed
.2
58+ 16.93
Proposed edge of traveled way
CP
14107
CP
14108
R= 1,380.00'
T= 362.45'
L= 708.88'
D
.8
OHW limits
OHW limits
El= Match Existing
E= 8796764.24
N= 403225.88
LEGEND:
Subexcavation
Deep Patch
Subgrade reinforcement
D.1
STATE PROJECT
A u g u s t
I n t_ ft m y fi le s p w p r o d u c ti o n d o r a fa .d
S la n
M il
C h e c k e d b y
D e s ig n e d b y
3" compacted depth
(type IV pavement roughness), maximum size aggregate, 0.3 to <3 million esal
-inch nominal4 3-inch or 2
1gyratory mix, Begin asphalt concrete pavement, Begin asphalt pavement milling, 3" depth, 27+41.18
4530 4530
P C
.6
P C
C
.4
4 9
P T
.2
P
C
.1
P T
.1
P C
.1
P C
.1
P T
.5
5 1
0 1
5 1
0 1
N
L= 1,406.37'
T= 759.67'
R= 1,500.00'
D
CP
14109
GPS
14110
CP
14111
CP
14112
75+00 TO 135+00
PLAN AND PLAN
N
L= 1,006.38'
R= 2,160.00'
D
T= 512.50'
CP
14113
CP
14114
CP
14115 CP
14116
CP
14117
100 200050100
Scale in feet
D.2
STATE PROJECT
A u g u s t
I n t_ ft m y fi le s p w p r o d u c ti o n d o r a fb .d
S la n
M il
C h e c k e d b y
D e s ig n e d b y
Line to be constructed
.7
100+ 41.22
102+56.14
Proposed edge of traveled way
Line to be constructed
.0
Proposed edge of traveled way
See sheet C.2 for details
Begin pavement transition
132+51.18
OHW limits
Wetland boundary
OHW limits be installed by others
Culvert and riprap to
78+83 be installed by others
Culvert and riprap to
117+06
2" compacted depth
(type IV pavement roughness), maximum size aggregate, 0.3 to <3 million esal gyratory mix, 1#2-inch or 3#4-inch nominal
Begin asphalt concrete pavement, Begin cold in-place recycled asphalt base course, 3" compacted depth
Begin pavement transition, 3" compacted depth
(type IV pavement roughness), maximum size aggregate, 0.3 to <3 million esal gyratory mix, 1#2-inch or 3#4-inch nominal
End asphalt concrete pavement, End asphalt pavement milling, 3" depth
133+01.18
P C
.9
P T
.6
P C
.0
P T
.5
P C
.2
P T
.6
P C
.2
P T
.4
P C
.8
P C
.8
P T
.2
P C
.3
P T
.1
P C
.4
P T
.2
P C
.6
P T
.8
P C
.0
P T
.9
P C
.1
P T
.1
N
N
CP
14118 CP
14119
CP
14120
D
R= 775.00'
T= 445.55'
L= 808.73'
D
R= 530.00'
T= 133.46'
L= 261.49'
D
R= 420.00'
T= 75.48'
L= 149.37'
D
R= 500.00'
T= 142.25'
L= 277.18'
D
R= 4,400.00'
T= 235.91'
L= 471.38'
D
R= 415.00'
T= 114.72'
L= 223.85'
R= 900.00'
T= 71.04'
L= 141.79'
D
R= 540.00'
T= 112.17'
L= 221.20'
D
R= 1,370.00'
T= 126.82'
L= 252.92'
D
R= 650.00'
T= 160.68'
L= 315.04'
D
100 200050100
Scale in feet
D.3
STATE PROJECT
A u g u s t
I n t_ ft m y fi le s p w p r o d u c ti o n d o r a fc .d
S la n
.M il
C h e c k e d b y
D e s ig n e d b y
Line to be constructed
Line to be constructed
Maintain location of existing turnout
146+55 to 148+05 RT
9+ .0
3+
.5
.6
.4
Maintain location of existing turnout
146+65 to 148+05 LT
135+00 TO 195+00
PLAN AND PLAN
138+00 to 143+00 LT See sheet C.9 for details
Reinforcement, Install Subgrade culvert, do not disturb
Existing concrete box
140+76.51
See she et C.9 f or deta ils
Install Subgra de Rein forcement,173+50 to 1
78+00 LT
See sheet C.9 for details
Install Subgrade Reinforcement, 187+80 to 189+80 LT
See sheet C.9 for details
Install Subgrade Reinforcement, 194+00 to 196+50 LT
See sheet C.4 for details
Shoulder Stabilization, Install Reinforced
190+50 to 192+10 LT u e W e s t
5P C
.2
PT 205+85.72
PC 208+92.75
P T
.6
P C
.4
P T
.1
P C
.3
PT 227+54.49
PC 230+84.69
Due West
P T
.4
P C
.6
P T
.6
P C
.3
P T
.5
P C
.8
P T
.6
P C
.0
P T
.6
P C
.1
P T
.6
P C
.6
N
N
D
R= 340.00'
T= 155.65'
L= 291.93'
R= 245.00'
T= 1,337.65'
L= 858.45'
D
D
R= 645.00'
T= 196.08'
L= 380.71'
D
R= 440.00'
T= 215.75'
L= 401.18'
D
R= 249.11'
T= 82.35'
L= 159.06'
D
R= 1,432.39'
T= 146.76'
L= 292.50'
D
R= 1,909.86'
T= 185.86'
L= 370.56'
D
R= 248.36'
T= 13,025.41'
L= 770.76'
D
R= 650.00'
T= 98.29'
L= 195.11'
D
R= 755.00'
T= 83.30'
L= 165.93'
100 200050100
Scale in feet
D.4
STATE PROJECT
A u g u s t
I n t_ ft m y fi le s p w p r o d u c ti o n d o r a fd .d
S la n
M il
C h e c k e d b y
D e s ig n e d b y
Line to be constructed
Line to be constructed
.4
.6
195+00 TO 265+00
PLAN AND PLAN
contractor staging
Turnout for
S ee s h ee t C .9 f or d et ai ls
In st al l S u b g ra d e
R ei n fo rc em en t, t o L
T
See sheet C.7 for details
Install Subexcavation, 226+00 to 227+50 RT
See sheet C.9 for details
Reinforcement, Install Subgrade
241+00 to 241+35 LT
See sheet C.5 for details
Install Subexcavation, 239+60 to 240+50 RT boundary
Wetland
See sheet C.4 for details
Shoulder Stabilization, Install Reinforcement
233+00 to 234+40 LT
See sheet C.4 for details
Shoulder Stabilization, Install Reinforcement
235+75 to 236+20 LT
See sheet C.4 for details
Shoulder Stabilization, Install Reinforcement
237+80 to 238+50 LT
PT 262+88.62
PC 265+11.65
P T
.7
P C
.5
PT 269+09.19
PC 271+05.01 P
T
.3
P C
.1
PT 280+43.48
PC 281+10.78
P T
.4
P C
.8
PT 286+46.38
PC 287+07.74
PT 2
.4
PC
.8
P T
.3
P C
.7
PT 290+12.67
PC 293+02.15
P T
.0
P C
.3
P T
.9
P C
.6
P T
.9
P C
.5
PT 311+22.71
PC 316+36.36
N
N
D
R= 249.11'
T= 82.35'
L= 159.06'
D
R= 260.44'
T= 103.86'
L= 197.66'
D
R= 204.63'
T= 182.75'
L= 298.34'
D
R= 204.63'
T= 144.26'
L= 251.31'
D
R= 286.48'
T= 141.38'
L= 262.67'
Curve= C30
D
R= 204.63'
T= 112.38'
L= 205.54'
Curve= C31
R= 238.73'
T= 177.24'
L= 304.93'
D
R= 204.63'
T= 221.82'
L= 337.92'
D
D
R= 286.48'
T= 114.34'
L= 217.58'
D
R= 954.93'
T= 97.98'
L= 195.28'
D
R= 286.48'
T= 418.65'
L= 556.17'
100 200050100
Scale in feet
D.5
STATE PROJECT
A u g u s t
I n t_ ft m y fi le s p w p r o d u c ti o n d o r a fe .d
S la n
M il ll
C h e c k e d b y
D e s ig n e d b y
Line to be constructed
Line to be constructed
272+94.96
0+
.4
265+00 TO 315+00
PLAN AND PLAN
See sheet C.7 for details
Install Subexcavation, 277+00 to 280+00 RT
See sheet C.4 for details
Shoulder Stabilization, Install Reinforcement
281+78 to 283+60 LT
See sheet C.4 for details
Shoulder Stabilization, Install Reinforcement
304+40 to 305+10 LT
PC 316+
36.36
P T
.4
P C
.2
P T
.7
P C
.2
PT 330+19.33
PC 333+28.44
P T
.2
P C
.1
PT 347+
66.01
PC 349+
32.24 3
PC 349+32.24
P T .9
P C .0
P T
.5
P O
T
.3
N
N
END PROJECT
D
R= 409.26'
T= 266.96'
L= 473.10' D
R= 318.31'
T= 103.17'
L= 199.54'
D
R= 220.37'
T= 287.54'
L= 404.11'
D
R= 260.44'
T= 272.46'
L= 420.84'
D
R= 636.62'
T= 228.57'
L= 438.89'
361+42.30
OR BAKER 520(1)
100 200050100
Scale in feet
Curve= C48
D
R= 368.00'
T= 205.91'
L= 375.46'Curve= C47
D
R= 259.49'
T= 559.21'
L= 589.73'
315+00 TO 361+42.30
PLAN AND PLAN
EL= Match Existing
E= 8777124.38
N= 404431.42
D.6
STATE PROJECT
NUMBER
SHEET
A u g u s t
I n t_ ft m y fi le s p w p r o d u c ti o n d o r a ff .d g
OR BAKER 520(1)
S la n
M il
C h e c k e d b y
D e s ig n e d b y
Line to be constructed
Line to be constructed
.6
See sheet C.7 for details
Install Subexcavation, 333+00 to 335+00 RT
Wetland boundary
See sheet C.4 for details
Shoulder Stabilization, Install Reinforcement
317+50 to 318+00 LT
See sheet C.4 for details
Shoulder Stabilization, Install Reinforcement
326+50 to 327+50 LT
See sheet C.4 for details
Shoulder Stabilization, Install Reinforcem ent
344+ 50 to 346+
00 LT
2" compacted depth
(type IV pavement roughness), maximum size aggregate, 0.3 to <3 million esal gyratory mix, 1#2-inch or 3#4-inch nominal
End asphalt concrete pavement, End cold in-place recycled asphalt base, 3" compacted depth
361+42.30
GPK FILE DATED: 7/30/2014
PROJECT COORDINATES GEO COORDINATES
POINT
NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID
HEIGHT
COMBINED
FACTOR DESCRIPTION
14101 402966.356 8797415.207 4450.269 44°44'55.739127"N 118°12'29.437070"W 4394.7441 0.99971136 5/8" IR w/FHWA Alum Cap
14102 403162.537 8796809.143 4460.010 44°44'57.845281"N 118°12'37.755070"W 4404.4883 0.99971082 5/8" IR w/FHWA Alum Cap
14103 403704.630 8796262.094 4449.912 44°45'03.349244"N 118°12'45.120061"W 4394.4068 0.99971111 5/8" IR w/FHWA Alum Cap
14104 404229.274 8795603.419 4437.433 44°45'08.712011"N 118°12'54.038593"W 4381.9442 0.99971152 5/8" IR w/FHWA Alum Cap
14105 404766.382 8795073.826 4443.600 44°45'14.161602"N 118°13'01.164537"W 4388.1276 0.99971103 5/8" IR w/FHWA Alum Cap
14106 405164.359 8794503.574 4450.620 44°45'18.249046"N 118°13'08.908548"W 4395.1574 0.99971055 5/8" IR w/FHWA Alum Cap
14107 405485.439 8793760.066 4459.729 44°45'21.625538"N 118°13'19.083121"W 4404.2795 0.99971 5/8" IR w/FHWA Alum Cap
14108 405837.698 8793300.127 4465.403 44°45'25.230676"N 118°13'25.317361"W 4409.9634 0.9997096 5/8" IR w/FHWA Alum Cap
14109 406536.152 8792882.294 4471.438 44°45'32.241296"N 118°13'30.833403"W 4416.0148 0.99970907 5/8" IR w/FHWA Alum Cap
14110 407026.578 8792454.444 4477.195 44°45'37.201183"N 118°13'36.569717"W 4421.7849 0.99970863 5/8" IR w/FHWA Alum Cap
14111 407284.443 8791913.785 4484.685 44°45'39.896697"N 118°13'43.959865"W 4429.2782 0.99970818 5/8" IR w/FHWA Alum Cap
14112 407350.608 8791238.156 4492.220 44°45'40.737230"N 118°13'53.294805"W 4436.8165 0.99970779 5/8" IR w/FHWA Alum Cap
14113 407359.253 8790377.394 4503.586 44°45'41.061029"N 118°14'05.217172"W 4448.1825 0.99970723 5/8" IR w/FHWA Alum Cap
14114 407533.579 8789776.860 4509.967 44°45'42.947969"N 118°14'13.469830"W 4454.5667 0.99970687 5/8" IR w/FHWA Alum Cap
14115 407896.021 8789231.745 4518.817 44°45'46.676328"N 118°14'20.881844"W 4463.42 0.99970632 5/8" IR w/FHWA Alum Cap
14116 408292.785 8788512.494 4531.846 44°45'50.791409"N 118°14'30.693575"W 4476.4556 0.99970555 5/8" IR w/FHWA Alum Cap
14117 408606.578 8787956.583 4541.391 44°45'54.042215"N 118°14'38.274595"W 4486.0071 0.99970499 5/8" IR w/FHWA Alum Cap
14118 408868.599 8787470.251 4555.344 44°45'56.762669"N 118°14'44.911786"W 4499.9634 0.99970423 5/8" IR w/FHWA Alum Cap
14119 408880.659 8786967.556 4566.617 44°45'57.020141"N 118°14'51.872458"W 4511.2364 0.99970368 5/8" IR w/FHWA Alum Cap
14120 408429.069 8786257.821 4611.945 44°45'52.757707"N 118°15'01.880821"W 4556.5546 0.99970166 5/8" IR w/FHWA Alum Cap
Note:
PROJECT :Granite Hill Highway Reconstruction
DATE OF FIELD WORK : 7/2014
DATE OF FINAL ADJUSTMENT :7/14/2014
PROJECT UNITS : International Feet COORDINATE SYSTEM : Oregon North SPCS NAD83 (2011)
EPOCH DATE : 2010.0000
VERTICAL DATUM : NAVD88 based on GEOID12A
To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
STATE PROJECT
BAKER 520(1) D.7OR
c:
\m yf ile s\ pw _p ro du ct io n\ d0
O R _B
AK
ER
_5
(1
C on tr ol
S he et .x ls x]
Sh ee t
-F eb
-2
9:
A
M W
FL
H
D
D av ie s
D es ig ne d by
C he ck ed b y:
NUMBER
SURVEY CONTROL
SKEW CALCULATION
ROAD APPROACH CENTERLINE
o a d W id th
Line to be constructed
R2
R1
S k e w
I n c r e a s in g i n s ta ti o
Length
16' traveled way edge of
Propose
14'
Edge of pavement intersecting mainline centerline
Road approach
NO SCALE
Unit conversion is 1.94 TON/CUYD.[2]
Unit conversion is 1.97 TON/CUYD.[1]
QUANTITIES
ROAD APPROACH
TABULATION OF
E.1
STATE PROJECT
u g u s t
I n t_ ft m y fi le s p w p r o d u c ti o n d o r a q a .d
S la n
M il
C h e c k e d b y
D e s ig n e d b
TYPICAL SECTION
ROAD APPROACH
E d g e o f tr a v e le d w a y
E d g e o f s h o u ld e r
Existing ground
2'
E d g e o f tr a v e le d w a y
E d g e o f s h o u ld e r
Existing ground
2'
Existing aggregate base
FOOTNOTE:
PAVED
ROAD APPROACH
Existing aggregate base
(typ.)
(typ.)
[2]Length
GRAVEL
ROAD APPROACH
340+22.63 LT
300+14.42 LT
272+94.96 LT
244+65.69 RT
175+51.46 RT
163+44.64 LT
3" compacted depth
Cold-in-place recycled asphalt, 5" compacted depth
Roadway aggregate, method 2, [2]Length
See Sheet E.1 for length dimensions.[2]
Match existing slope.[1]
[1] [1]
3" compacted depth
Asphalt concrete pavement, 6" compacted depth
Roadway aggregate, method 2, 2" compacted depth
0.3 to <3 million esal (type IV), nominal maximum size aggregate, gyratory mix, 1/2-inch or 3/4-inch
Asphalt concrete pavement, 3" compacted depth
0.3 to <3 million esal (type IV), nominal maximum size aggregate, gyratory mix, 1/2-inch or 3/4-inch
Asphalt concrete pavement, E d g e o f tr a v e le d w a y
E d g e o f s h o u ld e r
2'
Existing aggregate base
(typ.)
3" compacted depth
Cold-in-place recycled asphalt, [2]Length
2" compacted depth
0.3 to <3 million esal (type IV), nominal maximum size aggregate, gyratory mix, 1/2-inch or 3/4-inch
Asphalt concrete pavement, Existing ground
[1]
3" compacted depth
Asphalt concrete pavement, 6" compacted depth
Roadway aggregate, method 2, PAVED
ROAD APPROACH
195+37.40 RT
143+63.56 RT
139+99.07 RT
119+08.08 RT
102+56.14 LT
100+41.22 RT
95+38.79 RT
67+50.88 RT
58+16.93 RT
46+23.28 RT
39+77.48 LT
36+47.92 RT
33+88.69 LT
30+05.28 RT
E.2
STATE PROJECT
NUMBER
SHEET
OR BAKER 520(1)
u g u s t
I n t_ ft m y fi le s p w p r o d u c ti o n d o r a q b a a .d
S la n
M il le r
C h e c k e d b y
D e s ig n e d b
N N
'-0
R
R
'-0
"R16'-0"R
Edge of traveled way Edge of traveled way
Line of construction Line of construction
P1001
P1002 P1003
P1004
30+05.28 RT 33+88.69 LT
Scale in feet
12.5 256.2512.5
P1010 P1013
P1011 P1012
30+05.28 RT & 33+88.69 LT
ROAD APPROACH DETAILS
Existing culvert, do not disturb
12'-0"
16'-0"
E.3
STATE PROJECT
u g u s t
I n t_ ft m y fi le s p w p r o d u c ti o n d o r a q c .d
S la n
M il
C h e c k e d b y
D e s ig n e d b
N N
R
'-0
R
Line of construction
Edge of travel way
Edge of travelway
Scale in feet
12.5 256.2512.5
36+47.92 RT & 39+77.48 LT
ROAD APPROACH DETAILS
P1020
P1021 P1022
P1023
P1030
P1031 P1032
P1033
39+77.48 LT
36+47.92 RT
Line of construction
'-0
R 1
R
16'-0"
16'-0"
E.4
STATE PROJECT
NUMBER
SHEET
OR BAKER 520(1)
u g u s t
I n t_ ft m y fi le s p w p r o d u c ti o n d o r a q d .d
S la n
M il le r
C h e c k e d b y
D e s ig n e d b
R
'-0
R
Edge of travelway
Line of construction
Scale in feet
12.5 256.2512.5
46+23.28 RT
P1050
P1051 P1052
P1053
N
R 1 '-0
R
Line of construction
Edge of travelway
58+16.93 RT
P1060
P1061 P1062
P1063
20'-0"
46+23.28 RT & 58+16.93 RT
ROAD APPROACH DETAILS
16'-0"
E.5
STATE PROJECT
NUMBER
SHEET
OR BAKER 520(1)
u g u s t
I n t_ ft m y fi le s p w p r o d u c ti o n d o r a q e .d
S la n
M il le r
C h e c k e d b y
D e s ig n e d b
Edge of travel way
Scale in feet
12.5 256.2512.5
P1076
P1077
P1078
P1079
Line of construction
67+50.88 RT
'-0
R
67+50.88 RT & 95+38.79 RT
ROAD APPROACH DETAILS
N
0"
R
R
Line of construction
Edge of travelway
95+38.79 RT
P2001
P2002 P2003
P2004
'-0
20'-0"
R
5 9
E.6
STATE PROJECT
NUMBER
SHEET
OR BAKER 520(1)
u g u s t
I n t_ ft m y fi le s p w p r o d u c ti o n d o r a q f.
d
S la n
M il le r
C h e c k e d b y
D e s ig n e d b
Line of construction
Edge of travelway
Scale in feet
12.5 256.2512.5
100+41.22 RT
P2011 P2012
P2013
P2010
R '-0
R
16'-0"
N
Line of construction
102+56.14 LT
P2020
P2021 P2022
P2023
Edge of travelway
16'-0" R 16
0"
R
16'-0"
100+41.22 RT & 102+56.14 LT
ROAD APPROACH DETAILS
E.7
STATE PROJECT
NUMBER
SHEET
OR BAKER 520(1)
u g u s t
I n t_ ft m y fi le s p w p r o d u c ti o n d o r a q h .d
S la n
M il le r
C h e c k e d b y
D e s ig n e d b
Edge of travelway
Scale in feet
12.5 256.2512.5
Existing box culvert
P2050
P2051
P2052
P2053
N
16'-0"R
P2054
P2055
R
139+99.07 RT
N
Line of construction
Edge of travelway
'-0
R
R
119+08.08 RT
P2030
P2031
P2032
P2033
119+08.08 RT & 139+99.07 RT
ROAD APPROACH DETAILS
16'-0"
9 1
E.8
STATE PROJECT
NUMBER
SHEET
OR BAKER 520(1)
u g u s t
I n t_ ft m y fi le s p w p r o d u c ti o n d o r a q j.
d
S la n
M il le r
C h e c k e d b y
D e s ig n e d b
Line of construction
Edge of travelway
Edge of travelway
Scale in feet
12.5 256.2512.5
143+63.56 RT
163+44.64 LT
143+63.56 RT & 163+44.64 LT
ROAD APPROACH DETAILS
P2060
P2061
P2062
P2063
P2070 P2071
P2073
P2074
N
'-0
P2065P2064
7'- 0"
R
'-0
R
P2072
'-0
"R
R
E.9
STATE PROJECT
NUMBER
SHEET
OR BAKER 520(1)
u g u s t
I n t_ ft m y fi le s p w p r o d u c ti o n d o r a q k .d
S la n
M il le r
C h e c k e d b y
D e s ig n e d b
Line of construction
Line of construction
Edge of travelway
Edge of travelway
Scale in feet
12.5 256.2512.5
175+51.46 RT 195+37.40 RT
175+51.46 RT & 195+37.40 RT
ROAD APPROACH DETAILS
Existing culvert Existing culvert
P2080
P2081
P2083 P2084
P2090
P2091
P2092
P2095
P2094
P2093
'-0
0"
R
'-0
R
P2082
16'-0" R
R
E.10
STATE PROJECT
NUMBER
SHEET
OR BAKER 520(1)
u g u s t
I n t_ ft m y fi le s p w p r o d u c ti o n d o r a q l.
d
S la n
M il le r
C h e c k e d b y
D e s ig n e d b
16'-0" R
Line of construction Line of construction
Edge of travelway
Edge of travelway
Scale in feet
12.5 256.2512.5
244+65.69 RT
272+94.96 LT
244+65.69 RT & 272+94.96 LT
ROAD APPROACH DETAILS
P3001
P3002
P3003
P3004
P3005
P3010
P3012
P3013
P3014
Existing culvert
'-0
R
P3011
0"
R
16'-0" R
16'-0"
E.11
STATE PROJECT
NUMBER
SHEET
OR BAKER 520(1)
u g u s t
I n t_ ft m y fi le s p w p r o d u c ti o n d o r a q m .d
S la n
M il le r
C h e c k e d b y
D e s ig n e d b
Line of construction
Edge of travelway Edge of travelway
Line of construction
Scale in feet
12.5 256.2512.5
300+14.42 LT
340+22.63 LT
300+14.42 LT & 340+22.63 LT
ROAD APPROACH DETAILS
P3020
P3021
P3022
P3024 P3030
P3031
P3032
P3033
P3034
P3023
10'-0"
R
'-0
R
'-0
'-0
R
R
E.12
STATE PROJECT
NUMBER
SHEET
OR BAKER 520(1)
u g u s t
I n t_ ft m y fi le s p w p r o d u c ti o n d o r a q n .d
S la n
M il le r
C h e c k e d b y
D e s ig n e d b
CONTROL QUANTITIES
TABULATIONS OF EROSION
F.1
STATE PROJECT
A u g u s t
I n t_ ft m y fi le s p w p r o d u c ti o n d o r a d a .d
S la n
M il
C h e c k e d b y
D e s ig n e d b
Drive stakes at each end and at 4' spacing
(ft)
(ft)
Excavate trench 2"
NPS PMIS NO.: XXXXX DRAWING NO.: XXX-XXXXX
REVISED:
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 10/2014
FIBER ROLL
W157-21
3' min.
3' min. or m in
M in t o
1" x 1" Wood stake
3" to 5"
A u g u s t
U
S C m y fi le s p w p r o d u c ti o n d o r a d b .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
F.2 BAKER 520(1) OR
Fl ow
T o e o f fi ll s lo p e
ELEVATION
PLAN
ELEVATION
Direction of runoff Fi ll slo pe
Flow
PLAN
Spacing Slope
STAKES REQUIRED
disturbed areas
Runoff from
1:1
1:2
1:3
1:4 or flatter as specified in plans
2.
1.
DRAINAGE DITCH INSTALLATION
INSTALLATION BEYOND TOE OF SLOPE
INSTALLATION ALONG SLOPES
Fiber roll length for each roll
Stakes required
FIBER ROLL SPACINGStep 2: Backfill soil against fiber rolls and install fiber rolls
Step 1: Excavate trench
FIBER ROLL STAKING DETAIL
conditions.
Use drainage ditch installation only in low flow permanent installations.
roll while staking. Live stakes may be used for until fiber roll is secure to slope. Do not crush
PROPERLY STAKED AND ENTRENCHED FIBER ROLL
NOTE:
NO SCALE
Fiber roll larger than fiber roll
Existing ground (typ.)
Stagger joints (typ.)
Existing ground
Fiber roll along contours.
Install fiber rolls
Flow direction to end, without overlapping the ends
Abut adjacent fiber rolls tightly, end
Install fiber rolls snugly into trench.
soil to ground level
Backfilled and compacted
Slope
Stake and entrench fiber roll water from flowing around the fiber roll
Provide sufficient length to prevent sp ac in g ch ar t
S ee f ib er r ol l
Direction of runof f from distur bed area s
SUMPTER STOCKADE
SUMPTER
Granite Hill Rd.
END PROJECT
BEGIN PROJECT
d
R k e e r
C r e k c ar
C d
R e g di
R g ni dl u a p
S
Carey Gulch
Bear GulchGrays Gulch
Blue Spring d
R
7-
F N d
R k r oF y llu
Cc M
N k e er C k c u B el tt i L
27+41.18
OR BAKER 520(1)
RECONSTRUCTION
GRANITE HILL HIGHWAY
361+42.30
OR BAKER 520(1)
RECONSTRUCTION
GRANITE HILL HIGHWAY
d
R yr at e me
C r et p m u
S
10 m iles
To G ranite
Pow d er
R iver
7-
F N
5-
F N
Sum pter V alley
M cE w en V a lley
RAILROAD
SUMPTER VALLEY
26 miles
To Baker City
Powder River
NATIONAL FOREST
WILLOWA WHITMAN
Su m pt er S ta ge H wy
Loop
Iron Horse
DREDGE STATE PARK
SUMPTER VALLEY
Silver Creek
County Pit
Baker
MATERIAL SOURCE
See MATERIAL SOURCE
Access Road
A c c e s s R o a d
Material source limits
WILLOWA
WHITMAN
N A
T I O
N A
L
FOREST
B O
U N
D A
R Y
N A
T I O
N A
L F
O R
E S
T B
O U
N D
A R
Y
WHITMANWILLOWA
VICINITY MAP
MATERIAL SOURCE
FOOTNOTE:
Material Source boundry limits.
Refer to Special Contract Requirements (SCR) 105 for [1]
[1] disturb stock pile, do not
Existing aggregate unsuitable material
Location for
G.1
STATE PROJECT
u g u s t
I n t_ ft m y fi le s p w p r o d u c ti o n d o r a m a .d
S la n
M il
C h e c k e d b y
D e s ig n e d b
TRAFFIC CONTROL
TABULATIONS OF TEMPORARY
L.1
STATE PROJECT
A u g u s t
I n t_ ft m y fi le s p w p r o d u c ti o n d o r a n a .d
S la n
M il
C h e c k e d b y
D e s ig n e d b
SIGNS IN FEET
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
For work zones that are 2 miles or more in length, install G20-1 signs at signs "B" feet apart according to the Sign Spacing Table.
sign when approach speeds exceed 50 MPH. When used place the two W20-1
STANDARD APPROVED FOR USE 6/2005
DRAFT: 9/2010
REVISED:
635-1
TEMPORARY TRAFFIC CONTROL
ADVANCE SIGNING
J u ly
U m y fi le s p w p r o d u c ti o n d o r a n b .d g n
STATE PROJECT
NUMBER
L.2
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY STANDARD
STANDARD
G20-2
G20-2
G20-2
See Note 11
G20-1
See Note 11
G20-1
M in o r R o a d
M a jo r R o a d
See Note 10
W20-1
See Note 10
W20-1
See Note 9
W16-8P
W20-1 over
See Note 9
W16-8P
W20-1 over
W20-1
Ro ad N am e
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
14.
13.
12.
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
ROAD WORK
END
WORK
ROAD
AHEAD
ROAD WORK
END
ROAD WORK
END
ROAD WORK
END
WORK
ROAD
AHEAD
WORK
ROAD
AHEAD
See Note 10
W20-1
See Note 10
W20-1
G20-2
NOTE:
NO SCALE
the distance to the work area in feet or in miles. Install an additional W20-1
The message on the W20-1 signs may be "ROAD WORK AHEAD" or may specify of the road on which the construction does occur (applies to major roads only).
construction work occurs, include a supplementary plaque indicating the name
If W20-1 is placed on a roadway other than that on which the actual post-mounted signs when not applicable.
Do not store traffic control devices along the roadway when not in use. Cover
Maintain two-way traffic during all non-work hours except as approved by the CO.
NCHRP-350 or MASH for crashworthiness.
Ensure all sign supports exposed to impact by traffic meet the requirements of indicate a maximum recommended speed through the construction area.
Install advisory speed plates under the W20 series warning signs as needed to construction conditions.
Additional or different message signs may be required to fit the actual messages as required.
locate the warning signs as determined by the CO for best results. Vary
Where advance warning signs, placed as shown, interfere with permanent signs, traffic control plan as necessary to accommodate actual operations.
to this project. The Contractor may add or delete information and details in this
Not all details shown on the temporary traffic control sheets may be applicable
Erect all project advance warning signs before starting construction work.
retroreflective sheeting types.
Refer to the Section 635 of the Special Contract Requirements for allowable
State standards may be used as an alternative if approved by the CO.
that an encroachment permit has been obtained.
If signing on a roadway under a jurisdiction other than the client agency, verify whole mile.
each end of the project. Show the distance on the G20-1 sign to the nearest
Expressway / Freeway
A
B
C
(S ee S ig n
Sp ac in g
Ta bl e)
ADVANCE
W
ARNI
NG
AREA
B as d et er m in ed b y th e
CO
W or k zo ne A re a of In flu en ce
Pr oj ec t L im its
A
A
(S ee S ig n
Sp ac in g
Ta bl e)
ADVANCE
W
ARNI
NG
AREA
A
A
ROAD NAME
ROAD NAME
ROAD WORK
NEXT xx MILES
WORK
ROAD
xxxxxxx
WORK
ROAD
xxxxx
WORK
ROAD
xxxxxxx
WORK
ROAD
xxxxxxx
ROAD WORK
NEXT xx MILES temporary traffic control zones greater than 3 miles long.
Repeat W8-12 after each major intersection and every 2 miles for
Repeat R4-1 at 1 mile intervals.
On curves with radius less than 500', reduce cycle length to 20'.
with paint or tape, use Standard 635-2.
FOR UNMARKED PAVEMENTS
DELINEATION AND SIGNING
STANDARD APPROVED FOR USE 6/2005
DRAFT: 9/2010
REVISED:
635-3
500'
500'
500'
500'
500'
500' cycle length
40' cycle length
40' cycle length
40'
J u ly
U m y fi le s p w p r o d u c ti o n d o r a n c .d g n
STATE PROJECT
NUMBER
L.3
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY STANDARD
STANDARD
NO
CENTER
LINE
NO
CENTER
LINE
NO
CENTER
LINE
NO
CENTER
LINE
NO
CENTER
LINE
NO
CENTER
LINE
DO
NOT
PASS
DO
NOT
PASS
DO
NOT
PASS
PASS
WITH
CARE
PASS
WITH
CARE
PASS
WITH
CARE
Traffic flow
Traffic flow
W8-12
Traffic flow
Traffic flow
Traffic flow
Traffic flow
W8-12
W8-12
W8-12
W8-12
W8-12 each direction of travel.
Use permanent markings plan to determine no passing zones for
(optional)
W14-3
(optional)
W14-3
(optional)
W14-3
TABLE A
Markings Are Required
Maximum Duration Before
ADT
See Note 2
See Note 2
See Note 2
3 Days
14 Days
> 1000
≤ 1000
R4-1
R4-1
R4-1
See Note 6
R4-2
See Note 6
R4-2
See Note 6
R4-2
6.
5.
4.
3.
2.
1.
longer periods/higher ADT or for application of temporary markings positioning guides and signing are provided per this detail. For
For periods noted in Table A, pavement may be unmarked if vehicle installed at the upstream end of the zone.
a no-passing zone only if a "DO NOT PASS" (R4-1) sign has been
Use the "PASS WITH CARE" (R4-2) sign at the downstream end of
NOTE:
NO SCALE
Two-way traffic
Passing zone both directions
DETAIL A
Two-way traffic
No Passing zone one direction
DETAIL B
Two-way traffic
No Passing zone both directions
DETAIL C
vehicle positioning guides
Bi-directional yellow vehicle positioning guides
Bi-directional yellow vehicle positioning guides
Bi-directional yellow
PROJECT LIMITS
PROJECT LIMITS
PROJECT LIMITS
Passing AllowedNo Passing ZonePassing Allowed
NO
PASSING
ZONE
NO
PASSING
ZONE
NO
PASSING
ZONE
MPH
SPACING IN FEET
FEET
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
SIGNS IN FEET
50' - 100' (optional)50' - 100'
SINGLE LANE CLOSURE LAYOUT
TEMPORARY TRAFFIC CONTROL
(WITH FLAGGERS)
STANDARD APPROVED FOR USE 6/2005
DRAFT: 8/2013
REVISED:
635-6
See Note 6
10' min.
J u ly
U m y fi le s p w p r o d u c ti o n d o r a n d .d g n
STATE PROJECT
NUMBER
L.4
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY STANDARD
STANDARD
Traffic flow
Traffic flow
See Note 4
W20-1 W20-7W20-4
See Note 4
G20-2
Spacing Table)
(See Length and
(optional)
WORK SPACE (optional)(optional)
(optional)
W13-1P
(optional)
W16-2P
7.
6.
5.
4.
3.
2.
1.
the buffer space.
Do not allow equipment, materials, or vehicles to be parked or stored in
Requirements, Section 156.
For project specific minimum width, refer to the Special Contract
For night time flagging operation, provide floodlighting at flagger stations.
WORK AHEAD" (W20-1) and "END ROAD WORK" (G20-2) signs.
If closure is completely within the project limits, eliminate the "ROAD name of the contractor on the pilot car.
a conspicuous location on the rear of vehicle. Prominently display the
For pilot car operation, mount the PILOT CAR FOLLOW ME (G20-4) sign at conditions as approved by the CO.
Final location and spacing of signs and devices may be changed to fit field those depicted for the opposite direction of travel.
Signs are shown for one direction of travel only. Place devices similar to
LENGTH AND SPACING TABLE
SPEED*
APPROACH
AREA
TAPER
SPACE
BUFFER
SPACE
WORK
CHANNELIZING DEVICE
not the advisory speed.
Approach speed based on the regulatory posted speed, *
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
LENGTH
BUFFER SPACE
NOTE:
NO SCALE
Expressway / Freeway
Channelizing devices
Flagger location
Flagger location
ATAPER AREABUFFER SPACEVARIABLEBUFFER SPACETAPER AREAABC
(See Length and Spacing Table)ADVANCE WARNING AREA (See Sign Spacing Table) TERMINATION AREA
Device spacing
BUFFER SPACE
WORK
ROAD
AHEAD
ONE LANE
ROAD
AHEAD
xx
MPH
xxx
FEET
ROAD WORK
END
6" x 6" or larger.
Use 7' minimum spacing between posts for sign posts and 6' minimum mounting height for secondary sign.
obstructed, use 7' minimum mounting height for main sign
Diamond ≤ 48"
> 30'
> 17'
12' - 16'
> 13'
< 10
65 - 95
65 - 95
50 - 65
50 - 65
20 - 50
10 - 20
10 - 20
6 x 6
4 x 6
4 x 6
6 x 6
4 x 6
4 x 4
6 x 6
4 x 6
4 x 4
(INCH) (INCH)
(INCH)
1.5
1.5
1.5
(SQFT)
STANDARD APPROVED FOR USE 6/2005
DRAFT: 9/2011
REVISED:
635-14
TEMPORARY TRAFFIC CONTROL
WOOD POSTS
SIGN INSTALLATION
200' m in m in
6' - 12'
" dia. bolts per 4 1Attach sign panels with a minimum of 2 -minimum lateral offset of 1' behind the face of the curb lateral offset of 2' may be used. In urban areas, a
Other Shapes ≤ 48" Diamond ≤ 36"
Other Shapes ≤ 12' Diamond ≤ 48"
J u ly
U m y fi le s p w p r o d u c ti o n d o r a n e .d g n
STATE PROJECT
NUMBER
L.5
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY STANDARD
STANDARD
NOTE:
NO SCALE
"X"
WIDTH AREA
OF POSTS
NUMBER POST SIZE D HOLE SIZE
WOOD POST SELECTION TABLE
Post
See table for hole size parallel to sign face.
Field drill holes through post
Local tangent
Bottom of sign panel
X
H
H
D
H
0.75X
X
X
H
Y D
H
0.2X
0.6X
0.2X
SINGLE POST SIGN TWO POST SIGN
SIGN INSTALLATION ANGLE
POST DETAIL
D
See post detail (typ.)
Break-away holes.
S e e N o te
S e e N o te
In rural areas where lateral distance is limited, a minimum
D = Post embedment depth for average soil conditions.
field conditions.
H1 and H2 = Overall post length. Select post lengths to fit post.
7.
6.
5.
4.
3.
2.
1.
by the CO.
State standards may be used as an alternative if approved
See Note 4 E d g e o f tr a v e le d w a y
E d g e o f p a v e d s h o u ld e r
CL
Long side of post
D
90°
93°
In pedestrian locations, or in areas where the view is may be used.
Little u ck
C re e k
SUMPTER VALLEY RAILROAD
SUMPTER STOCKADE
SUMPTER
Granite Hill Rd.
5-
F N
1-
F N
END PROJECT
BEGIN PROJECT
d
R k e e r
C r e k c ar
C d
R e g di
R g ni dl u a p
S
Carey Gulch
Bear GulchGrays Gulch
Blue Spring
McCully Fork Rd.
d
R
7-
F N
F N d
R k r oF y llu
Cc M
SCALE IN MILES
0 11 2
N
To B aker C ity
7-
F N
27+41.18
OR BAKER 520(1)
RECONSTRUCTION
GRANITE HILL HIGHWAY
361+42.30
OR BAKER 520(1)
RECONSTRUCTION
GRANITE HILL HIGHWAY
DREDGE STATE PARK
SUMPTER VALLEY
d
R yr at e me
C r et p m u
S
30 m iles
10 m iles
To G ranite
Silver Creek
Loop Iron Horse
ROAD WORK
END
ROAD WORK
NEXT 7 MILES
WORK
ROAD
1000 FT
WORK
ROAD
500 FT
ROAD WORK
END
ROAD WORK
NEXT 7 MILES
WORK
ROAD
1000 FT
WORK
ROAD
500 FT
NOTE:
1.
Sheet L.2-L.5.
signs per Standard details on
Install temporary traffic control
VICINITY MAP
CONTROL SIGN
TEMPORARY TRAFFIC
FOREST
NATIONAL
WHITMAN
WALLOWA
L.6
STATE PROJECT
NUMBER
SHEET
OR BAKER 520(1)
J u ly
I n t_ ft m y fi le s p w p r o d u c ti o n d o r a n f.
d
S la n
M il
C h e c k e d b y
D e s ig n e d b y
WILLOWA
WHITMAN
N A
T I O
N A
L F
O R
E S
T B
O U
N D
A R
Y
WILLOWA WHITMAN
d
R k e e r
C r e k c a
TRAFFIC CONTROL
TABULATION OF PERMANENT
FOOTNOTE:
for striping information.
Refer to Special Contract Requirements (SCR) Section 634 [1]
M.1
STATE PROJECT
u g u s t
I n t_ ft m y fi le s p w p r o d u c ti o n d o r a p a .d
S la n
M il
C h e c k e d b y
D e s ig n e d b
PAVEMENT MARKINGS
LINEAR
4" solid double
4" dotted white
4" solid white edge
4" dotted white line
4" solid white edge line
4" broken yellow centerline
10'30'10'30'10' m a x m in
2' to 6'
2'
Locate 12" wide stop line to
NOTE:
NO SCALE
L a n e
L a n e
LC
LC
TYPICAL PAVEMENT MARKING APPLICATIONS CENTERLINE DETAIL
CENTERLINE MODIFICATION FOR CURVES WITH WIDENING…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .