AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

N/A

PAGE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)

A003 5/29/15 N/A WA NPS OLYM 2013(1)

SPRUCE RAILROAD TRAIL

6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A

Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

X

DTFH70-15-B-00005

9B. DATED (SEE ITEM 11)

5/6/15

10A. MODIFICATION OF CONTRACT/ORDER NO.

N/A

10B. DATED (SEE ITEM 13)

CODE: N/A FACILITY CODE: N/A

N/A

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

(__ ) is extended, ( x ) is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN

ITEM 10A.

N/A

B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D OTHER (Specify type of modification and authority)

N/A

E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

WA NPS OLYM 2013(1),

Spruce Railroad Trail

Amendment A003 is issued to revise the following:

SPECIAL CONTRACT REQUIREMENTS

104.05 Load Restrictions, Adds verbiage for commercial construction trucks not being allowed on East Beach Road.

Enclosure: Page E-4

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

N/A

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION NOT USABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

E-4

Special Contract Requirements Project: WA NPS OLYM 2013(1), Spruce Railroad Trail

03USC07/01/09

Section 104. — CONTROL OF WORK

104.03 Specifications and Drawings. Amend as follows:

Add the following paragraph:

(c) As-built working drawings. Furnish two as-built working drawings. The Government will provide one set of contract drawings to be used exclusively for recording the as-built details of the project. Use red pencil or red ink to record the information described below.

Note all additions or revisions to the location, character, and dimensions of the prescribed work shown on the contract drawings. Line out all details shown that are not applicable to the completed work. Check off details shown that were incorporated into the completed work without change.

Retain the drawings at the project site and, as work progresses, continuously update them to reflect the as-built details. Upon request, make the drawings available to the CO to review for compliance with these specifications.

As a minimum, show the following types of changes on the as-built drawings:

(1) Typical section(s)

(a) Revisions in dimensions; and

(b) Revisions in materials.

(2) Plan and profile

(a) Plan

(1) Revisions to the alignment;

(2) Changes in the construction limits;

(b) Profile

(1) Revisions to grades, elevations, and stationing of vertical points of intersection (VPI);

(2) Location, length, stationing, and type of reinforced soil slopes; and

Provide one paper as-built set of working drawings for review. Furnish the as-built working drawings to the CO before the final inspection.

Correct all details found during the final inspection that are not shown on the as-built drawings.

Scan the drawings to produce clear, colored images. Develop separate files for each plan section and create an index by bookmarking each sheet. Furnish the electronic version in PDF format on CD or DVD. Return one paper and one electronic set of corrected as-built drawings to the CO within 5 working days of the final inspection.

104.05 Load Restrictions. Amend as follows:

Add the following paragraph:

Dump trucks with trailers, belly dump trucks, or lowboy trucks are not allowed to travel on East Beach Road between US Highway 101 and Joyce-Piedmont Road.

Revised by Amendment A003