PrelimPlans_MT_BLM_ERFO_111-7401.pdf
PDF 4 MB Posted
- Attached to
- MT BLM ERFO 111-7401, Maiden Canyon Repairs
- Solicitation number
- DTFH70-12-B-00017
About this file
Prelim Plans
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MONTANA KEY MAP
COLUMBIA
BRITISH
ALBERTA
SASKATCHEWAN
N O
R T
H D
A K
O T
A
S O
U T
H D
A K
O T
A
WYOMING
ID
A
H O
UNITED STATES
CANADA
GLACIER
NATIONAL
PARK
YELLOWSTONE
NATIONAL
PARK
CHARLES M. RUSSELL
NATIONAL
WILDLIFE RANGE
Lake
Flathead
Elwell
Lake
M
Lake
Fort Peck
I SOS U IR
KALISPELL
MISSOULA
Anaconda
HELENA
BUTTE
BOZEMAN
Livingston
BILLINGS
City
Miles
Glendive
Point
Wolf Glasgow
HAVRE
Shelby
FALLS
GREAT
Lewistown
Dillon
E N
O T
S
WOLLEY
R E
VIR
90 15
2 2
MONTANA
REVIR
FEDERAL HIGHWAY ADMINISTRATION
U. S. DEPARTMENT OF TRANSPORTATION
e (max)
V
ADT (YR+20)
ADT (2010)
0.040
20 MPH
Project Location
Projects, FP-03 US Customary Units of Roads and Bridges on Federal Highway
Standard Specifications for Construction
APPROVED:
DATE
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
TYPE OF CONSTRUCTION:
DESIGN DESIGNATION:
SPECIFICATION:
Western Federal Lands Highway Division
Director, Project Delivery, INDEX TO SHEETS
PROJECT MANAGER
VANCOUVER, WASHINGTON
WESTERN FEDERAL LANDS HIGHWAY DIVISION
PLANS PREPARED BY
MONTANA
FERGUS COUNTY
PLANS FOR PROPOSED PROJECT
MAIDEN CANYON ERFO REPAIRS
LENGTH 1.660 MILES
COMMITMENT TO EXCELLENCE
FEDERAL LANDS HIGHWAY
R
E N
O R
A I
N
N
ST F
R
I
D
D E P A
T
NTOFT A SP
T T
O
U
TE
ATESO
AM
E R
IC
A
M
Grading, culverts and base
A.1
STATE PROJECT
NUMBER
SHEET
MT
BLM ERFO 111-7401
A
M
S e p te m b e r
I n t_ ft
D c m y fi le s p w p r o d u c ti o n d B
L M a a .d g n
C h e c k e d b y
D e s ig n e d b y
KRATOVIL
SCALE IN MILES
0 1 21
N
Giltedge
Maiden New Year
Baxter
LewistownLewistown
M a id e n C a n y o n
20087
B lin d B re a d G u lc h
R u b y
G u lc h
Peak
Pyramid
Peak
New Year
Peak
Burnette
Mountain
Sheep
Peak
Pekay
A lp in e
G u lc h
Peak
CrystalPeak
Maiden
Mountain
Flat
Hill
Kelly
BEGIN PROJECT
END PROJECT
J. TEMPORARY TRAFFIC CONTROL PLAN
H. DRAINAGE
F. EROSION CONTROL
E. APPROACH ROADS AND PARKING AREAS
D. PLAN-PROFILE
C. TYPICAL SECTION(S)
B. SUMMARIES
A. GENERAL INFORMATION
INFORMATIONAL AND PROJECT LIMIT SIGNING
TABULATION OF TRAFFIC CONTROL DEVICES
STANDARD DRAWINGS
TABULATION OF DRAINAGE QUANTITIES
EROSION CONTROL DETAILS
EROSION CONTROL PLAN
TABULATION OF QUANTITIES
PLAN AND PROFILE
TABULATION OF PLAN QUANTITIES
ROADWAY & STREAM CHANNEL
TABULATION OF QUANTITIES
SUMMARY OF QUANTITIES
VICINITY MAP
PLAN SYMBOLS AND ABBREVIATIONS
TITLE SHEET
H.2
H.1
G.2-?
G.1
F.?
F.2-?
F.1
E.1
D.2-?
D.1
C.2
C.1
B.1
A.3
A.2
A.1
MT BLM ERFO 111-7401
PRELIMINARY
NOT FOR CONSTRUCTION
NOTE: Site #1 is located 0.9 miles south of the Maiden Road/Judith Peak Road intersection as found on MapQuest
Julee.K.McTaggart Typewritten Text
NOTE:
FOOTNOTE:
under the curve data shown on the plan-profile.
Maximum superelevation on curves are at the rate ’e’ as indicated
Construct slopes as shown in the Staking Report Data listing.
NO SCALE
ROADWAY SECTIONS
2% crown 1:3
Traveled way
2’
Shld.
2’
Shld.
1:
1.
1’
Subgrade topsoil
Placing conserved
Seeding
14.0’ excavation conserved from Embankment
-2.000% +2.000% 1:3
1:1.75
16.0’ width
Roadway excavation (stream channel)
Variable depth
2.
1.
1:2 1:
Traveled way
2’
Shld.
2’
Shld.
14.0’
Subgrade excavation conserved from
Embankment
6.0’ width
Turnout (as required)
For riprap quantities, see Sheet XX.
Place conserved topsoil according to Section 624.
1:3 +1.156% -1.156%
1:3 1:
compacted depth method 2, 6 inch
Roadway aggregate, SITE 9 - 134+75 to 145+90
CL
and drainage ditches
Recondition roadway compacted depth method 2, 6 inch
Roadway aggregate, Traveled way
2’
Shld.
2’
Shld.
14.0’
C.1
STATE PROJECT
ERFO 111-7401
O c to b e r
I n t_ ft m y fi le s p w p r o d u c ti o n d B
L M c a .d
C h e c k e d b y
D e s ig n e d b y details see Sheet XX
For riprap dimensions and
Riprap slope where applicable.
method 2, 6"compacted depth
Roadway aggregate, LC
Hinge point and details see Sheet XX
For riprap dimensions
SITE 3 - 89+65 to 90+10 SITE 6 - 108+55 to 115+55
SITE 2 - 84+75 to 87+60 SITE 5 - 96+15 to 97+20
SITE 1 - 58+00 to 59+00 SITE 4 - 93+20 to 93+80
SITES 8A, 8B & 8C - 125+55 to 134+75
SITES 7A & 7B - 118+70 to 121+50
LC
NO SCALE
CHANNEL SECTIONS
C.2
STATE PROJECT
P
S e p te m b e r
I n t_ ft m y fi le s p w p r o d u c ti o n d C h a n n e l_
T y p ic a ls .d
C h e c k e d b y
D e s ig n e d b y
LOCATION
LENGTH (FT)
CHANNEL
W (FT) H (FT) THROUGH REACH (FT/FT)
THALWEG SLOPE
AVERAGE MINIMUM MAXIMUM
L C roughness - not flat Imitate existing bottom for
W
H (varies)
H (varies)
Existing ground
Proposed channel
SITE 1
STATION / ELEVATION
BEGIN CHANNEL
STATIONS / ELEVATION
END CHANNEL
NOTE:
FOOTNOTE:
2.
1.
NO SCALE
undulating and replicate the natural shape of the existing channel.
as directed byt the Engineer. Channel side slopes are to be in the field shall dectate the final constructed geometry and layout be constructed. Subsurface material and obstructions experienced
Cross sectional geometries represent approximate geometries to of constructed channel distance.
Transition changes in cross section geometries within a 50’ reach
Stations are based on the channel centerline at each site.
SITE 6
SITE 7
SITE 8
255SITE 8 3
158+00 / 4920.20 159+32 / 4913.86 0.0480 0.0380 0.0580
208+00 / 4705.50 216+40 / 4673.41 0.0382 0.0302 0.0482
0.05650.0465218+00 / 4659.60
0.0465
0.0465
0.0365
0.0365
0.0415 0.0565
0.0565
224+95 / 4627.28
224+95 / 4627.28 234+10 / 4584.73
234+10 / 4584.73 236+65 / 4572.87
16–2
16–2
9–1
16–2
16–2
TYPICAL CHANNEL SECTION
Channel excavation (quantities included in Roadway Excavation)
5 4
48004
F I R
F I R
F I R
F
IR
C
P T
.1
P C
.8
P T
.4
O f f s et
.3
L T
S ta
+5
.2
O f f s et
.3
L T
S ta
+7
.7
P C
.9
P T
.0
P C
.9
O f f s e t= .3
L T
S ta
+9
.5
O f f s e t= .3
L T
S ta
+0
.7
CP
12101
N
N
CP
CP
SITE #1 SITE #2
58+00 to 59+00 84+70 to 87+60
CUYD
EXC.
CUYD
EMB.
4915 4795
4920 4800
4925 4805
4930 4810
Curve= C17
R= 125.00’
T= 30.64’
L= 60.09’
D Curve= C28
R= 200.00’
T= 67.49’
L= 130.18’
D
Curve= C29
D
R= 400.00’
T= 82.42’
L= 162.57’
12109
12110
58+00 59+00 85+00 86+00 87+00 88+00
Line to be constructed
Profile grade
Existing ground
Profile grade
Existing ground
60+00 80+00
BEGIN PROJECT
57+75 to 145+90
MAIDEN CANYON ERFO REPAIR
MT BLM ERFO 111-7401
E=2040431.56
N=1066821.38
SUSPEND WORK
59+25
RESUME WORK
84+50
SUSPEND WORK
87+85
D.2
STATE PROJECT
WY
c to b e r
I n t_ ft m y fi le s p w p r o d u c ti o n d B
L M d b .d
C h e c k e d b y
D e s ig n e d b y
Line to be constructed
Match existing channel
Site 1
159+32 channel
59+26, 29’ LT Road=
Match existing channel
Site 1
158+00 channel
57+83, 29’ LT Road=
NOTE:
prior to construction.
Final location shall be determined in the field
Proposed channel location is approximate.1.
Approximate channel centerline
P C
C
.6
P T
.0
O ff se t= .3
LT
S ta +6 .2
O ff se t= .3
LT
S ta +1 .4
C
M P
S H
O T
G U
N N
E D
C
M P
S H
O T
G U
N N
E D
P T
.9
P C
.8
P T
.0
Of fs et .9
LT
S ta
+7 6.
Of fs et .9
LT
S ta
+2 0.
P C
.5
P T
.9
P C
.7
P T
.4
CP
N
SITE #3
89+65 to 90+10
CP
SITE #4
93+20 to 93+80
Curve= C31
D
R= 600.00’
T= 68.01’
L= 135.45’
Curve= C33
D
R= 2,000.00’
T= 41.59’
L= 83.17’
Line to be constructed
Line to be constructed
12111
12112
Profile grade
Existing ground
N
CUYD
EXC.
4780 4755
4785 4760
4790 4765
4795 4770
88+00 89+00 90+00 96+00 97+0093+00 94+00
Profile grade
Existing ground
Curve= C35
D
R= 400.00’
T= 85.61’
L= 168.67’
Line to be constructed
N
4750 4750
Profile grade
Existing ground
SITE #5
96+15 to 97+20
RESUME WORK
89+45
SUSPEND WORK
90+35 93+00 94+00
WORK
RESUME
WORK
SUSPEND
98+00
SUSPEND WORK
98+30RESUME WORK
95+60
STATE PROJECT
c to b e r
I n t_ ft m y fi le s p w p r o d u c ti o n d B
L M d c .d
C h e c k e d b y
D e s ig n e d b y
NOTE:
prior to construction.
Final location shall be determined in the field
Proposed channel location is approximate.1.
P C
.2
P T
.2
P C
.0
P T
.7
P C
.9
P T
.5
P C
.8
N
CP
108+00 to 115+55
Curve= C40
D
R= 600.00’
T= 43.42’
L= 86.70’
Curve= C41
D
R= 200.00’
T= 35.67’
L= 70.60’
12117
Profile grade
Existing ground
Line to be constructed
RESUME WORK
107+75
A E
NI
L
H C
T A
M
SITE 6
SHEET 1 OF 2
Match existing channel
Site 6
208+00 channel
107+59, 38’ LT Road= centerline
Approximate channel
NOTE:
prior to construction.
Final location shall be determined in the field
Proposed channel location is approximate.1.
CUYD
EXC.
4690 4690
4695 4695
4700 4700
4705 4705
4710 4710
108+00 109+00 110+00 112+00
D.4
STATE PROJECT
c to b e r
I n t_ ft m y fi le s p w p r o d u c ti o n d B
L M d d .d
C h e c k e d b y
D e s ig n e d b y
107+00 111+00
4680 4
P C
.8
P T
.2
P C
.0
5 P
T
.9
4 1
P C
.1
N
CP
108+00 to 115+55
CUYD
EXC.
4675 4675
4680 4680
4685 4685
4690 4690
4695 4695
Curve= C43
D
R= 600.00’
T= 26.73’
12118
112+00 113+00 114+00 113+00 116+00
Profile grade
Existing ground
D.5
STATE PROJECT
c to b e r
I n t_ ft m y fi le s p w p r o d u c ti o n d B
L M d d d .d
C h e c k e d b y
D e s ig n e d b y
115+00
Line to be constructed
SUSPEND WORK
115+80
A E
N I
L H
C T
A M
SITE 6
SHEET 2 OF 2
Match existing channel
Site 6
216+40 channel
115+80, 42’ LT Road=
NOTE:
prior to construction.
Final location shall be determined in the field
Proposed channel location is approximate.1.
Approximate channel centerline
X S
Q U
A S
H
F
IR
F
IR
9 1
0 1
1 2
CP
SITE 7 A & B
118+70 to 121+50
N
Curve= C47
D
R= 240.00’
T= 41.67’
L= 82.51’
Curve= C48
D
R= 500.00’
T= 26.70’
L= 53.36’
Curve= C46
D
R= 690.00’
T= 44.94’
L= 89.75’
12120 equivalant arch pipe installation
Recommended 84-inch round or
NOT ELIGIBLE UNDER ERFO FUNDING
(undersized/25 yr design)
Existing 60-inch equivalent arch pipe
Line to be constructed
Profile grade
Profile grade
Existing ground
Existing ground
CUYD
EXC.
CUYD
117+00
4660 4645
4665 4650
4670 4655
4675 4660
118+00 119+00 120+00 121+00 122+00 123+00
RESUME WORK
SUSPEND WORK
121+75
118+45
D.6
STATE PROJECT
c to b e r
I n t_ ft m y fi le s p w p r o d u c ti o n d B
L M d e .d
C h e c k e d b y
D e s ig n e d b y
NOTE:
prior to construction.
Final location shall be determined in the field
Proposed channel location is approximate.1.
Match existing channel
Site 7
218+00 channel
118+61, 41’ RT Road= centerline
Approximate channel
Stream barb A
119+40 RT
Stream barb B
120+00 RT
Stream barb C
120+60 RT
Stream barb D
121+20 RT
SITE 8 A & B
125+55 to 131+20
CUYD
EXC.
CUYD
EMB.
125+00
126+00 127+00 128+00 129+00 130+00 131+00
Curve= C51
D
R= 125.00’
T= 22.64’
L= 44.80’
Curve= C52
D
R= 280.00’
T= 27.42’
L= 54.66’
Curve= C71
D
R= 60.00’
T= 32.94’
L= 60.25’ D
Curve= C72
R= 60.00’ T= 14.96’ L= 29.32’
T= 16.74’
L= 33.18’
R= 100.00’ D
Curve= C73
D
L= 43.17’ T= 21.73’ R= 150.00’
Curve= C74
D
T= 44.06’
R= 170.00’
L= 86.22’
Curve= C75
Curve= C76
D
R= 200.00’
T= 37.97’
L= 75.04’
Curve= C53
D
R= 650.00’
T= 114.60’
L= 226.86’
Curve= C80
R= 100.00’
T= 40.34’
L= 76.69’
D
Curve= C77
D
R= 200.00’
T= 37.45’
L= 74.04’
132+00
CP
12122
CP
12123
Profile grade
Profile grade
Existing ground
Existing ground
N
125+30
RESUME WORK
131+20
SUSPEND WORK
D.7
STATE PROJECT
c to b e r
I n t_ ft m y fi le s p w p r o d u c ti o n d B
L M d f.
d
C h e c k e d b y
D e s ig n e d b y centerline channel
Approximate
NOTE:
prior to construction.
Final location shall be determined in the field
Proposed channel location is approximate.1.
Line to be constructed
Stream barb E
128+75 RT
Stream barb F
129+25 RT
Stream barb G
130+00 RT
Stream barb H
130+75 RT
1 ?1
Curve= C77
D
R= 200.00’
T= 37.45’
L= 74.04’
Curve= C54
D
R= 110.00’
T= 63.56’
L= 115.27’
Curve= C78
D
R= 50.00’
T= 28.54’
L= 51.86’
Curve= C79
D
R= 110.00’
T= 29.93’
L= 58.45’
Curve= C83
D
R= 100.00’
T= 28.91’
L= 56.28’
Curve= C84
D
R= 120.00’
T= 29.16’
L= 57.21’
12124
CP
12125
CP
Line to be constructed
Profile grade
Existing ground
N 131+20
RESUME WORK
134+75
SUSPEND WORK
131+20 to 134+75
CUYD
EXC.
4590 4590
4595 4595
4600 4600
4605 4605
4610 4610
131+00 132+00 133+00 134+00 135+00
D.8
STATE PROJECT
c to b e r
I n t_ ft m y fi le s p w p r o d u c ti o n d B
L M d g .d
C h e c k e d b y
D e s ig n e d b y
SITE 8 C
NOTE:
prior to construction.
Final location shall be determined in the field
Proposed channel location is approximate.1.
centerline
Approximate channel
C
M P
P L
U G
G E
D
1 1
N
Curve= C58
D
R= 220.00’
T= 26.31’
L= 52.36’
Curve= C59
D
R= 500.00’
T= 22.45’
L= 44.87’
Curve= C60
D
R= 200.00’
T= 32.67’
L= 64.76’
Curve= C61
D
R= 550.00’
T= 101.93’
L= 201.57’
CP
12127
CP
12128
137+20 to 145+90
CUYD
EXC.
CUYD
EMB.
135+00
4570 4550
4575 4555
4580 4560
4585 4565
4590 4570
136+00 137+00 138+00 139+00 140+00 141+00 142+00
SITE 9
Curve= C55 D
R= 400.00’ T= 80.59’ L= 159.06’
Curve= C85
D
R= 100.00’
T= 43.33’
L= 81.78’
Curve= C86
D
R= 500.00’
T= 41.73’
L= 83.26’
Curve= C56
D
R= 300.00’
T= 28.63’
L= 57.08’
Curve= C87
D
R= 100.00’
T= 51.87’
L= 95.69’
12126
CP
Existing ground
Profile grade
Existing ground
Profile grade
Line to be constructed
RECONDITIONED ROADWAY
D.9
STATE PROJECT
c to b e r
I n t_ ft m y fi le s p w p r o d u c ti o n d B
L M d h .d
C h e c k e d b y
D e s ig n e d b y
Install 10 ft. CMP
Install cutoff berm
Sheet 1 of 2
4 1
N
CP
12129
Line to be constructed
137+20 to 145+90
SITE 9
RECONDITIONED ROADWAY
CUYD
EXC.
CUYD
142+00
143+00 144+00 145+00 146+00 147+00
D.10
STATE PROJECT
c to b e r
I n t_ ft m y fi le s p w p r o d u c ti o n d B
L M d i.
d
C h e c k e d b y
D e s ig n e d b y
Curve= C62
D
R= 600.00’
T= 16.37’
L= 32.73’
D
R= 240.00’
T= 45.53’
L= 90.00’
Curve= C63
D
Curve= C64
R= 190.00’
T= 58.05’
L= 112.68’
Existing ground
Existing ground
Profile grade
Profile grade
END PROJECT
145+90
MAIDEN CANYON ERFO REPAIRS
MT BLM ERFO 111-7401
E=2044384.39
N=1059942.20
Sheet 2 of 2
N
LCScale in feet
5 0 5 10 15 20
OUTLETINLETPIPEHYDRAULIC INFORMATION
0 10 20 30 40 50 6010203040506070
LC
FOOTNOTE:
Proposed road
Proposed road grade
Existing ground
New road
See Sheet __
See Sheet __
H.__
STATE PROJECT
NUMBER
ERFO 111-7401
B L
M fa .d g n
U
S S u r
B
T h o m p s o
C h e c k e d b
K n u th e s ig n e d b y
36 inBURIAL DEPTH: 36 inBURIAL DEPTH:
30 inLOWER BEVEL HEIGHT: 30 inLOWER BEVEL HEIGHT:
STEP, 1.75(h):1(v)BEVEL: STEP, 1.75(h):1(v)BEVEL:
RIPRAPHEADWALL:
120 inSPAN: 120 inRISE: CMP, ROUNDTYPE:
LENGTH: 72 ft
PIPE SLOPE: 0.0454 ft/ft 0.0454 ft/ftFLOWLINE SLOPE:
WALL THICKNESS: 0.109 inQ : 178 CFS
Q : 14 CFS HW : 4.3 ft /4569.601830439.02/846436.08INV N/E/EL: INV N/E/EL: /4572.871830367.01/846436.13
HEADWALL: RIPRAP
10’ DIAMETER CULVERT
STA. 137+18.60
Skew
Top El. 4581.50 ft
Construct ditch block
1Riprap end treatment
Placed riprap, class 4, Riprap end treatment
Placed riprap, class 4, Riprap end treatment
Placed riprap, class 4, Riprap end treatment
Placed riprap, class 4, ACTIVE CHANNEL WIDTH: 16 ft ends and riprap Step bevel
Proposed channel edge channel excavation
Proposed bottom of
Slope 4.54% streambed material
Backfill with conserved
:1
:1
26.96 RT
Sta. 136+99.55, centerline
New culvert
Proposed 120" CMP culvert
Sta. 137+18.60
Sta. 137+40.93, 31.85 RT xxx
STATE PROJECT
OR
R ip r a p
A p r o n .d g n
U
S I n t2
J
D o u c e c k e d b
N e ig h o r s ig n e d b y
Sl op e
PIPE BEVEL DETAIL
Sl op e
SKEW ANGLE DIAGRAM
c e n te r li n e
R o a d w a y
Cu lv er t ce nt er lin e
BOP
NOTE:
FOOTNOTE:
EOP
Manufacturer’s standards
0.25 D or R or the
(DIAMETER OR SPAN GREATER OR EQUAL TO 48-INCHES)
(DIAMETER OR SPAN LESS THAN 48-INCHES)
Class 4 riprap
RIPRAP END TREATMENT
Sl op e
FRONT VIEW SIDE VIEW
beneath and at all sides of placed riprap.
Place earthwork geotextile between riprap and existing ground, Earthwork geotextile, type III-A is subsidiary to 251.
Contractor to field verify all invert elevations, prior to installation.
3.
2.
1.
type III-A Earthwork geotextile, shown on site specific details, whichever is greater.
Construct riprap end treatment to a thickness of 36-inches or as
Riprap end treatment slope to match roadway embankment slope.
Bevel to match roadway embankment.
PIPE BEVEL
(END TREATMENT) AND
PLACED RIPRAP
137+18.60
Class 4 riprap .2
D o r R
.2
D o r R o r R is e
R
D ia m e te r
D o r R is e
R
D ia m e te r
D
Skew angle
D
D2
Variable D D2
V a r ia b le D
V a r ia b le D
" m in
36" xxx
STATE PROJECT
OR
D it c h b lo c k .d g n
U
S I n t2
D o u c e c k e d b
N e ig h o s ig n e d b y
B e r m
A
A
FLOW
PLAN
Slope
1:1.5 maximum
S u b g r a d e s h o u ld e r
SECTION A-A
Subgrade shoulder
Berm
Subgrade
Cut Slope Existing
Ditch line
Aggregate surface
T o e o f r o a d e m b a n k m e n t
B B
DITCH BLOCK DETAIL
DITCH BLOCK DETAIL
cut slope
Existing on site plan
Elevation as shown
4’
FOOTNOTE:
:1
Earthwork geotextile type IV-B
EMBANKMENT PROTECTION
Riprap crest
Riprap toe
SHEET 1 OF 2
PROTECTION DETAILS
TYPICAL EMBANKMENT
See sheet H.__ for revetment enhancement details and quantities.
Backfill with conserved streambed material or revetment enhancement materials
Maiden Crk.
Existing ground
H
4’ min.
(see table for class) Place riprap
D varies
Slope
D
4 4
(ft)
H
XX
CLASS
RIPRAP
BEGIN STATION
(ft)
D
(Vert:Hor)
SLOPE
(cy)
VOLUME
STONE
END STATION LT/RT
RIPRAP TOE ELEVATION (ft)
BEGIN END
1 : 1.5LT
4 4 XX51 : 1.75LT
4 4 XX5LT
4 4 XX5LT
4 5 XX61 : 1.75LT
5 4 XX51 : 1.75LT
5 4 XX51 : 1.75RT
5 4 XX5RT
6 4 XX5RT
6 4 XX5RT
6 5 XX6RT
58+00 59+00
84+75 87+60
89+65 90+10
93+20 93+80
96+15 97+20
108+00 115+55
118+70 120+00
121+00 121+50
125+55 128+75
128+75 131+20
131+20 134+75
1 : 2
1 : 2
1 : 1.75
1 : 1.75
1 : 1.75
1 : 1.75
4660.76
4703.53
4751.10
4767.00
4781.00
4801.65
4918.95
4651.12
4629.33
4615.69
4603.12
4914.62
4789.47
4779.50
4764.50
4748.21
4672.41
4655.73
4647.41
4615.69
4603.12
4587.63
H.XX
STATE PROJECT
c to b e r
I n t_ ft m y fi le s p w p r o d u c ti o n d R e v e tm e n t_
D e ta il s .d in h P h a m e s N e ig h o
C h e c k e d b y
D e s ig n e d b y
A
FLOW
Ls
SECTION A-A
SECTION B-B
PLAN
30 4 50 10 4
(ft)
Bl
(ft)
Bw
(deg.)
Ah
(ft)
X
(ft)
Be
(cy/ each)
VOLUME
STONE
(h.1v)
Ls
B
A
Stream barb
B
(ft)
Kh
(ft)
Kl
FOOTNOTE:
LC
Stream barb key
Existing grade
Stream barb limits
Existing stream bed
Stream barb bottom
Stream barb bottom
Stream barb crest
Existing stream bed
OHW line
Bank toe
Stream barb key
OHW line
Bank toe
Stream barb crest
STREAM BARB
A 80
B
C
D
CLASS
RIPRAP
Placed riprap
TYPICAL DETAILS
STREAM BARB
Stream barb key
1 2
E NE N
STREAM BARB COORDINATES
2 XXXX XXXX XXXX XXXX
E
F
G
35 XXXX XXXX XXXX XXXX
30 XXXX XXXX XXXX XXXX
30 XXXX XXXX XXXX XXXX
30 XXXX XXXX XXXX XXXX
40 XXXX XXXX XXXX XXXX
40 XXXX XXXX XXXX XXXX
H 40 XXXX XXXX XXXX XXXX
NA
NA
30 4 10 4 62
30 4 10 4 62
30 4 10 4 62
30 4 10 4 62
30 4 10 4 62
30 4 10 4 62
30 4 10 4 62
Proposed channel bottom channel bottom elevation
Set barb tip at proposed
Placed riprap
Placed riprap
Placed riprap to original ground with conserved material.
bench, conserve excavated stream material. Backfill excavation
For stream barbs constructed below existing grade within a flood or constructed riprap revetment.
Do not install stream barb key where barb abuts against existing specified Ah.
Adjust coordinates to meet field conditions and maintain
Field verify dimension needed to obtain Kh.
H.XX
STATE PROJECT
c to b e r
I n t_ ft m y fi le s p w p r o d u c ti o n d S tr e a m
B a r b
D e ta il s .d in h P h m e s N e ig h o
C h e c k e d b y
D e s ig n e d b y
B w
A h
B e
Bw
K l
K h
B e
Kl Bl
Bl
X (Distance to next downstream barb)
B e
| A-01 |
| A-03 |
| C-01 |
| C-02 |
| D-Sheets |
| Hydraulics.pdf |
| 10'_dia_culvert |
| Ditch_block |
| Revetment_Details |
| Stream_Barb_Details |