WA PRA MORA 13(4), Stevens Canyon Road, Mount Rainier National Park, Pierce and Lewis Counties, Washington
The work consists of grading, drainage, paving, stone masonry, bridge rehabilitation, reinforced soil slope embankment, MSE wall and other small items of work.
Project length: 10.093 Miles
Fixed Completion Date: Approximately September 30, 2012
Estimated Price Range: $10 million to $15 million
Location: 11 Miles N of Packwood, Washington
DESCRIPTION OF WORK in US CUSTOMARY UNITS
DIVISION 150 – Project Requirements 152 Construction Survey & Staking x YES NO 153 Contractor Quality Control and Assurance x YES NO 154 Contractor Sampling & Testing x YES NO 155 Schedules for Construction Contracts (construction schedules) x YES NO 157 Soil Erosion Control Devices (erosion control devices)
Soil stabilization Sediment wattle
0.2 Acre
1,600 Lnft
DIVISION 200 – Earthwork 203 Removal of Structures & Obstructions (structures, demolition)
Delineator Pipe culvert Sign
135 Each 4 Each 93 Each
204 Excavation & Embankment Subexcavation Select borrow
110 Cuyd 440 Cuyd
207 Earthwork Geotextiles (geotextiles) 950 Sqyd 211 Roadway Obliteration 1,400 Sqyd
DIVISION 250 - Slope Reinforcement and Retaining Walls 251 Riprap
Boulder 26 Each 252 Rockery 210 Cuyd 253 Gabions & Revet Mattresses 100 Each
DIVISION 300 – Aggregate Courses 308 Minor Crushed Aggregate (crushed aggregate) 3,300 Ton
DIVISION 400 – Asphalt Pavements & Surface Treatments 401 Superpave Hot Asphalt Concrete Pavement 14,000 Ton 403 Hot Asphalt Concrete Pavement (asphalt concrete pavement) 1,470 Ton
412 Asphalt Tack Coat (asphalt surface treatment) 64 Ton 413 Asphalt Pavement Milling 3,700 Sqyd
DIVISION 550 – Bridge Construction 552 Structural Concrete (concrete – major structures)
- Clean and Reseal Joints 1,263 LNFT 559 Waterproofing (concrete – major structures) 35 SQYD 563 Painting (structures, painting) - Bridge Rail 2 - LPSM 575 Minor Bridge Work 3 - LPSM
DIVISION 600 – Incidental Construction 602 Culverts & Drains (indicate one or both)
Culverts 110 Lnft 605 Underdrains, Sheet Drains & Pavement Edge Drains
(culverts & drains) (indicate which) Standard Underdrain System Outlet Pipe
80 Lnft 22 Lnft
607 Cleaning, Reconditioning and Repairing Existing Drainage Structures
Cleaning Culvert In Place 22 Each 619 Fences, Gates & Cattle Guards
Bollard Post 10 Each 622 Rental Equipment x YES NO 633 Permanent Traffic Control Devices (traffic control devices)
Sign system Snowpole holders Delineators
1,250 Sqft 13 Each 218 Each
634 Permanent Pavement Markings (traffic pavement markings) Pavement markings (lane striping) Pavement markings (accessibility symbols)
324,650 Lnft 2 Each
635 Temporary Traffic Control (traffic control – flaggers & pilot cars)
Barricades Cones Concrete Barrier Construction Sign
9 Each 300 Each 120 Lnft 460 Sqft
Flagger: Hours: 9000 Pilot Car: Hours: 900