AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A001 June 28, 2010 N/A OR FS ARRA FR 1376(1)
UPPER CHETCO RIVER BRIDGE
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X DTFH70-10-B-00013
9B. DATED (SEE ITEM 11)
6/22/10
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A
N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
(__ ) is extended, ( x ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
N/A
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
N/A
D OTHER (Specify type of modification and authority) N/A
E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
OR FS ARRA FR 1376(1), UPPER CHETCO RIVER BRIDGE
See page 2 for revisions.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment No. A001, dated 06/28/10 OR FS ARRA FR 1376(1) Solicitation No. DTFH70-10-B-00013 Upper Chetco River Bridge
REVISIONS ARE AS FOLLOWS:
SPECIAL CONTRACT REQUIREMENTS
Page Section/Table Revision E-12 108.01 Commencement, Prosecution, and
Completion of Work Adds sentence
E-28 156.03 Accommodating Traffic During Work Revises dates
ENCLOSURES
Pages:
E-12 D-28
E-12
Special Contract Requirements Project: OR FS ARRA FR 1376(1), Upper Chetco River Bridge
03USC05/12/09
Section 108.— PROSECUTION AND PROGRESS
108.01 Commencement, Prosecution, and Completion of Work. Add the following:
Do not perform work at the project site before March 15, 2011.
Furnish at least 48 hours advance notice before changing the current work schedule. Work schedule changes that include additional shifts require 14 days notice.
108.01A Labor. (Added Subsection.)
Follow the requirements of FAR Clause 52.222-6 Davis Bacon Act.
Adjacent or virtually adjacent work sites are defined to be work sites within ½ mile of the project. Application of the Davis-Bacon Act for work sites beyond ½ mile of the project will be determined by the CO.
Waste Site has been determined to be adjacent or virtually adjacent to the project. Davis-Bacon Wage Rates will apply.
108.02 Subcontracting. Amend as follows:
Delete the first paragraph and substitute the following:
Follow the requirements of FAR clauses 52.219-3, Notice of Total HUBZone Set-Aside and 52.222-11 Subcontracts (Labor Standards).
Delete the fourth paragraph and substitute the following:
In FAR Clauses 51.219-8, Utilization of Small Business Concerns and 52.232-27, Prompt Payment for Construction Contracts, the subcontracts include both on-site work and supply contracts.
In FAR Clause 52.219-3, Notice of Total HUBZone Set-Aside, the percentage of the cost of contract performance incurred for personnel will be computed according to the following formula:
P = H / T
Where:
P = Percent of the cost of contract performance incurred for personnel working for HUBZone firms
T = Total wages/benefits paid during the life of the contract
H = Total wages/benefits paid to employees working for HUBZone firms (prime and subcontractors)
Revised by Amendment A001
E-28
Special Contract Requirements Project: OR FS ARRA FR 1376(1), Upper Chetco River Bridge
03USC04/07/06
Section 156.— PUBLIC TRAFFIC
Construction Requirements
156.03 Accommodating Traffic During Work. Add the following:
The road may be closed to public traffic at the project site to complete the bridge repair and adjacent roadwork. Do not close the road until all materials and equipment are on hand or guaranteed to be delivered in a timely manner. Provide signing according to the traffic control details shown in the plans before the road is closed; one full closure will be permitted between April 1st and July 15th. At the end of the specified closure period, open the road to public traffic and provide any needed traffic control.
No other road closures will be permitted.
156.08 Traffic and Safety Supervisor. Amend as follows:
Delete the text of the second sentence in the first paragraph.
Delete the text in paragraph (f) and substitute the following:
(f) Coordinate and ensure that all traffic control devices are furnished, installed, maintained, removed, stored, replaced, relocated and cleaned according to Subsection 635.03 (a) through (i).
Measurement and Payment
156.10 Add the following:
No measurement for payment will be made for additional traffic control needed to open the road to public traffic due to the Contractor’s failure to complete the bridge repair and associated roadway construction within the roadway closure period.
03USC12/13/05
Section 157.— SOIL EROSION CONTROL
Material
157.02 Add the following
Seed will be provided by the Government.
Revised by Amendment A001