Project Description_Bitterroot.pdf

PDF 55 KB Posted

Attached to
RECOVERY: MT PFH 78(1), EAST FORK BITTERROOT ROAD Federal contract opportunity
Solicitation number
DTFH70-09-B-00017
Issued by
Department of Transportation Federal Highway Administration

About this file

Project Description

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MT PFH 78(1), EAST FORK BITTERROOT ROAD, Bitterroot National Forest, Ravalli County, Montana.

The work consists of subexcavation, grading, drainage, base and paving and other small items of work.

Project length: 14.513 miles

Fixed Completion Date: October 15, 2010

Estimated Price Range: $5 million to $7 million

Location: 35 miles south of Hamilton, MT.

DESCRIPTION OF WORK in US CUSTOMARY UNITS

DIVISION 150 –Project Requirements 152 Construction Survey & Staking X YES NO 153 Contractor Quality Control and Assurance X YES NO 154 Contractor Sampling & Testing X YES NO 155 Schedules for Construction Contracts (construction schedules) X YES NO 157 Soil Erosion Control Devices (erosion control devices) Wattle 1,998 lnft

Sandbag 405 each Plastic Lining 36 sqyd

158 Watering for Dust Control lpsm

DIVISION 200 –Earthwork 201 Clearing & Grubbing N/A 202 Additional Clearing & Grubbing (clearing & grubbing) Selective 1,222 sqyd 203 Removal of Structures & Obstructions (structures, demolition) Delineator 57 each

Sign System 23 each Pipe Culvert 65 lnft

204 Excavation & Embankment Rdwy Exc 606 cuyd Subexc 1,850 cuyd Conserve & Stockpile Topsoil 700 cuyd

207 Earthwork Geotextiles (geotextiles) Type IA 10,000 sqyd Geogrid 14,600 sqyd

DIVISION 250 - Slope Reinforcement and Retaining Walls 251 Riprap Class 3 10 cuyd

DIVISION 300 –Aggregate Courses 303 Road Reconditioning Ditch 1 10,055 lnft

Ditch 2 1,930 lnft Agg Surf 630 sqyd

308 Minor Crushed Aggregate (crushed aggregate) Rdwy Agg, Meth 1

10,190 tons 310 Recycled Aggregate Course (asphalt pavement recycling) Base 79,935 sqyd

DIVISION 400 –Asphalt Pavements & Surface Treatments 401 Superpave Hot Asphalt Concrete Pavement AC Pavt 33,000 tons

Antistrip 331 tons 403 Hot Asphalt Concrete Pavement (asphalt concrete pavement) Wedge & Levelling

500 tons 404 Minor Hot Asphalt Concrete (asphalt concrete pavement) 640 tons 411 Asphalt Prime Coat (asphalt surface treatment) Prime 94 tons

Blotter 1,550 tons 412 Asphalt Tack Coat (asphalt surface treatment) 91 tons 413 Asphalt Pavement Milling 8,186 sqyd Other: Crack, Cleaning Routing and Sealing 2,500 lnft

DIVISION 600 –Incidental Construction 601 Minor Concrete Structures (concrete –minor structures) Headwall 18” 2 each

Headwall 24” 1 each 602 Culverts & Drains (indicate one or both) Culverts:

8” repair 2 lnft 12” 65 lnft 12” repair 6 lnft 15” 30 lnft 18” 131 lnft 18” repair 16 lnft 24” 125 lnft 24” repair 4 lnft 15” equiv arch repair4 lnft 24” equiv arch repair4 lnft

604 Manholes, Inlets, & Catch Basins (culverts & drains) (indicate which)

Inlet, no HW 2 each Inlet, w/ HW 3 each

622 Rental Equipment X YES NO 624 Topsoil (landscaping & related items) Furnish and Place

50 cuyd Place Conserved

9,180 sqyd 625 Turf Establishment (indicate seeding or mulching separately) Dry Mulching

9,180 sqyd 629 Rolled Erosion Control Products & Cellular Confinement

Systems (turf establishment) Type 5.A 850 sqyd

633 Permanent Traffic Control Devices (traffic control devices) System 131 sqft Panel 55 sqft Obj Mrkr 3 4 each Delin A 114 each Delin C 114 each Delin D 114 each Delin F 114 each

634 Permanent Pavement Markings (traffic pavement markings) Type B Solid:

Wht 305,840 lnft Ylw 110,718 lnft

Type B Broken Ylw 103,536 lnft

635 Temporary Traffic Control

(traffic control –flaggers & pilot cars) Cone 1,100 each Drum 160 each Mrkgs 269,607 lnft Sign 405 sqft TSS 180 days

Flagger 2320 hr Pilot Car 1160 hr