Project Description_Bitterroot.pdf
PDF 55 KB Posted
- Attached to
- RECOVERY: MT PFH 78(1), EAST FORK BITTERROOT ROAD Federal contract opportunity
- Solicitation number
- DTFH70-09-B-00017
About this file
Project Description
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment A001_MT PFH 78(1) East Fork Bitterroot Road.pdf | ||
| PlanRequestForm_Bitterroot.pdf | ||
| PhisicalData Request Form_Bitterroot.pdf | ||
| IFB_Sol_Book2_Bitterroot.pdf | ||
| http //www.wfl.fhwa.dot.gov/contracting/construction/plans/mtpfh78-1/ | — | |
| IFB_Sol_Book1_Bitterroot.pdf | ||
| Prelims Transmittal Ltr_MT PFH 78_1_ East Fork Bitterroot Road.pdf | ||
| CALL for HUBZone INTEREST__Bitterroot.pdf | ||
| Prelim Plans_MT PFH 78(1) East Fork Bitterroot Road.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MT PFH 78(1), EAST FORK BITTERROOT ROAD, Bitterroot National Forest, Ravalli County, Montana.
The work consists of subexcavation, grading, drainage, base and paving and other small items of work.
Project length: 14.513 miles
Fixed Completion Date: October 15, 2010
Estimated Price Range: $5 million to $7 million
Location: 35 miles south of Hamilton, MT.
DESCRIPTION OF WORK in US CUSTOMARY UNITS
DIVISION 150 –Project Requirements 152 Construction Survey & Staking X YES NO 153 Contractor Quality Control and Assurance X YES NO 154 Contractor Sampling & Testing X YES NO 155 Schedules for Construction Contracts (construction schedules) X YES NO 157 Soil Erosion Control Devices (erosion control devices) Wattle 1,998 lnft
Sandbag 405 each Plastic Lining 36 sqyd
158 Watering for Dust Control lpsm
DIVISION 200 –Earthwork 201 Clearing & Grubbing N/A 202 Additional Clearing & Grubbing (clearing & grubbing) Selective 1,222 sqyd 203 Removal of Structures & Obstructions (structures, demolition) Delineator 57 each
Sign System 23 each Pipe Culvert 65 lnft
204 Excavation & Embankment Rdwy Exc 606 cuyd Subexc 1,850 cuyd Conserve & Stockpile Topsoil 700 cuyd
207 Earthwork Geotextiles (geotextiles) Type IA 10,000 sqyd Geogrid 14,600 sqyd
DIVISION 250 - Slope Reinforcement and Retaining Walls 251 Riprap Class 3 10 cuyd
DIVISION 300 –Aggregate Courses 303 Road Reconditioning Ditch 1 10,055 lnft
Ditch 2 1,930 lnft Agg Surf 630 sqyd
308 Minor Crushed Aggregate (crushed aggregate) Rdwy Agg, Meth 1
10,190 tons 310 Recycled Aggregate Course (asphalt pavement recycling) Base 79,935 sqyd
DIVISION 400 –Asphalt Pavements & Surface Treatments 401 Superpave Hot Asphalt Concrete Pavement AC Pavt 33,000 tons
Antistrip 331 tons 403 Hot Asphalt Concrete Pavement (asphalt concrete pavement) Wedge & Levelling
500 tons 404 Minor Hot Asphalt Concrete (asphalt concrete pavement) 640 tons 411 Asphalt Prime Coat (asphalt surface treatment) Prime 94 tons
Blotter 1,550 tons 412 Asphalt Tack Coat (asphalt surface treatment) 91 tons 413 Asphalt Pavement Milling 8,186 sqyd Other: Crack, Cleaning Routing and Sealing 2,500 lnft
DIVISION 600 –Incidental Construction 601 Minor Concrete Structures (concrete –minor structures) Headwall 18” 2 each
Headwall 24” 1 each 602 Culverts & Drains (indicate one or both) Culverts:
8” repair 2 lnft 12” 65 lnft 12” repair 6 lnft 15” 30 lnft 18” 131 lnft 18” repair 16 lnft 24” 125 lnft 24” repair 4 lnft 15” equiv arch repair4 lnft 24” equiv arch repair4 lnft
604 Manholes, Inlets, & Catch Basins (culverts & drains) (indicate which)
Inlet, no HW 2 each Inlet, w/ HW 3 each
622 Rental Equipment X YES NO 624 Topsoil (landscaping & related items) Furnish and Place
50 cuyd Place Conserved
9,180 sqyd 625 Turf Establishment (indicate seeding or mulching separately) Dry Mulching
9,180 sqyd 629 Rolled Erosion Control Products & Cellular Confinement
Systems (turf establishment) Type 5.A 850 sqyd
633 Permanent Traffic Control Devices (traffic control devices) System 131 sqft Panel 55 sqft Obj Mrkr 3 4 each Delin A 114 each Delin C 114 each Delin D 114 each Delin F 114 each
634 Permanent Pavement Markings (traffic pavement markings) Type B Solid:
Wht 305,840 lnft Ylw 110,718 lnft
Type B Broken Ylw 103,536 lnft
635 Temporary Traffic Control
(traffic control –flaggers & pilot cars) Cone 1,100 each Drum 160 each Mrkgs 269,607 lnft Sign 405 sqft TSS 180 days
Flagger 2320 hr Pilot Car 1160 hr
File details come from the government source that posted it. Updated .