Amendment A001_MT PFH 78(1) East Fork Bitterroot Road.pdf

PDF 21 KB Posted

Attached to
RECOVERY: MT PFH 78(1), EAST FORK BITTERROOT ROAD Federal contract opportunity
Solicitation number
DTFH70-09-B-00017
Issued by
Department of Transportation Federal Highway Administration

About this file

Amendment A001

View the file

Other files for this federal contract opportunity

Other files attached to RECOVERY: MT PFH 78(1), EAST FORK BITTERROOT ROAD, newest first.
File Type Posted
PhisicalData Request Form_Bitterroot.pdf PDF
IFB_Sol_Book1_Bitterroot.pdf PDF
PlanRequestForm_Bitterroot.pdf PDF
IFB_Sol_Book2_Bitterroot.pdf PDF
http //www.wfl.fhwa.dot.gov/contracting/construction/plans/mtpfh78-1/ —
Prelims Transmittal Ltr_MT PFH 78_1_ East Fork Bitterroot Road.pdf PDF
CALL for HUBZone INTEREST__Bitterroot.pdf PDF
Project Description_Bitterroot.pdf PDF
Prelim Plans_MT PFH 78(1) East Fork Bitterroot Road.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

N/A

PAGE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)

A001 April 5, 2010 N/A MT PFH 78(1)

East Fork Bitterroot Road

6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A

Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

X

DTFH70-09-B-00017

9B. DATED (SEE ITEM 11)

03/04/2010

10A. MODIFICATION OF CONTRACT/ORDER NO.

N/A

10B. DATED (SEE ITEM 13)

CODE: N/A FACILITY CODE: N/A

N/A

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

(__ ) is extended, ( x ) is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN

ITEM 10A.

N/A

B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D OTHER (Specify type of modification and authority)

N/A

E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

MT PFH 78(1) East Fork Bitterroot Road

Amendment A001 is issued to revise the following:

Page F-40, Subsection 625.08 Mulching. Revises paragraph (a) and deletes (1) and (2)

ENCLOSURE: Page F-40

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

N/A

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION NOT USABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

F-40

Special Contract Requirements Project: MT PFH 78(1), East Fork Bitterroot Road

03USC01/01/04

Section 625.— TURF ESTABLISHMENT

Materials

625.02 Add the following:

Furnish and place mulch that meets the requirements of Subsection 713.05(a).

Construction Requirements

625.03 General. Delete the text of this Subsection and substitute the following:

Apply turf establishment to finished slopes; rolled erosion control products (RECP); to complete restoration work at staging, stockpile, and fueling sites; and to stabilize waste sites. Apply turf establishment between April 19th and May 31st or September 1st and October 15th of a given year.

Do not apply turf establishment during windy weather or when the ground is excessively wet, frozen, snow covered, extremely dry, cloddy, hard pan, or not friable.

625.04 Preparing Seedbed. Delete the text of this Subsection and substitute the following:

(a) RECP and Finish Waste Site Surfaces. Prepare the Seedbed according to the manufacturer’s recommendations.

(b) Staging, Stockpile, and Fueling Site Surfaces. Remove separation materials and dispose according to Subsection 203.05. De-compact disturbed surface areas. Fertilize and water according to this Section.

625.05 Watering. Delete the text of this Subsection and substitute the following:

Irrigate according to the manufacturer’s recommendations. Do not over irrigate.

625.06 Fertilizing. Delete the text of this Subsection and substitute the following:

Apply fertilizer according to the manufacturer’s recommended rate.

625.07 Seeding. Delete the text of the first paragraph and substitute the following:

Apply seed at the rate of 20¼ pounds of live seed per acre.

625.08 Mulching. Delete paragraph (a) and substitute the following:

(a) Dry method. Within 48-hours of completing seeding and fertilizing, apply mulch at a rate of 2,000 pounds per acre.

Revised by Amendment A001