Prelims Transmittal Ltr_MT PFH 78_1_ East Fork Bitterroot Road.pdf

PDF 23 KB Posted

Attached to
RECOVERY: MT PFH 78(1), EAST FORK BITTERROOT ROAD Federal contract opportunity
Solicitation number
DTFH70-09-B-00017
Issued by
Department of Transportation Federal Highway Administration

About this file

Preliminary Plans Letter

View the file

Other files for this federal contract opportunity

Other files attached to RECOVERY: MT PFH 78(1), EAST FORK BITTERROOT ROAD, newest first.
File Type Posted
Amendment A001_MT PFH 78(1) East Fork Bitterroot Road.pdf PDF
IFB_Sol_Book1_Bitterroot.pdf PDF
PlanRequestForm_Bitterroot.pdf PDF
PhisicalData Request Form_Bitterroot.pdf PDF
IFB_Sol_Book2_Bitterroot.pdf PDF
http //www.wfl.fhwa.dot.gov/contracting/construction/plans/mtpfh78-1/ —
CALL for HUBZone INTEREST__Bitterroot.pdf PDF
Project Description_Bitterroot.pdf PDF
Prelim Plans_MT PFH 78(1) East Fork Bitterroot Road.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

610 East Fifth Street Vancouver, WA 98661-3801

(360) 619-7520 FAX: (360) 619-7932

Western Federal Lands Highway Division

NOTICE TO PROSPECTIVE BIDDERS

MT PFH 78(1) East Fork Bitterroot Road

Solicitation No: DTFH70-09-B-00017

The attached preliminary plans are being furnished to aid prospective bidders in identifying the location and type of work for this project. The project will be advertised during a period when viewing of the project is not possible due to snow. Therefore, prospective bidders are encouraged to view the project during fall as conditions permit. No Federal Highway Administration personnel will be available for show-me tours.

While it is not required, we highly recommend that you videotape the entire project for your use during the estimating phase. We have received good feedback from contractors who have done this in the past.

The East Fork Bitterroot Road is located approximately 35 miles south of Hamilton, in Ravalli County, Montana. The main access to the project site is from US Highway 93.

This project begins at approximately milepost 0 on the East Fork Bitterroot Road and heads northeast. The project ends at approximately milepost 14.6. The project consists of 14.513 miles of subexcavation, drainage, base, grading, and paving. It was designed using U.S.

Customary measurement and references the Standard Specifications for Roads and Bridges on Federal Highway Projects, US Customary Units.

Requests for technical information about this project will only be accepted in writing. Send written questions to:

Fax: 360.619.7932; OR Email: plans_spec@dot.gov; (plans_spec@dot.gov)

Should you have general questions, please contact our office at wfl.contracts@dot.gov or at 360.619.7520.

Solicitation documents will be available on FedBizOpps (FBO) www.fbo.gov in early 2010. To receive automatic notification through FBO, select the “Add to Watchlist” box and follow the steps. Please monitor FBO or our Western Federal Lands Webpage www.wfl.fhwa.dot.gov/contracting/construction/ for actual date of solicitation release.