Amendment A002 removes a note about a possible water source, makes a minor revision to a MSE wall note, and makes benching subsidiary. See amendment for details.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Opening_Summary_One_Schedule.pdf | ||
| DTFH6817B00008_Questions_and_Answers_8-28-17.pdf | ||
| DTFH6817B00008_8-18-17_Questions_and_Answers.pdf | ||
| Amendment_A001.pdf | ||
| Buchanan_CADD_files.zip | ZIP file | |
| Buchanan_Plans.pdf | ||
| DTFH6817B00008_Buchanan_Road_IFB.pdf | ||
| Cross_Sections.pdf | ||
| 2012-08-13_Buchanan_Road_Final_Hydraulics_Report.pdf | ||
| 2012-09-12_Buchanan_Road_Geotechnical_Report.pdf | ||
| 2017-03-30_Final_Pavement_Report_Buchanan_Rd_and_Fish_Hatchery_Rd_update.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Jeremiah.Rogers Typewritten Text
Jeremiah.Rogers Typewritten Text
Jeremiah.Rogers Typewritten Text
N
Parking Area
West Side Trailhead
A5 d R yrehctaH h si F
SITE MAP
0 20
0 4
+00
90+
130+00
Begin rehabilitation
Begin Project PFH 191-1(1)
Station 10+00
Begin reconstruction
End rehabilitation
Station 42+00
A8
N
S ta n is la u s N a ti o n a l F o r e s t
B o u n d a r y
Tuolumne
To
H u n te r C re e k
T o
River Ranch reviRenmulouT kr o
F htr o N reviR e nmulo u T kroF htr o N daorlia
R arreiS r e mr o
F d R n a n a h c u B hcu B n a n a dR evA t s1 r
D n o y n aC
N d R e n m ul o u
T t S r etr a
C
Ca mpgr oun d -m i
To Ch err y L ake
- 10 mi
To Sonora
Forest
National
Stanislaus
Cherry Valley Blvd. N
Tuolum ne Rd. N &
To Intersection of
S ta n is la u s N a ti o n a l F o r e s t
B o u n d a r y
& Parkway District
Tuolumne Park Recreation
Requirements of the Special Contract
See Subsection 204.14
Potential Waste Site
B L
M B o u n d a r y of the Special Contract Requirements
See Subsections 105.04 and 107.10
Potential Staging Area
End reconstruction
Station 138+42.31
End Project PFH 191-1(1)
Station 1+00 to 6+83.87
Replace Buchanan Mine Road Bridge
Riverside
Scale in Feet
1000' 2000' for more information about this area.
of the Special Contract Requirements
See Subsections 105.02(c) and 107.10
Potential Water Source location
8/28/17 Deleted Potential Water Source
AMENDMENT A002
5 CA
BUCHANAN RD
PFH 191-1(1)
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
A
M N C
A c a R o a d w a y C
A D
D S h e e ts A G e n s h t\
M A
P .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
Amendment A002 8/28/2017
0 2
5 2
5 CA
BUCHANAN RD
PFH 191-1(1)
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
A
M N C
A c a R o a d w a y C
A D
D S h e e ts G
W A
L a n d .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
A
M N C
A c a R o a d w a y C
A D
D S h e e ts G
W A
L a n d .d g n
Layout Line (L.O.L.)
Mainline Station
Wall Height (ft.)
(ft.)
Reinforcement Length
ELEVATION
G10
PC
.1
PT
3+
.8
+00
2,670
2,680
2,690
2,700
2,660
0+00 1+000+50 1+50
2,710
2,720
2,650
2,720
2,710
2,700
2,690
2,680
2,670
2,660
2,650
G2
100'50'0
Scale in Feet
0+00 1+000+50 1+50
8 11.2 8 8
19.333 Rt.
PT Sta. 53+60.80 = 1+55.41
19.333 Rt.
POC Sta. 52+23.78 = 0+00.00
19.333 Rt.
POC Sta. 53+89.39 = 1+84.00
19.333 Rt.
POC Sta. 51+17.43 = 1+68.00
19.333 Rt.
POC Sta. 49+58.60 = 0+00.00
19.333 Rt.
PC Sta. 50+49.11 = 0+90.51
Layout Line (L.O.L)
Elev. 2715.829
L.O.L 0+00.00
Retaining wall POC
Bottom of Wall
Top of Wall
8 8
10 12 18 20
11.29.8
-7.851% grade Elev. 2697.791
L.O.L. 0+00.00
Retaining wall POC
Bottom of Wall
Elev. 2683.450
L.O.L. 1+84.00
Retaining wall POC
Top of Wall
-7.851% grade
16 8 6
Layout Line (L.O.L.)
Elev. 2705.435
L.O.L 1+68.00
Retaining wall POC
184 6
8 8 at wall L.O.L.
Existing ground profile
6.0 ft from wall L.O.L.
Original ground profile
212141614
.4
.2
.6
.6
.8
.4 at wall L.O.L.
Existing ground profile
6.0 ft from wall L.O.L.
Original ground profile
6 8 1210 14 16 18 14 12 4 2
8 8 888.4 8.49.8 9 .8
.2
12.6
50+00 51+00 53+00 54+00
(See Special 255-50A)
Reinforced foundation
(See Special 255-50A)
Reinforced foundation
52+23.78 TO 53+89.39
49+58.60 TO 51+17.43
SITES 2 & 3
MSE WALL LAYOUT
AMENDMENT A002
to 1+84.00
Wall L.O.L. length
8/28/17 Corrected MSE 2
S lo p e fa ce (V :H
C L
Structural backfill embankment benching
See Detail C204-50 for
L min. = 0.7H (8' min.)
(L) Length of reinforcement
Proposed roadway surface
Finished ground
Embankment construction
NOTE:
272-A
TYPICAL SECTION
H S lo p e h e ig h t
2% min.
6" max.
10"
2"
12"
RSS DRAINAGE DETAIL
Primary reinforcement S lo p e fa ce
Granular backfill
Slope to the drain in the direction of flow as appropriate).
Drain to outboard side of road (skew
4" diameter non-perforated outlet pipe.
24"
12"
4" diameter perforated collector pipe
Type I-B non-woven geotextile
Geocomposite sheet drain
Fill
Reinforced
S lo p e fa c e (V :H
(secondary reinforcement)
Biaxial geogrid type VII
4' min.
topsoil and seed
Place conserved
GEOGRID PLACEMENT DETAIL
(L) Length of reinforcement (min.)
control product
Place rolled erosion m a x
.5 ty p
NO SCALE
G10
1.5' max.
See table this sheet
(primary reinforcement)
Uniaxial geogrid type VIII
(See table this sheet) reinforcement
Primary geogrid detail this sheet)
(See geogrid placement reinforcement
Secondary geogrid
See RSS Drainage Detail (this sheet)
4' min.
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
SOIL SLOPE (RSS)
REINFORCED
length (L) may be adjusted by the CO to suit field conditions.
If bedrock is encountered or temporary shoring used, then the flatter than 1V:1.5H.
Secondary reinforcement not necessary for slopes equal to or for payment.
Embankment Construction (RSS) and geogrid is measured extended to centerline, embankment is measured under required for the length of the fabric for the top reinforcement areas in front of the existing slope and additional excavation
Embankment benching will not be measured for payment. For reinforced soil slopes.
Refer to Section 272 for more information on constructing
Use granular backfill conforming to Subsection 703.03(a).
fittings conforming to Subsection 706.08(d).
Subsection 714.02(b). Furnish collector pipe, outlet pipe, and
Furnish geocomposite sheet drain meeting the requirements of coupling bands or by other approved means.
Subsection 605.03. Secure the screen in place with standard
Cover the end of the outlet pipe with a screen according to with temporary lath.
spacing. Stagger outlet pipes between rows. Mark outlet
Outlet geocomposite drainage at low points at 50' max for a 5' wide strip).
spacing X to achieve a 25%-35% coverage (example: X = 11.5'
Place geocomposite sheet drains in 3' minimum wide strips with to centerline of roadway.
For slopes H<25', extend top 2 layers of primary reinforcement reinforcement from the face of slope to the far edge of roadway.
For slopes with H>25', extend top 3 layers of primary
Face of slope may be adjusted by the CO to suit field conditions.
AMENDMENT A002
for embankment and geogrid
8/28/17 Corrected note 9 concerning measurement 2
REVISED: AUGUST 28, 2017
5 CA
BUCHANAN RD
PFH 191-1(1)
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
P
M N C
A c a R o a d w a y C
A D
D S h e e ts G s p A .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
SPECIAL
U.S. CUSTOMARY SPECIAL
G10
| Full Appendix B.pdf |
| APPENDIX B.pdf |
| subcontractingplan |
| Plan Pages.pdf |
| S31-S32 - A001.PDF |
| rg2810retaining wall2 |
| rg2810retaining wall3 |
| Text1: |
| Text2: |
| 0: 1 |
| 1: 4 |
| Text3: |
| 0: A002 |
| 1: 8/28/2017 |
| 2: |
| 0: |
| 1: CA FLAP 460507(1) |
| Text4: |
| 0: |
| 0: FEDERAL HIGHWAY ADMINISTRATION |
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 WEST DAKOTA AVENUE, SUITE 360
LAKEWOOD, COLORADO 80228
ATTENTION: JEREMIAH ROGERS
1:
| 1: |
| 0: |
| Text6: |
| 0: DTFH6817B00008 |
| 1: 8/2/2017 |
| 2: |
| 3: |
| Check Box7: |
| 0: Yes |
| 2: Yes |
| 1: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Yes |
| Check Box9: |
| 1: Off |
| 2: Off |
| 0: |
| 0: Off |
| 1: Off |
| Text10: 0* |
| Text11: |
| 0: |
| 1: |
| Text12: * See Item 14 Below |
| Text13: PLANS |
Remove page A5 and replace with new A5. A note about a possible watersource was removed. There is no Government provided water source locations.
Remove page G2 and replace with new G2. The MSE Wall L.O.L length was corrected.
Remove page G5 and replace with new G5. Embankment benching will not be paid for, it is considered subsidiary.
*FAILURE TO ACKNOWLEDGE THIS AMENDMENT IN BLOCK 19 OF THE SF 1442 BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID (REFER TO ITEM 11.)
| Text14: |
| 0: |
| 1: |
| Text15: |
| 1: |
| 0: |
| 1: |
| 0: |
| 0: |
| 1: |
| Text16: |
| 0: |
| 1: |
| Text17: |
| Text5: |
| 0: 6905001 |
| 1: |
| Check Box1: |
| 0: Yes |
| 1: Off |
File details come from the government source that posted it. Updated .