Amendment_A001.pdf
PDF 4 MB Posted
- Attached to
- CA FLAP 460507(1), Buchanan Road Federal contract opportunity
- Solicitation number
- DTFH6817B00008
About this file
Amendment A001.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Opening_Summary_One_Schedule.pdf | ||
| DTFH6817B00008_Questions_and_Answers_8-28-17.pdf | ||
| Amendment_A002.pdf | ||
| DTFH6817B00008_8-18-17_Questions_and_Answers.pdf | ||
| Buchanan_CADD_files.zip | ZIP file | |
| Buchanan_Plans.pdf | ||
| DTFH6817B00008_Buchanan_Road_IFB.pdf | ||
| Cross_Sections.pdf | ||
| 2012-08-13_Buchanan_Road_Final_Hydraulics_Report.pdf | ||
| 2012-09-12_Buchanan_Road_Geotechnical_Report.pdf | ||
| 2017-03-30_Final_Pavement_Report_Buchanan_Rd_and_Fish_Hatchery_Rd_update.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Jeremiah.Rogers Typewritten Text
Jeremiah.Rogers Typewritten Text
Jeremiah.Rogers Typewritten Text
5 2
22302230
52235
5 2240
2245 22
2250 22
2255 2255
22602260
2265 2265
2275 2275
2280 228
22802
2325 2325
30 2330
95 2395
U T
IL
IT
Y U T
IL
IT
Y
U T
IL
IT
Y
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
P
M N C
A c a R o a d w a y C
A D
D S h e e ts D
M in o r P
P D
P
N P
B R
D G .d g n
,2
.2
,2
.2
E L
,2
.8
-2.000%
250' VC
K = 26
V P I
E L
,2
.3
+7.5
V P I
E L
,2
.8
+5.1 39%
,2
.2
V P I
.9
SSD = 255'
K = 13
61' VC
70' VC
K = 29
0 POT 1+00.00
P T
.9
0 P C
.4
PT
.8
PC 1+92.44
P C
.0
P T
.5
P O
T
.3
1+00 2+00 3+00
4+00
5 CA
200'100'0
Scale in Feet
5+00 6+00
Tuolumne River
North Fork
D1
BUCHANAN RD
PFH 191-1(1)
B e g in B r id g e
E n d B r id g e
Guardrail, Lt.
D6
Remove existing bridge
Guardrail, Rt. Guardrail, Rt.
e = 4%
Widening = 3.5'
Curve = BRDG5-1
PI 3+26.50
D
R = 180.00'
T = 134.06'
L = 230.46'
Curve = BRDG5-2
PI 6+36.10
D
R = 170.00'
T = 50.62'
L = 98.39'
7+00
Sta. 1+92.44
Begin proposed bridge
Approach road 1+00.00
Mainline 137+54.34 =
Proposed grade
Existing ground
E 6646506.56
N 2180380.41
Sta. 6+83.87
End reconstruction
Sta. 3+62.44
End proposed bridge
End project (mainline)
STA. 137+54.34
BUCHANAN MINE ROAD BRIDGE
Guardrail, Lt. Rock Buttress, Rt.
Approximate bottom of wall (typ.)
Top of wall
Special Contract Requirements)
(See Subsection 107.02 of the
Roadway obliteration, method 1 (typ.)
E L
.8
E L
.8 see sheet T-35 existing sign, Remove and reset
Temporary construction fence
(Do not disturb)
Wetland
Ordinary high water clear zone as directed by CO
Place boulders outside the
AMENDMENT A001
to STA 3+89.74
Concrete Retaining Wall
8/17/17 Changed start of Reinforced
A001 8/18/2017
WELDED WIRE FACE
EARTH WALL
MECHANICALLY STABILIZED
255-50A
G8
1:3 or flatter
V a rie s
6' (min.)0.7H (8' min.)
Reinforcment length
1:10
Subgrade shoulder
Layout line
L im it s o f
M S
E w a ll f o r p a y m e n t
Top of wall reinforcement elements spacing between
24" (max.) vertical
TYPICAL SECTION
Select granular backfill
ISOMETRIC VIEW
bottom geotextile
Type I-B non-woven
Base reinforcement
1' bottom geotextile overlap
See 255.03
18"
D e s ig n w a ll h e ig h t, H
(Metal or geosynthetic)
Reinforcement elements
12" (min.)
RETURN MAT
MSE WELDED WIRE FACED
m in
4' (m in.) 1.5'
(See detail C255-51) and collector pipe
Geocomposite sheet drain
Wall facing fill
Leveling course
12" (min.)
1.5' borrow
Unclassified
Face of wall varies reinforcem ent (L)
Base length of
Existing ground
6" (min.), 20" (max.)
Varies, 12" normal
Slope to the drain
4' foundation is not required
Drain location when reinforced
1:10
(See detail C255-51) and collector pipe
Geocomposite sheet drain borrow
Unclassified foundation is required
Drain location when reinforced
:1 (ty p ) 1
:1 ty p
8" (max.)
3"
(min.)
3'
4' (min.)
wall facing
Bottom of
(3 layers)
Type III-A geotextile backfill
Select granular
Bench width
Guardrail
(See Standard 617-11)
REINFORCED FOUNDATION
m in m in
Unclassified borrow
Step loss of backfill, end of all lifts
Place and join facing to prevent
Additional reinforcement length 5' (min) conditions.
adjusted by the CO to suit field length of reinforcement (L) may be temporary shoring used, then the
14. If bedrock is encountered or
208.
13. Slope or shore excavation according to Section
Reinforced foundation is incidental to MSE wall.12.
reinforcement and extend 1.5' up the wall face.
Bottom geotextile to cover the base 11.
omit top reinforcement mat.
face. Geosynthetic reinforcement systems may uses stiffeners to adequately reinforce the wall top reinforcement mat, unless the wall facing
Welded wire reinforcement systems require a 10.
to the MSE wall.
not measured for payment and are subsidiary minimum of 4' into the backfill. The returns are material (backing mat & hardware cloth) a end of each lift with a return of the wall facing
Terminate wire-face wall at the beginning and 9.
drainage details.
See Special 255-51A for wall facing and 8.
conformance with GEC11 and 704.10.
the contractor for the supplied materials and in
MSE wall soil properties to be determined by
Design data:7.
Install guardrail posts according to 617.03.6.
allowed within 1' of the back of guardrail post.
requirements of 705.08. No wall facing fill is
Furnish wall facing fill conforming to the 5.
meeting the requirements of 704.06.
Furnish unclassified borrow consisting of soil 4.
meeting the requirements of 704.10.
Furnish select granular backfill consisting of soil 3.
the field.
bottom of wall elevations to be determined in according to 104.03. See 255.03. Actual submit for approval preliminary drawings acquire current terrain data. Prepare and
Survey MSE wall locations according to 152 to 2.
drawings. No steps will be allowed.
Top of wall will be as shown on wall layout 1.
NOTE:
AMENDMENT A001
REVISED: AUGUST 15, 2017
to 1:24 spacing to 24" (max.) and batter
8/15/17 Changed reinforcement vertical
NO SCALE
5 CA
BUCHANAN RD
PFH 191-1(1)
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
P
M N C
A c a R o a d w a y C
A D
D S h e e ts G s p
A .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
SPECIAL
U.S. CUSTOMARY SPECIAL
G10 collector pipe 6" diameter perforated
MSE wall face
Welded wire facing Welded wire facing
DETAILS
MSE WALL3' (min.)
mat and anchor in place tension in reinforcement Adjust wall batter with
Reinforcement element
255.09)
(See zone compaction
1.5' special
3' (min.)
mat and anchor in place tension in reinforcement Adjust wall batter with
255.09)
(See zone compaction
1.5' special
1'
MSE WALL DRAINAGE DETAIL
2"
NO SCALE
Select granular backfill
H m in geotextile non-woven Type I-B
24" Granular backfill min. 2% direction of flow as appropriate) Drain to fill side of road (skew in the 6" Non perforated diameter outlet pipe
1:10
NOTE:
4' (min.)
by the manufacturer)
(Spacing to be determined
Stiffener
4' (min.)
geotextile (See 714.01) Type 1-B non-woven geotextile (See 714.01)
Type I-B non-woven geotextile (See 714.01) Type 1-B non-woven by the manufacturer)
(Spacing to be determined
Stiffener geotextile (See 714.01)
Type I-B non-woven
12"
BUCHANAN RD
PFH 191-1(1)
5 CA
255-51A
G10
(See 714.02b) sheet drain Geocomposite
(Primary reinforcement) Uniaxial geogrid m in requirements of 706.08(d).
Furnish collector pipe, outlet pipe, and fittings meeting the8.
requirements of 714.02(b).
Furnish geocomposite sheet drain meeting the7.
See Special 255-50A for MSE wall typical section.6.
of the pipe.
other suitable marker. Place post within 12" of the end
Mark the outlet of the outlet pipe with a 4' long post or5.
securing screws.
coupling bands or by other approved means with
605.03. Hold the screen securely in place with standard
Cover the end of the outlet pipe with screen according to4.
703.03(a).
Furnish granular backfill meeting the requirements of3.
(Example; X = 11.5' for a 5' wide strip).
wide strips with a spacing to achieve a 30% ± 5% coverage
Place geocomposite sheet drains in 3' (min.)2.
and outlet at low points of wall and at 50' (max.) spacing.
Connect collector pipes to oulet pipes using a t-connector1.
METALLIC REINFORCED MSE WALL DETAIL GEOGRID REINFORCED MSE WALL DETAIL
G9 m a x m a x
1 1
AMENDMENT A001
spacing to 24" (max.)
8/15/17 Changed reinforcement vertical
REVISED: AUGUST 15, 2017
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
P
M N C
A c a R o a d w a y C
A D
D S h e e ts G s p
A .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
El. 2255.00
Gutterline geocomposite sheet drain
@ outside edge of footing
Approximate original ground
ELEVATION
PLAN
Gutterline Traffic face
Other face wall. Extend to daylight. (typ.)
'T' intersection thru retaining
M A
T C
H L I N
E S ta
M A
T C
H L I N
E S ta
" = 1'-0"16
NOTES:
1. 8 - Indicates estimated design height for retaining wall.
(2 OF 3)
RETAINING WALL LAYOUT
Offset = 14.80
El. 2268.65
C Sta. 4+73.14L
Offset = 12.00
El. 2273.00
C Sta. 5+29.57L
24'-0"
12 12
Offset = 13.52
El. 2270.48
C Sta. 4+97.11L
21'-0"
N
32'-6"
11'-0"
M A
T C
H L I N
E S ta
M A
T C
H L I N
E S ta
El. 2258.00
El. 2260.50
30'-0"30'-0" 30'-0"
Reference line for expansion joint Reference line for contraction joint gutterline along measured Joint spa.
Finished ground line at face of wall gutterline along measured Wall panels
El. 2263.00
EE31 SAMIR SIDHOM STEVEN BELCHER
and contraction joint.
See RG2810-II for Expansion Joint
Note:
S31
1 8/17/17 RW REVISED ELEVATIONS
TOTAL
SHEETS
SHEET
NO.
PROJECT
CA PFH 191-1(1)
STATEREGION
CA
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
BUCHANAN MINE ROAD BRIDGE
STANISLAUS NATIONAL FOREST
DRAWING NO.DATEBRIDGE DRAWING
SAMIR SIDHOM
PROJECT TEAM LEADERSCALE
CHECKED BYDRAWN BY
RYAN WEHNER
DESIGNED BYREVISIONS
BY
DATENO.
REVISIONS
N
C A c a
1- 1( 1) B r id g e R
G C
A
F il e s D
G N
F il e s r g r e ta in in g w a ll .d g n
RG2810-
TUOLUMNE COUNTY, CALIFORNIA
of 49
S495
APRIL 2017
El. 2263.00
Gutterline geocomposite sheet drain
@ outside edge of footing
Approximate original ground
ELEVATION
PLAN
Gutterline Traffic face
Other face wall. Extend to daylight. (typ.)
'T' intersection thru retaining
M A
T C
H L I N
E S ta
" = 1'-0"16 perforated pipe
NOTES:
1. 8 - Indicates estimated design height for retaining wall.
(3 OF 3)
RETAINING WALL LAYOUT
8'-6" 13'-0" "2 14'-5
Offset = 12.00
El. 2273.91
C Sta. 5+40.57L
Offset = 11.97
El. 2279.02
C Sta. 5+95.84L
27'-6"
Offset = 11.98
El. 2279.42
C Sta. 6+00.00L
Offset = 11.99
El. 2277.85
C Sta. 5+83.57L
N
Offset = 12.00
El. 2277.02
C Sta. 5+75.07L
Offset = 12.00
El. 2274.51
C Sta. 5+47.57L
7'-0"
El. 2266.00
El. 2268.50
El. 2271.00
El. 2273.00
El. 2275.00
8 8 6 6 4
M A
T C
H L I N
E S ta
"2 128'-230'-0" along gutterline
Wall Joint spacing measured
Reference line for contraction joint Reference line for contraction joint at face of wall
Finished ground line
30'-0"
11'-0" along gutterline
Wall panels measured
FF32 SAMIR SIDHOM STEVEN BELCHER
and Contraction Joint.
See RG2810-II for Expansion Joint
Note:
S32
8/17/171 RW
REVISED LENGTH
TOTAL
SHEETS
SHEET
NO.
PROJECT
CA PFH 191-1(1)
STATEREGION
CA
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
BUCHANAN MINE ROAD BRIDGE
STANISLAUS NATIONAL FOREST
DRAWING NO.DATEBRIDGE DRAWING
SAMIR SIDHOM
PROJECT TEAM LEADERSCALE
CHECKED BYDRAWN BY
RYAN WEHNER
DESIGNED BYREVISIONS
REVISIONS
N
C A c a
1- 1( 1) B r id g e R
G C
A
F il e s D
G N
F il e s r g r e ta in in w ll .d g n
RG2810-
TUOLUMNE COUNTY, CALIFORNIA
of 49
S495
APRIL 2017
H
H
S
L /2
W
W
SECTION A-A
FRONT ELEVATION
ARCH
SIZE
H L
LENGTH OF WH L
D
CIRCULAR PIPE CULVERT HEADWALLS
HEADWALL
CMP
ConcConcConcConcConc
Conc Conc Conc Conc Conc
CORRUGATED METAL PIPE ARCH CULVERT HEADWALLS
3'-8"
3'-11"
LB CY LB CY LB CY LB CY LB CY
3'-9"
50 0.79
0.91
1.04
1.15
1.29
1.44
1.55
1.71
1.88
0.98
1.11
1.25
1.36
1.51
1.67
1.80
1.97
2.15
1.74
1.91
2.05
2.23
2.41
2.56
2.29
2.48
2.68
2.84
2.95
3.12
2.76
2.97
3.13
3.05
3.27
3.44
3.67
3.91
210 3.34
3.57
3.75
3.99
4.24
2.28
2.42
LB CYLB CYLB CYLB CYLB CY
64" x 43"
71" x 47"
3'-9"
60 1.00
1.07
1.26
1.51
1.82
2.12
2.52
2.89
3.25
1.18
1.32
1.47
1.74
2.06
2.37
2.79
3.11
3.56
1.38
1.53
1.68
1.97
2.31
2.64
3.07
3.48
3.86
1.58
1.74
1.90
2.20
2.55
2.90
3.35
3.77
4.17
1.77
1.94
2.11
2.42
2.83
3.15
3.61
4.06
4.48
A
9" 9"
9"
9"
2'-0" 2'-0" 2'-0"
2'-0"
5"
21"
24"
27"
30"
33"
36"
39"
42"
48"
51"
54"
12"
15"
18"
45"
2'-8"
2'-11"
3'-2"
3'-5"
4'-2"
4'-5"
4'-8"
4'-11"
5'-2"
5'-5"
5'-8"
5'-11"
6'-2"
2'-6"
3'-0"
3'-6"
4'-3"
4'-9"
5'-0"
5'-6"
6'-0"
6'-3"
6'-9"
7'-3"
7'-6"
8'-0"
8'-6"
3'-3"
4'-3"
5'-3"
6'-3"
7'-3"
8'-6"
9'-6"
10'-6"
3'-8"
2'-11"
3'-2"
3'-4"
4'-1"
4'-5"
4'-10"
5'-3"
5'-7"
3'-4" 4'-10" 6'-4" 7'-10" 9'-4"
3'-4" 4'-10" 6'-4" 7'-10" 9'-4"
21" x 15"
24" x 18"
28" x 20"
35" x 24"
42" x 29"
49" x 33"
57" x 38"
LENGTH OF W
L /2
"L" HEADWALLS
FRONT ELEVATION "L" HEADWALL SECTION "L" HEADWALL
"L" HEADWALLS
"L" HEADWALL
SECTION "L"
FOR CORNER STEEL DETAIL SEE
SECTION A-A OMIT ROUNDING
FOR PIPES
LESS THAN
48" DIAMETER
CORNER STEEL
DETAIL
STEEL STEEL STEEL STEELSTEEL
STEEL STEEL STEEL STEEL STEEL
NO SCALE
FOR PIPE CULVERT
"L" CONCRETE HEADWALL
Adopted from Caltrans Standard Plan No. D89
601-A
T3
No deduction made in quantities for thickness of pipe walls.
1.
All reinforcing steel #4 bars. All vertical and horizontal tie bars 1'-6" maximum spacing.
2.
3.
NOTE:
4.Quantities are for design purposes only.
be varied to suit conditions encountered in the field.
quantities.
Straight line interpolation may be used to calculate
Length of wall "W" assumed to be 4'-10" but may
" CHAMFER4
3 D4
"2
"2 17 "2
17 "2
S4
"2
"2
"2
"2
" CHAMFER4
AMENDMENT A001
dimensions
8/17/17 Corrected missing
REVISED: AUGUST 17, 2017
5 CA
BUCHANAN RD
PFH 191-1(1)
REG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
P
M N C
A c a R o a d w a y C
A D
D S h e e ts T T s p A .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
T60
C
A B
U C
H A
N A
N R
O A
D
P F
H
Y
Y
00 2020 4040 6060 8080
P R
O J E
C T
N O
S H
E E
T S
H E
E T S
T O
T A
L S
T A
T E
R E
G
N:\CA\ca191-1(1)\Roadway\CADD_Sheets\Y-Minor_Xsec\XSSBRDG5.dgn3:03:21 PM8/17/2017 _User: thomas.mccrary_
2250 2250
2260 2260
2270 2270
1+21.41
2240 2240
2250 2250
2260 2260
1+45.08
2240 2240
2250 2250
2260 2260
1+47.93
2240 2240
2250 2250
2260 2260
1+52.00
2240 2240
2250 2250
2260 2260
1+62.00
2240 2240
2250 2250
2260 2260
1+69.79
2240 2240
2250 2250
2260 2260
1+77.44 on S-Sheets sections. Information provided
8/17/17 Removed conflicting cross 1
AMENDMENT A001
CL_SG
Sta. 1+21.41 R 1
Des. Grade = 2,256.84
Subgrade = 2,255.92
Orig. Grnd. = 2,255.84
CL
1:4
SHLD_SGFM_SSG1:6.2
BDTHPC
SSCCP_SG 1:2.3 +7.64%
-7.64%11
1:4
SHLD_SGFM_SSGBDTHPC
SSCCP_SG1:2
.6
E x is ti n
U
P h o n e
E x is ti n
U
P h o n e
F a c e o f
E x is t
C u r b
E d g e o f
E x is t
P a v e m e n t
E d g e o f
E x is t
P a v e m e n t
CL_SG
Sta. 1+45.08 R 1
Des. Grade = 2,256.36
Subgrade = 2,255.45
Orig. Grnd. = 2,251.07
CL
1:4
SHLD_SGFM_SSGHPF
SSFCP_SG
1:2
+6.26% -6.26%
-6.26%
1:4
SHLD_SGFM_SSGHPF
SSFCP_SG
1:2
E d g e o f
E x is t
P a v e m e n t
E d g e o f
E x is t
P a v e m e n t
CL_SG
Sta. 1+47.93 R 1
Des. Grade = 2,256.31
Subgrade = 2,255.39
Orig. Grnd. = 2,250.78
CL
+6.09%
1:4
SHLD_SGFM_SSGHPF
SSFCP_SG
1:2 .1
+6.09% -6.09%
-6.09%
1:4
SHLD_SGFM_SSGHPF
SSFCP_SG
1:2
E d g e o f
E x is t
P a v e m e n t
E d g e o f
E x is t
P a v e m e n t
CL_SG
Sta. 1+52.00 R 1
Des. Grade = 2,256.23
Subgrade = 2,255.31
Orig. Grnd. = 2,250.37
CL
+5.85%
1:4
SHLD_SGFM_SSGHPF
SSFCP_SG
1:2 .1
+5.85% -5.85%
-5.85%
1:4
SHLD_SGFM_SSGHPF
SSFCP_SG
1:2
E d g e o f
E x is t
P a v e m e n t
E d g e o f
E x is t
P a v e m e n t
CL_SG
Sta. 1+62.00 R 1
Des. Grade = 2,256.06
Subgrade = 2,255.15
Orig. Grnd. = 2,249.51
CL
+5.27%
1:4
SHLD_SGFM_SSGHPF
SSFCP_SG
1:2 .1
+5.27% -5.27%
-5.27%
1:4
SHLD_SGFM_SSGHPF
SSFCP_SG
1:2
E d g e o f
E x is t
P a v e m e n t
E d g e o f
E x is t
P a v e m e n t
CL_SG
Sta. 1+69.79 R 1
Des. Grade = 2,255.96
Subgrade = 2,255.04
Orig. Grnd. = 2,248.93
CL
33SG_HG
1:2
SHLD_SGFM_SSGHPF
SSFCP_SG
1:2 .6
+4.81% -4.81%
1:2
SHLD_SGFM_SSGHPF
SSFCP_SG
1:2.6
E d g e o f
E x is t
P a v e m e n t
E d g e o f
E x is t
P a v e m e n t
E d g e o f
E x is t
P a v e m e n t
CL_SG
Sta. 1+77.44 R 1
Des. Grade = 2,255.88
Subgrade = 2,254.97
Orig. Grnd. = 2,248.43
CL
33SG_HG
1:2
SHLD_SGFM_SSGHPF
SSFCP_SG
1:2
+4.37% -4.37%
1:2
SHLD_SGFM_SSGHPF
SSFCP_SG
1:2
E d g e o f
E x is t
P a v e m e n t
E d g e o f
E x is t
P a v e m e n t
E d g e o f
E x is t
P a v e m e n t
00 2020 4040 6060 8080
P R
O J E
C T
N O
S H
E E
T S
H E
E T S
T O
T A
L S
T A
T E
R
N:\CA\ca191-1(1)\Roadway\CADD_Sheets\Y-Minor_Xsec\XSSBRDG5.dgn3:03:45 PM8/17/2017 _User: thomas.mccrary_
2240 2240
2250 2250
2260 2260
1+83.76
2230 2230
2240 2240
2250 2250
2260 2260
1+92.44
2220 2220
2230 2230
2240 2240
2250 2250
2260 2260
2270 2270
2280 2280
2290 2290
2300 2300
3+62.44
2220 2220
2230 2230
2240 2240
2250 2250
2260 2260
2270 2270
2280 2280
2290 2290
2300 2300
3+65.00
Y
B U
C H
A N
A N R
O A
D
P F
H
C A
Y
Y on S-Sheets sections. Information provided
8/17/17 Removed conflicting cross 1
AMENDMENT A001
CL_SG
Sta. 1+83.76 R 1
Des. Grade = 2,255.84
Subgrade = 2,254.92
Orig. Grnd. = 2,248.01
CL
33SG_HG
1:2
SHLD_SGFM_SSGHPF
SSFCP_SG
1:2
+4.00% -4.00%
1:2
SHLD_SGFM_SSGHPF
SSFCP_SG
1:2
E d g e o f
E x is t
P a v e m e n t
E d g e o f
E x is t
P a v e m e n t
E d g e o f
E x is t
P a v e m e n t
E d g e o f
E x is t
P a v e m e n t
E d g e o f
E x is t
P a v e m e n t
CL_SG
Sta. 1+92.44 R 1
Des. Grade = 2,255.80
Subgrade = 2,254.88
Orig. Grnd. = 2,246.43
CL
33SG_HG
1:2
SHLD_SGFM_SSGHPF
SSFCP_SG
1:2
+4.00% -4.00%
1:2
SHLD_SGFM_SSGHPF
SSFCP_SG
1:2
E d g e o f
E x is t
P a v e m e n t
E d g e o f
E x is t
P a v e m e n t
E d g e o f
E x is t
P a v e m e n t
E d g e o f
E x is t
P a v e m e n t
CL_SG
Sta. 3+62.44 R 1
Des. Grade = 2,260.82
Subgrade = 2,259.90
Orig. Grnd. = 2,258.24
CL
33SG_HG
1:2
SHLD_SGFM_SSGHPF
SSFCP_SG
1:2
+4.00% -4.00%
WL
32SHLD_SGSSG
CCWBF
GU
PT12 PT13
SSC
BWFBPT11BWFF
TWF
PT1
PT8
PT2
OG
PT4 PT5
PT6
PT7
PT9
PT10
TWFG
BWFG
4.71'
.0
PT3
CP_SG
E d e
W te r
E d g e o f
E x is t
P a v e m e n t
E d g e o f
E x is t
P a v e m e n t
CL_SG
Sta. 3+65.00 R 1
Des. Grade = 2,260.98
Subgrade = 2,260.06
Orig. Grnd. = 2,259.29
CL
33SG_HG
1:2
SHLD_SGFM_SSGHPF
SSFCP_SG
1:2
+4.00% -4.00%
WL
32SHLD_SGSSG
CCWBF
GU
PT12 PT13
SSC
BWFBPT11BWFF
TWF
PT1
PT8
PT2
OG
PT4 PT5
PT6
PT7
PT9
PT10
TWFG
BWFG
5.70'
.0
PT3
CP_SG
E d g e o f
E x is t
P a v e m e n t
E d g e o f
E x is t
P a v e m e n
R
O J E
C T
N O
S H
E E
T S
H E
E T S
T O
T A
L S
T A
T E
R
N:\CA\ca191-1(1)\Roadway\CADD_Sheets\Y-Minor_Xsec\XSSBRDG5.dgn3:04:03 PM8/17/2017 _User: thomas.mccrary_
2220 2220
2230 2230
2240 2240
2250 2250
2260 2260
2270 2270
2280 2280
2290 2290
2300 2300
3+70.00
2220 2220
2230 2230
2240 2240
2250 2250
2260 2260
2270 2270
2280 2280
2290 2290
2300 2300
2310 2310
3+75.00
Y
B U
C H
A N
A N R
O A
D
P F
H
C A
Y on S-Sheets sections. Information provided
8/17/17 Removed conflicting cross 1
AMENDMENT A001
CL_SG
Sta. 3+70.00 R 1
Des. Grade = 2,261.29
Subgrade = 2,260.38
Orig. Grnd. = 2,260.22
CL
33SG_HG
1:2
SHLD_SGFM_SSGHPF
SSFCP_SG
1:2 +4.00% -4.00%
WL
32SHLD_SGSSG
CCWBF
GU
PT12 PT13
SSC
BWFBPT11BWFF
TWF
PT1
PT8
PT2
OG
PT4 PT5
PT6
PT7
PT9
PT10
TWFG
BWFG
7.48'
.0
PT3
CP_SG
E d g e o f
E x is t
P a v e m e n t
E d g e o f
E x is t
P a v e m e n t
CL_SG
Sta. 3+75.00 R 1
Des. Grade = 2,261.62
Subgrade = 2,260.71
Orig. Grnd. = 2,260.77
CL
33SG_HG
1:2
SHLD_SGFM_SSGHPF
SSFCP_SG
1:2 +4.00% -4.00%
WL
32SHLD_SGSSG
CCWBF
GU
PT12 PT13
SSC
BWFBPT11BWFF
TWF
PT1
PT8
PT2
OG
PT4 PT5
PT6
PT7
PT9
PT10
TWFG
BWFG
6.28'
.0
PT3
CP_SG
E d g e o f
E x is t
P a v e m e n t
E d g e o f
E x is t
P a v e m e n
R
O J E
C T
N O
S H
E E
T S
H E
E T S
T O
T A
L S
T A
T E
R
N:\CA\ca191-1(1)\Roadway\CADD_Sheets\Y-Minor_Xsec\XSSBRDG5.dgn3:04:23 PM8/17/2017 _User: thomas.mccrary_
2230 2230
2240 2240
2250 2250
2260 2260
2270 2270
2280 2280
2290 2290
2300 2300
2310 2310
3+77.44
2220 2220
2230 2230
2240 2240
2250 2250
2260 2260
2270 2270
2280 2280
2290 2290
2300 2300
2310 2310
3+82.23
Y
B U
C H
A N
A N R
O A
D
P F
H
C A
Y on S-Sheets sections. Information provided
8/17/17 Removed conflicting cross 1
AMENDMENT A001
CL_SG
Sta. 3+77.44 R 1
Des. Grade = 2,261.79
Subgrade = 2,260.87
Orig. Grnd. = 2,260.98
CL
33SG_HG
1:2
SHLD_SGFM_SSGHPF
SSFCP_SG
1:2 .1
+4.00% -4.00%
WL
32SHLD_SGSSG
CCWBF
GU
PT12 PT13
SSC
BWFBPT11BWFF
TWF
PT1
PT8
PT2
OG
PT4 PT5
PT6
PT7
PT9
PT10
TWFG
BWFG
7.02'
.0
PT3
CP_SG
E d g e o f
E x is t
P a v e m e n t
E d g e o f
E x is t
P a v e m e n t
CL_SG
Sta. 3+82.23 R 1
Des. Grade = 2,262.12
Subgrade = 2,261.20
Orig. Grnd. = 2,261.40
CL
33SG_HG
1:2
SHLD_SGFM_SSGHPF
SSFCP_SG
1:2 .6
+4.00% -4.00%
WL
32SHLD_SGSSG
CCWBF
GU
PT12 PT13
SSC
BWFBPT11BWFF
TWF
PT1
PT8
PT2
OG
PT4 PT5
PT6
PT7
PT9
PT10
TWFG
BWFG
8.44'
.0
PT3
CP_SG
E d g e o f
E x is t
P a v e m e n t
E d g e o f
E x is t
P a v e m e n
R
O J E
C T
N O
S H
E E
T S
H E
E T S
T O
T A
L S
T A
T E
R
N:\CA\ca191-1(1)\Roadway\CADD_Sheets\Y-Minor_Xsec\XSSBRDG5.dgn3:04:45 PM8/17/2017 _User: thomas.mccrary_
2230 2230
2240 2240
2250 2250
2260 2260
2270 2270
2280 2280
2290 2290
2300 2300
2310 2310
3+85.00
2220 2220
2230 2230
2240 2240
2250 2250
2260 2260
2270 2270
2280 2280
2290 2290
2300 2300
2310 2310
3+90.00
Y
B U
C H
A N
A N R
O A
D
P F
H
C A
Y on S-Sheets sections. Information provided
8/17/17 Removed conflicting cross
AMENDMENT A001
CL_SG
Sta. 3+85.00 R 1
Des. Grade = 2,262.31
Subgrade = 2,261.40
Orig. Grnd. = 2,261.66
CL
+4.00%
1:4
SHLD_SGFM_SSG1:4.1
BDTHPC
SSCCP_SG 1.9
:1 +4.00% -4.00%
WL
32SHLD_SGSSG
CCWBF
GU
PT12 PT13
SSC
BWFBPT11BWFF
TWF
PT1
PT8
PT2
OG
PT4 PT5
PT6
PT7
PT9
PT10
TWFG
BWFG
6.44'
.0
PT3
CP_SG
E d g e o f
E x is t
P a v e m e n t
E d g e o f
E x is t
P a v e m e n t
CL_SG
Sta. 3+90.00 R 1
Des. Grade = 2,262.67
Subgrade = 2,261.75
Orig. Grnd. = 2,262.14
CL
+4.00%
1:4
SHLD_SGFM_SSG1:4.1
BDTHPC
SSCCP_SG
1.9 :1 +4.00% -4.00%
WL
32SHLD_SGSSG
CCWBF
GU
PT12 PT13
SSC
BWFBPT11BWFF
TWF
PT1
PT8
PT2
OG
PT4 PT5
PT6
PT7
PT9
PT10
TWFG
BWFG
6.31'
.9
PT3
CP_SG
E d g e o f
E x is t
P a v e m e n t
E d g e o f
E x is t
P a v e m e n t
Wall Chain = BRDG5WALL Station = 0+00.23 Wall Height = 12.97
Gutterline Elev. = 2,261.97 Bottom of Wall Elev. = 2,249.00
| Full Appendix B.pdf |
| APPENDIX B.pdf |
| subcontractingplan |
| Plan Pages.pdf |
| S31-S32 - A001.PDF |
| rg2810retaining wall2 |
| rg2810retaining wall3 |
| Text1: |
| Text2: |
| 0: 1 |
| 1: 12 |
| Text3: |
| 0: A001 |
| 1: 8/18/2017 |
| 2: |
| 0: |
| 1: CA FLAP 460507(1) |
| Text4: |
| 0: |
| 0: FEDERAL HIGHWAY ADMINISTRATION |
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 WEST DAKOTA AVENUE, SUITE 360
LAKEWOOD, COLORADO 80228
ATTENTION: JEREMIAH ROGERS
1:
| 1: |
| 0: |
| Text6: |
| 0: DTFH6817B00008 |
| 1: 8/2/2017 |
| 2: |
| 3: |
| Check Box7: |
| 0: Yes |
| 2: Yes |
| 1: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Yes |
| Check Box9: |
| 1: Off |
| 2: Off |
| 0: |
| 0: Off |
| 1: Off |
| Text10: 0* |
| Text11: |
| 0: |
| 1: |
| Text12: * See Item 14 Below |
| Text13: PLANS |
Remove plan pages D1, G8, G9, S31, S32, T3, Y1, Y2, Y3, Y4, and Y5. Replace with new plan pages. These pages have been amended as a result of the questions received so far.
*FAILURE TO ACKNOWLEDGE THIS AMENDMENT IN BLOCK 19 OF THE SF 1442 BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID (REFER TO ITEM 11.)
| Text14: |
| 0: |
| 1: |
| Text15: |
| 1: |
| 0: |
| 1: |
| 0: |
| 0: |
| 1: |
| Text16: |
| 0: |
| 1: |
| Text17: |
| Text5: |
| 0: 6905001 |
| 1: |
| Check Box1: |
| 0: Yes |
| 1: Off |
File details come from the government source that posted it. Updated .