CA_FTNP_DEVA_500(1)_SchedA_Bid_Tabs.pdf
PDF 32 KB Posted
- Attached to
- CA FTNP DEVA 500(1) Artists Road Federal contract opportunity
- Solicitation number
- DTFH6816B00030
About this file
Schedule A Bid Tabs
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| CA_FTNP_DEVA_500(1)Opt_X_Bid_Tabs.pdf | ||
| Bid_Opening_Summary_CA_FTNP_DEVA_500(1).pdf | ||
| QnA_CA_FTNP_DEVA_500(1)_rev.pdf | ||
| QnA_CA_FTNP_DEVA_500(1).pdf | ||
| DTFH6816B00030.pdf | ||
| CA_FTNP_DEVA_500(1)_Artists_Drive_Plans.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T A B U L A T I O N O F B I D S
11/9/2016 Page 1 of 1
Schedule A Total of Bid Items: 1,948,250.00$ 24.9% 2,433,350.00$ -4.0% 1,869,485.00$ -27.0% 1,421,522.45$ 10.9% 2,161,004.00$ 24.0% 2,415,785.00$ 21.5% 2,366,989.00$ 11.0% 2,162,755.00$ Project No: CA FTNP DEVA 500(1)
Project Name: Artists Drive
CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
15101-0000
Line A0020 ALL LPSM 250,475.00$ 250,475.00$ 328,000.00$ 180,000.00$ 121,102.00$ 191,000.00$ 240,000.00$ 220,000.00$ 120,000.00$
15201-0000
Line A0040 ALL LPSM 15,000.00$ 15,000.00$ 60,000.00$ 20,000.00$ 25,900.00$ 25,000.00$ 50,000.00$ 21,700.00$ 40,000.00$
15301-0000
Line A0060 ALL LPSM 125,000.00$ 125,000.00$ 89,000.00$ 175,000.00$ 17,700.00$ 40,000.00$ 100,000.00$ 150,000.00$ 86,000.00$
15401-0000
Line A0080 ALL LPSM 75,000.00$ 75,000.00$ 141,500.00$ 150,000.00$ 47,914.05$ 30,000.00$ 160,000.00$ 171,000.00$ 105,000.00$
15501-0000
Line A0100 ALL LPSM 10,000.00$ 10,000.00$ 7,500.00$ 115,000.00$ 2,500.00$ 1,000.00$ 3,000.00$ 6,094.00$ 5,000.00$
15802-0000
Line A0120 ALL LPSM 40,000.00$ 40,000.00$ 37,000.00$ 60,000.00$ 4,080.00$ 20,000.00$ 100,000.00$ 15,000.00$ 18,000.00$
21101-1000
Line A0140 360 SQYD 20.00$ 7,200.00$ 2,880.00$ 5,400.00$ 2,970.00$ 4,680.00$ 3,600.00$ 1,800.00$ 3,600.00$
25101-0100
Line A0160 380 CUYD 180.00$ 68,400.00$ 79,800.00$ 57,000.00$ 79,800.00$ 114,000.00$ 64,600.00$ 57,000.00$ 81,700.00$
25101-0200
Line A0180 150 CUYD 200.00$ 30,000.00$ 33,000.00$ 22,500.00$ 26,850.00$ 45,000.00$ 30,000.00$ 39,000.00$ 41,250.00$
30202-2000
Line A0200 1,125 TON 45.00$ 50,625.00$ 78,750.00$ 73,125.00$ 86,625.00$ 78,750.00$ 146,250.00$ 90,000.00$ 90,000.00$
30302-1000
Line A0220 4,400 LNFT 10.00$ 44,000.00$ 22,000.00$ 30,800.00$ 5,280.00$ 8,800.00$ 26,400.00$ 44,000.00$ 61,600.00$
30401-1000
Line A0240 5.000 MILE 30,000.00$ 150,000.00$ 150,000.00$ 210,000.00$ 87,500.00$ 150,000.00$ 115,000.00$ 160,000.00$ 290,000.00$
40101-5600
Line A0260 4,500 TON 145.00$ 652,500.00$ 832,500.00$ 405,000.00$ 651,375.00$ 1,062,000.00$ 900,000.00$ 783,000.00$ 729,000.00$
40105-3000
Line A0280 45 TON 450.00$ 20,250.00$ 54,000.00$ 31,500.00$ 4,500.00$ 2,250.00$ 45.00$ 225.00$ 45.00$
40601-0000
Line A0300 17 TON 800.00$ 13,600.00$ 20,400.00$ 20,400.00$ 5,950.00$ 34,000.00$ 20,400.00$ 17,000.00$ 17,000.00$
41102-1000
Line A0320 40,000 SQYD 0.75$ 30,000.00$ 90,000.00$ 32,000.00$ 19,200.00$ 60,000.00$ 40,000.00$ 32,000.00$ 26,000.00$
41801-1000
Line A0340 490 SQYD 150.00$ 73,500.00$ 53,900.00$ 44,100.00$ 28,346.50$ 73,500.00$ 68,600.00$ 68,600.00$ 34,300.00$
60901-2300
Line A0360 310 LNFT 40.00$ 12,400.00$ 10,230.00$ 8,060.00$ 6,804.50$ 12,400.00$ 11,470.00$ 11,470.00$ 10,850.00$
61801-0000
Line A0380 1,700 LNFT 90.00$ 153,000.00$ 221,000.00$ 100,300.00$ 99,620.00$ 119,000.00$ 221,000.00$ 340,000.00$ 323,000.00$
62201-0050
Line A0400 40 HOUR 150.00$ 6,000.00$ 5,840.00$ 4,800.00$ 5,240.00$ 6,000.00$ 5,200.00$ 5,000.00$ 5,000.00$
62201-0350
Line A0420 40 HOUR 150.00$ 6,000.00$ 5,120.00$ 7,200.00$ 5,080.00$ 6,000.00$ 6,000.00$ 4,800.00$ 5,000.00$
62201-0750
Line A0440 40 HOUR 150.00$ 6,000.00$ 6,720.00$ 7,200.00$ 5,880.00$ 6,400.00$ 6,000.00$ 6,800.00$ 5,400.00$
62201-2050
Line A0460 40 HOUR 150.00$ 6,000.00$ 5,920.00$ 7,200.00$ 4,960.00$ 6,400.00$ 6,400.00$ 5,800.00$ 5,000.00$
62201-2750
Line A0480 40 HOUR 150.00$ 6,000.00$ 7,080.00$ 8,000.00$ 7,840.00$ 6,400.00$ 7,200.00$ 6,400.00$ 5,600.00$
62301-0000
Line A0500 80 HOUR 70.00$ 5,600.00$ 5,280.00$ 7,200.00$ 5,320.00$ 6,400.00$ 6,400.00$ 6,000.00$ 5,440.00$
62302-1000
Line A0520 10 HOUR 120.00$ 1,200.00$ 1,950.00$ 1,800.00$ 1,060.00$ 3,000.00$ 1,500.00$ 1,500.00$ 1,000.00$
62302-1100
Line A0540 10 HOUR 150.00$ 1,500.00$ 3,100.00$ 2,300.00$ 3,300.00$ 4,000.00$ 2,000.00$ 2,200.00$ 1,250.00$
62304-0000
Line A0560 25 DAY 1,000.00$ 25,000.00$ 40,500.00$ 25,000.00$ 28,500.00$ 25,000.00$ 25,000.00$ 5,000.00$ 22,500.00$
63401-0300
Line A0580 120 LNFT 200.00$ 24,000.00$ 2,880.00$ 3,600.00$ 20.40$ 24.00$ 720.00$ 600.00$ 720.00$
63402-0300
Line A0600 10.0 MILE 2,000.00$ 20,000.00$ 7,500.00$ 25,000.00$ 6,930.00$ 10,000.00$ 14,000.00$ 10,000.00$ 15,000.00$
63501-0000
Line A0620 ALL LPSM 20,000.00$ 20,000.00$ 30,000.00$ 30,000.00$ 23,375.00$ 10,000.00$ 35,000.00$ 85,000.00$ 8,500.00$
Engineer's Estimate
30,000.00$ 30,000.00$ 23,375.00$ 10,000.00$ 35,000.00$ 85,000.00$ 8,500.00$
750.00$ 2,500.00$ 693.00$ 1,000.00$ 1,400.00$ 1,000.00$ 1,500.00$
24.00$ 30.00$ 0.17$ 0.20$ 6.00$ 5.00$ 6.00$
1,620.00$ 1,000.00$ 1,140.00$ 1,000.00$ 1,000.00$ 200.00$ 900.00$
310.00$ 230.00$ 330.00$ 400.00$ 200.00$ 220.00$ 125.00$
195.00$ 180.00$ 106.00$ 300.00$ 150.00$ 150.00$ 100.00$
66.00$ 90.00$ 66.50$ 80.00$ 80.00$ 75.00$ 68.00$
177.00$ 200.00$ 196.00$ 160.00$ 180.00$ 160.00$ 140.00$
148.00$ 180.00$ 124.00$ 160.00$ 160.00$ 145.00$ 125.00$
168.00$ 180.00$ 147.00$ 160.00$ 150.00$ 170.00$ 135.00$
128.00$ 180.00$ 127.00$ 150.00$ 150.00$ 120.00$ 125.00$
146.00$ 120.00$ 131.00$ 150.00$ 130.00$ 125.00$ 125.00$
130.00$ 59.00$ 58.60$ 70.00$ 130.00$ 200.00$ 190.00$
33.00$ 26.00$ 21.95$ 40.00$ 37.00$ 37.00$ 35.00$
110.00$ 90.00$ 57.85$ 150.00$ 140.00$ 140.00$ 70.00$
2.25$ 0.80$ 0.48$ 1.50$ 1.00$ 0.80$ 0.65$
1,200.00$ 1,200.00$ 350.00$ 2,000.00$ 1,200.00$ 1,000.00$ 1,000.00$
1,200.00$ 700.00$ 100.00$ 50.00$ 1.00$ 5.00$ 1.00$
185.00$ 90.00$ 144.75$ 236.00$ 200.00$ 174.00$ 162.00$
30,000.00$ 42,000.00$ 17,500.00$ 30,000.00$ 23,000.00$ 32,000.00$ 58,000.00$
5.00$ 7.00$ 1.20$ 2.00$ 6.00$ 10.00$ 14.00$
70.00$ 65.00$ 77.00$ 70.00$ 130.00$ 80.00$ 80.00$
220.00$ 150.00$ 179.00$ 300.00$ 200.00$ 260.00$ 275.00$
210.00$ 150.00$ 210.00$ 300.00$ 170.00$ 150.00$ 215.00$
8.00$ 15.00$ 8.25$ 13.00$ 10.00$ 5.00$ 10.00$
37,000.00$ 60,000.00$ 4,080.00$ 20,000.00$ 100,000.00$ 15,000.00$ 18,000.00$
7,500.00$ 115,000.00$ 2,500.00$ 1,000.00$ 3,000.00$ 6,094.00$ 5,000.00$
240,000.00$ 220,000.00$ 120,000.00$
20,000.00$ 25,900.00$ 25,000.00$ 50,000.00$ 21,700.00$ 40,000.00$
89,000.00$ 175,000.00$ 17,700.00$ 40,000.00$ 100,000.00$ 150,000.00$ 86,000.00$
Hat Creek Const. & Materials, Inc. S.T. Rhoades Construction, Inc.Hooker Creek Inc. Steve Manning Construct Hardrives Construction, Inc. L.B. Civil Construction, Inc. Qualcon Contractors, Inc.
60,000.00$
328,000.00$ 180,000.00$ 121,102.00$ 191,000.00$
MOBILIZATION
CONSTRUCTION SURVEY AND STAKING
CONTRACTOR QUALITY CONTROL
PRIME COAT, METHOD 1
ASPHALT CONCRETE PAVEMENT PATCH, TYPE 1
CURB, ASPHALT, 6-INCH DEPTH
ROADWAY OBLITERATION, METHOD 1
PLACED RIPRAP, METHOD A, CLASS 1
PLACED RIPRAP, METHOD A, CLASS 2
ROADWAY AGGREGATE, METHOD 2
DITCH RECONDITIONING
FULL DEPTH RECLAMATION, METHOD 1
GENERAL LABOR
SPECIAL LABOR, HIRED TECHNICAL SERVICES
SPECIAL LABOR, HIRED SURVEY SERVICES
SPECIAL LABOR (ARCHEOLOGICAL SERVICES)
PAVEMENT MARKINGS, TYPE B, SOLID
CONCRETE BARRIER
DUMP TRUCK, 5 CUBIC YARD MINIMUM CAPACITY
BACKHOE
WHEEL LOADER, 0.4 CUBIC YARD MINIMUM RATED CAPACITY
ROLLER
MOTOR GRADER
CONSTRUCTION SCHEDULE
WATERING FOR DUST CONTROL
ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL
ANTISTRIP ADDITIVE, TYPE 3
FOG SEAL
CONTRACTOR TESTING
141,500.00$ 150,000.00$ 47,914.05$ 30,000.00$ 160,000.00$ 171,000.00$ 105,000.00$
PAVEMENT MARKINGS, TYPE B, SOLID
TEMPORARY TRAFFIC CONTROL
Bid Tabs
File details come from the government source that posted it. Updated .