CA_FTNP_DEVA_500(1)_Artists_Drive_Plans.pdf

PDF 6 MB Posted

Attached to
CA FTNP DEVA 500(1) Artists Road Federal contract opportunity
Solicitation number
DTFH6816B00030
Issued by
Department of Transportation Federal Highway Administration

About this file

Plans

View the file

Other files for this federal contract opportunity

Other files attached to CA FTNP DEVA 500(1) Artists Road, newest first.
File Type Posted
CA_FTNP_DEVA_500(1)Opt_X_Bid_Tabs.pdf PDF
CA_FTNP_DEVA_500(1)_SchedA_Bid_Tabs.pdf PDF
Bid_Opening_Summary_CA_FTNP_DEVA_500(1).pdf PDF
QnA_CA_FTNP_DEVA_500(1)_rev.pdf PDF
QnA_CA_FTNP_DEVA_500(1).pdf PDF
DTFH6816B00030.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet and Description

B3 B4

Miscellaneous Summaries

Miscellaneous Summaries ALLOWANCE Bid

Schedule

A0020 15101-0000 MOBILIZATION LPSM ALL

A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL

A0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL

A0080 15401-0000 CONTRACTOR TESTING LPSM ALL

A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL

A0120 15802-0000 WATERING FOR DUST CONTROL LPSM ALL

A0140 21101-1000 ROADWAY OBLITERATION, METHOD 1 SQYD 350 10 360

A0160 25101-0100 PLACED RIPRAP, METHOD A, CLASS 1 CUYD 362 18 380

A0180 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2 CUYD 145 5 150

A0200 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 1,095 30 1,125

A0220 30302-1000 DITCH RECONDITIONING LNFT 4,196 204 4,400

A0240 30401-1000 FULL DEPTH RECLAMATION, METHOD 1 MILE 4.500 0.500 5.000

A0260 40101-5600 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH NOMINAL

MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL TON 4,347 153 4,500

A0280 40105-3000 ANTISTRIP ADDITIVE, TYPE 3 TON 43 2 45

A0300 40601-0000 FOG SEAL TON 16 1 17

A0320 41102-1000 PRIME COAT, METHOD 1 SQYD 39,137 863 40,000

A0340 41801-1000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 1 SQYD 472 18 490

A0360 60901-2300 CURB, ASPHALT, 6-INCH DEPTH LNFT 305 5 310

A0380 61801-0000 CONCRETE BARRIER LNFT 1,630 70 1,700

A0400 62201-0050 DUMP TRUCK, 5 CUBIC YARD MINIMUM CAPACITY HOUR 40

A0420 62201-0350 BACKHOE HOUR 40

A0440 62201-0750 WHEEL LOADER, 0.4 CUBIC YARD MINIMUM RATED CAPACITY HOUR 40

A0460 62201-2050 ROLLER HOUR 40

A0480 62201-2750 MOTOR GRADER HOUR 40

A0500 62301-0000 GENERAL LABOR HOUR 80

A0520 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES HOUR 10

A0540 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES HOUR 10

A0560 62304-0000 SPECIAL LABOR (ARCHEOLOGICAL SERVICES) DAY 25

A0580 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID LNFT 110 10 120

A0600 63402-0300 PAVEMENT MARKINGS, TYPE B, SOLID MILE 9.5 0.5 10.0

A0620 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL

-A ug -2

3:

P M

N

C A \d ev a5

(1

R oa dw ay \E st im at es

_S ch ed ul es \E ng in ee r

Es tim at es

C

A F

TN

P

D

EV

A

(1

EE

_S ch ed ul e

A .x ls x]

S he et

SUMMARY OF QUANTITIES - Schedule A

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

Estimated Quantities

Remarks and/or Determination of Estimated Quantity

STATE PROJECT

B1FTNP DEVA 500(1)CA

SHEET

NUMBER

Sheet and Description

B3 B4

Miscellaneous Summaries

Miscellaneous Summaries ALLOWANCE Bid

Schedule

X0020 15101-0000 MOBILIZATION LPSM ALL

X0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL

X0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL

X0080 15401-0000 CONTRACTOR TESTING LPSM ALL

X0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL

X0120 20304-1000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS LPSM ALL

X0140 20420-0000 EMBANKMENT CONSTRUCTION CUYD 13 2 15

X0160 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3 CUYD 17 3 20

X0180 41801-1000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 1 SQYD 45 5 50

X0200 62201-0050 DUMP TRUCK, 5 CUBIC YARD MINIMUM CAPACITY HOUR 20

X0220 62201-0350 BACKHOE HOUR 20

X0240 62201-0750 WHEEL LOADER, 0.4 CUBIC YARD MINIMUM RATED CAPACITY HOUR 20

X0260 62301-0000 GENERAL LABOR HOUR 80

X0280 62304-0000 SPECIAL LABOR (ARCHEOLOGICAL SERVICES) DAY 5

X0300 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL

SUMMARY OF QUANTITIES - Option X

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

Estimated Quantities

Remarks and/or Determination of Estimated Quantity

-A ug -2

4:

P M

N

C A \d ev a5

(1

R oa dw ay \E st im at es

_S ch ed ul es \E ng in ee r

Es tim at es

C

A F

TN

P

D

EV

A

(1

EE

_O pt io n_ X .x ls x]

S he et

STATE PROJECT

B2FTNP DEVA 500(1)CA

SHEET

NUMBER

21101-1000

ROADWAY

OBLITERATION, METHOD

Remarks

SQYD

RT 350 Pullout on right

OBLITERATION SUMMARY

SCHEDULE A TOTAL

Item Number

Milepost Side

2.5

30202-2000 30401-1000 40101-5600 40105-3000 40601-0000 41102-1000 41801-1000

ROADWAY AGGREGATE,

METHOD 2

FULL DEPTH

RECLAMATION,

METHOD 1

ASPHALT CONCRETE

PAVEMENT, GYRATORY

MIX, 1/2-INCH OR 3/4-

INCH NOMINAL

MAXIMUM SIZE

AGGREGATE, 0.3 TO

<3 MILLION ESAL

ANTISTRIP

ADDITIVE, TYPE 3 FOG SEAL

PRIME

COAT,

METHOD 1

ASPHALT

CONCRETE

PAVEMENT PATCH,

TYPE 1

TON MILE TON TON TON SQYD SQYD

1082 4.4 4301 43 16 38720

13.3 0.1 46 0.2 417 Pullout on right

38 Concrete barrier location

233 Concrete barrier location

1,095 4 4,347 43 16 39,137 472

0 0 0 0 0 45

Aggregate base . . . . 139 lb/ft3 Hot asphalt concrete pavement . . . . 145.2 lb/ft3

Antistrip . . . . 1.0% by weight of mix Fog seal . . . . 0.1 gal/yd2 (240.7 gal/ton)

MP 4.26 - MP 4.31

MP 4.5 - MP 4.76

SCHEDULE A TOTAL

OPTION X TOTAL

MP 5.1

Harmony Borax Works Trail Site 6 Site 7 Site 8

Values used for estimating purposes:

Milepost to Milepost Site #

Artists Drive

MP 4.9

MP 1.5

SURFACING SUMMARY

Remarks

MP 0.0 - MP 4.4

MP 4.7

20420-0000 30302-1000

EMBANKMENT

CONSTRUCTION

DITCH

RECONDITIONING Remarks

CUYD LNFT

MP 4.0 to MP 4.1 528

MP 5.5 to MP 6.1 3168 0 4196

13 Erosion Repair 13 0

MP 5.1

OPTION X TOTAL

SHOULDERING AND DITCH SUMMARY

Harmony Borax Works Trail Sites 2 - 8

Milepost to Milepost Site #

SCHEDULE A TOTAL

Artists Drive

MP 3.2

MP 4.9

60901-2300

CURB, ASPHALT, 6-

INCH DEPTH Remarks

LNFT

RT 305 Pullout on right

ASPHALT CURB SUMMARY

1.5

SCHEDULE A TOTAL

Item Number

Milepost Side

For Info. Only in x in SQFT G20-1 Road Work Next XX Miles 36 x 18 4.5 4 18 G20-2 End Road Work 36 x 18 4.5 4 18 R11-2 Road Closed 48 x 30 38 2 76

Special 1 Road Construction 33 Miles Ahead 114 x 48 38 1 38 Special 2 Road Construction 26 Miles Ahead 114 x 48 38 1 38 Special 3 Road Construction Ahead Expect Delays 114 x 36 28.5 2 57 W20-1 Road Work Ahead 36 x 36 9 4 36 W20-1 Road Work XX FT 36 x 36 9 4 36

G20-1 Road Work Next XX Miles 36 x 18 4.5 4 18 G20-2 End Road Work 36 x 18 4.5 4 18 R11-2 Road Closed 48 x 30 4.5 2 9 W20-1 Road Work Ahead 36 x 36 4.5 4 18 W20-1 Road Work XX FT 36 x 36 4.5 4 18

SCHEDULE A TOTAL

Quantity

TEMPORARY TRAFFIC

CONTROL,

CONSTRUCTION

SIGN

CONSTRUCTION SIGN SUMMARY

Item Number

AreaDescription Sign PanelMUTCD

Reference

OPTION X TOTAL

25101-0100 25101-0200 25101-0300 61801-0000 NO PAY

PLACED RIPRAP,

METHOD A, CLASS 1

PLACED RIPRAP,

METHOD A, CLASS 2

PLACED RIPRAP,

METHOD A, CLASS 3 CONCRETE BARRIER GEOTEXTILE Remarks

CUYD CUYD CUYD LNFT SQYD

5 13 Low Water Crossing Outlet (3'x2'x20') 5 13 Low Water Crossing Outlet (3'x2'x20')

RT 45 133 Ditch Lining (4'x2'x150') RT 45 133 Ditch Lining (4'x2'x150')

45 133 Ditch Lining (4'x2'x150')

MP 4.26 - MP 4.31 RT 51 230 404

MP 4.5 - MP 4.76 RT 311 1400 2492

362 145 0 1630 3321

17 33 25'x12'x1.5' 0 0 17 0 33

RIPRAP AND CONCRETE BARRIER SUMMARY

OPTION X TOTAL

Item Number

Milepost to Milepost Site # Side

Artists Drive

MP 3.0

Harmony Borax Works Trail Site 1

SCHEDULE A TOTAL

MP 3.6

MP 4.7

MP 4.9

MP 5.1

63401-0300 63402-0300

LNFT MILE

0.0 - 4.76 9.5

110 Pullout on right 110 9.5

Note: Apply two coats of paint.

SCHEDULE A TOTAL

Milepost to Milepost

LEFT RIGHT

25,133

LNFTLNFT

Remarks

Item Number

Edge Solid Yellow 4 inches

1.5

PAVEMENT

MARKINGS TYPE B

SOLID

PERMANENT PAVEMENT MARKINGS SUMMARY

PAVEMENT

MARKINGS TYPE B

SOLID

Edge Solid White

4 inches

25,133

63501-0000 For Info. Only For Info. Only For Info. Only

TEMPORARY TRAFFIC

CONTROL

TEMPORARY TRAFFIC

CONTROL,

BARRICADE TYPE 3

TEMPORARY TRAFFIC

CONTROL,

CONSTRUCTION

SIGN

TEMPORARY TRAFFIC

CONTROL, PAVEMENT

MARKINGS

Remarks

LPSM EACH SQFT MILE

ALL 4 317 9.5

ALL 4 81

TEMPORARY TRAFFIC CONTROL SUMMARY

SCHEDULE A TOTAL

Item Number

Milepost to Milepost Side

OPTION X TOTAL

U.S. CUSTOMARY DETAIL

NO SCALE

DETAIL

TRANSITIONS

PAVEMENT

K VALUE TABLE (ft/in)

DETAIL APPROVED FOR USE

(Full Depth of existing asphalt pavement)

Saw cut

APPROVED : FEBRUARY 2013

30 35 40 45 50 55 60 65 70 75

30 32.5 35 37.5 40 42.5 45 47.5 50 52.5

* Use a K Value of 30 for speeds less than 30 MPH.

K

(MPH) *

POSTED SPEED

2 inches x 42.5 ft./in. = 85 feet.

Then the minimum transition length = Effective overlay thickness = 2 inches If the posted speed is 55 MPH Example :

(Minimum transition length=30 feet) obtain the transition length.

Use K*[e1-e2]=T, or K*[d1-d2]=T (whichever applies), to

K value from the Table for the posted speed of the roadway.

(difference between the existing and overlaid elevations) by the obtained by multiplying the effective overlay thickness in inches Provide a transition length in feet that is not less than the value

NOTE :

K1

401-1

Existing asphalt pavement

Existing base course

New asphalt pavement

New base course

Existing asphalt pavement

Existing base course

Remove pavement (mill) d

Existing asphalt pavement

Existing base course d1

NEW PAVEMENT

OVERLAY - DEPTH TRANSITIONS

(depth 2)

Asphalt overlay

(Final course)

Asphalt overlay

(depth 1)

Asphalt overlay

K Transition length variable (See table)

K Transition length variable (See table)

(Depth equals overlay thickness)

Saw cut

Existing elevation e2

Overlaid elevation e1

(for table e - e = effective overlay thickness)

(for table d -d = effective overlay thickness)

OVERLAY

STATE PROJECT

P

M N C

A d e v a R o a d w a y C

A D

D S h e e ts K s t4 d e ta il .d g n

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

U s e r S e b a s ti a n .g u z m a n

NUMBER

SHEET

DRAWING NO.: 143/133579

NPS PMIS NO.: 232820

CA

Artists Drive

CA FTNP DEVA 500(1)