DINO_101(2)_Q A_2-19-16.pdf
PDF 48 KB Posted
- Attached to
- CO FTNP DINO 101(2), Deer Lodge Road
- Solicitation number
- DTFH6814B00026
About this file
Q A for DINO 101(2).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Opening_Summary_CO_FTNP_DINO_101(2).pdf | ||
| Amendment_A0001.pdf | ||
| Plans.pdf | ||
| IFB_SBSA_CO_DINO_101(2).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q&A – CO FTNP DINO 101(2), Deer Lodge Road
2/19/16
1) Q: Just to clarify only small Business can bid on this project as the General Contractor?
A: Correct. See page A‐i and C‐8 of the IFB for more information and the clause (52.219‐6).
2) Q: Is there a designated spot for the asphalt pavement to be hauled too after its removed and who will own the material when its removed ?
A: It is the responsibility of the contractor to remove and dispose of the material outside the project limits.
3) Q: What forms and /or Documents need to be sent in with the bid to the General Contractors if you are bidding as a subcontractor?
A: None. The CFLHD contracts are with prime contractors only. No information on subcontractors is required.
4) Q: Will the contractor have to pay for the water out of Yampa River?
A: <no answer at this time>