L-4 draft TFM2 Cost-Price Mapping Matrix 2016-08-01.xlsx
XLSX spreadsheet 68 KB Posted
- Attached to
- Traffic Flow Management 2 (TFM2)- Request for Offer-SIR Federal contract opportunity
- Solicitation number
- DTFAWA-16-R-00010
About this file
L-4 draft TFM2 Cost-Price Mapping Matrix 2016-08-01 (xlsx)
View the file
Other files for this federal contract opportunity
Show all 50
Traffic Flow Management 2 (TFM2)- Request for Offer-SIR has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
L-4 CLIN 1 Matrix
| Important: Offerors must comply with requirements stated in Section L 7.3.1.5 when completing the Cost Price Mapping Matrix below. Contractor must add rows (but not columns) as needed to reflect the required details (all applicable CLINs and WBS activities per required SOW reference provided below). Offerors must add and complete a separate table/sheet for each corresponding CLIN (1.1 through 1.12) L-3 TAB B CLIN Sheet completed.Offeror's subcontractors must use same format for Mapping Matrix if providing separate BOE for their Cost/Price information. Offerors must use Attachment J-8 for Program WBS definitions. | ||||||
| CLIN 1.1 | ||||||
| SOW Section # | SOW Section Title | CWBS(s) | PWBS(s) | Basis of Estimate (BOE) Section Title (if applicable) | BOE Page Number(s) | Notes |
| C.3 | Program Management | |||||
| C.3.1 | Program Management Organization | |||||
| C.3.3 | Program Management Plan (PMP) | |||||
| C.3.4 | Meetings, Reviews, Conferences, and Evaluations | |||||
| C.3.4.1 | Meeting Logistics and Action Tracking | |||||
| C.3.4.2 | Program Management Review (PMR) | |||||
| C.3.4.3 | Other Meetings | |||||
| C.3.5 | Program Control | |||||
| C.3.5.1 | Contract Work Breakdown Structure (CWBS) | |||||
| C.3.5.2 | Earned Value Management System (EVMS) | |||||
| C.3.5.3 | Integrated Baseline Review | |||||
| C.3.5.4 | Performance Measurement | |||||
| C.3.5.5 | Quality Assurance | |||||
| C.3.5.6 | Configuration Management (CM) | |||||
| C.4.1 | General | |||||
| C.4.2 | Operations Support | |||||
| C.8 | Implementation | |||||
| C.9 | Training | |||||
| C.9.4 | First Level maintenance Training | |||||
| C.9.5 | Training Updates for System Refreshes and Upgrades | |||||
| C.10.1 | First-Level Support (optional CLIN-1) | |||||
| C.10.1.1 | Help Desk | |||||
| C.10.1.2 | Daily Service Reviews |
TFM-2
SIR DTFAWA-16-R-00010 L-4 CLIN 1 Cost Price Mapping Matrix
L-4 CLIN 2 Matrix
| Important: Offerors must comply with requirements stated in Section L 7.3.1.5 when completing the Cost Price Mapping Matrix below. Contractor must add rows (but not columns) as needed to reflect the required details (all applicable CLINs and WBS activities per required SOW reference provided below). Offerors must add and complete a separate table/sheet for each corresponding CLIN (2.1 through 2.12) L-3 TAB B CLIN Sheet completed. Offeror's subcontractors must use same format for Mapping Matrix if providing separate BOE for their Cost/Price information. Offerors must use Attachment J-8 for Program WBS definitions. | ||||||
| CLIN 2.1 | ||||||
| SOW Section # | SOW Section Title | CWBS(s) | PWBS(s) | Basis of Estimate (BOE) Section Title (if applicable) | BOE Page Number(s) | Notes |
| C.3 | Program Management | |||||
| C.3.1 | Program Management Organization | |||||
| C.3.3 | Program Management Plan (PMP) | |||||
| C.3.4 | Meetings, Reviews, Conferences, and Evaluations | |||||
| C.3.4.1 | Meeting Logistics and Action Tracking | |||||
| C.3.4.2 | Program Management Review (PMR) | |||||
| C.3.4.3 | Other Meetings | |||||
| C.3.5 | Program Control | |||||
| C.3.5.1 | Contract Work Breakdown Structure (CWBS) | |||||
| C.3.5.2 | Earned Value Management System (EVMS) | |||||
| C.3.5.3 | Integrated Baseline Review | |||||
| C.3.5.4 | Performance Measurement | |||||
| C.3.5.5 | Quality Assurance | |||||
| C.3.5.6 | Configuration Management (CM) | |||||
| C.4.1 | General | |||||
| C.4.2 | Operations Support | |||||
| C.5 | Engineering, Design & Development | |||||
| C.5.2 | Requirements Analysis & Development | |||||
| C.5.3 | System-level Design | |||||
| C.5.4 | Detailed Design | |||||
| C.5.5 | Development | |||||
| C.5.6 | Human Factors | |||||
| C.7 | Test & Evaluation | |||||
| C.7.1 | Test Tools | |||||
| C.7.2.1 | WJHC System Acceptance Test (WSAT) | |||||
| C.7.2.2 | Support Government Test Activities | |||||
| C.7.2.3 | Key Site Acceptance Test (KSAT) | |||||
| C.7.2.4 | Site System Acceptance Test (SAT) | |||||
| C.8 | Implementation | |||||
| C.9 | Training | |||||
| C.9.2 | System operations Training | |||||
| C.9.3 | Second-Level Engineering Support Training | |||||
| C.9.5 | Training Updates for System Refreshes and Upgrades | |||||
| C.10.2 | Second-Level Engineering (SLE) and Support | |||||
| C.10.2.1 | SLE Meetings, Reviews, and Workgroups | |||||
| C.10.2.2 | Operations Support | |||||
| C.10.2.3 | System and Software Support | |||||
| C.10.2.4 | Adaptation | |||||
| C.10.2.5 | Root Cause Analysis (RCA) | |||||
| C.10.2.6 | Disaster Recovery Center (DRC) |
SIR DTFAWA-16-R-00010 L-4 CLIN 2 Cost Price Mapping Matrix
L-4 CLIN 3 Matrix
| Important: Offerors must comply with requirements stated in Section L 7.3.1.5 when completing the Cost Price Mapping Matrix below. Contractor must add rows (but not columns) as needed to reflect the required details (all applicable CLINs and WBS activities per required SOW reference provided below). Offerors must add and complete a separate table/sheet for each corresponding CLIN (3.1 through 3.12) L-3 TAB C CLIN Sheet completed. Offeror's subcontractors must use same format for Mapping Matrix if providing separate BOE for their Cost/Price information. Offerors must use Attachment J-8 for Program WBS definitions. | ||||||
| CLIN 3.1 | ||||||
| SOW Section # | SOW Section Title | CWBS(s) | PWBS(s) | Basis of Estimate (BOE) Section Title (if applicable) | BOE Page Number(s) | Notes |
| C.10.3.2 | Commercial Software Maintenance Services |
SIR DTFAWA-16-R-00010 L-4 CLIN 3 Cost Price Mapping Matrix
L-4 CLIN 5A Matrix
| Important: Offerors must comply with requirements stated in Section L 7.3.1.5 when completing the Cost Price Mapping Matrix below. Contractor must add rows (but not columns) as needed to reflect the required details (all applicable CLINs and WBS activities per required SOW reference provided below). Offeror's subcontractors must use same format for Mapping Matrix if providing separate BOE for their Cost/Price information. Offerors must use Attachment J-8 for Program WBS definitions. | ||||||
| CLIN 5A | ||||||
| SOW Section # | SOW Section Title | CWBS(s) | PWBS(s) | Basis of Estimate (BOE) Section Title (if applicable) | BOE Page Number(s) | Notes |
| C.3 | Program Management | |||||
| C.3.1 | Program Management Organization | |||||
| C.3.2 | Contract Transition | |||||
| C.3.3 | Program Management Plan (PMP) | |||||
| C.3.4 | Meetings, Reviews, Conferences, and Evaluations | |||||
| C.3.4.1 | Meeting Logistics and Action Tracking | |||||
| C.3.4.2 | Program Management Review (PMR) | |||||
| C.3.4.3 | Post - Award Conference (PAC) | |||||
| C.3.4.3 | Other Meetings | |||||
| C.3.5 | Program Control | |||||
| C.3.5.1 | Contract Work Breakdown Structure (CWBS) | |||||
| C.3.5.2 | Earned Value Management System (EVMS) | |||||
| C.3.5.3 | Integrated Baseline Review | |||||
| C.3.5.4 | Performance Measurement | |||||
| C.3.5.5 | Quality Assurance | |||||
| C.3.5.6 | Configuration Management (CM) | |||||
| C.4.1 | General | |||||
| C.4.2 | Operations Support | |||||
| C.5 | Engineering, Design & Development | |||||
| C.7 | Test & Evaluation | |||||
| C.10.1 | First-Level Support (optional CLIN-1) | |||||
| C.10.1.1 | Help Desk | |||||
| C.10.1.2 | Daily Service Reviews | |||||
| C.10.2 | Second-Level Engineering (SLE) and Support | |||||
| C.10.2.1 | SLE Meetings, Reviews, and Workgroups | |||||
| C.10.2.2 | Operations Support | |||||
| C.10.2.3 | System and Software Support | |||||
| C.10.2.4 | Adaptation | |||||
| C.10.2.6 | Disaster Recovery Center (DRC) |
SIR DTFAWA-16-R-00010 L-4 CLIN 5A Cost Price Mapping Matrix
L-4 CLIN 9A Matrix
| Important: Offerors must comply with requirements stated in Section L 7.3.1.5 when completing the Cost Price Mapping Matrix below. Contractor must add rows (but not columns) as needed to reflect the required details (all applicable CLINs and WBS activities per required SOW reference provided below). Offeror's subcontractors must use same format for Mapping Matrix if providing separate BOE for their Cost/Price information. Offerors must use Attachment J-8 for Program WBS definitions. | ||||||
| CLIN 9A | ||||||
| SOW Section # | SOW Section Title | CWBS(s) | PWBS(s) | Basis of Estimate (BOE) Section Title (if applicable) | BOE Page Number(s) | Notes |
| C.3 | Program Management | |||||
| C.3.1 | Program Management Organization | |||||
| C.3.3 | Program Management Plan (PMP) | |||||
| C.3.4 | Meetings, Reviews, Conferences, and Evaluations | |||||
| C.3.4.1 | Meeting Logistics and Action Tracking | |||||
| C.3.4.2 | Program Management Review (PMR) | |||||
| C.3.4.3 | Other Meetings | |||||
| C.3.5 | Program Control | |||||
| C.3.5.1 | Contract Work Breakdown Structure (CWBS) | |||||
| C.3.5.2 | Earned Value Management System (EVMS) | |||||
| C.3.5.3 | Integrated Baseline Review | |||||
| C.3.5.4 | Performance Measurement | |||||
| C.3.5.5 | Quality Assurance | |||||
| C.3.5.6 | Configuration Management (CM) | |||||
| C.4.1 | General | |||||
| C.5 | Engineering, Design & Development | |||||
| C.5.2 | Requirements Analysis & Development | |||||
| C.5.3 | System-level Design | |||||
| C.5.4 | Detailed Design | |||||
| C.5.5 | Development | |||||
| C.7 | Test & Evaluation | |||||
| C.7.1 | Test Tools | |||||
| C.7.2.1 | WJHC System Acceptance Test (WSAT) | |||||
| C.7.2.2 | Support Government Test Activities | |||||
| C.7.2.3 | Key Site Acceptance Test (KSAT) | |||||
| C.7.2.4 | Site System Acceptance Test (SAT) | |||||
| C.7.2.5 | Development Problem Trouble Report (PTR) | |||||
| C.8 | Implementation | |||||
| C.9 | Training | |||||
| C.9.1 | Test and Evaluation Training Program Requirements | |||||
| C.9.2 | System operations Training | |||||
| C.9.3 | Second-Level Enginering Support Training | |||||
| C.9.4 | First Level maintenance Training | |||||
| C.9.5 | Training Updates for System Refreshes and Upgrades | |||||
| C.11.2 | TFMS Remote Sites (TRS) |
SIR DTFAWA-16-R-00010 L-4 CLIN 9A Cost Price Mapping Matrix
L-4 CLIN 11 Matrix
| Important: Offerors must comply with requirements stated in Section L 7.3.1.5 when completing the Cost Price Mapping Matrix below. Contractor must add rows (but not columns) as needed to reflect the required details (all applicable CLINs and WBS activities per required SOW reference provided below). Offerors must add and complete a separate table/sheet for each corresponding CLIN (11A through 11C) L-3 TAB B CLIN Sheet completed.Offeror's subcontractors must use same format for Mapping Matrix if providing separate BOE for their Cost/Price information. Offerors must use Attachment J-8 for Program WBS definitions. | ||||||
| CLIN 11A | ||||||
| SOW Section # | SOW Section Title | CWBS(s) | PWBS(s) | Basis of Estimate (BOE) Section Title (if applicable) | BOE Page Number(s) | Notes |
| C.3 | Program Management | |||||
| C.3.1 | Program Management Organization | |||||
| C.3.3 | Program Management Plan (PMP) | |||||
| C.3.4 | Meetings, Reviews, Conferences, and Evaluations | |||||
| C.3.4.1 | Meeting Logistics and Action Tracking | |||||
| C.3.4.2 | Program Management Review (PMR) | |||||
| C.3.4.3 | Other Meetings | |||||
| C.3.5 | Program Control | |||||
| C.3.5.1 | Contract Work Breakdown Structure (CWBS) | |||||
| C.3.5.2 | Earned Value Management System (EVMS) | |||||
| C.3.5.3 | Integrated Baseline Review | |||||
| C.3.5.4 | Performance Measurement | |||||
| C.3.5.5 | Quality Assurance | |||||
| C.3.5.6 | Configuration Management (CM) | |||||
| C.4.1 | General | |||||
| C.5 | Engineering, Design & Development | |||||
| C.5.2 | Requirements Analysis & Development | |||||
| C.5.3 | System-level Design | |||||
| C.5.4 | Detailed Design | |||||
| C.5.5 | Development | |||||
| C.5.6 | Human Factors | |||||
| C.7 | Test & Evaluation | |||||
| C.7.1 | Test Tools | |||||
| C.7.2.1 | WJHC System Acceptance Test (WSAT) | |||||
| C.7.2.2 | Support Government Test Activities | |||||
| C.7.2.3 | Key Site Acceptance Test (KSAT) | |||||
| C.7.2.4 | Site System Acceptance Test (SAT) | |||||
| C.7.2.5 | Development Problem Trouble Report (PTR) | |||||
| C.8 | Implementation | |||||
| C.9 | Training | |||||
| C.9.1 | Test and Evaluation Training Program Requirements | |||||
| C.9.2 | System operations Training | |||||
| C.9.3 | Second-Level Enginering Support Training | |||||
| C.9.4 | First Level maintenance Training | |||||
| C.9.5 | Training Updates for System Refreshes and Upgrades |
Draft SIR DTFAWA-16-R-00010 L-4 CLIN 11 Cost Price Mapping Matrix
File details come from the government source that posted it. Updated .