Attachment III -B316-Chiller-Replacement-Project-Pre-qualification-Worksheet.docx
DOCX document 17 KB Posted
- Attached to
- Pre-Qualification: FAA WJHTC Building 316 Chillers Replacement Project Federal contract opportunity
- Solicitation number
- DTFACT-17-R-00012
About this file
Attachment III -B316-Chiller-Replacement-Project-Pre-qualification-Worksheet (docx)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment I -B316-Chiller-Replacement-Project Draft SOW.doc | DOC document | |
| B316-F2014074-FULL-SET-11-28-2016-E.pdf | ||
| Specification - B316 Chiller Replacement.pdf | ||
| Attachment II - Business Declaration.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment III FAA WJHTC Building 316 Chiller Replacement Project Pre-Qualification Corporate Experience Worksheet
Requirements: Contractor must have completed as the prime (performing at least 50% of the work) a minimum of four (4) completed projects. The listed projects must have been completed within the past six (6) years. Each project must have a scope consisting of installation of chiller(s) 600 tons or greater and involve multiple disciplines or trades. At least two (2) of the projects must have been for replacement of chiller(s), 600 tons or greater, in a continuously operated facility in which cooling needed to be maintained during the replacement of the chiller(s).
Contractor Name:______________________________________________________________________
Project # 1
Project Title:__________________________________________________________________________
Chiller Capacity (Tons): ________________
Completion Date of Project (must be within the last 6 years):____________________________________
Brief Description of Project:______________________________________________________________
Types of Contract Work/Disciplines/Trades Performed: ________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________
Percentage of Work as a Prime Contractor (50% minimum):_______________
Was this project performed in a continuously operated facility in which cooling needed to be maintained during the replacement of the chiller(s)? If applicable, please describe:____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Project # 2
Chiller Capacity (Tons): ________________
Completion Date of Project (must be within the last 6 years):____________________________________
Brief Description of Project:______________________________________________________________
Types of Contract Work/Disciplines/Trades Performed: ________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________
Was this project performed in a continuously operated facility in which cooling needed to be maintained during the replacement of the chiller(s)? If applicable, please describe:____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Project # 3
Chiller Capacity (Tons): ________________
Completion Date of Project (must be within the last 6 years):____________________________________
Brief Description of Project:______________________________________________________________
Types of Contract Work/Disciplines/Trades Performed: ________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________
Was this project performed in a continuously operated facility in which cooling needed to be maintained during the replacement of the chiller(s)? If applicable, please describe:____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Project # 4
Chiller Capacity (Tons): ________________
Completion Date of Project (must be within the last 6 years):____________________________________
Brief Description of Project:______________________________________________________________
Types of Contract Work/Disciplines/Trades Performed: ________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________
Was this project performed in a continuously operated facility in which cooling needed to be maintained during the replacement of the chiller(s)? If applicable, please describe:____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
File details come from the government source that posted it. Updated .