Attachment I -B316-Chiller-Replacement-Project Draft SOW.doc
DOC document 41 KB Posted
- Attached to
- Pre-Qualification: FAA WJHTC Building 316 Chillers Replacement Project Federal contract opportunity
- Solicitation number
- DTFACT-17-R-00012
About this file
Attachment I -B316-Chiller-Replacement-Project Draft SOW (doc)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B316-F2014074-FULL-SET-11-28-2016-E.pdf | ||
| Specification - B316 Chiller Replacement.pdf | ||
| Attachment III -B316-Chiller-Replacement-Project-Pre-qualification-Worksheet.docx | DOCX document | |
| Attachment II - Business Declaration.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment I part i - Section C DRAFT Statement of Work
C.1 Statement of Work
The work includes the provision of all labor, materials and equipment to replace the two Chillers in Building 316 at the FAA William J. Hughes Technical Center (WJHTC) and all incidental related work. The work includes, but is not limited to, the following:
· The removal and disposal of two 900 ton chillers
· Installation of two new 900 ton VFD Chillers.
· Installation of VFD pumps
· Installation and modification to Controls and BAS.
· Electrical system modifications
· Piping Modifications
· Provision of Temporary Chiller
C.2
CONTRACT SPECIFICATIONS
SPECIFICATION SECTIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 33 00 SUBMITTAL PROCEDURES
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 23 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DIVISION 05 - METALS
05 05 23 WELDING, STRUCTURAL
05 12 00 STRUCTURAL STEEL
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 00 METAL STAIRS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 71 00 DOOR HARDWARE
08 91 00 LOUVERS
DIVISION 09 - FINISHES
09 90 00 PAINTS AND COATINGS
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 15 COMMON PIPING FOR HVAC
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 00.00 40 COMMON WORK RESULTS FOR ELECTRICAL
26 05 13.00 40 MEDIUM-VOLTAGE CABLES
26 05 73 OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY
26 08 00 APPARATUS INSPECTION AND TESTING
26 11 16 SECONDARY UNIT SUBSTATIONS
26 28 00.00 10 MOTOR CONTROL CENTERS
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
DIVISION 40 - PROCESS INTEGRATION
40 95 00 PROCESS CONTROL
C.3 Contract Drawings
The contract drawings are considered the property of the Government and shall not be used for any purpose other than that contemplated by the specifications. The contract drawings indicate general arrangements, approximate sizes and relative locations of principal materials to be provided or tasks to be completed. Contract drawings are diagrammatic and are a graphic representation of contract requirements to best available standards at the scale used. The Contractor shall provide offsets to clear interferences and supports which are not specifically shown, but which are obviously needed to make the system complete, operable, and safe. The Contractor shall verify all elevations, dimensions and clearances at the site. The following contract drawings accompany the specifications and are a part thereof:
DRAWING LIST
Drawing Number
Drawing Title 2014-000074-G000
COVER SHEET
2014-000074-G001
SITE LOGISTIC PLAN
2014-000074-A102
SECOND FLOOR (GRADE LEVEL) DEMOLITION & FLOOR PLANS
2014-000074-A400
TYPICAL DETAILS
2014-000074-M001 SYMBOLS and ABBREVIATIONS
2014-000074-ME101
EXISTING CONDITIONS PHOTOS
2014-000074-MD101-B
MECHANICAL DEMOLITION PLAN - AREA 1 BASE BID DESIGN
2014-000074-MD101-1
MECHANICAL DEMOLITION PLAN - AREA 1 BID OPTION-1 DESIGN
2014-000074-MD101-2
MECHANICAL DEMOLITION PLAN - AREA 1 BID OPTION-2 DESIGN
2014-000074-MR101
MECHANICAL EQUIPMENT RIGGING PLAN ALL BID OPTIONS
2014-000074-M101-B
MECHANICAL RENOVATION PLAN - AREA 1 BASE BID DESIGN
2014-000074-M101-1
MECHANICAL RENOVATION PLAN - AREA 1 BID OPTION-1 DESIGN
2014-000074- M101-2
MECHANICAL RENOVATION PLAN - AREA 1 BID OPTION-2 DESIGN
2014-000074-M102
MECHANICAL AREA 2 RENOVATION PLAN ALL BID OPTIONS DESIGN
2014-000074-MD601-B
CHILLED WATER FLOW DIAGRAM DEMOLITION - BASE BID DESIGN
2014-000074- MD601-1
CHILLED WATER FLOW DIAGRAM DEMOLITION - BID OPTION 1 DESIGN
2014-000074- MD601-2
CHILLED WATER FLOW DIAGRAM DEMOLITION - BID OPTION 2 DESIGN
2014-000074- M601-B
CHILLED WATER FLOW DIAGRAM RENOVATION - BASE BID DESIGN
2014-000074- M601-1
CHILLED WATER FLOW DIAGRAM RENOVATION - BID OPTION 1 DESIGN
2014-000074- M601-2
CHILLED WATER FLOW DIAGRAM RENOVATION - BID OPTION 2 DESIGN
2014-000074-M701
CHILLED WATER CONTROL DIAGRAM RENOVATION
2014-000074-M801
DETAILS
2014-000074-M802
CHILLED WATER VALVE REPLACEMENT DIAGRAMS
2014-000074-M802
MECHANICAL PIPE SUPPORTS
2014-000074-M901
SCHEDULES
2014-000074-E001
ELECTRICAL SYMBOLS
2014-000074-E002
ELECTRICAL ABBREVIATIONS AND SCHEDULES
2014-000074-E101
SINGLE LINE DIAGRAMS
2014-000074-E102
TEMPORARY CHILLERSELECTRICAL SITE PLAN
2014-000074-E201
SECOND FLOOR PLAN (GROUND LEVEL) DEMOLITION
2014-000074-E202
SECOND FLOOR PLAN (GROUND LEVEL) POWER
2014-000074-E901
OUTDOOR SWITCHGEAR ELEVATION
2014-000074-E902
OUTDOOR SWITCHGEAR STRUCTURAL ELEVATION CONDUIT RACK & DETAILS
2014-000074-S901
OUTDOOR SWITCHGEAR STRUCTURAL ELEVATION CONDUIT RACK & DETAILS
C.4 PROPRIETARY WORK
The following work will be required to be performed in accordance with WJHTC standards and tied into existing monitoring stations, along with the selected chillers; contact information is provided since a subcontracting arrangement is expected:
HVAC equipment control and monitoring system:
Tri-M Building Automation Systems Corp.
Mike May, Senior Project Manager P.O. Box 69, 206 Gale Lane, Kennett Square, PA 19348
(610) 444-1002; email MMay@Tri-Mgroup.com Substation power monitoring system:
DVL Group Inc.
Stephen M. Graham, Sales Manager for Power Systems
115 Sinclair Road, Bristol, PA 19007
(215) 826-1134; email sgraham@dvlnet.com Chiller Manufacturer:
York, Johnson Controls, Inc
Eric Marano, Senior Account Executive
1001 Lower Landing Road, Suite 409
Blackwood, NJ 08012
(610) 276-3700 email Eric.A.Marano@jci.com
--- END OF SECTION C---
File details come from the government source that posted it. Updated .