Attachment I -B316-Chiller-Replacement-Project Draft SOW.doc

DOC document 41 KB Posted

Attached to
Pre-Qualification: FAA WJHTC Building 316 Chillers Replacement Project Federal contract opportunity
Solicitation number
DTFACT-17-R-00012
Issued by
Department of Transportation Federal Aviation Administration Technical Center

About this file

Attachment I -B316-Chiller-Replacement-Project Draft SOW (doc)

View the file

Other files for this federal contract opportunity

Other files attached to Pre-Qualification: FAA WJHTC Building 316 Chillers Replacement Project, newest first.
File Type Posted
B316-F2014074-FULL-SET-11-28-2016-E.pdf PDF
Specification - B316 Chiller Replacement.pdf PDF
Attachment III -B316-Chiller-Replacement-Project-Pre-qualification-Worksheet.docx DOCX document
Attachment II - Business Declaration.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment I part i - Section C DRAFT Statement of Work

C.1 Statement of Work

The work includes the provision of all labor, materials and equipment to replace the two Chillers in Building 316 at the FAA William J. Hughes Technical Center (WJHTC) and all incidental related work. The work includes, but is not limited to, the following:

· The removal and disposal of two 900 ton chillers

· Installation of two new 900 ton VFD Chillers.

· Installation of VFD pumps

· Installation and modification to Controls and BAS.

· Electrical system modifications

· Piping Modifications

· Provision of Temporary Chiller

C.2

CONTRACT SPECIFICATIONS

SPECIFICATION SECTIONS

DIVISION 01 - GENERAL REQUIREMENTS

01 33 00 SUBMITTAL PROCEDURES

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 23 OPERATION AND MAINTENANCE DATA

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

DIVISION 03 - CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE

DIVISION 05 - METALS

05 05 23 WELDING, STRUCTURAL

05 12 00 STRUCTURAL STEEL

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 51 00 METAL STAIRS

05 52 00 METAL RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 71 00 DOOR HARDWARE

08 91 00 LOUVERS

DIVISION 09 - FINISHES

09 90 00 PAINTS AND COATINGS

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS

23 05 15 COMMON PIPING FOR HVAC

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE

23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS

DIVISION 26 - ELECTRICAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 05 00.00 40 COMMON WORK RESULTS FOR ELECTRICAL

26 05 13.00 40 MEDIUM-VOLTAGE CABLES

26 05 73 OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY

26 08 00 APPARATUS INSPECTION AND TESTING

26 11 16 SECONDARY UNIT SUBSTATIONS

26 28 00.00 10 MOTOR CONTROL CENTERS

26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION

26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS

DIVISION 40 - PROCESS INTEGRATION

40 95 00 PROCESS CONTROL

C.3 Contract Drawings

The contract drawings are considered the property of the Government and shall not be used for any purpose other than that contemplated by the specifications. The contract drawings indicate general arrangements, approximate sizes and relative locations of principal materials to be provided or tasks to be completed. Contract drawings are diagrammatic and are a graphic representation of contract requirements to best available standards at the scale used. The Contractor shall provide offsets to clear interferences and supports which are not specifically shown, but which are obviously needed to make the system complete, operable, and safe. The Contractor shall verify all elevations, dimensions and clearances at the site. The following contract drawings accompany the specifications and are a part thereof:

DRAWING LIST

Drawing Number

Drawing Title 2014-000074-G000

COVER SHEET

2014-000074-G001

SITE LOGISTIC PLAN

2014-000074-A102

SECOND FLOOR (GRADE LEVEL) DEMOLITION & FLOOR PLANS

2014-000074-A400

TYPICAL DETAILS

2014-000074-M001 SYMBOLS and ABBREVIATIONS

2014-000074-ME101

EXISTING CONDITIONS PHOTOS

2014-000074-MD101-B

MECHANICAL DEMOLITION PLAN - AREA 1 BASE BID DESIGN

2014-000074-MD101-1

MECHANICAL DEMOLITION PLAN - AREA 1 BID OPTION-1 DESIGN

2014-000074-MD101-2

MECHANICAL DEMOLITION PLAN - AREA 1 BID OPTION-2 DESIGN

2014-000074-MR101

MECHANICAL EQUIPMENT RIGGING PLAN ALL BID OPTIONS

2014-000074-M101-B

MECHANICAL RENOVATION PLAN - AREA 1 BASE BID DESIGN

2014-000074-M101-1

MECHANICAL RENOVATION PLAN - AREA 1 BID OPTION-1 DESIGN

2014-000074- M101-2

MECHANICAL RENOVATION PLAN - AREA 1 BID OPTION-2 DESIGN

2014-000074-M102

MECHANICAL AREA 2 RENOVATION PLAN ALL BID OPTIONS DESIGN

2014-000074-MD601-B

CHILLED WATER FLOW DIAGRAM DEMOLITION - BASE BID DESIGN

2014-000074- MD601-1

CHILLED WATER FLOW DIAGRAM DEMOLITION - BID OPTION 1 DESIGN

2014-000074- MD601-2

CHILLED WATER FLOW DIAGRAM DEMOLITION - BID OPTION 2 DESIGN

2014-000074- M601-B

CHILLED WATER FLOW DIAGRAM RENOVATION - BASE BID DESIGN

2014-000074- M601-1

CHILLED WATER FLOW DIAGRAM RENOVATION - BID OPTION 1 DESIGN

2014-000074- M601-2

CHILLED WATER FLOW DIAGRAM RENOVATION - BID OPTION 2 DESIGN

2014-000074-M701

CHILLED WATER CONTROL DIAGRAM RENOVATION

2014-000074-M801

DETAILS

2014-000074-M802

CHILLED WATER VALVE REPLACEMENT DIAGRAMS

2014-000074-M802

MECHANICAL PIPE SUPPORTS

2014-000074-M901

SCHEDULES

2014-000074-E001

ELECTRICAL SYMBOLS

2014-000074-E002

ELECTRICAL ABBREVIATIONS AND SCHEDULES

2014-000074-E101

SINGLE LINE DIAGRAMS

2014-000074-E102

TEMPORARY CHILLERSELECTRICAL SITE PLAN

2014-000074-E201

SECOND FLOOR PLAN (GROUND LEVEL) DEMOLITION

2014-000074-E202

SECOND FLOOR PLAN (GROUND LEVEL) POWER

2014-000074-E901

OUTDOOR SWITCHGEAR ELEVATION

2014-000074-E902

OUTDOOR SWITCHGEAR STRUCTURAL ELEVATION CONDUIT RACK & DETAILS

2014-000074-S901

OUTDOOR SWITCHGEAR STRUCTURAL ELEVATION CONDUIT RACK & DETAILS

C.4 PROPRIETARY WORK

The following work will be required to be performed in accordance with WJHTC standards and tied into existing monitoring stations, along with the selected chillers; contact information is provided since a subcontracting arrangement is expected:

HVAC equipment control and monitoring system:

Tri-M Building Automation Systems Corp.

Mike May, Senior Project Manager P.O. Box 69, 206 Gale Lane, Kennett Square, PA 19348

(610) 444-1002; email MMay@Tri-Mgroup.com Substation power monitoring system:

DVL Group Inc.

Stephen M. Graham, Sales Manager for Power Systems

115 Sinclair Road, Bristol, PA 19007

(215) 826-1134; email sgraham@dvlnet.com Chiller Manufacturer:

York, Johnson Controls, Inc

Eric Marano, Senior Account Executive

1001 Lower Landing Road, Suite 409

Blackwood, NJ 08012

(610) 276-3700 email Eric.A.Marano@jci.com

--- END OF SECTION C---

File details come from the government source that posted it. Updated .