DTC-RFQ_21-02EN-FC_Library_of_Engineering_Services_for_Continuing_Contract.pdf

PDF 6 MB Posted

Attached to
Professional Consulting Services Continuing Contracts
Solicitation number
26-039EN-RFQu
Issued by
Hillsborough County, Florida

About this file

This is a Request for Qualifications (RFQ) issued by the City of Plant City, Florida, for continuing professional engineering services across multiple discipline categories. The City seeks qualified firms to provide on-call engineering support for projects with estimated construction costs not exceeding $7.5 million or study costs not exceeding $0.5 million. The RFQ encompasses ten discipline categories: General Engineering, Transportation Engineering, Environmental Engineering, Stormwater Engineering, Geotechnical Engineering, Water and Wastewater Engineering, Sub-Surface Utility Engineering, Instrumentation and Controls Engineering, Electrical Engineering, and Registered Surveying and Mapping. The initial contract term is one year with four optional one-year renewal periods for a potential five-year engagement. Respondents may apply for one or multiple categories and must submit proposals by December 10, 2020, at 2:00 p.m. to the Community Engagement Center at City Hall. No minimum work volume is guaranteed, and selected firms will receive work through individual work orders issued by the City as needed.

Compensation shall be based on actual salary costs plus overhead and profit percentages as specified in the fee proposal, with reimbursable costs listed separately and invoiced monthly. The City will process proper invoices within 15 days of receipt and issue payment within 45 days thereafter in accordance with Florida Statutes Part VII, Chapter 218. The City has designated one minority business enterprise set-aside category; Diversified Technology Consultants, Inc. (DTC), the respondent in this file, holds current MBE certification from the City of Tampa valid through April 4, 2021. DTC proposes services for Categories 1 (General Engineering), 6 (Water and Wastewater Engineering), and 9 (Electrical Engineering), with key personnel including Shay Atluru as Principal-in-Charge, A. Graham Curtis as Project Manager for water and wastewater services, and Warren Reid as Project Manager for electrical services. DTC's office location for Categories 1 and 6 is in Hamden, Connecticut, while the General Engineering and Electrical Engineering office is located in Sarasota, Florida. The City reserves the right to withhold payment if performance is deemed unsatisfactory and may retain amounts to cover claims or liabilities arising from the work.

View the file

Other files

File Type Posted
Professional_Consulting_Services_Continuing_Contracts_(Addendum_#2_Revision).pdf PDF
Universal_Engineering_-RFQ_21-020EN-FC_-_Library_of_Engineering_Services.pdf PDF
Total_Scoring_and_Recap_21-020_Revised_(009).xlsx XLSX spreadsheet
Tierra.pdf PDF
Terracon_Consultants_Inc._-_RFQ_21-02EN-FC.pdf PDF
SurvTech.pdf PDF
Southeastern_Surveying.pdf PDF
SinghofenAssociates_RFQ21-020EN-FC_PlantCity.pdf PDF
SGM_Submittal_RFQ_21-020EN-FC_Library_of_Engineering_Continuing_Contracts.pdf PDF
RK_26K.pdf PDF
Reiss_-_Plant_City_RFQ_21_20_EN_FC_.pdf PDF
Ramos_Engineering.pdf PDF
Quigg_RFQ_21-020EN-FC.pdf PDF
PSI_RFQ_21-020EN-FC_submitted_by_Intertek.pdf PDF
PreproposalMeeting_042426.pdf PDF
PPM_Consultants_2C_Inc._RFQ_21-020-EN-FC_Library_of_Engineering_Services_for_Continuing_Contracts_(Cat_3).pdf PDF
Patel_2C_Greene_and_Associates.pdf PDF
OHC_Environmental_RFQ_21-020EN-FC_Plant_City.pdf PDF
OCI_Associates_2C_Inc.pdf PDF
Nova_-RFQ_21-020EN-FC_Library_of_Engineering_Services.pdf PDF
Metzger_Willard_-Submittal_for_Library_Prof_Srvs_-.pdf PDF
Mead__26_Hunt.pdf PDF
Maser_Consulting_Response_to_RFQ_21-020EN-FC_Plant_City.pdf PDF
Madrid_CPWG_Response_to_Plant_City_-_Library_of_Engineeing_Services.pdf PDF
KPI_Engineering_16-014EN-MS.pdf PDF
Kimley-Horn_submittal_for_Plant_City_RFQ_21-020EN-FC.pdf PDF
KCA_City_of_Plant_City_Library_of_Engineering_Svcs_for_Cont_Contracts_RFQ_21-020EN-FC.pdf PDF
JMTs_CoPC_Library_of_Eng_Services_21-020EN-FC.pdf PDF
Inwood_RFQ21-020EN-FC.pdf PDF
Hydro_Solutions_Consulting.pdf PDF
Hyatt_RFQ_21-020EN-FC.pdf PDF
Hazen_and_Sawyer.pdf PDF
Halff_Associates_Inc.pdf PDF
Griner_Engineering_Inc_RFQ_Response.pdf PDF
GOLDER_Plant_City_RFQ_21-020EN-FC_12-10-2020.pdf PDF
GLE_Plant_City_RFQ_21-020EN-FC_Response.pdf PDF
George_F_Young.pdf PDF
Gallagher_Bassett_BSI_RFQ_21-020EN-FC_RESPONSE-121020.pdf PDF
Florida_Transportation_Engineering.pdf PDF
EES_Submital_RFQ_21_020EN_FC_(1).pdf PDF
DTC-RFQ_21-02EN-FC_Library_of_Engineering_Services_for_Continuing_Contract.pdf PDF
DRMP_PlantCity_RFQ_21-020EN-FC.pdf PDF
Dewberry_Engineers_Inc.pdf PDF
Curtoom_Libraries_of_Engineering_Services_RFQ_21_020EF_FC.pdf PDF
CPC_RFQ_21-020EN-FC_Planty_City_Library_of_Engineering_Services.pdf PDF
Conemco_RFQ_21-020EN-FC_Library_of_Engineering_Services.pdf PDF
CivilSurv.pdf PDF
Chastain_Skillman_SOQ-Plant_City_RFQ_2321-020EN-FC.pdf PDF
Carollo_Engineers.pdf PDF
Cardno_2C_Inc.pdf PDF
Show 40 more

Latest 50 of 71 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DELIVERING YOUR PROJECTS WITH INNOVATION & INTEGRITY

RFQ 21-020EN-FC

Library of Engineering Services for

Continuing Contracts Categories:

1 General Engineering 6 Water & Wastewater Engineering 9 Electrical Engineering

Submitted to:

Community Engagement Center First Floor City Hall West Entrance

PROCUREMENT DEPARTMENT

302 W. Reynolds Street, 3rd Floor Plant City, Florida 33563

Date / Time Due:

December 10, 2020 / 2:00 p.m.

Library of Engineering Services for Continuing Contracts RFQ 21-02EN-FC P a g e | 7

Section 6 – Scope of Services

The City intends to award continuing contracts to one or more firms in each of the library of services listed below, for those firms deemed to be the most highly qualified to perform the required services.

In determining whether a firm is qualified, the City shall consider such factors as the ability of professional personnel; whether a firm is a certified minority business enterprise; past performance; willingness to meet time and budget requirements; location; recent, current, and projected workloads of the firms; and the volume of work previously awarded to each firm by the City, with the object of effecting an equitable distribution of contracts among qualified firms, provided such distribution does not violate the principle of selection of the most highly qualified firms. Firms selected by the City will provide engineering services to the City on an as-needed basis for their specific category, based upon work orders to be issued by the City under the terms of their continuing contracts. The contracts shall be for one year with four one-year renewal options.

One firm may qualify for more than one category in the library of services. The table listing the various areas of engineering is shown below, providing a checkbox to indicate which category or categories respondents are submitting for their services to be considered. It may be that a firm submitting for more than one category may be selected for one or more of those checked categories.

Check one or more of these Categories and submit with proposal.

Category No. Category Descriptions Checkbox 1 General Engineering 2 Transportation Engineering 3 Environmental Engineering 4 Stormwater Engineering 5 Geotechnical Engineering 6 Water and Wastewater Engineering 7 Sub-Surface Utility Engineering 8 Instrumentation and Controls Engineering 9 Electrical Engineering 10 Registered Surveying and Mapping

The scope of services to be provided, but not limited to, are described under each category of services listed below:

General Engineering (Category 1) Roadway Design (small projects)

CATEGORY CHECKLIST

1 | P a g e

Library of Engineering Services for Continuing Contracts

Categories:

1 General Engineering / 6 Water & Wastewater Engineering / 9 Electrical Engineering

Executive Summary The City of Plant City has a diverse requirement for engineering services in many categories. DTC is pursuing Category 1-General Engineering and Categories 6 and 9-Water/Wastewater and Electrical Engineering.

Although we do not know the exact nature of this task order under this contract, we can state that we have sufficient depth and breadth experience on these types of projects thought the United States. In particular, we dealt with a long-term control program for various municipalities in the State of Connecticut. This 41-year history of sophisticated utility work allows DTC to provide services to Plant City Utilities.

Water and Wastewater Diversified Technology Consultants, Inc. (DTC) has been serving the needs of Federal, State, and municipal clients of wastewater collection and treatment since our inception in 1979. These clients have recognized the value DTC brings in the delivery of successful combined sewer separation, consolidation, and treatment of combined sewer systems projects.

DTC’s General Engineering, Water and Wastewater team will be led by Mr. A. Graham Curtis, PE, LEED AP. Mr. Curtis served as Project Manager and Technical Design lead on numerous combined, sanitary, and storm sewer projects. Supporting Mr. Curtis is a highly qualified team of professionals all based at DTC.

DTC’s staff of over 30 individuals are experienced in a variety of technical trades including Civil, Structural, Mechanical, Fire Protection, Plumbing, and Electrical Engineering.

DTC’s Water and Wastewater experience includes performing studies, design and construction services for combined sewer separation, combined sewer consolidation, sewer installation and sewer upgrades for CSO Contracts.

Through our extensive sewer design experience, DTC has developed a series of design measures geared specifically to the design of sewers in congested urban areas. In the urban environment, we recognize the confinement and congestion presented by extensive utilities, traffic and pedestrian issues, public coordination, and constructibility problems, has considerations that affect the feasibility and final cost of a project. The following is a sampling of some of the measures that DTC employs in urban infrastructure projects:

• Development of a comprehensive subsurface investigation program. This program will identify existing soil conditions as well as potential utility and other subsurface factors that may influence the design. With geotechnical support, the suitability of subsurface soil conditions can be ascertained, and any special design provisions can be incorporated into the design efforts at its earliest stage. This program also includes development of a comprehensive pre-design test pit program to locate utilities and tie down sewer routing and utility related design parameters.

• Early and consistent coordination with utility companies. Including the effected utility companies as part of the design process from the earliest concepts to the final design plans, allows a more effective and efficient project. In past projects we have worked with both public and private utility companies to:

• Identify potential utility relocations, and balance relocation costs with sewer rerouting costs to establish the most cost-effective design approach.

• Identify special treatments needed to protect existing utilities such as establishing limits for sheet piling, temporary utility support needs, and encasement requirements. Temporary support can also impact required construction access and should be considered in any traffic management planning needed for the project.

• Based on test pit information and available mapping, develop details of each potential utility crossing to graphically represent the potential conflict and how the conflict is resolved. Although not generally represented in the design plans, this information has proved invaluable from a QA/QC standpoint, and for reference during construction.

• Early utility relocation planning can allow utility companies to begin some relocation activity in advance of sewer construction efforts.

Design Approach

2 | P a g e

Library of Engineering Services for Continuing Contracts

Categories:

1 General Engineering / 6 Water & Wastewater Engineering / 9 Electrical Engineering

• Early and consistent coordination with residents, business owners and other effected organizations and individuals within and surrounding the construction area. In our experiences, an informed public is generally understanding of the need for temporary impacts, and willing to make some sacrifices if they have been provided with reliable information. An uninformed or under-informed public is generally less cooperative, and quicker become impatient with even the smallest perceived inconvenience. Localized coordination should also include provisions for traffic and pedestrian control and safety. A realistic estimation of required construction work and staging requirements is essential in defining these impacts and conveying them accurately to the public.

• Detailed and accurate survey base information is critical in development of design and in adequately conveying existing conditions. Inclusion of extensive detail on all proposed design elements as well as existing site conditions and utilities, provides a much clearer picture of the designer’s expectations.

Electrical Engineering DTC’s Electrical Engineering team will be led by Mr. Warren Reid, PE, as Project Manager. He has been providing electrical engineering services for over 38 years.

DTC provides electrical engineering and support services in the design of public safety, commercial, industrial, and educational facilities. We provide mechanical and electrical engineering, plumbing and fire protection systems to support renovations and new construction.

DTC is dedicated to developing a clear understanding of the problems and needs of our clients and working toward effective, economical, and timely solutions consistent with project objectives. Our staff of technical experts provides sophisticated designs that adapt to the unique needs of each client in both new construction and renovation situations. We are committed to offering cost-effective solutions that meet or exceed standards of efficiency, sustainability, and maintainability.

As part of an on-call contract with Manatee County, DTC provided design and construction administration services for a 350-kW natural gas generator and ATS (Automatic Transfer Switch) addition to power the entire building that houses the Children’s Protective Services Department of the Manatee County Sherriff’s Office during hurricane season electric utility outages. The existing building is approximately 22,000 square feet and has an existing 800 Amp 3 Phase 240 Volt High leg DELTA pad mount transformer service from Florida Power & Light (FP&L). Recorded demand Load metering for one week, as well as two (2) years of FP&L billing records with their peak demand history were reviewed and analyzed to determine the power load and required generator capacity needed to adequately serve the building. Other factors that influenced this design were the fact that the building had an existing 130 kVA roof mounted solar power PV (Photovoltaic) array and inverter cogeneration system as well as a special IT Room with its own UPS System (Uninterruptible Power Supply) with a dedicated Roll-Up generator tie in and transfer switch. The facilities director specified that the fuel supply would be natural gas because a gas main ran adjacent to the property and this eliminated any concern with diesel fuel shortages or fuel truck delivery problems during storms. The design was optimized to take advantage of existing conditions to minimize the cost and complexity of the installation, and it also had to minimize the interference with existing operations during weekdays and any power outages for construction “switch overs” had to be limited in time to just a few hours in order to meet IT system UPS limitations, as well as, be conducted over week-ends.

Construction administration services included pre-construction meeting participation, bid evaluations and selection recommendations, contractor RFI responses and coordination directives, owner requested design and equipment changes, construction progress inspections, pay application reviews, approvals and certifications, contractor equipment submittal reviews and approvals, electrical testing observations, test report reviews and approvals. The construction administration services contract also included locating and tracing electrical system feeders and panels for detailed “As-Built” documents in order to provide the facilities department with accurate “record documents” of the electrical system building plans and panel schedules. The timeframe for Professional Services and Construction Administration was October of 2017 to June 2019.

3 | P a g e

Library of Engineering Services for Continuing Contracts

Categories:

1 General Engineering / 6 Water & Wastewater Engineering / 9 Electrical Engineering

Conclusion DTC has built a solid reputation for producing high-quality cost-effective designs for public clients for over 41 years.

Our multidiscipline team of professionals provides our clients with a single source for a wide array of design projects.

We have a vested interest in serving the needs of clients and can mobilize our best people to the project areas very quickly.

DTC has a proven track record in electrical engineering and in design of urban combined sewer improvement projects.

The entire DTC team is looking forward to the opportunity to let our wealth of experience assist the City of Plant City in its important mission.

4 | P a g e

Library of Engineering Services for Continuing Contracts

Categories:

1 General Engineering / 6 Water & Wastewater Engineering / 9 Electrical Engineering

Table of Contents

Tab A Ability of Professional Personnel & Staff Experience

Tab B Relevant Experience

Tab C Location/Accessibility

Tab D Volume of Similar Contracts with Government Agencies within the Past Five Years and Past

Performance of Respondent, Including Partners and Team Members

Tab E Current and Projected Workload

Tab F Certified Minority Business Enterprise

Tab G Local Preference

Tab H Required Forms

5 | P a g e

Library of Engineering Services for Continuing Contracts

Categories:

1 General Engineering / 6 Water & Wastewater Engineering / 9 Electrical Engineering

Tab A Ability of Professional Personnel & Staff Experience

a. The following organizational chart illustrates DTC’s Key Personnel who will be assigned to the following Categories for RFQ 21-020EN-FC:

Category 1: General Engineering

Category 6: Water and Wastewater Engineering

Category 9: Electrical Engineering

6 | P a g e

Library of Engineering Services for Continuing Contracts

Categories:

1 General Engineering / 6 Water & Wastewater Engineering / 9 Electrical Engineering

b. Brief Resumes of Key Personnel

Shay Atluru, President & CEO

Role: Principal-in-Charge – Mr. Atluru has over 31 years of consulting, construction and environmental experience and extensive experience in a variety of civil and site engineering projects including site selection and zoning issues. Mr. Atluru has a BS in Engineering and Business Administration from Vanderbilt

University, and has taken post-graduate studies in law, deconstruction, hazardous waste, and contracts. He sits on many civic and community boards, and truly becomes involved with communities in which he works and lives.

Mr. Atluru was DTC’s Principal-in-Charge on the following projects:

Mechanical, Electrical and Plumbing Engineering Services Continuing Services Contract, Manatee

County, Florida

DTC was selected for a continuing services contract to provide mechanical, electrical, and plumbing services on a variety of projects for Manatee County, FL. Project services include pre-design, site analysis, design development, construction documents, site supervision and project close out. DTC shall provide engineering for site development, design, and specifications as well as engineering calculations, structural analysis, system evaluation and system recommendation. Services also include performance of feasibility studies, bidding, permitting, shop drawings and preparation of project schedules.

Miscellaneous Plumbing, HVAC and Electrical Engineering Services, Lee County, Florida

DTC was selected by Lee County, FL to provide miscellaneous plumbing, HVAC, and electrical engineering services as part of the county’s continuing services contract library. Services are provided to numerous

County departments such as Facilities Management, Parks & Recreation, Construction Management, Public

Works, and Utilities.

Tunxis Community College, Farmington, Connecticut

DTC provided mechanical, electrical, plumbing, fire protection and telecom services for the 100,000-square foot addition for Tunxis Community Technical College in Farmington, CT. The construction consists of a two-story library, cyber cafe, classrooms, administration offices, two-story open corridor, laboratories with fume hoods, natural gas, compressed air, distilled water and acid neutralizing tanks, and dental classrooms with dental chairs.

Stamford Urban Transitway, Phase II, Stamford, Connecticut

DTC provided civil engineering services to make improvements to Myrtle Avenue and East Main Street as an extension of its Stamford Urban Transitway Project. This project involved a wide range of services including Topographic and Boundary Survey, Preliminary Engineering Study and Design, Sanitary Sewer

Study and Design, Storm Sewer Study and Design, Traffic Study and Geotechnical Investigations. Both the

Sanitary Sewer Study and Design and the Storm Sewer Study and Design involved not only determining the condition of the existing pipes and the design of the sanitary sewer and storm sewer within the project area, but also the determination of what was needed to convey all the flows from the upstream system if all upstream problems and restrictions were corrected for both existing and proposed flows. This also included analyzing the system downstream of the project area for problems in conveying the existing and proposed flows.

Millbrook Roadway Improvements, Middletown, Connecticut

DTC designed roadway improvements on Millbrook Road from Lake Ridge Heights to the Durham Town line, a distance of 7,900 feet, for the City of Middletown. DTC performed an inspection of an existing stone masonry/concrete slab culvert over an unnamed brook. The culvert was found to be in poor condition (scour, poor concrete slab, and damaged parapets). DTC designed a replacement culvert. This project included survey, roadway and culvert design, geotechnical engineering, preparation of environmental documents, construction documents, bidding phase services, construction contract administration and full-time

Inspection.

7 | P a g e

Library of Engineering Services for Continuing Contracts

Categories:

1 General Engineering / 6 Water & Wastewater Engineering / 9 Electrical Engineering

Category No. 1: General Engineering

Category No. 6: Water and Wastewater Engineering

A. Graham Curtis, PE, LEED AP, Vice President

Role: Project Manager - Mr. Curtis has over 38 years of experience as a professional civil engineer. He is a Florida licensed professional civil engineer and is also a LEED Accredited Professional. Mr. Curtis has worked with private and government clients.

Mr. Curtis was the Project Manager on projects listed below*.

Jane Witherell, PE

Role: Civil Engineer – Ms. Witherell is a Florida licensed professional civil engineer, with over 35 years of civil and environmental engineering experience. Ms. Witherell is also a licensed environmental professional and a certified hazardous materials manager.

Brian Skonieczny

Role: Civil Engineer – Mr. Skonieczny has over 40 years of civil engineering experience. He has been responsible for the management and coordinate of wastewater, highway, roadway, and bikeway projects. He also managed bridge rehabilitation and replacement projects, the bridge safety and inspection program as well as environmental projects.

Joe Whitley, EIT

Role: Civil Engineer / Inspector – Mr. Whitley has a BS in Civil Engineering from Worcester Polytechnic

Institute and has over 20 years of experience working in multiple environments within construction engineering and inspection as well as the civil engineering field.

Blake Widmer, EIT

Role: Civil Engineer – Mr. Widmer graduated from University of Connecticut with a BS in Civil

Engineering. Mr. Widmer has been working on a project with DTC’s civil engineers finalizing the design of a new stormwater management and sanitary sewer collection system for the West Rock Redevelopment project in New Haven, Connecticut.

*DTC’S PROJECT EXPERIENCE FOR CATEGORIES 1 AND 6 INCLUDES:

On-Call Collection System, The Greater New Haven WPCA

The Greater New Haven Water Pollution Control Authority selected DTC to provide on-call professional design services related to the Greater New Haven WPCA’s Clean Water Project for sewer separation associated with the Yale Campus/Trumbull Street Area Sewer Separation Project Phase 2A in New Haven, CT. The project scope entailed evaluation of alternative storm pipe routing, and designing of storm drainage mains, in an area of the City suffering periodic combined sewer overflow issues.

Stamford Urban Transitway, Phase II, Stamford, Connecticut

DTC provided civil engineering services to make improvements to Myrtle Avenue and East Main Street as an extension of its Stamford Urban Transitway Project. This project involved a wide range of services including Topographic and Boundary Survey, Preliminary Engineering Study and Design, Sanitary Sewer

Study and Design, Storm Sewer Study and Design, Traffic Study and Geotechnical Investigations. Both the

Sanitary Sewer Study and Design and the Storm Sewer Study and Design involved not only determining the condition of the existing pipes and the design of the sanitary sewer and storm sewer within the project area, but also the determination of what was needed to convey all the flows from the upstream system if all upstream problems and restrictions were corrected for both existing and proposed flows. This also included analyzing the system downstream of the project area for problems in conveying the existing and proposed flows.

Millbrook Roadway Improvements, Middletown, Connecticut

DTC designed roadway improvements on Millbrook Road from Lake Ridge Heights to the Durham Town line, a distance of 7,900 feet, for the City of Middletown. DTC performed an inspection of an existing stone masonry/concrete slab culvert over an unnamed brook. The culvert was found to be in poor condition (scour, poor concrete slab, and damaged parapets). DTC designed a replacement culvert. This project included survey, roadway and culvert design, geotechnical engineering, preparation of environmental documents, construction documents, bidding phase services, construction contract administration and full-time Inspection.

8| P a g e

Library of Engineering Services for Continuing Contracts

Categories:

1 General Engineering / 6 Water & Wastewater Engineering / 9 Electrical Engineering

Category No. 9: Electrical Engineering

Warren Reid, PE

Role: Project Manager - Mr. Reid is a licensed professional engineer with over 30 years of consulting engineering experience. He as acted as the primary electrical engineer overseeing a diverse clientele as well as a large variety of project types including, but not limited to, educational and recreational facilities, community and senior centers, and correctional and healthcare institutions.

John SanVicente

Role: Electrical Designer – Mr. SanVicente has over 30 years of diverse experience in Electrical Design, Construction Administration, and Field Inspection in Electrical and Structural disciplines. Mr. SanVicente currently provides electrical design and construction administration services for municipal, governmental, and private sector clients.

Marian Spitza

Role: Electrical Designer – Mr. Spitza has been designing electrical systems for over 20 years. He received his bachelor’s degree in Romania, and a master’s degree in electrical engineering from the University of New

Haven. Mr. Spitza’s experience is extensive, completing many Municipal and State projects. His projects have included banks, college dorms, and full schools. Many projects also included standalone generators, housing, and fast-food restaurants.

DTC’S PROJECT EXPERIENCE FOR CATEGORY 9 INCLUDES:

Mechanical, Electrical and Plumbing Engineering Services Continuing Services Contract, Manatee

County, Florida

DTC was selected for a continuing services contract to provide mechanical, electrical, and plumbing services on a variety of projects for Manatee County, FL. Project services include pre-design, site analysis, design development, construction documents, site supervision and project close out. DTC shall provide engineering for site development, design, and specifications as well as engineering calculations, structural analysis, system evaluation and system recommendation. Services also include performance of feasibility studies, bidding, permitting, shop drawings and preparation of project schedules. Mr. Reid provided electrical engineering services for this contract.

Miscellaneous Plumbing, HVAC and Electrical Engineering Services, Lee County, Florida

DTC was selected by Lee County, FL to provide miscellaneous plumbing, HVAC, and electrical engineering services as part of the county’s continuing services contract library. Services are provided to numerous

County departments such as Facilities Management, Parks & Recreation, Construction Management, Public

Works, and Utilities. Mr. Reid provided electrical engineering services for this contract.

Tunxis Community College, Farmington Connecticut

DTC provided mechanical, electrical, plumbing, fire protection and telecom services for the 100,000-square foot addition for Tunxis Community Technical College in Farmington, CT. The construction consists of a two-story library, cyber cafe, classrooms, administration offices, two-story open corridor, laboratories with fume hoods, natural gas, compressed air, distilled water and acid neutralizing tanks, and dental classrooms with dental chairs.

9 | P a g e

Library of Engineering Services for Continuing Contracts

Categories:

1 General Engineering / 6 Water & Wastewater Engineering / 9 Electrical Engineering

Tab B Relevant Experience

a. DTC’s Background and History

For over four decades, DTC has implemented cost-effective, innovative design, planning, and management both locally and across the globe. We cover projects from start to finish – and we do so by employing a diverse set of experts experienced in providing engineering, environmental, and construction management services to meet our clients’ project needs. Our team is made up of specialized professionals from each discipline in the building world including:

• Civil and Site Engineering

• Electrical Engineering

• Mechanical Engineering

• Plumbing and Fire Protection

• Structural Engineering

• Construction Administration

• Transportation and Bridge Design

• Sustainable Design

• Urban and Environmental Planning

• Environmental Services

DTC has a long history of servicing a wide variety of client types. These successful relationships have built our reputation second to none of quality technical competence, capability, and capacity to perform work within tight project schedules and budgets, as well as understanding and knowledge of Federal, State, and local policies, regulations, and procedures. DTC is an industry leader in implementing innovative and cost-effective solutions for a variety of engineering and project management challenges. We bring together each of these entities under one roof to collaborate and administer successful project results.

DTC utilizes the most current Computer Aided Design (CAD), Building Information Modeling (BIM), and Graphical Information System (GIS) software to accurately generate engineering models, visual schematics, and contract documents for projects in various market sectors including:

• Water

• Public Infrastructure

• Parks and Recreation

• Housing

• Healthcare

• Education

• Commercial

• Energy

• Federal

• Residential

A leader in providing multi-discipline consulting services, DTC interfaces with teams of architects, engineers, urban planners, financing experts, subcontractors, and specialty service providers to realize building projects. These teams plan and implement innovative and cost-effective solutions for a variety of engineering and project management challenges. DTC combines farsighted strategy with creative technical solutions to provide value-added programs for clients.

Experience for each Category of Service

Category 1: General Engineering

Category 6: Water & Wastewater Engineering

Hydraulics and Drainage: DTC offers an extensive background in study and design of drainage and stormwater management systems for government and business. Our expertise encompasses municipal master drainage studies, stormwater management planning for proposed development sites, permitting for floodplain modifications, channel relocation studies, and roadway drainage design. DTC's multi-discipline approach to dealing with stormwater issues, results in solutions that minimize drainage impacts and cost, while maintaining sensitivity to the environmental issues necessary for regulatory approval.

Extensive use of computer technology through hydrologic and hydraulic modeling software, CAD systems, and a multitude of on-line resources streamlines the study and design process.

10 | P a g e

Library of Engineering Services for Continuing Contracts

Categories:

1 General Engineering / 6 Water & Wastewater Engineering / 9 Electrical Engineering

In addition to our highly qualified drainage and hydraulics engineers, DTC offers the talents of skilled environmental scientists, structural engineers, and construction professionals, all in-house, working together to ensure a practical and cost-effective project.

• Storm Drainage Design

• Federal, State, and Local Permitting

• Hydraulic Analysis for Bridges and

Culverts

• Municipal Master Drainage Studies

• Stormwater Pump Stations and Lift Stations

• Hydrologic Analysis & Modeling

• Stormwater Management Studies

• Bridge Scour Analysis and Countermeasure Design

• Flood Damage Assessment

• Expert Testimony

• FEMA LOMR and CLOMR Approvals

• Stormwater Detention and Retention

Systems

• Stormwater Quality Basins

• Sediment Removal Systems

• Water Diversion Design and

Permitting

• Stream Channel Encroachment

Assessments and Channel Improvement Studies

• Pond and Channel Dredging

Design and Permitting

• Dam Analysis, Design and

Permitting

• Coordination of tidal and inland wetland mapping

• Tidal Hydraulic Modeling for

Bridges

• NPDES Stormwater Management

Permitting Local Pe

Wastewater System Engineering: DTC has conducted extensive wastewater system evaluations and designs for municipal and private clients. From Sewer System Evaluation Studies (SSES), and Infiltration and Inflow Studies (I&I), through complete wastewater treatment plant design, our experienced multidisciplinary team provides our clients with turn-key wastewater solutions. Our specialized experience in Combined Sewer Overflow (CSO) abatement includes computerized sewer system modeling, design of automated on-line and offline CSO storage and treatment facilities, as well as combined sewer separation design, all in highly urbanized areas.

Study and design of sanitary sewage pumping stations and associated pressure sewer systems is a specialty of the firm. DTC's experience includes vacuum primed, submersible, and wet pit/dry pit stations, with both constant and variable speed drive systems. From rehabilitation of existing pump stations, to design of new low-pressure sewer systems, DTC's experienced staff understands the technical needs and inevitable cost constraints associated with every project.

Water System Engineering: Offering a complete package of planning, design, and construction services, our team brings state-of-the-art design upgrades to yield high-level efficiencies in aquifer evaluation, source water quality assessments, domestic and fire flow requirements, distribution systems, storage systems, pretreatment, and permitting. DTC’s talented team has designed treatment plants, transmission and distribution pipelines, pump stations and pressure regulate facilities. We also provided regulatory review, compliance, permitting, source identification and capacities.

Water

Distribution

Water

Treatment

Wastewater

Collection Systems

Wastewater

Treatment Systems

• Booster Stations

• Fire Protection

Stations

• Distribution System

Evaluation

• Flow Testing

• Quality Testing

• Wells

• Storage

• Groundwater Systems

• Surface Water Systems

• Corrosive

Evaluations/Treatments

• Lead and Copper

• Activated Carbon

Treatment

• Pump Systems, Grinders,

• Submersible, Dry Pit, Vacuum Primed

• Odor Control

• Gravity Sewer Design

• Low Pressure Sewer

Design

• Operation and

Maintenance

• Mapping CADD/GIS

• CSO Separation, Storage and Treatment

• Sewer System Modeling and Simulations

• Nitrification/

Denitrification

• Treatment and Ground

Disposal

• Large Ground Disposal

• Systems

• Cost Evaluations of

Alternatives

• Process Support, Design and Construction Services

• Mechanical, Electrical, Plumbing, Structural, Civil

11 | P a g e

Library of Engineering Services for Continuing Contracts

Categories:

1 General Engineering / 6 Water & Wastewater Engineering / 9 Electrical Engineering

Category 9: Electrical Engineering

DTC provides electrical engineering and support services in the design of research, commercial, industrial, and educational facilities. Working for owners or architects, we provide mechanical and electrical engineering, plumbing and fire protection systems to support renovations and new construction.

DTC is dedicated to developing a clear understanding of the problems and needs of our clients and working toward effective, economical, and timely solutions consistent with project objectives. Our staff of technical experts provides sophisticated designs that adapt to the unique needs of each client in both new construction and renovation situations. We are committed to offering cost-effective solutions that meet or exceed standards of efficiency, sustainability, and maintainability.

Electrical Engineering services:

• Power System Survey/Demand Analysis

• AC/DC System Alternatives and Voltage Selection

• Generation and Transmission System Development

• Cogeneration, Hydro and Solar Power Systems

• Electrical Service and Distribution

• Automatic Controls and Instrumentation

• Automatic Fire Alarm and Detection Systems

• Energy Recovery Systems

• Hospital and Surgery Suites

12 | P a g e

Library of Engineering Services for Continuing Contracts

Categories:

1 General Engineering / 6 Water & Wastewater Engineering / 9 Electrical Engineering

b. Florida Department of Transportation Pre-Qualifications

DTC is prequalified from the Florida Department of Transportation on the following types of work:

Group 3 Highway Design – Roadway

3.1 Minor Highway Design

Group 5 Bridge Inspection

5.4 Bridge Load Rating

13 | P a g e

Library of Engineering Services for Continuing Contracts

Categories:

1 General Engineering / 6 Water & Wastewater Engineering / 9 Electrical Engineering

c. DTC’s Past and Current Related Experience

Categories: 1 General Engineering and 6 Water and Wastewater Engineering

Millbrook Roadway Improvements, Middletown, Connecticut

Project Scope: Design and Construction of Roadway Improvements

DTC Role: Prime

Project Cost: $2,000,000

Design Fee: $90,000

Construction/CEI Fee: $235,000

Owner/Client: City of Middletown, Connecticut

Christopher Holden, Deputy Director

Department of Public Works

860.638.4857

Contract Dates: January 2014 - January 2017

Project Overview:

DTC designed roadway improvements on Millbrook Road from Lake Ridge Heights to the Durham Town line, a distance of 7,900 feet, for the City of Middletown.

The existing road is nominally 22 feet wide with occasional wider sections through curves and is uncurbed except in isolated locations. The roadway is rural in nature and adjacent properties are residential. Much of the roadway pavement is in fair condition. However, some areas exhibit alligator cracking. Since alligator cracking is generally a result of poor base material, a subsurface geotechnical program was undertaken to determine limits of full depth reconstruction, pavement replacement and mill and overlay.

Additionally, DTC performed an inspection of an existing stone masonry/concrete slab culvert over an unnamed brook. The culvert was found to be in poor condition (scour, poor concrete slab, and damaged parapets). DTC designed a replacement culvert.

Roadway improvements consist of pavement improvements (replacement or overlay), extruded concrete curb in isolated locations, additional drainage and underdrains in areas exhibiting problems, and pavement markings.

This project included survey, roadway and culvert design, geotechnical engineering, preparation of environmental documents, construction documents, bidding phase services, construction contract administration and full-time Inspection.

As part of the construction inspection and administration services due to project funding coming from the

State LOTCIP program, DTC was responsible to follow CTDOT inspection standards and record keeping requirements.

14 | P a g e

Library of Engineering Services for Continuing Contracts

Categories:

1 General Engineering / 6 Water & Wastewater Engineering / 9 Electrical Engineering

On-Call Collection System – The Greater New Haven WPCA

Project Scope: On-Call Civil Engineering Services

DTC Role: Prime

Construction Cost: $10,000,000

Design Fee: $478,000

Owner/Client: The Greater New Haven Water Pollution Control Authority

New Haven, Connecticut

Thomas Sgroi, Director of Engineering

203.466.5185

Project Overview:

The Greater New Haven Water Pollution Control Authority selected DTC to provide on-call professional design services related to the Greater New Haven WPCA’s Clean Water Project for sewer separation associated with the Yale Campus/Trumbull Street Area Sewer Separation Project Phase 2A in New Haven, CT. The project scope entailed evaluation of alternative storm pipe routing, and designing of storm drainage mains, in an area of the City suffering periodic combined sewer overflow issues.

Located in a high density urban residential/institutional setting, conflicts with existing utilities were a significant challenge for the project. Working closely with the City and public and private utility providers, DTC evaluated numerous routing schemes to provide the most cost effective and least disruptive design solutions. Through topographic surveys, records research and a comprehensive test pit program, existing utility routing and potential conflicts with proposed storm sewer lines were identified. Where necessary, utility relocations, temporary utility support, and specialized pipe construction methods were employed to help reduce construction costs and minimize construction impacts on heavily traveled downtown streets.

Flow monitoring and CCTV inspections of existing storm and combined sewer lines was performed to help in refinement of computer modeling of existing and proposed piping systems. This effort allowed for a more accurate understanding of pipe capacities at appropriate connection points and ensured that existing downstream drain lines were not overloaded.

DTC worked closely with numerous key neighborhood stakeholders including the Yale University to address a variety of concerns and issues including lateral back-ups, street flooding, traffic disruptions, and potential construction impacts on existing stately street trees lining many of the City streets in the study area.

The final design documents will incorporate GNHWPCA and City of New Haven construction details and specifications. Project deliverables included an opinion of probable construction cost presented in a format consistent with GNHWPCA standard pay items, as well as a construction schedule summarizing the total construction duration.

15 | P a g e

Library of Engineering Services for Continuing Contracts

Categories:

1 General Engineering / 6 Water & Wastewater Engineering / 9 Electrical Engineering

On-Call Civil/Structural Engineering University of Connecticut, Storrs, Connecticut

Project Scope: Civil and Structural Engineering

DTC Role: Prime

Project Cost: Varies, On-Call Contract Multiple Assignments, $500,000 max. Contract

Owner/Client: University of Connecticut

Mohammad Hassan Haghpanah, PE

Operational Engineer

959.200.3834/mohammad.haghpanah@uconn.edu

Contract Date Ended: July 30, 2020

Project Overview:

As part of an On-Call contract with the University of Connecticut, DTC performed various structural and civil engineering services.

Water Pollution Control Facility Priority Repairs

Through DTC’s on-call engineering contract with the University of

Connecticut, DTC designed repairs for the Water Pollution Control Facility

(WPCF). The University conducted a vulnerability assessment of the WPCF and four areas were deemed to need immediate repairs. DTC reviewed the findings of this assessment, documented existing conditions, and offered recommendations to address each concern. Oxidation ditch repairs included replacement of aerators, mixers, and dissolved oxygen control, repair froth spray system, and new slide gates in distribution box No. 1. Repairs to the headworks building included a flow meter, replacement of a mechanical screen, addition of a perforated plate screen, repairs to the aerated grit chamber and hazardous gas detectors.

Engineering and Science Building

DTC performed an Independent Structural Engineering Review (ISER) to determine if the school’s new engineering building conformed to standards established by the Connecticut Building Code. As such, DTC conducted a preliminary review, foundation review, primary design review and construction phase review. An outline of the findings was provided to the client.

Castleman Crane Modification

DTC reviewed the existing condition drawings and documentation in order to create a schematic design, with cost estimate, of the client’s existing crane.

DTC was able to provide permanent access to the crane way via a ladder and adhered to required clearances of the crane to the nearby structures and/or appurtenances. Finally, recommendations were made to modify the existing structure/crane members to satisfy requirements of CMAA (Crane

Manufacturers Association of America publication 70.)

Clowes Artwork Installation

DTC engineers designed a structural system to support the installation of a modern sculpture created by artist Jonathan Clowes. The $1 million sculpture was installed in the lobby atrium in the UConn School of Pharmacy/Biology building and is visible from the first three floors.

The art piece, which weighs roughly 300 pounds, has eight different support locations hanging from the ceiling. Although the weight is relatively low, DTC structural engineers considered the cost of the sculpture and the safety of students and staff when making design decisions.

16 | P a g e

Library of Engineering Services for Continuing Contracts

Categories:

1 General Engineering / 6 Water & Wastewater Engineering / 9 Electrical Engineering

Improvements to Stamford Urban Transitway, Stamford, Connecticut

Project Scope: Topographic and Boundary Survey, Preliminary Engineering Study and Design, Traffic Study and Geotechnical Investigation

DTC Role: Consultant

Project Cost: $12,000,000

Owner/Client: City of Stamford, Connecticut

Laura Labosky

SUT Project Coordinator

203.977.5901

Contract Dates: October 2004 – April 2019

Project Overview:

The City of Stamford has retained DTC to make improvements to Myrtle Avenue and East Main Street as an extension of its Stamford Urban Transitway Project. This project involves a wide range of services including

Topographic and Boundary Survey, Preliminary Engineering Study and Design, Sanitary Sewer Study and

Design, Storm Sewer Study and Design, Traffic Study and Geotechnical Investigations.

Both the Sanitary Sewer Study and Design and the Storm Sewer Study and Design involved not only determining the condition of the existing pipes and the design of the sanitary sewer and storm sewer within the project area, but also the determination of what is needed to convey all the flows from the upstream system if all upstream problems and restrictions are corrected for both existing and proposed flows. This also included analyzing the system downstream of the project area for problems in conveying the existing and proposed flows.

The Traffic Study determined optimum lane arrangement and signalization. The Geotechnical Investigation determined subsurface conditions and parameters for the design of the roadway pavement, utility structures, retaining walls and relocation and reconstruction of an Amtrak and MetroNorth wingwall at a railroad bridge.

Other phases of the project include preparation of property maps, semi-final and final design, bidding services, shop drawing & construction drawing reviews and consultation during construction.

The design includes two normal travel lanes, two high occupancy vehicle lanes, two bike lanes, bus turnouts and sidewalks and streetscape improvements throughout the project area as well as additional turning lanes at approaches to intersections and the redesign of four signalized intersections.

The Stamford Urban Transitway Project is being executed in a phased approach, with another consulting engineer designing the first phase. DTC’s project is the second phase of the Stanford Urban Transitway

(SUT). Extensive coordination was and is required with the other consultant to be sure that roadway alignment, storm drainage systems and sanitary sewer systems mesh perfectly from project to project.

17 | P a g e

Library of Engineering Services for Continuing Contracts

Categories:

1 General Engineering / 6 Water & Wastewater Engineering / 9 Electrical Engineering

Category 9: Electrical Engineering

Miscellaneous Plumbing, HVAC and Electrical Engineering Services, Lee County, Florida

Project Scope: Electrical, Plumbing, HVAC Engineering Services

DTC Role: Prime

Owner/Client: Lee County, Florida

Marco Dano, Facilities Manager

239.707.2333

Project Cost: Varies for each assignment

Contract Dates: On-Going

Project Overview:

DTC was selected by Lee County, FL to provide miscellaneous plumbing, HVAC, and electrical engineering services as part of the county’s continuing services contract library.

Professional consultant services for the following tasks: plumbing, HVAC, electrical and telecommunications projects or systems that included, but were not limited to:

• Design

• Construction drawings (AutoCAD)

• Construction specifications

• Permitting

• Bidding and negotiation services

• Construction observation/administration

• Energy management program evaluations

• Conceptual estimates for new construction and renovation/retrofit projects

• Analysis of existing systems

• As built drawings (AutoCAD)

• Performing eleventh month warranty inspections

The project assignments under this contract have included Lee County Real Time Crime Center, Lee County

Jails Plumbing Retrofit and Lee County Jails HVAC Retrofit. Services were provided to numerous County departments such as Facilities Management, Parks & Recreation, Construction Management, Public Works, and Utilities.

18 | P a g e

Library of Engineering Services for Continuing Contracts

Categories:

1 General Engineering / 6 Water & Wastewater Engineering / 9 Electrical Engineering

Continuing Services Contract for Electrical, Mechanical, and Plumbing Engineering Services, Manatee County, Florida

Project Scope: Electrical, Mechanical, and Plumbing, Engineering Services

DTC Role: Prime

Owner/Client: Manatee County, Florida

Charles Frazier, Construction Coordinator

941.749.3052

Project Cost: Varies for each assignment

Contract Dates: On-Going

Project Overview:

DTC was selected for a continuing services contract to provide mechanical, electrical, and plumbing engineering services to Manatee County, FL. Project services include pre-design, site analysis, design development, construction documents, site supervision and project close out. DTC provided engineering for site development, design, and specifications as well as engineering calculations, structural analysis, system evaluation and system recommendation. The services also included performance of feasibility studies, bidding, permitting, shop drawings and preparation of project schedules.

The contract required DTC to provide services specializing in environmentally sensitive and sustainable systems that are economical, efficient, user friendly and operationally sound.

The mechanical, electrical, plumbing CAD services include:

• HVAC layout design and detailing

• Ductwork shop/coordination drawings

• Mechanical layout design and detailing

• Electrical layout design and detailing

• Plumbing layout design and detailing

• Piping & plumbing shop/coordination drawings

• As-built Drawings for new and existing construction/ renovations

• Preparation of cost estimates

The recent project assignments under this contract have included the Manatee

County fan coil replacement design and study, the boiler and steam piping for

Manatee County jail, and a generator replacement for Manatee County Children

Services.

19 | P a g e

Library of Engineering Services for Continuing Contracts

Categories:

1 General Engineering / 6 Water & Wastewater Engineering / 9 Electrical Engineering

Tunxis Community Technical College, Farmington, Connecticut

Project Scope: Electrical, Mechanical, and Plumbing Engineering Services

DTC Role: Consultant

Owner/Client: Connecticut Community Technical College System

Connecticut Department of Public Works

Project Cost: $34.4 Million

Contract Dates: On-Going

Project Overview:

DTC provided mechanical, electrical, plumbing, fire protection and telecom for a $34.4 million, 100,000 square foot addition to the library and classroom building for Tunxis Community Technical College in

Farmington, CT. The new library consists of two computer classrooms and 14 study rooms to allow for additional study space in the existing library. The new classroom building consists of five science laboratories with fume hoods natural gas, compressed air and acid neutralizing tanks for biology, chemistry, microbiology, and physics, a dental hygiene suite and laboratory, computer graphics studios, art and photography studios, six classrooms, eight break-out rooms, and academic resource space.

20 | P a g e

Library of Engineering Services for Continuing Contracts

Categories:

1 General Engineering / 6 Water & Wastewater Engineering / 9 Electrical Engineering

Tab C Location/Accessibility

Location for each work category and future accessibility.

Category 1 - General Engineering Category 6 - Water/Wastewater

505 S. Orange Avenue, Sarasota, Florida 34236 2321 Whitney Avenue, Suite 303, Hamden, Connecticut 06518

Category 9 - Electrical Engineering

505 S. Orange Avenue, Sarasota, Florida 34236

21 | P a g e

Library of Engineering Services for Continuing Contracts

Categories:

1 General Engineering / 6 Water & Wastewater Engineering / 9 Electrical Engineering

Tab D Volume of Similar Contracts with Government Agencies within the Past 5 Years/Past Performance

1. Lee County Government, Lee County Sheriff's…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .