DS PWS Attachment V -- Required Budget Format.xlsx

XLSX spreadsheet 59 KB Posted

Attached to
Global ICT Sector Desk Study (DS) Series
Solicitation number
1131PL20RDS91074
Issued by

View the file

Other files

File Type Posted
1131PL20RDS91074 Amendment 0001.pdf PDF
1131PL20RDS91074 PWS.pdf PDF
Desk Study Price Sheet.xls XLS spreadsheet
1131PL20RDS91074 SF1449.pdf PDF
1131PL20RDS91074 Combined Synopsis Solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary

Sinova Php Bankable Feasibility Grant Request
Dedicated Plant
TOTAL COSTS (DIRECT LABOR COSTS + OTHER DIRECT COSTS)$ 1,060,888.94see "Budget - Dedicated Plant" for details
Co-Fired Plant
TOTAL COSTS (DIRECT LABOR COSTS + OTHER DIRECT COSTS)$ 327,261.70see "Budget - Co-fired Plant" for details
Total Grant Request
TOTAL COSTS (DIRECT LABOR COSTS + OTHER DIRECT COSTS)$ 1,388,150.65
Total U.S. Company Cost Share (50%)$ 694,075.32
PROPOSED USTDA GRANT$ 694,075.32

Summary Detail

BUDGET ESTIMATE

CONTRACTOR DIRECT LABOR COSTS
TOR TaskTOR Task NamePrimary Contractor (Employee) Labor
Total Person Daysx Daily Rate*TOTAL COST
1Project Preparation and Kick-Off
Project Manager$0
$0ERROR:#REF!
$0
$0ERROR:#REF!
TOTALS0$0
2
Project Manager$0
$0
$0ERROR:#REF!
$0ERROR:#REF!
$0
TOTALS0$0ERROR:#REF!
3
Project Manager$0
$0
$0
$0
$0ERROR:#REF!
TOTALS0$0ERROR:#REF!
4ERROR:#REF!
Project Manager$0
$0
$0ERROR:#REF!
$0
$0
$0
$0
TOTALS0$0ERROR:#REF!
5ERROR:#REF!
Project Manager$0
$0
$0
$0
TOTALS0$0
Page 6
6
Project Manager$0
$0
$0
$0
$0
$0
TOTALS0$0
7
Project Manager$0
$0
$0
$0
TOTALS0$0
8
Project Manager$0
$0
$0
$0
$0
$0
TOTALS0$0
9
Project Manager$0
$0
$0
$0
TOTALS0$0
10
Project Manager$0
$0
$0
$0
$0
$0
$0
$0
TOTALS0$0
11Final Report
Project Manager$0
$0
$0
$0
$0
$0
$0
$0
$0
TOTALS0$0
TOTAL CONTRACTOR LABOR0$0
Page 7
NON-EMPLOYEE LABOR COSTS (SUBCONTRACTOR):
TOR TaskTOR Task NameLocal Subcontractor
Total Person Daysx Daily Rate**TOTAL COST
1Project Preparation and Kick-Off
Job title$0
$0ERROR:#REF!
$0
$0ERROR:#REF!
$0
TOTALS0$0
2
Job title$0
$0ERROR:#REF!
$0
$0ERROR:#REF!
TOTALS0$0
3
Job title$0
$0ERROR:#REF!
$0
$0
$0ERROR:#REF!
$0
TOTALS0$0ERROR:#REF!
4ERROR:#REF!
Job title$0
$0ERROR:#REF!
$0
$0
TOTALS0$0ERROR:#REF!
5ERROR:#REF!
Job title$0
$0ERROR:#REF!
$0
$0
$0
$0ERROR:#REF!
$0
TOTALS0.00$0
6
Job title$0
$0ERROR:#REF!
$0
$0
$0ERROR:#REF!
$0
TOTALS0$0
Page 8
7
Job title10
ERROR:#REF!

ERROR:#REF!

TOTALS10$0
8
Job title$0
ERROR:#REF!

ERROR:#REF!

TOTALS0$0
9
Job title$0
$0ERROR:#REF!
$0
$0
TOTALS0$0
10
Job title$0
$0ERROR:#REF!
$0
$0
$0ERROR:#REF!
TOTALS0$0
11Final Report
Job title$0
$0ERROR:#REF!
$0
$0
$0
$0ERROR:#REF!
$0
$0
TOTALS0$0
TOTAL NON-EMPLOYEE LABOR10$0
TOTAL DIRECT LABOR COSTS:$0
OTHER DIRECT COSTS:
Purchased Services and Contracts***
International Transportation & Per Diem Expenses# Trips/daysUnit costTotal Cost
International transportation - US personnel only
Local transport to and from airport
Per Diem - China
TOTAL TRAVEL COSTS$0
Other Costs
In country transportation$0$ - 0
Translation Services
Materials, Supplies, Publications
Tel., Fax, Internet, Courier
TOTAL OTHER DIRECT COSTS$ - 0

PILOT INSTALLATION EQUIPMENT AND COSTS****

$0

TOTAL PROJECT COSTS$0
U.S. COMPANY COST SHARE
GRANTEE COST SHARE
USTDA GRANT$0
* Primary Contractor (Employee) Labor Costs = Salary + Overhead + Benefits (no fee or profit).
** Non-Employee Labor Cost = Salary + Overhead + Benefits + Reasonable Fee or Profit.
*** Purchased Services/ Contracts may include engineering drawings, lab work, surveys, translation, etc., which
would not be included in Non-Employee Labor Cost above.
**** USTDA funds cannot be used to purchase equipment

Sum of 2

Bankable Feasibility Study Costs - Dedicated Plant (fully burdened with Sinova and other 1x costs)
DIRECT LABOR COSTS:
TOR TaskTOR Task Name (per Section L of application)Contractor Labor
(To be completed prior to project specific TOR belowTotal Person Daysx Daily Rate*=TOTAL COST
Prefeasibility Study (site specific)SCProject Manager3$ 4,000.00$ 12,000.00
TOTALS3$ 12,000.00Days (original)Budget(original)Days (revised)Budget(revised)Multiplier
Technology ComparisonSCProject Manager6$ 4,000.00$ 24,000.00536%6$ 22,000.001.1
{scope increased by $115k ratably for RWBRWBtechnology specialist17.0269764063$ 3,032.08$ 51,627.15422%17$ 51,627.1517.0269764063
as per USTDA request for 7 scenarios}RWBengineer34.0539528126$ 2,602.96$ 88,641.08838%34$ 88,641.0834.0539528126
RWBsupport staff10.6418602539$ 914.48$ 9,731.772.54%11$ 9,731.7710.6418602539
TOTALS68$ 174,000.00RWB Scope$ 35,238.20$ 150,000.004.3x
Total$ 55,238.20$ 172,000.003.1x
1Technical AssessmentSCProject Manager15$ 4,000.00$ 60,000.00
RWBProject manager22.75$ 2,602.96$ 59,217.34
RWBtechnical specialist (s)24.0625$ 2,202.64$ 53,001.02
RWBvarious engineers8.75$ 1,760.00$ 15,400.00
TOTALS70.5625$ 187,618.37
2Economic analysisSCProject Manager5$ 4,000.00$ 20,000.00
RWBProject Manager5.25$ 2,602.96$ 13,665.54
RWBFinance/Econ. Specialist(s)8.75$ 1,520.00$ 13,300.00
RWBVarious Engineer(s)10.5$ 1,784.88$ 18,741.24
RWBCost Estimator8.75$ 2,413.00$ 21,113.75
TOTALS38.25$ 86,820.53
3Financial analysisSCProject Manager15$ 4,000.00$ 60,000.00
Finance/Econ. Specialist(s)0$ 1,442.00$ - 0
Various Engineer(s)0$ 962.00$ - 0
Environmental Specialist(s)0$ 962.00$ - 0
Cost Estimator0$ 817.00$ - 0
TOTALS15$ 60,000.00
4Environmental analysisSCProject Manager15$ 4,000.00$ 60,000.00
Finance/Econ. Specialist(s)0$ 1,442.00$ - 0
Various Engineer(s)0$ 962.00$ - 0
Cost Estimator0$ 817.00$ - 0
TOTALS15$ 60,000.00
5Regulatory reviewRWBProject Manager5.25$ 2,602.96$ 13,665.54
RWBVarious Engineer(s)8.75$ 1,728.00$ 15,120.00
SCProject Manager10$ 4,000.00$ 40,000.00
none0$ 817.00$ - 0
TOTALS24$ 68,785.54
6Host contry development impactsSCProject Manager2$ 4,000.00$ 8,000.00
Various Engineer(s)0$ 962.00$ - 0
Finance/Econ. Specialist(s)0$ 1,442.00$ - 0
TOTALS2$ 8,000.00
7US sources of supplySCProject Manager2$ 4,000.00$ 8,000.00
Cost Estimator0$ 817.00$ - 0
Various Engineer(s)0$ 962.00$ - 0
Legal Advisor(s)0$ 1,923.00$ - 0
TOTALS2$ 8,000.00
8Implementation planSCProject Manager10$ 4,000.00$ 40,000.00
Finance/Econ. Specialist(s)0$ 1,442.00$ - 0
Environmental Specialist(s)0$ 962.00$ - 0
Institutional Advisor0$ 1,442.00$ - 0
Cost Estimator0$ 817.00$ - 0
TOTALS10$ 40,000.00
Draft Final and Final Report Preparation and PresentationSCProject Manager3$ 4,000.00$ 12,000.00
RWBProject Manager12.25$ 2,602.96$ 31,886.26
RWBtechnical Specialist(s)5.25$ 3,032.08$ 15,918.42
RWBVarious Engineer(s)3.5$ 1,760.00$ 6,160.00
RWBsecreterial support7.875$ 914.48$ 7,201.53
TOTALS31.875$ 73,166.21
Additional Items
Waste Characterization/Market MappingSCProject Manager2$ 4,000.00$ 8,000.00
TOTALS2$ 8,000.00
Transmission, Power Demand-Supply ForecastSCProject Manager2$ 4,000.00$ 8,000.00
TOTALS2$ 8,000.00
283.41794,390.65
TOTAL CONTRACTOR LABOR283.41794,390.65
TOR TaskTOR Task NameNon-Employee Labor
Total Person Days xDaily Rate**=TOTAL COST
Prefeasibility Study (site specific)STRATCON to provide detailed budgetTBC$ 45,000.00
Technology ComparisonLocal Specialists0$ 250.00$ - 0
2Technical AssessmentLocal Specialists0$ 600.00$ - 0
2Economic analysisLocal Specialists0$ 250.00$ - 0
3Financial analysisLocal Specialists0$ 250.00$ - 0
4Environmental analysisLocal Env. Consultant to provide detailed budgetTBC$ 150,000.00
5Regulatory reviewWhite and Case to provide detailed budgetTBC$ 160,000.00
6Host contry development impactsLocal Consultant to provide detailed budgetTBC$ 10,000.00
7US sources of supplyLocal Specialists0$ 250.00$ - 0
8Implementation planLocal Specialists0$ 250.00$ - 0
Draft Final and Final Report Preparation and PresentationLocal Specialists0$ 250.00$ - 0
Waste Characterization/Market MappingPoyry to provide detailed budgetTBC$ 150,000.00
Transmission, Power Demand-Supply ForecastSCLocal Engineering firm to provide detailed budgetTBC$ 30,000.00

TOTAL HOST COUNTRY LABOR - 0 $ 545,000.00

TOTAL DIRECT LABOR COSTS $ 1,339,390.65

OTHER DIRECT COSTS:
TasksTOTAL COST
Purchased Services/Contracts***N/A
TravelTripsTrip CostTotal Cost
International Air Travel6$ 5,000.00$ 30,000.00
Domestic Travel8$ 2,000.00$ 16,000.00
Trip DaysPer Diem Rate
Per Diem24$ 365.00$ 8,760.00
Other (local travel, etc.)$ - 0
Other
Reproduction and Binding$ 3,000.00
Courier Services$ 1,000.00
Communication$ 2,000.00
Insurance$ - 0
TOTAL OTHER DIRECT COSTS$ 60,760.00

TOTAL COSTS (DIRECT LABOR COSTS + OTHER DIRECT COSTS) $ 1,400,150.65

Total U.S. Company Cost Share (50%)$ 700,075.32
PROPOSED USTDA GRANT$ 700,075.32
* Primary Contractor (Employee) Labor Costs = Salary + Overhead + Benefits (No Fee or Profit)
** Non-Employee Labor Cost = Salary + Overhead + Benefits + Reasonable Fee or Profit
*** Purchased Services/Contracts may include engineering drawings, lab work, surveys, translation, etc. which would not be included in Non-Employee Labor Cost above
$ 863,706.18
$ 1,727,412.35
TOTAL COSTS (DIRECT LABOR COSTS + OTHER DIRECT COSTS)$ 863,706.18
Total U.S. Company Cost Share (50%)$ 431,853.09
PROPOSED USTDA GRANT$ 431,853.09

Budget - Dedicated Plant

Bankable Feasibility Study Costs - Dedicated Plant (fully burdened with Sinova and other 1x costs)
DIRECT LABOR COSTS:
TOR TaskTOR Task Name (per Section L of application)Contractor Labor
(To be completed prior to project specific TOR belowTotal Person Daysx Daily Rate*=TOTAL COST
Prefeasibility Study (site specific)SCProject Manager3$ 4,000.00$ 12,000.00
TOTALS3$ 12,000.00Days (original)Budget(original)Days (revised)Budget(revised)Multiplier
Technology ComparisonSCProject Manager6$ 4,000.00$ 24,000.00536%6$ 22,000.001.1
{scope increased by $115k ratably for RWBRWBtechnology specialist17$ 3,032.08$ 51,627.15422%17$ 51,627.1517.0269764063
as per USTDA request for 7 scenarios}RWBengineer34$ 2,602.96$ 88,641.08838%34$ 88,641.0834.0539528126
RWBsupport staff11$ 914.48$ 9,731.772.54%11$ 9,731.7710.6418602539
TOTALS68$ 174,000.00RWB Scope$ 35,238.20$ 150,000.004.3x
Total$ 55,238.20$ 172,000.003.1x
1Technical AssessmentSCProject Manager15$ 4,000.00$ 60,000.00
RWBProject manager13$ 2,602.96$ 33,838.48
RWBtechnical specialist (s)13.75$ 2,202.64$ 30,286.30
RWBvarious engineers5$ 1,760.00$ 8,800.00
TOTALS46.75$ 132,924.78
2Economic analysisSCProject Manager5$ 4,000.00$ 20,000.00
RWBProject Manager3$ 2,602.96$ 7,808.88
RWBFinance/Econ. Specialist(s)5$ 1,520.00$ 7,600.00
RWBVarious Engineer(s)6$ 1,784.88$ 10,709.28
RWBCost Estimator5$ 2,413.00$ 12,065.00
TOTALS24$ 58,183.16
3Financial analysisSCProject Manager15$ 4,000.00$ 60,000.00
Finance/Econ. Specialist(s)0$ 1,442.00$ - 0
Various Engineer(s)0$ 962.00$ - 0
Environmental Specialist(s)0$ 962.00$ - 0
Cost Estimator0$ 817.00$ - 0
TOTALS15$ 60,000.00
4Environmental analysisSCProject Manager15$ 4,000.00$ 60,000.00
Finance/Econ. Specialist(s)0$ 1,442.00$ - 0
Various Engineer(s)0$ 962.00$ - 0
Cost Estimator0$ 817.00$ - 0
TOTALS15$ 60,000.00
5Regulatory reviewRWBProject Manager3$ 2,602.96$ 7,808.88
RWBVarious Engineer(s)5$ 1,728.00$ 8,640.00
SCProject Manager10$ 4,000.00$ 40,000.00
none0$ 817.00$ - 0
TOTALS18$ 56,448.88
6Host contry development impactsSCProject Manager2$ 4,000.00$ 8,000.00
Various Engineer(s)0$ 962.00$ - 0
Finance/Econ. Specialist(s)0$ 1,442.00$ - 0
TOTALS2$ 8,000.00
7US sources of supplySCProject Manager2$ 4,000.00$ 8,000.00
Cost Estimator0$ 817.00$ - 0
Various Engineer(s)0$ 962.00$ - 0
Legal Advisor(s)0$ 1,923.00$ - 0
TOTALS2$ 8,000.00
8Implementation planSCProject Manager10$ 4,000.00$ 40,000.00
Finance/Econ. Specialist(s)0$ 1,442.00$ - 0
Environmental Specialist(s)0$ 962.00$ - 0
Institutional Advisor0$ 1,442.00$ - 0
Cost Estimator0$ 817.00$ - 0
TOTALS10$ 40,000.00
Draft Final and Final Report Preparation and PresentationSCProject Manager3$ 4,000.00$ 12,000.00
RWBProject Manager7$ 2,602.96$ 18,220.72
RWBtechnical Specialist(s)3$ 3,032.08$ 9,096.24
RWBVarious Engineer(s)2$ 1,760.00$ 3,520.00
RWBsecreterial support4.5$ 914.48$ 4,115.16
TOTALS19.5$ 46,952.12
Additional Items
Waste Characterization/Market MappingSCProject Manager2$ 4,000.00$ 8,000.00
TOTALS2$ 8,000.00
Transmission, Power Demand-Supply ForecastSCProject Manager2$ 4,000.00$ 8,000.00
TOTALS2$ 8,000.00

TOTAL CONTRACTOR LABOR 226.97 660,508.94 283.41 $ 782,390.65

TOR TaskTOR Task NameNon-Employee Labor
Total Person Days xDaily Rate**=TOTAL COST
Prefeasibility Study (site specific)STRATCON to provide detailed budgetTBC$ 30,000.00
Technology ComparisonLocal Specialists0$ 250.00$ - 0
2Technical AssessmentLocal Specialists0$ 600.00$ - 0
2Economic analysisLocal Specialists0$ 250.00$ - 0
3Financial analysisLocal Specialists0$ 250.00$ - 0
4Environmental analysisLocal Env. Consultant to provide detailed budgetTBC$ 75,000.00
5Regulatory reviewWhite and Case to provide detailed budgetTBC$ 95,000.00
6Host contry development impactsLocal Consultant to provide detailed budgetTBC$ 5,000.00
7US sources of supplyLocal Specialists0$ 250.00$ - 0
8Implementation planLocal Specialists0$ 250.00$ - 0
Draft Final and Final Report Preparation and PresentationLocal Specialists0$ 250.00$ - 0
Waste Characterization/Market MappingPoyry to provide detailed budgetTBC$ 150,000.00
Transmission, Power Demand-Supply ForecastSCLocal Engineering firm to provide detailed budgetTBC$ 15,000.00

TOTAL HOST COUNTRY LABOR - 0 $ 370,000.00

TOTAL DIRECT LABOR COSTS $ 1,030,508.94

OTHER DIRECT COSTS:
TasksTOTAL COST
Purchased Services/Contracts***N/A
TravelTripsTrip CostTotal Cost
International Air Travel3$ 5,000.00$ 15,000.00
Domestic Travel4$ 2,000.00$ 8,000.00
Trip DaysPer Diem Rate
Per Diem12$ 365.00$ 4,380.00
Other (local travel, etc.)$ - 0
Other
Reproduction and Binding$ 1,500.00
Courier Services$ 500.00
Communication$ 1,000.00
Insurance$ - 0
TOTAL OTHER DIRECT COSTS$ 30,380.00

TOTAL COSTS (DIRECT LABOR COSTS + OTHER DIRECT COSTS) $ 1,060,888.94

Total U.S. Company Cost Share (50%)$ 530,444.47
PROPOSED USTDA GRANT$ 530,444.47
* Primary Contractor (Employee) Labor Costs = Salary + Overhead + Benefits (No Fee or Profit)
** Non-Employee Labor Cost = Salary + Overhead + Benefits + Reasonable Fee or Profit
*** Purchased Services/Contracts may include engineering drawings, lab work, surveys, translation, etc. which would not be included in Non-Employee Labor Cost above
$ 694,075.32
$ 1,388,150.65
TOTAL COSTS (DIRECT LABOR COSTS + OTHER DIRECT COSTS)$ 694,075.32
Total U.S. Company Cost Share (50%)$ 347,037.66
PROPOSED USTDA GRANT$ 347,037.66

Budget - Co-Fired Plant

Bankable Feasibility Study Costs - Cofiring
DIRECT LABOR COSTS:
TOR TaskTOR Task Name (per Section L of application)Contractor Labor
(To be completed prior to project specific TOR belowTotal Person Daysx Daily Rate*=TOTAL COST
Prefeasibility Study (site specific)SCProject Manager0$ 4,000.00$ - 0
TOTALS0$ - 0
Technology ComparisonSCProject Manager0$ 4,000.00$ - 0
RWBtechnology specialist0$ 3,032.08$ - 0
RWBengineer0$ 2,602.96$ - 0
RWBsupport staff0$ 914.48$ - 0
TOTALS0$ - 0
0.75
1Technical AssessmentSCProject Manager0$ 4,000.00$ - 0
RWBProject manager9.75$ 2,602.96$ 25,378.86
RWBtechnical specialist (s)10.3125$ 2,202.64$ 22,714.73
RWBvarious engineers3.75$ 1,760.00$ 6,600.00
TOTALS23.8125$ 54,693.59
2Economic analysisSCProject Manager0$ 4,000.00$ - 0
RWBProject Manager2.25$ 2,602.96$ 5,856.66
RWBFinance/Econ. Specialist(s)3.75$ 1,520.00$ 5,700.00
RWBVarious Engineer(s)4.5$ 1,784.88$ 8,031.96
RWBCost Estimator3.75$ 2,413.00$ 9,048.75
TOTALS14.25$ 28,637.37
3Financial analysisSCProject Manager0$ 4,000.00$ - 0
Finance/Econ. Specialist(s)0$ 1,442.00$ - 0
Various Engineer(s)0$ 962.00$ - 0
Environmental Specialist(s)0$ 962.00$ - 0
Cost Estimator0$ 817.00$ - 0
TOTALS0$ - 0
4Environmental analysisSCProject Manager0$ 4,000.00$ - 0
Finance/Econ. Specialist(s)0$ 1,442.00$ - 0
Various Engineer(s)0$ 962.00$ - 0
Cost Estimator0$ 817.00$ - 0
TOTALS0$ - 0
5Regulatory reviewRWBProject Manager2.25$ 2,602.96$ 5,856.66
RWBVarious Engineer(s)3.75$ 1,728.00$ 6,480.00
SCProject Manager0$ 4,000.00$ - 0
none0$ 817.00$ - 0
TOTALS6$ 12,336.66
6Host contry development impactsSCProject Manager0$ 4,000.00$ - 0
Various Engineer(s)0$ 962.00$ - 0
Finance/Econ. Specialist(s)0$ 1,442.00$ - 0
TOTALS0$ - 0
7US sources of supplySCProject Manager0$ 4,000.00$ - 0
Cost Estimator0$ 817.00$ - 0
Various Engineer(s)0$ 962.00$ - 0
Legal Advisor(s)0$ 1,923.00$ - 0
TOTALS0$ - 0
8Implementation planSCProject Manager0$ 4,000.00$ - 0
Finance/Econ. Specialist(s)0$ 1,442.00$ - 0
Environmental Specialist(s)0$ 962.00$ - 0
Institutional Advisor0$ 1,442.00$ - 0
Cost Estimator0$ 817.00$ - 0
TOTALS0$ - 0
Draft Final and Final Report Preparation and PresentationSCProject Manager0$ 4,000.00$ - 0
RWBProject Manager5.25$ 2,602.96$ 13,665.54
RWBtechnical Specialist(s)2.25$ 3,032.08$ 6,822.18
RWBVarious Engineer(s)1.5$ 1,760.00$ 2,640.00
RWBsecreterial support3.375$ 914.48$ 3,086.37
TOTALS12.375$ 26,214.09
Additional Items
Waste Characterization/Market MappingSCProject Manager0$ 4,000.00$ - 0
TOTALS0$ - 0
Transmission, Power Demand-Supply ForecastSCProject Manager0$ 4,000.00$ - 0
TOTALS0$ - 0

TOTAL CONTRACTOR LABOR 56.44 121,881.70

TOR TaskTOR Task NameNon-Employee Labor
Total Person Days xDaily Rate**=TOTAL COST
Prefeasibility Study (site specific)STRATCON to provide detailed budgetTBC$ 15,000.00
Technology ComparisonLocal Specialists0$ 250.00$ - 0
2Technical AssessmentLocal Specialists0$ 600.00$ - 0
2Economic analysisLocal Specialists0$ 250.00$ - 0
3Financial analysisLocal Specialists0$ 250.00$ - 0
4Environmental analysisLocal Env. Consultant to provide detailed budgetTBC$ 75,000.00
5Regulatory reviewWhite and Case to provide detailed budgetTBC$ 65,000.00
6Host contry development impactsLocal Consultant to provide detailed budgetTBC$ 5,000.00
7US sources of supplyLocal Specialists0$ 250.00$ - 0
8Implementation planLocal Specialists0$ 250.00$ - 0
Draft Final and Final Report Preparation and PresentationLocal Specialists0$ 250.00$ - 0
Waste Characterization/Market MappingPoyry to provide detailed budgetTBC$ - 0
Transmission, Power Demand-Supply ForecastSCLocal Engineering firm to provide detailed budgetTBC$ 15,000.00

TOTAL HOST COUNTRY LABOR - 0 $ 175,000.00

TOTAL DIRECT LABOR COSTS $ 296,881.70

OTHER DIRECT COSTS:
TasksTOTAL COST
Purchased Services/Contracts***N/A
TravelTripsTrip CostTotal Cost
International Air Travel3$ 5,000.00$ 15,000.00
Domestic Travel4$ 2,000.00$ 8,000.00
Trip DaysPer Diem Rate
Per Diem12$ 365.00$ 4,380.00
Other (local travel, etc.)$ - 0
Other
Reproduction and Binding$ 1,500.00
Courier Services$ 500.00
Communication$ 1,000.00
Insurance$ - 0
TOTAL OTHER DIRECT COSTS$ 30,380.00

TOTAL COSTS (DIRECT LABOR COSTS + OTHER DIRECT COSTS) $ 327,261.70

Total U.S. Company Cost Share (50%)$ 163,630.85
PROPOSED USTDA GRANT$ 163,630.85
* Primary Contractor (Employee) Labor Costs = Salary + Overhead + Benefits (No Fee or Profit)
** Non-Employee Labor Cost = Salary + Overhead + Benefits + Reasonable Fee or Profit
*** Purchased Services/Contracts may include engineering drawings, lab work, surveys, translation, etc. which would not be included in Non-Employee Labor Cost above

File details come from the government source that posted it. Updated .