SHEET NOTES

KEYED NOTES

B L D

G

P

O S

T

E

A D

D e a

E

X H

A U

S T

B

L O

W E

R S

E X

H A

U S

T

D

U C

T I N

G

AutoCAD SHX Text Revision

AutoCAD SHX Text Date

AutoCAD SHX Text By

AutoCAD SHX Text Description

AutoCAD SHX Text U.S Air Force

AutoCAD SHX Text Tinker AFB

AutoCAD SHX Text Oklahoma City, OK

AutoCAD SHX Text Remember that other hazards could exist but are currently unknown. Always be wary.

AutoCAD SHX Text Known Hazards

AutoCAD SHX Text N

AutoCAD SHX Text

EXHAUST REEL ASSY INSTALL BETWEEN BEAMS

AutoCAD SHX Text

SCALE: ~6"=1'-0"

AutoCAD SHX Text

PITCH POCKET ANCHOR POINT

AutoCAD SHX Text

PITCH POCKET ANCHOR POINT THREE EQUALLY SPACED ON INDICATED RADIUS

AutoCAD SHX Text

AutoCAD SHX Text M2

AutoCAD SHX Text M2

AutoCAD SHX Text A. MONOXIVENT UNITS MONOXIVENT UNITS A.A. THE MONOXIVENT UNITS WILL BE MOUNTED TO THE BRIDGE CRANE FRAMEWORK WITH 3/8"-16 UNC AND 1/2"-10UNC GRADE 5 THE MONOXIVENT UNITS WILL BE MOUNTED TO THE BRIDGE CRANE FRAMEWORK WITH 3/8"-16 UNC AND 1/2"-10UNC GRADE 5 HARDWARE. APPROPRIATE HOLES WILL BE DRILLED INTO THE W BEAMS AS REQUIRED TO MATCH THE HOLE PATTERNS IN THE REEL AND BLOWER MOUNTING STRUCTURES. A.B. THE UNITS ALONG THE SOUTH WALL OF BAY B WILL HAVE PART OF THEIR SUPPORT STRUCTURE ANCHORED TO THE BUILDING WALL AND THE UNITS ALONG THE SOUTH WALL OF BAY B WILL HAVE PART OF THEIR SUPPORT STRUCTURE ANCHORED TO THE BUILDING WALL AND BEAM STRUCTURE AS REQUIRED. A.C. ALL SPIRAL DUCT CONNECTIONS TO BE STANDARD FLANGE TYPE. USE SILICON SEALANT ON ALL FLANGE CONNECTIONS WITH ALL SPIRAL DUCT CONNECTIONS TO BE STANDARD FLANGE TYPE. USE SILICON SEALANT ON ALL FLANGE CONNECTIONS WITH APPROPRIATE FASTENERS. . B. EXHAUST TRANSITIONS EXHAUST TRANSITIONS B.A. THE TRANSITION WELDMENTS SHOWN ON THIS SHEET ARE TO BE MADE OF A36 STL SHEET. THE FUMES TO BE EXHAUSTED ARE FROM THE TRANSITION WELDMENTS SHOWN ON THIS SHEET ARE TO BE MADE OF A36 STL SHEET. THE FUMES TO BE EXHAUSTED ARE FROM VEHICLE ENGINE EXHAUST. B.B. 5EA EXHAUST TRANSITIONS ARE NEEDED. 5EA EXHAUST TRANSITIONS ARE NEEDED. 1. INSTALL RIGHT HAND REEL FRAME TO DRIVE CHAIN END OF HOSE REEL. INSTALL RIGHT HAND REEL FRAME TO DRIVE CHAIN END OF HOSE REEL. 2. INSTALL LEFT HAND REEL FRAME TO DISCHARGE END OF HOSE REEL. INSTALL LEFT HAND REEL FRAME TO DISCHARGE END OF HOSE REEL. 3. INSTALL BLOWER BASE TO ANGLE FRAME USING 3/8"-16UNC ALL-THREAD STL ROD WITH APPROPRIATE NUTS AND WASHERS. USE INSTALL BLOWER BASE TO ANGLE FRAME USING 3/8"-16UNC ALL-THREAD STL ROD WITH APPROPRIATE NUTS AND WASHERS. USE BLOWER BASE TO ANGLE FRAME USING 3/8"-16UNC ALL-THREAD STL ROD WITH APPROPRIATE NUTS AND WASHERS. USE BLOWER BASE TO ANGLE FRAME USING 3/8"-16UNC ALL-THREAD STL ROD WITH APPROPRIATE NUTS AND WASHERS. USE BASE TO ANGLE FRAME USING 3/8"-16UNC ALL-THREAD STL ROD WITH APPROPRIATE NUTS AND WASHERS. USE BASE TO ANGLE FRAME USING 3/8"-16UNC ALL-THREAD STL ROD WITH APPROPRIATE NUTS AND WASHERS. USE TO ANGLE FRAME USING 3/8"-16UNC ALL-THREAD STL ROD WITH APPROPRIATE NUTS AND WASHERS. USE TO ANGLE FRAME USING 3/8"-16UNC ALL-THREAD STL ROD WITH APPROPRIATE NUTS AND WASHERS. USE ANGLE FRAME USING 3/8"-16UNC ALL-THREAD STL ROD WITH APPROPRIATE NUTS AND WASHERS. USE ANGLE FRAME USING 3/8"-16UNC ALL-THREAD STL ROD WITH APPROPRIATE NUTS AND WASHERS. USE FRAME USING 3/8"-16UNC ALL-THREAD STL ROD WITH APPROPRIATE NUTS AND WASHERS. USE FRAME USING 3/8"-16UNC ALL-THREAD STL ROD WITH APPROPRIATE NUTS AND WASHERS. USE USING 3/8"-16UNC ALL-THREAD STL ROD WITH APPROPRIATE NUTS AND WASHERS. USE USING 3/8"-16UNC ALL-THREAD STL ROD WITH APPROPRIATE NUTS AND WASHERS. USE 3/8"-16UNC ALL-THREAD STL ROD WITH APPROPRIATE NUTS AND WASHERS. USE 3/8"-16UNC ALL-THREAD STL ROD WITH APPROPRIATE NUTS AND WASHERS. USE ALL-THREAD STL ROD WITH APPROPRIATE NUTS AND WASHERS. USE ALL-THREAD STL ROD WITH APPROPRIATE NUTS AND WASHERS. USE STL ROD WITH APPROPRIATE NUTS AND WASHERS. USE STL ROD WITH APPROPRIATE NUTS AND WASHERS. USE ROD WITH APPROPRIATE NUTS AND WASHERS. USE ROD WITH APPROPRIATE NUTS AND WASHERS. USE WITH APPROPRIATE NUTS AND WASHERS. USE WITH APPROPRIATE NUTS AND WASHERS. USE APPROPRIATE NUTS AND WASHERS. USE APPROPRIATE NUTS AND WASHERS. USE NUTS AND WASHERS. USE NUTS AND WASHERS. USE AND WASHERS. USE AND WASHERS. USE WASHERS. USE WASHERS. USE USE USE USE THREADED ROD TO ALIGN BLOWER DUCT TO HOSE REEL DUCT. 4. JOIN BLOWER AND HOSE REEL TOGETHER AT 7" DUCT CONNECTIONS BEFORE COMPLETING INSTALLATION ON CRANE STRUCTURE. SEAL JOIN BLOWER AND HOSE REEL TOGETHER AT 7" DUCT CONNECTIONS BEFORE COMPLETING INSTALLATION ON CRANE STRUCTURE. SEAL BLOWER AND HOSE REEL TOGETHER AT 7" DUCT CONNECTIONS BEFORE COMPLETING INSTALLATION ON CRANE STRUCTURE. SEAL BLOWER AND HOSE REEL TOGETHER AT 7" DUCT CONNECTIONS BEFORE COMPLETING INSTALLATION ON CRANE STRUCTURE. SEAL AND HOSE REEL TOGETHER AT 7" DUCT CONNECTIONS BEFORE COMPLETING INSTALLATION ON CRANE STRUCTURE. SEAL AND HOSE REEL TOGETHER AT 7" DUCT CONNECTIONS BEFORE COMPLETING INSTALLATION ON CRANE STRUCTURE. SEAL HOSE REEL TOGETHER AT 7" DUCT CONNECTIONS BEFORE COMPLETING INSTALLATION ON CRANE STRUCTURE. SEAL HOSE REEL TOGETHER AT 7" DUCT CONNECTIONS BEFORE COMPLETING INSTALLATION ON CRANE STRUCTURE. SEAL REEL TOGETHER AT 7" DUCT CONNECTIONS BEFORE COMPLETING INSTALLATION ON CRANE STRUCTURE. SEAL REEL TOGETHER AT 7" DUCT CONNECTIONS BEFORE COMPLETING INSTALLATION ON CRANE STRUCTURE. SEAL TOGETHER AT 7" DUCT CONNECTIONS BEFORE COMPLETING INSTALLATION ON CRANE STRUCTURE. SEAL TOGETHER AT 7" DUCT CONNECTIONS BEFORE COMPLETING INSTALLATION ON CRANE STRUCTURE. SEAL AT 7" DUCT CONNECTIONS BEFORE COMPLETING INSTALLATION ON CRANE STRUCTURE. SEAL AT 7" DUCT CONNECTIONS BEFORE COMPLETING INSTALLATION ON CRANE STRUCTURE. SEAL 7" DUCT CONNECTIONS BEFORE COMPLETING INSTALLATION ON CRANE STRUCTURE. SEAL 7" DUCT CONNECTIONS BEFORE COMPLETING INSTALLATION ON CRANE STRUCTURE. SEAL DUCT CONNECTIONS BEFORE COMPLETING INSTALLATION ON CRANE STRUCTURE. SEAL DUCT CONNECTIONS BEFORE COMPLETING INSTALLATION ON CRANE STRUCTURE. SEAL CONNECTIONS BEFORE COMPLETING INSTALLATION ON CRANE STRUCTURE. SEAL CONNECTIONS BEFORE COMPLETING INSTALLATION ON CRANE STRUCTURE. SEAL BEFORE COMPLETING INSTALLATION ON CRANE STRUCTURE. SEAL BEFORE COMPLETING INSTALLATION ON CRANE STRUCTURE. SEAL COMPLETING INSTALLATION ON CRANE STRUCTURE. SEAL COMPLETING INSTALLATION ON CRANE STRUCTURE. SEAL INSTALLATION ON CRANE STRUCTURE. SEAL INSTALLATION ON CRANE STRUCTURE. SEAL ON CRANE STRUCTURE. SEAL ON CRANE STRUCTURE. SEAL CRANE STRUCTURE. SEAL CRANE STRUCTURE. SEAL STRUCTURE. SEAL STRUCTURE. SEAL SEAL SEAL SEAL FLANGE CONNECTION WITH SILICON SEALANT. 5. INSTALL RECTANGULAR TO ROUND TRANSITION TO DISCHARGE OF BLOWER. INSTALL RECTANGULAR TO ROUND TRANSITION TO DISCHARGE OF BLOWER. 6. CONTINUE 8" SPIRAL DUCT TO ROOF PENETRATION USING TWO 45° ELBOWS AND APPROPRIATE STRAIGHT SECTIONS OF SPIRAL DUCT. CONTINUE 8" SPIRAL DUCT TO ROOF PENETRATION USING TWO 45° ELBOWS AND APPROPRIATE STRAIGHT SECTIONS OF SPIRAL DUCT. 7. USE RAIN SHIELD AND RAIN SKIRT TO SEAL ROOF PENETRATION. USE RAIN SHIELD AND RAIN SKIRT TO SEAL ROOF PENETRATION. 8. EXTEND STACK ABOVE ROOF LINE TO 10'-0" ELEVATION INCLUDING THE 9" RAIN PROTECTION STACK EXTENSION. EXTEND STACK ABOVE ROOF LINE TO 10'-0" ELEVATION INCLUDING THE 9" RAIN PROTECTION STACK EXTENSION. 9. INSTALL THREE STL CABLES WITH TURNBUCKLES TO ANCHOR POINTS TO STABILIZE THE STACK IN THE WIND. INSTALL THREE STL CABLES WITH TURNBUCKLES TO ANCHOR POINTS TO STABILIZE THE STACK IN THE WIND. 10. 3/16" THICK A36 STL PLATE AS FLANGES. 3/16" THICK A36 STL PLATE AS FLANGES. 11. 16 GA STL SHEET AS FORMED WALLS.16 GA STL SHEET AS FORMED WALLS.

AutoCAD SHX Text

OFFSET RECTANGULAR TO ROUND TRANSITION

AutoCAD SHX Text

SCALE: 3"=1'-0"

AutoCAD SHX Text Sheet M2 of 5

AutoCAD SHX Text Project

AutoCAD SHX Text Number

AutoCAD SHX Text 20D017

AutoCAD SHX Text Product Engr:

AutoCAD SHX Text 76MXSG/MXDEJ Engr:

AutoCAD SHX Text 76MXSG/MXDEJ Review Engr:

AutoCAD SHX Text 76MXSG/MXDEJ Planner:

AutoCAD SHX Text MXRI Safety Engr:

AutoCAD SHX Text Date:

AutoCAD SHX Text Scale:

AutoCAD SHX Text Project Location:

AutoCAD SHX Text As Noted

AutoCAD SHX Text 1/8/2022

AutoCAD SHX Text N/A

AutoCAD SHX Text

BLDG 3705 - E13

AutoCAD SHX Text

IRA TOPP/MXSG/734-9446

AutoCAD SHX Text

AutoCAD SHX Text M2

AutoCAD SHX Text M2

AutoCAD SHX Text

AutoCAD SHX Text M2

AutoCAD SHX Text M3

AutoCAD SHX Text

AutoCAD SHX Text M2

AutoCAD SHX Text M4

AutoCAD SHX Text

AutoCAD SHX Text M2

AutoCAD SHX Text M5

AutoCAD SHX Text

MILLION H/MXSG/736-5725

B L D

G

P

O S

T

E

A D

D e a

E

X H

A U

O

W E

R S

B O

T T

O M

R A

C I N

G

AutoCAD SHX Text Revision

AutoCAD SHX Text Date

AutoCAD SHX Text By

AutoCAD SHX Text Description

AutoCAD SHX Text U.S Air Force

AutoCAD SHX Text Tinker AFB

AutoCAD SHX Text Oklahoma City, OK

AutoCAD SHX Text Remember that other hazards could exist but are currently unknown. Always be wary.

AutoCAD SHX Text Known Hazards

AutoCAD SHX Text A. THIS SHEET SHOWS THE BLOWER MOUNT FOR THE 4ea HOSE REEL EXHAUST ASSEMBLIES MOUNTED BETWEEN THE BEAMS OF THE CRANE THIS SHEET SHOWS THE BLOWER MOUNT FOR THE 4ea HOSE REEL EXHAUST ASSEMBLIES MOUNTED BETWEEN THE BEAMS OF THE CRANE SYSTEM. B. THE BLOWER WILL BE MOUNTED ON THREADED ROD TO ALLOW THE ALIGNMENT OF THE HOSE REEL DISCHARGE AND THE BLOWER INLET THE BLOWER WILL BE MOUNTED ON THREADED ROD TO ALLOW THE ALIGNMENT OF THE HOSE REEL DISCHARGE AND THE BLOWER INLET C. THE HOLE PATTERN FOR THE THREADED ROD WILL REQUIRE MEASUREMENT OF THE BLOWER ASSEMBLY AFTER DELIVERY SINCE VENDOR COULD THE HOLE PATTERN FOR THE THREADED ROD WILL REQUIRE MEASUREMENT OF THE BLOWER ASSEMBLY AFTER DELIVERY SINCE VENDOR COULD NOT GIVE THE FINAL DIMENSIONS UNTIL MANUFACTURE. D. VERIFY DISTANCE BETWEEN CRANE STRUCTURAL BEAMS AND ADJUST 3'-8 DIMENSION AS REQUIRED VERIFY DISTANCE BETWEEN CRANE STRUCTURAL BEAMS AND ADJUST 3'-8 DIMENSION AS REQUIRED 116 DIMENSION AS REQUIRED E. THE WELDED FRAME IS CONSTRUCTED OF STL PLATE AND ANGLE. THE WELDED FRAME IS CONSTRUCTED OF STL PLATE AND ANGLE. 1. BASE PLATE: " A36 STL, 1ea BASE PLATE: " A36 STL, 1ea 12" A36 STL, 1ea 2. BASE PLATE: " A36 STL, 1ea BASE PLATE: " A36 STL, 1ea 12" A36 STL, 1ea 3. BASE PLATE: " A36 STL, 1ea BASE PLATE: " A36 STL, 1ea 12" A36 STL, 1ea 4. BASE PLATE: " A36 STL, 1ea BASE PLATE: " A36 STL, 1ea 12" A36 STL, 1ea 5. LEG ANGLE: 3"x3"x ", 6ea LEG ANGLE: 3"x3"x ", 6ea 38", 6ea 6. FRAME ANGLE: 3"x3"x ", 2ea FRAME ANGLE: 3"x3"x ", 2ea 38", 2ea 7. CROSS MEMBER: 3"x3"x ", 2ea CROSS MEMBER: 3"x3"x ", 2ea 38", 2ea 8. COPE CROSS MEMBER ANGLES ON BOTH ENDS TO FIT FRAME ANGLE CONTOUR.COPE CROSS MEMBER ANGLES ON BOTH ENDS TO FIT FRAME ANGLE CONTOUR.

AutoCAD SHX Text

ANGLE TO ANGLE

AutoCAD SHX Text 3/16

AutoCAD SHX Text

LEG TO ANGLE

AutoCAD SHX Text 3/16

AutoCAD SHX Text

ANGLE TO ANGLE

AutoCAD SHX Text 3/16

AutoCAD SHX Text 3/16

AutoCAD SHX Text

LEG TO BASE

AutoCAD SHX Text 3/16

AutoCAD SHX Text

ANGLE TO ANGLE

AutoCAD SHX Text 3/16

AutoCAD SHX Text

LEG TO ANGLE

AutoCAD SHX Text 3/16

AutoCAD SHX Text

ANGLE TO ANGLE

AutoCAD SHX Text 3/16

AutoCAD SHX Text Sheet M3 of 5

AutoCAD SHX Text Project

AutoCAD SHX Text Number

AutoCAD SHX Text 20D017

AutoCAD SHX Text Product Engr:

AutoCAD SHX Text 76MXSG/MXDEJ Engr:

AutoCAD SHX Text 76MXSG/MXDEJ Review Engr:

AutoCAD SHX Text 76MXSG/MXDEJ Planner:

AutoCAD SHX Text MXRI Safety Engr:

AutoCAD SHX Text Date:

AutoCAD SHX Text Scale:

AutoCAD SHX Text Project Location:

AutoCAD SHX Text As Noted

AutoCAD SHX Text 1/8/2022

AutoCAD SHX Text N/A

AutoCAD SHX Text

BLDG 3705 - E13

AutoCAD SHX Text

IRA TOPP/MXSG/734-9446

AutoCAD SHX Text

AutoCAD SHX Text M2

AutoCAD SHX Text M3

AutoCAD SHX Text

BETWEEN BEAMS BLOWER FRAME WMT

AutoCAD SHX Text

SCALE: 3"=1'-0"

B L D

G

P

O S

T

E

A D

D e a

E

X H

A U

O

W E

R S

L E

F

H

A N

D

B

R A

C I N

G

AutoCAD SHX Text Revision

AutoCAD SHX Text Date

AutoCAD SHX Text By

AutoCAD SHX Text Description

AutoCAD SHX Text U.S Air Force

AutoCAD SHX Text Tinker AFB

AutoCAD SHX Text Oklahoma City, OK

AutoCAD SHX Text Remember that other hazards could exist but are currently unknown. Always be wary.

AutoCAD SHX Text Known Hazards

AutoCAD SHX Text A. THIS SHEET SHOWS THE LH HOSE REEL MOUNT FOR THE 4ea HOSE REEL EXHAUST ASSEMBLIES MOUNTED BETWEEN THE CRANE BEAMS. THIS SHEET SHOWS THE LH HOSE REEL MOUNT FOR THE 4ea HOSE REEL EXHAUST ASSEMBLIES MOUNTED BETWEEN THE CRANE BEAMS. B. THE BLOWER WILL BE MOUNTED ON THREADED RODS TO ALLOW THE ALIGNMENT OF THE HOSE REEL DISCHARGE AND THE BLOWER INLET. THE BLOWER WILL BE MOUNTED ON THREADED RODS TO ALLOW THE ALIGNMENT OF THE HOSE REEL DISCHARGE AND THE BLOWER INLET. C. THE HOSE REEL WILL BE MOUNTED WITH "-13 UNC STL GRADE 5 HARDWARE. THE HOSE REEL WILL BE MOUNTED WITH "-13 UNC STL GRADE 5 HARDWARE. 12"-13 UNC STL GRADE 5 HARDWARE. D. THE WELDED FRAME IS CONSTRUCTED OF STL PLATE, ANGLE AND CHANNEL. THE WELDED FRAME IS CONSTRUCTED OF STL PLATE, ANGLE AND CHANNEL. E. THE 3'-8 DIMENSION MAY REQUIRE ADJUSTMENT SINCE I WAS NOT ABLE TO MEASURE THE EXACT DIMENSION BETWEEN THE BEAM CENTERS. THE 3'-8 DIMENSION MAY REQUIRE ADJUSTMENT SINCE I WAS NOT ABLE TO MEASURE THE EXACT DIMENSION BETWEEN THE BEAM CENTERS. 116 DIMENSION MAY REQUIRE ADJUSTMENT SINCE I WAS NOT ABLE TO MEASURE THE EXACT DIMENSION BETWEEN THE BEAM CENTERS. . 1. MOUNT PLATE: " A36 STL, 2ea MOUNT PLATE: " A36 STL, 2ea 14" A36 STL, 2ea 2. BASE PLATE: " A36 STL, 1ea BASE PLATE: " A36 STL, 1ea 12" A36 STL, 1ea 3. BASE PLATE: " A36 STL, 1ea BASE PLATE: " A36 STL, 1ea 12" A36 STL, 1ea 4. LEG ANGLE: 2"X2 "X , 1ea LEG ANGLE: 2"X2 "X , 1ea 12"X , 1ea 38, 1ea 5. LEG ANGLE: 3"X3"X3 ", 2ea LEG ANGLE: 3"X3"X3 ", 2ea 8", 2ea 6. SUPPORT CHANNEL: C6x8.2, 1ea SUPPORT CHANNEL: C6x8.2, 1ea 7. MOUNT CHANNEL: C6x8.2, 2eaMOUNT CHANNEL: C6x8.2, 2ea

AutoCAD SHX Text 3/16

AutoCAD SHX Text

BASE TO LEG

AutoCAD SHX Text 3/16

AutoCAD SHX Text

CHANNEL TO LEG

AutoCAD SHX Text 3/16

AutoCAD SHX Text

CHANNEL TO MT PLATE

AutoCAD SHX Text 3/16

AutoCAD SHX Text

CHANNEL TO LEG

AutoCAD SHX Text Sheet M4 of 5

AutoCAD SHX Text Project

AutoCAD SHX Text Number

AutoCAD SHX Text 20D017

AutoCAD SHX Text Product Engr:

AutoCAD SHX Text 76MXSG/MXDEJ Engr:

AutoCAD SHX Text 76MXSG/MXDEJ Review Engr:

AutoCAD SHX Text 76MXSG/MXDEJ Planner:

AutoCAD SHX Text MXRI Safety Engr:

AutoCAD SHX Text Date:

AutoCAD SHX Text Scale:

AutoCAD SHX Text Project Location:

AutoCAD SHX Text As Noted

AutoCAD SHX Text 1/8/2022

AutoCAD SHX Text N/A

AutoCAD SHX Text

BLDG 3705 - E13

AutoCAD SHX Text

IRA TOPP/MXSG/734-9446

AutoCAD SHX Text

AutoCAD SHX Text M2

AutoCAD SHX Text M4

AutoCAD SHX Text

BETWEEN BEAMS BLOWER LH FRAME WMT

AutoCAD SHX Text

SCALE: 3"=1'-0"

B L D

G

P

O S

T

E

A D

D e a

E

X H

A U

O

W E

R S

R I G

A N

D

B

R A

C I N

G

AutoCAD SHX Text Revision

AutoCAD SHX Text Date

AutoCAD SHX Text By

AutoCAD SHX Text Description

AutoCAD SHX Text U.S Air Force

AutoCAD SHX Text Tinker AFB

AutoCAD SHX Text Oklahoma City, OK

AutoCAD SHX Text Remember that other hazards could exist but are currently unknown. Always be wary.

AutoCAD SHX Text Known Hazards

AutoCAD SHX Text A. THIS SHEET SHOWS THE LH HOSE REEL MOUNT FOR THE 4ea HOSE REEL EXHAUST ASSEMBLIES MOUNTED BETWEEN THE CRANE BEAMS. THIS SHEET SHOWS THE LH HOSE REEL MOUNT FOR THE 4ea HOSE REEL EXHAUST ASSEMBLIES MOUNTED BETWEEN THE CRANE BEAMS. B. THE BLOWER WILL BE MOUNTED ON THREADED RODS TO ALLOW THE ALIGNMENT OF THE HOSE REEL DISCHARGE AND THE BLOWER INLET. THE BLOWER WILL BE MOUNTED ON THREADED RODS TO ALLOW THE ALIGNMENT OF THE HOSE REEL DISCHARGE AND THE BLOWER INLET. C. THE HOSE REEL WILL BE MOUNTED WITH "-13 UNC STL GRADE 5 HARDWARE. THE HOSE REEL WILL BE MOUNTED WITH "-13 UNC STL GRADE 5 HARDWARE. 12"-13 UNC STL GRADE 5 HARDWARE. D. THE WELDED FRAME IS CONSTRUCTED OF STL PLATE, ANGLE AND CHANNEL. THE WELDED FRAME IS CONSTRUCTED OF STL PLATE, ANGLE AND CHANNEL. E. THE 3'-8 " DIMENSION MAY REQUIRE ADJUSTMENT SINCE I WAS NOT ABLE TO MEASURE THE EXACT DIMENSION BETWEEN THE BEAM CENTERS. THE 3'-8 " DIMENSION MAY REQUIRE ADJUSTMENT SINCE I WAS NOT ABLE TO MEASURE THE EXACT DIMENSION BETWEEN THE BEAM CENTERS. 116" DIMENSION MAY REQUIRE ADJUSTMENT SINCE I WAS NOT ABLE TO MEASURE THE EXACT DIMENSION BETWEEN THE BEAM CENTERS. 1. MOUNT PLATE: " A36 STL, 2ea MOUNT PLATE: " A36 STL, 2ea 14" A36 STL, 2ea 2. BASE PLATE: " A36 STL, 1ea BASE PLATE: " A36 STL, 1ea 12" A36 STL, 1ea 3. BASE PLATE: " A36 STL, 1ea BASE PLATE: " A36 STL, 1ea 12" A36 STL, 1ea 4. LEG ANGLE: 2"X2 "X , 1ea LEG ANGLE: 2"X2 "X , 1ea 12"X , 1ea 38, 1ea 5. LEG ANGLE: 3"X3"X ", 1ea LEG ANGLE: 3"X3"X ", 1ea 38", 1ea 6. SUPPORT CHANNEL: C6x8.2, 1ea SUPPORT CHANNEL: C6x8.2, 1ea 7. MOUNT CHANNEL: C6x8.2, 2eaMOUNT CHANNEL: C6x8.2, 2ea

AutoCAD SHX Text 3/16

AutoCAD SHX Text

BASE TO LEG

AutoCAD SHX Text 3/16

AutoCAD SHX Text

CHANNEL TO LEG

AutoCAD SHX Text 3/16

AutoCAD SHX Text

CHANNEL TO MT PLATE

AutoCAD SHX Text 3/16

AutoCAD SHX Text

CHANNEL TO LEG

AutoCAD SHX Text Sheet M5 of 5

AutoCAD SHX Text Project

AutoCAD SHX Text Number

AutoCAD SHX Text 20D017

AutoCAD SHX Text Product Engr:

AutoCAD SHX Text 76MXSG/MXDEJ Engr:

AutoCAD SHX Text 76MXSG/MXDEJ Review Engr:

AutoCAD SHX Text 76MXSG/MXDEJ Planner:

AutoCAD SHX Text MXRI Safety Engr:

AutoCAD SHX Text Date:

AutoCAD SHX Text Scale:

AutoCAD SHX Text Project Location:

AutoCAD SHX Text As Noted

AutoCAD SHX Text 1/8/2022

AutoCAD SHX Text N/A

AutoCAD SHX Text

BLDG 3705 - E13

AutoCAD SHX Text

IRA TOPP/MXSG/734-9446

AutoCAD SHX Text

AutoCAD SHX Text M2

AutoCAD SHX Text M5

AutoCAD SHX Text

BETWEEN BEAMS BLOWER RH FRAME WMT

AutoCAD SHX Text

SCALE: 3"=1'-0"

File details come from the government source that posted it. Updated .