Drawing.pdf
PDF 1 MB Posted
- Solicitation number
- W90VN924R0101
About this file
This document appears to be technical drawings and specifications related to a federal contract opportunity to Install Roll Screen Doors for Balcony at Tower 4, Camp Walker.
The key details are: The contractor shall install 90 roll screen doors with aluminum frames and base molding on the existing balcony doors across 15 floors in Tower 4 at Camp Walker. The contractor shall also install 90 door holders on the existing balcony doors. The contracting officer's representative (COR) shall coordinate the work schedule between the contractor and the point of contact for Army Family Housing (AFH). Specific installation requirements and project details are provided in the 7 pages of drawings and notes. The related federal contract opportunity is Solicitation Number W90VN924R0101, issued by the Department of the Army Materiel Command Army Contracting Command.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W90VN924R0101.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FEWR NO: JA-00022-4J
LOCATION: TOWER 4, CAMP WALKER
LOCATION PLAN
THIS LOCATION
B830, CAMP WALKER
GENERAL NOTE
1. THE CONTRACTOR SHALL BE RESPONSIBLE IN VERIFYING ALL EXISTING CONDITION AND DIMENSIONS PRIOR TO
COMMENCING ANY CONSTRUCTION, RENOVATION OR REPLACEMENT
2. COLORS AND PATTERNS IN DRAWING ARE FOR IDENTIFICATION PURPOSES ONLY, THE SELECTIONS SERVE ONLY TO INDICATE
COLOR AND PATTERN
3. IF THERE ARE ANY CONFLICTS WITHIN THE CONTRACT DOCUMENT, THE GENERAL CONTRACTOR SHALL NOTIFY THE
CONTRACTING OFFICER
4. THE CONTRACTOR SHALL BE RESPONSIBLE TO CONSTRUCT OR REPAIR ALL DAMAGES TO EXISTING AREAS CAUSED BY THIS PROJECT AND TO MATCH CONDITION TO ADJACENT AREAS AS DIRECTED BY THE CONTRACTING OFFICER.
5. SOME DETAILS SHOWN ON DRAWINGS MAY NOT MATCH FIELD CONDITIONS EXACTLY, SUCH DETAILS SHALL BE PREPARED IN
THE FIELD BY THE CONTRACTOR ACCORDING TO ACTUAL FIELD CONDITIONS
6. THE CONTRACTOR SHALL FOLLOW "STANDARD DETAIL DRAWINGS FOR OMA PROJECT", KOREA, 30 NOVEMBER 2015
7. CONTRACTOR SHALL PROVIDE, INSTALL AND MAINTAIN ALL NECESSARY SIGNS, LIGHTS, FLARES, BARRICADES, MARKERS, CONES AND OTHER PROTECTIVE FACILITIES AND SHALL TAKE ALL NECESSARY PRECAUTIONS FOR THE PROTECTION AND
SAFETY OF THE PUBLIC AND-OR MILITARY TRAFFIC AND OPERATIONS.
8. THE CONTRACTOR SHOULD COORDINATE ANY SALVAGEABLE AND RECYCLABLE MATERIALS WITHIN PROJECT LIMIT WITH COR
CAREFULLY TO DETERMINE PROPER MATERIAL HANDING METHODS.
FLOOR PLAN
LEGEND : THE LOCATION OF ROLL SCREEN DOORS AND DOOR HOLDERS TO BE INSTALLED
EXISTING BALCONY DOOR
EQEQEQ
ROLL SCREEN DOOR PROPOSAL PLAN
INSTALL ROLL SCREEN DOORS W/ALUMINUM
FRAME AND BASE MOLDING
(REQUIRED SAFETY ISSUE)
INSTALL ROLL SCREEN DOORS W/ALUMINUM
FRAME AND BASE MOLDING
(REQUIRED SAFETY ISSUE)
INSTALL ROLL SCREEN DOORS W/ALUMINUM
FRAME AND BASE MOLDING
(REQUIRED SAFETY ISSUE)
INSTALL ROLL SCREEN DOORS W/ALUMINUM
FRAME AND BASE MOLDING
(REQUIRED SAFETY ISSUE)
REMARKS
1. TOTAL : 90EA, 6 LOCATIONS PER FLOOR X 15F
2. COR SHALL CORDINATE WORKING SCHEDULE BETWEEN
THE CONTRACTOR AND POC OF AFH
DOOR HOLDER PROPOSAL PLAN
INSTALL DOOR HOLDERS
ON THE EXISTING BALCONY DOOR
INSTALL DOOR HOLDERS
ON THE EXISTING BALCONY DOOR
INSTALL DOOR HOLDERS
ON THE EXISTING BALCONY DOOR
INSTALL DOOR HOLDERS
ON THE EXISTING BALCONY DOOR
REMARKS
1. TOTAL : 90EA, 6 LOCATIONS PER FLOOR X 15F
2. COR SHALL CORDINATE WORKING SCHEDULE BETWEEN
THE CONTRACTOR AND POC OF AFH
DETAIL PLAN
SCOPE OF WORKS
1. INSTALL SLIDING ROLL SCREEN DOORS ON EXISTING BALCONY DOORS (90EA) AT TOWER 4, CAMP WALKER.
- ALUMINUM FRAME, OPENING DEVICES, ROLL SCREEN, ROLL SCREEN BOX, SAFETY FLOOR MOLDING AND DOOR HOLDERS
- REFER TO TOWER 2, 3 SLIDING ROLL SCREEN DOORS AND DOOR HOLDERS
2. ATTACH ROLL BOXES AND GUIDE RAILS WITH DOUBLE SIDED TAPE AND SEALANT
DOOR
HOLDER